TEST REPORT
Description of Sample: Anchor Bar Pullout Dia. 3.2 cm Report No.: METCL/DDN/05 1020/37
Letter Date: 05/10/2020 Date of Report: 07/10/2020
C. B No.: CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020
N.O.W.+ Reconstruction of with geometric improvement of existing
intermediate lane to two lane with paved shoulder configuration from
existing Km 28,600 to km 59.420 (Design Chainage 28.320 to 58.603)
of NH-94 in the state of Uttarakhand on Engineering, Procurement &
Construction (EPC) Mode.
Issued To:
M's Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana.
Location: Chainage ~38+240 (Downward).
S.No. | Parameters Test Value Method of Test
1. | Dia. of Anchor bar, em 32
2. | Radius of Grouted in hole, cm 2.6
3._| Length of embedded bar in_ cm 600 18-11309;1985
[40] Bond strength, kgf fem? 1.429)
Load in KN Displacement | S.No. | Loadin KN Displacement | Method of Test
In mm In mm
40.0 2.20 i 1400 16.62
50.0 792
60.0 8.23
70.0 ‘9.25
= Se 18-11309:1985,
90.0 1232
100.0 13.98
110.0 14.45
1200 1461
1300 15.35
Remark: Rock Anchor bar does complies at pulled applied load up to 14 Ton.
#4#**End of Report™*#***Gl TESTING & CALIBRATION
me ES (PN=relav-Nkeland
(1S0 9001:2015, 14001:2015 Certified & NABL Accredited Lab.)
Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K) India
Mobile: +91 7535000490, 491 | Email: metclddn@gmailcom
TEST REPORT
Description of Sample: Anchor Bar Pullout Dia, 3.2 em Report No.: METCL/DDN/051020/38
Date of Report: 07/10/2020
C. B No.: CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020
N.0.W.: Reconstruetion of with geometric improvement of existing
intermediate lane to two lane with paved shoulder configuration from
existing Km 28.600 to km 59.420 (Design Chainage 28,320 to 58.603)
of NH-94 in the state of Uttarakhand on Engineering, Procurement &
Construetion (EPC) Mode.
Issued To:
M/s Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana.
Location: Chainage ~ 38+260 (Downward),
[S.No Parameters Test Value Method of Fest
1. | Dia. of Anchor bar, em 32, :
2. | Radius of Grouted in hole, em 26 |
3.__| Length of embedded bar in em 600 IS-11309:1985 |
4_[ Bond strength, kgf emt 1633
[S.No] Loadin KN] Displacement] S.No] Loadin KN] Displacement] Method of Fear
Tn mn In mm
i oo 143 |r a0 1201
2. 30.0 234 12, 150.0 1377
3 a 332 1, 1600 1419
a 700 331
[3 800 670 1s-11309:1985
& 300 720
7. 100.0 3a
3 Ti00 956
3 1200 389
10, 1500 1138 [
Remark: Rock Anchor bar does complies at pulled applied load up to 16 Ton.
se++4End of Report***s##mz Ml TESTING & CALIBRATION
E | | LABORATORY
(1S 9001:2015, 14001:2015 Certified & NABL Accredited Lab.)
Harbanswala, Shimla By-Pass, Telpur Chowk Dehradun-248171 (U.K) India
Mobile: +91 7535000490, 491 | Email: metclddn@gmail com
TEST REPORT
Description of Sample: Anchor Bar Pullout Dia. 3.2 em
Letter Date: 05/10/2020
C. B No.: CB/CD/PIUIDDN/RFP-09
N.0.W.: Reconstruction of with geometric improvement of existing
intermediate lane to two lane with paved shoulder configuration from
existing Km 28.600 to km 59.420 (Design Chainage 28.320 to 58.603)
of NH-94 in the state of Uttarakhand on En;
Construction (EPC) Mode.
Issued To:
Report No.: METCL/DDN/05102039
Date of Report: 07/10/2020
Date of Testing: 05/10/2020
ering, Procurement &
M/s Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana.
Location: Chainage ~ 38+255 (Downward),
Parameters Test Value Method of Test
1. | Dia. of Anchor bar, em 32, |
2.__ | Radius of Grouted in hole, em 26
3.__| Length of embedded bar in cm 600 1S-11309:1985
4 | Bond strength, kgt/en? Taw
S.No] LoadinKN [Displacement | S.No. | Loadin KN | Displacement | Method of Test
In mm In mm
T. 400 134 i 100 1491
z 30.0 3.12
3. 60.0 478
4 700 5.66 :
5. 500 7.13 1S-11309:1985
é 900 3
3 1000 946
& 1100 10.10 ‘|
3 1200 11.03 |
10. 1300 1225
Remark: Rock Anchor bar does complies at pulled applied load up to 14 Ton.
+88*5End of Report**##**Mmm TESTING & CALIBRATION
ne |_| LABORATORY |
(ASO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.)
Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K) India
Mobile: +91 7535000490, 491 | Email: metclddn@gmail.com
TEST REPORT
Deseription of Sample: Anchor Bar Pullout Dia, 3.2 em Report No.: METCL/DDN/051020/40
Letter Date: 05/10/2020 Date of Report: 07/10/2020
C. BNo.: CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020
N.O.W.: Reconstruction of with geometric improvement of existing
intermediate lane to two lane with paved shoulder configuration from
existing Km 28,600 to km 59.420 (Design Chainage 28.320 to 58.603)
of NH-94 in the state of Uttarakhand on Engineering, Procurement &
Construction (EPC) Mode.
Issued To:
M/s Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana,
Location: Chainage ~38+230 (Downward).
‘S.No. Parameters ‘Test Value Method of Test
1, | Dia. oF Anchor bar, em 7 32
2._| Radius of Grouted in hole, em 26
3, | Lengih of embedded ber ia em 00 18-11309:1985
4.__| Bond strength, kgf Jem TS3t
[S.No] Loadin KN | Displacement | S.No. | Loadia KN] Displacement ~] Method of Tet
In mm iomm
1 00) 221 T 1400 BAG
2. 30.0 3.47 2. 150.0 15.34
3. 60.0 377
z 700 624
3. 800 731 15-11309:1985
6 90.0 a |
7. 1000 36
3 TOD 10.52 - |
a 1200) TT
10. 1300 Tas
Remark: Rock Anchor bar does complies at pulled applied load up to 15 Ton
4s404End of Report™*#*Mg TESTING & CALIBRATION
n= ES (WAzrola7-Nkelaad
(1S 9001:2015, 14001:2015 Certified & NABL Accredited Lab.)
Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K, India
Mobile: +91 7535000490, 491 | Email: metciddn@gmailcom
TEST REPORT
Description of Sample: Anchor Bar Pullout Dia. 3.2 em Report No.: METCLIDDN/051020/41
Letter Date: 05/10/2020 Date of Report: 07/10/2020
C. B No: CB/CD/PIUIDDN/RFP-09
N.0.W.: Reconstruction of with geometric improvement of existing
intermediate lane to two lane with paved shoulder configuration from
existing Km 28.600 to km 59.420 (Design ‘Chainage 28.320 to 58.603)
of NH-94 in the state of Uttarakhand on Engineering, Procurement &
Construction (EPC) Mode.
Issued To:
M/s Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana.
Location: Chainage ~ 38+270 (Upper)
S.No. Parameters Test Value Method of Test
T._| Dia. of Anchor bar_ om 32
2. _ | Radius of Grouted in hole, em 26
3._| Length of embedded bar in_em 600 IS-11309:1985
[4] Bond strength, Kgf/em* 7331 l
SNe] LoadinKN |” Displacement [S.No] Loadin KN | Displacement] Method of Text
Ja mm inmm
i 200. 132 Tr 1400 16.71
2 50.0 3.67 72. 150.0 18.10
3 60.0 6ar
a 700 338
5, 300 Sat 1-11309:1985
«| 308 Toa
7. 700.6 1132
8, 110.0 “R0F
3 1200 Baz
10. 00 i574 |
Remark: Rock Anchor bar does complies at pulled applied load up to 15 Ton,
*#2*4End of Report**##*#m= Gl TESTING & CALIBRATION
fea | + LABORATORY
(1S0 9001:2015, 14001:2015 Certified & NABL Accredited Lab.)
Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (UK) India
Mobile: +91 7535000490, 491 | Emait: metciddn@gmailcom
TEST REPORT
Description of Sample: Anchor Bar Pullout Dia. 3.2cm Report No.: METCL/DDN/0S 1020/42
Letter Date: 05/10/2020 Date of Report: 07/10/2020
C. B No.: CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020
N.0.W.: Reconstruction of with geometric improvement of existing
intermediate lane to two lane with paved shoulder configuration from
existing Km 28.600 to km 59.420 (Design Chainage 28.320 to 58.603)
of NH-04 in the state of Uttarakhand on Engineering, Procurement &
Construction (EPC) Mode.
Issued To:
‘M/s Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana.
Location: Chainage ~ 38+300 (Upper)
SNe. Parameters Test Value Method of Test
1_| Dia. of Anchor bar, em 32 “|
2._| Radius of Grouted in hole, em 26
3._| Length of embedded bar in_om ~__ 600 1-11309:1985
4 _| Bond strength, kat en 1327
S.No] LoadinKN | Displacement | S.No. | Loadin KN] Displacement] Method of Test
lam Tn am
i 00 105.
2 500 241
3 00 5.60
+ 700 72
5 80.0 825 18-11309:1985
6 30.0 937
7. 100.0 1022
® T1900 1247 =]
3. 7200 Bar [
70, 1300 1437
Rock Anchor bar does complies at pulled applied load up to 13 Ton.
+4044End of Report***#**Ml TESTING & CALIBRATION
n= | LABORATORY]
(ISO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.)
Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (UK) India
Mobile: +91 7535000490, 491 | Email: metcldin@gmailcom
TEST REPORT
Description of Samp! Report No: METCL/DDN/051020/43
Letter Date: 05/10/2020 Date of Report: 07/10/2020
C. B No. CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020
N.O.W.+ Reconstruction of with geometric improvement of existing
intermediate lane to two lane with paved shoulder configuration from
existing Km 28.600 to km 59.420 (Design Chainage 28.320 to 58.603)
of NH-94 in the state of Uttarakhand on Engineering, Procurement &
‘Construction (EPC) Mode.
Issued To:
M/s Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana.
Location: Chainage ~ 38+320 (Upper)
S.No. Parameters Test Value Method of Test
1._| Dia. of Anchor bar, cm. 32
2. | Radius of Grouted in hofe, em 26
3._| Length ofembedded bar in em 600 1S-11309:1985,
4 | Bond strength, ket en Tao
S.No |” LoadinKN |” Displacement | S.No | Loadin KN] Displacement | Method of Test
Tamm Ja mm
i wom Ua i TaD To
2 30.0 247
3 00 2.20
a 700 310
5 300 445 15-11309:1985
6 30.0 525
7_| 1000 679
3 1100 746
3 1200 32 |
10. 7300 9.10 I }
Remark: Rock Anchor bar does complies at pulled applied load up to 14 Ton.
s#4*4End of Report**##**
Wy tothe
reaGl TESTING & CALIBRATION
ne | LABORATORY |
(ISO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.)
Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K) India
Mobile: +91 7535000490, 491 | Email: metciddin@gmail com
TEST REPORT
Description of Samp! Report No.: METCL/DDN/051020/44
Letter Date: 05/10/2020 Date of Report: 07/10/2020
C. B No. CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020
N.O.W.: Reconstruction of with geometric improvement of existing
intermediate lane to two lane with paved shoulder configuration from
existing Km 28.600 to km 59.420 (Design Chainage 28,320 to 58.603)
of NH-94 in the state of Uttarakhand on Engineering, Procurement &
Construction (EPC) Mode.
Issued To:
M/s Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana,
Location: Chainage ~ 38+340 (Upper)
S.No. | Parameters Test Value Method of Test]
1. | Dia. of Anchor bar, em 32 mi
2. | Radius of Grouted in hole, em 26
3.__| Length ofembedded bar in emt 600 1S-11309:1985,
&_[Bond strength, keffem™ 1331
S.No. “Loadin KN” Displacement | S.No. | Loadin KN] Displacement | Method of Test
In mm
1 00 2.14 7 1400
2. 30.0 379 2. 150.0
3. 00 432
4 70.0 67
% 80.0 7H 1S-11309:1985,
& 900 892
7. 1000 1035
8 110.0 13.46
9. 1200 1432
1 | _ 300 TS
Remark: Rock Anchor bar does complies at pulled applied load up to 15 Ton.
san4*End of Report*##*4#
albran,
= 2.
AY Technica \G
(EK anager)
\ wan)@lE TESTING & CALIBRATION
he | LABORATORY]
(1SO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.)
Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K) India
Mobile: +91 7535000490, 491 | Email: metciddn@gmail.com
TEST REPORT
Description of Sample: Anchor Bar Pullout Dia. 3.2 cm Report No.: METCL/DDN/05 1020/45
Letter Date: 05/10/2020 Date of Report: 07/10/2020
C. B No. CB/CD/PIUIDDN/REP-09 Date of Testing: 05/10/2020
N.O.W.: Reconstruction of with geometric improvement of existing
intermediate lane to two lane with paved shoulder configuration from
existing Km 28,600 to km 59.420 (Design Chainage 28.320 to 58.603)
‘of NH-94 in the state of Uttarakhand on Engineering, Procurement &
Construction (EPC) Mode.
Issued To:
Mis Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana.
Location: Chainage - 384290 (Upper)
S.No. Parameters Test Value Method of Test
T._| Dia of Anchor bar, em 32
2._| Radius of Grouted in hole, em a 26
3._| Length ofembedded bar in_em 600 IS-11309:1985
4 | Bond strength, kgf fom 1429
S.No. | Loadin KN Displacement | SNo. | Load in KN Method of Test
In mm Inmm |
7 00 O71 i 1400) 12.04
2. 500 142
3. 60.0 237
4 70.0 394 =I
3 Be $55) IS-11309:1985
6 900 620
7. 1000 a4
8 1100 1078
9. 1200 Tis?
10. 1300 1267
Remark: Rock Anchor bar does complies at pulled applied load up to 14 Ton.
s#0*4End of Report**###*mz @@—i TESTING & CALIBRATION
Ee | + LABORATORY
(ISO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.)
Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (UK) India
Mobile: +91 7535000490, 491 | Email: metclddn@gmailcom
TEST REPORT
Deseription of Sample: Anchor Bar Pullout Dia. 3.2 cm Report No.: METCL/DDN/051020/46
Letter Date: 05/10/2020 Date of Report: 07/10/2020
C. B No. CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020
N.O.W.: Reconstruction of with geometric improvement of existing
intermediate lanc to two lane with paved shoulder configuration from
existing Km 28.600 to km 59.420 (Design Chainage 28.320 to 58.603)
‘of NH-94 in the state of Uttarakhand on Engineering, Procurement &
Construction (EPC) Mode,
Issued To:
Mis Gawar Construction Limited,
DSS-378, Sector 16-17,
Hisar, Haryana.
Location: Chainage ~ 38+255 (Upper)
[Sno Parameters Test Value Method of Test
[1 [Dia of Anchor bar, em 32
2.__| Radius of Grouted in hole, em 2.6
3.__| Length of embedded bar in em 600) t5-11309:1985.
4_| Bond strength, kgf vem" 1357
SNe] Loadin KN | Displacement | S.No. Displacement | Method of Test
In mm | In mm
T 00 112 i 1400 14.46,
2. 50.0 2.44 2. 1500 16.25
3. 00 347
4 700 +32 7
5. a0 an | 1s-1r309:1985
6 300 846
7. 100.0 oz
& 110.0 1025 ri
a 1300 124
10. 1300 13.98
Remark: Rock Anchor bar does complies at pulled applied load up to 15 Ton.