You are on page 1of 10
m= Gama TESTING & CALIBRATION Ee | + LABORATORY (ASO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (UX) India Mobile: +91 7535000490, 491 | Email: metclddn@gmail.com TEST REPORT Description of Sample: Anchor Bar Pullout Dia. 3.2 cm Report No.: METCL/DDN/05 1020/37 Letter Date: 05/10/2020 Date of Report: 07/10/2020 C. B No.: CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020 N.O.W.+ Reconstruction of with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration from existing Km 28,600 to km 59.420 (Design Chainage 28.320 to 58.603) of NH-94 in the state of Uttarakhand on Engineering, Procurement & Construction (EPC) Mode. Issued To: M's Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana. Location: Chainage ~38+240 (Downward). S.No. | Parameters Test Value Method of Test 1. | Dia. of Anchor bar, em 32 2. | Radius of Grouted in hole, cm 2.6 3._| Length of embedded bar in_ cm 600 18-11309;1985 [40] Bond strength, kgf fem? 1.429) Load in KN Displacement | S.No. | Loadin KN Displacement | Method of Test In mm In mm 40.0 2.20 i 1400 16.62 50.0 792 60.0 8.23 70.0 ‘9.25 = Se 18-11309:1985, 90.0 1232 100.0 13.98 110.0 14.45 1200 1461 1300 15.35 Remark: Rock Anchor bar does complies at pulled applied load up to 14 Ton. #4#**End of Report™*#*** Gl TESTING & CALIBRATION me ES (PN=relav-Nkeland (1S0 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K) India Mobile: +91 7535000490, 491 | Email: metclddn@gmailcom TEST REPORT Description of Sample: Anchor Bar Pullout Dia, 3.2 em Report No.: METCL/DDN/051020/38 Date of Report: 07/10/2020 C. B No.: CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020 N.0.W.: Reconstruetion of with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration from existing Km 28.600 to km 59.420 (Design Chainage 28,320 to 58.603) of NH-94 in the state of Uttarakhand on Engineering, Procurement & Construetion (EPC) Mode. Issued To: M/s Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana. Location: Chainage ~ 38+260 (Downward), [S.No Parameters Test Value Method of Fest 1. | Dia. of Anchor bar, em 32, : 2. | Radius of Grouted in hole, em 26 | 3.__| Length of embedded bar in em 600 IS-11309:1985 | 4_[ Bond strength, kgf emt 1633 [S.No] Loadin KN] Displacement] S.No] Loadin KN] Displacement] Method of Fear Tn mn In mm i oo 143 |r a0 1201 2. 30.0 234 12, 150.0 1377 3 a 332 1, 1600 1419 a 700 331 [3 800 670 1s-11309:1985 & 300 720 7. 100.0 3a 3 Ti00 956 3 1200 389 10, 1500 1138 [ Remark: Rock Anchor bar does complies at pulled applied load up to 16 Ton. se++4End of Report***s## mz Ml TESTING & CALIBRATION E | | LABORATORY (1S 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk Dehradun-248171 (U.K) India Mobile: +91 7535000490, 491 | Email: metclddn@gmail com TEST REPORT Description of Sample: Anchor Bar Pullout Dia. 3.2 em Letter Date: 05/10/2020 C. B No.: CB/CD/PIUIDDN/RFP-09 N.0.W.: Reconstruction of with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration from existing Km 28.600 to km 59.420 (Design Chainage 28.320 to 58.603) of NH-94 in the state of Uttarakhand on En; Construction (EPC) Mode. Issued To: Report No.: METCL/DDN/05102039 Date of Report: 07/10/2020 Date of Testing: 05/10/2020 ering, Procurement & M/s Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana. Location: Chainage ~ 38+255 (Downward), Parameters Test Value Method of Test 1. | Dia. of Anchor bar, em 32, | 2.__ | Radius of Grouted in hole, em 26 3.__| Length of embedded bar in cm 600 1S-11309:1985 4 | Bond strength, kgt/en? Taw S.No] LoadinKN [Displacement | S.No. | Loadin KN | Displacement | Method of Test In mm In mm T. 400 134 i 100 1491 z 30.0 3.12 3. 60.0 478 4 700 5.66 : 5. 500 7.13 1S-11309:1985 é 900 3 3 1000 946 & 1100 10.10 ‘| 3 1200 11.03 | 10. 1300 1225 Remark: Rock Anchor bar does complies at pulled applied load up to 14 Ton. +88*5End of Report**##** Mmm TESTING & CALIBRATION ne |_| LABORATORY | (ASO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K) India Mobile: +91 7535000490, 491 | Email: metclddn@gmail.com TEST REPORT Deseription of Sample: Anchor Bar Pullout Dia, 3.2 em Report No.: METCL/DDN/051020/40 Letter Date: 05/10/2020 Date of Report: 07/10/2020 C. BNo.: CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020 N.O.W.: Reconstruction of with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration from existing Km 28,600 to km 59.420 (Design Chainage 28.320 to 58.603) of NH-94 in the state of Uttarakhand on Engineering, Procurement & Construction (EPC) Mode. Issued To: M/s Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana, Location: Chainage ~38+230 (Downward). ‘S.No. Parameters ‘Test Value Method of Test 1, | Dia. oF Anchor bar, em 7 32 2._| Radius of Grouted in hole, em 26 3, | Lengih of embedded ber ia em 00 18-11309:1985 4.__| Bond strength, kgf Jem TS3t [S.No] Loadin KN | Displacement | S.No. | Loadia KN] Displacement ~] Method of Tet In mm iomm 1 00) 221 T 1400 BAG 2. 30.0 3.47 2. 150.0 15.34 3. 60.0 377 z 700 624 3. 800 731 15-11309:1985 6 90.0 a | 7. 1000 36 3 TOD 10.52 - | a 1200) TT 10. 1300 Tas Remark: Rock Anchor bar does complies at pulled applied load up to 15 Ton 4s404End of Report™*#* Mg TESTING & CALIBRATION n= ES (WAzrola7-Nkelaad (1S 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K, India Mobile: +91 7535000490, 491 | Email: metciddn@gmailcom TEST REPORT Description of Sample: Anchor Bar Pullout Dia. 3.2 em Report No.: METCLIDDN/051020/41 Letter Date: 05/10/2020 Date of Report: 07/10/2020 C. B No: CB/CD/PIUIDDN/RFP-09 N.0.W.: Reconstruction of with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration from existing Km 28.600 to km 59.420 (Design ‘Chainage 28.320 to 58.603) of NH-94 in the state of Uttarakhand on Engineering, Procurement & Construction (EPC) Mode. Issued To: M/s Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana. Location: Chainage ~ 38+270 (Upper) S.No. Parameters Test Value Method of Test T._| Dia. of Anchor bar_ om 32 2. _ | Radius of Grouted in hole, em 26 3._| Length of embedded bar in_em 600 IS-11309:1985 [4] Bond strength, Kgf/em* 7331 l SNe] LoadinKN |” Displacement [S.No] Loadin KN | Displacement] Method of Text Ja mm inmm i 200. 132 Tr 1400 16.71 2 50.0 3.67 72. 150.0 18.10 3 60.0 6ar a 700 338 5, 300 Sat 1-11309:1985 «| 308 Toa 7. 700.6 1132 8, 110.0 “R0F 3 1200 Baz 10. 00 i574 | Remark: Rock Anchor bar does complies at pulled applied load up to 15 Ton, *#2*4End of Report**##*# m= Gl TESTING & CALIBRATION fea | + LABORATORY (1S0 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (UK) India Mobile: +91 7535000490, 491 | Emait: metciddn@gmailcom TEST REPORT Description of Sample: Anchor Bar Pullout Dia. 3.2cm Report No.: METCL/DDN/0S 1020/42 Letter Date: 05/10/2020 Date of Report: 07/10/2020 C. B No.: CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020 N.0.W.: Reconstruction of with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration from existing Km 28.600 to km 59.420 (Design Chainage 28.320 to 58.603) of NH-04 in the state of Uttarakhand on Engineering, Procurement & Construction (EPC) Mode. Issued To: ‘M/s Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana. Location: Chainage ~ 38+300 (Upper) SNe. Parameters Test Value Method of Test 1_| Dia. of Anchor bar, em 32 “| 2._| Radius of Grouted in hole, em 26 3._| Length of embedded bar in_om ~__ 600 1-11309:1985 4 _| Bond strength, kat en 1327 S.No] LoadinKN | Displacement | S.No. | Loadin KN] Displacement] Method of Test lam Tn am i 00 105. 2 500 241 3 00 5.60 + 700 72 5 80.0 825 18-11309:1985 6 30.0 937 7. 100.0 1022 ® T1900 1247 =] 3. 7200 Bar [ 70, 1300 1437 Rock Anchor bar does complies at pulled applied load up to 13 Ton. +4044End of Report***#** Ml TESTING & CALIBRATION n= | LABORATORY] (ISO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (UK) India Mobile: +91 7535000490, 491 | Email: metcldin@gmailcom TEST REPORT Description of Samp! Report No: METCL/DDN/051020/43 Letter Date: 05/10/2020 Date of Report: 07/10/2020 C. B No. CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020 N.O.W.+ Reconstruction of with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration from existing Km 28.600 to km 59.420 (Design Chainage 28.320 to 58.603) of NH-94 in the state of Uttarakhand on Engineering, Procurement & ‘Construction (EPC) Mode. Issued To: M/s Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana. Location: Chainage ~ 38+320 (Upper) S.No. Parameters Test Value Method of Test 1._| Dia. of Anchor bar, cm. 32 2. | Radius of Grouted in hofe, em 26 3._| Length ofembedded bar in em 600 1S-11309:1985, 4 | Bond strength, ket en Tao S.No |” LoadinKN |” Displacement | S.No | Loadin KN] Displacement | Method of Test Tamm Ja mm i wom Ua i TaD To 2 30.0 247 3 00 2.20 a 700 310 5 300 445 15-11309:1985 6 30.0 525 7_| 1000 679 3 1100 746 3 1200 32 | 10. 7300 9.10 I } Remark: Rock Anchor bar does complies at pulled applied load up to 14 Ton. s#4*4End of Report**##** Wy tothe rea Gl TESTING & CALIBRATION ne | LABORATORY | (ISO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K) India Mobile: +91 7535000490, 491 | Email: metciddin@gmail com TEST REPORT Description of Samp! Report No.: METCL/DDN/051020/44 Letter Date: 05/10/2020 Date of Report: 07/10/2020 C. B No. CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020 N.O.W.: Reconstruction of with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration from existing Km 28.600 to km 59.420 (Design Chainage 28,320 to 58.603) of NH-94 in the state of Uttarakhand on Engineering, Procurement & Construction (EPC) Mode. Issued To: M/s Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana, Location: Chainage ~ 38+340 (Upper) S.No. | Parameters Test Value Method of Test] 1. | Dia. of Anchor bar, em 32 mi 2. | Radius of Grouted in hole, em 26 3.__| Length ofembedded bar in emt 600 1S-11309:1985, &_[Bond strength, keffem™ 1331 S.No. “Loadin KN” Displacement | S.No. | Loadin KN] Displacement | Method of Test In mm 1 00 2.14 7 1400 2. 30.0 379 2. 150.0 3. 00 432 4 70.0 67 % 80.0 7H 1S-11309:1985, & 900 892 7. 1000 1035 8 110.0 13.46 9. 1200 1432 1 | _ 300 TS Remark: Rock Anchor bar does complies at pulled applied load up to 15 Ton. san4*End of Report*##*4# albran, = 2. AY Technica \G (EK anager) \ wan) @lE TESTING & CALIBRATION he | LABORATORY] (1SO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (U.K) India Mobile: +91 7535000490, 491 | Email: metciddn@gmail.com TEST REPORT Description of Sample: Anchor Bar Pullout Dia. 3.2 cm Report No.: METCL/DDN/05 1020/45 Letter Date: 05/10/2020 Date of Report: 07/10/2020 C. B No. CB/CD/PIUIDDN/REP-09 Date of Testing: 05/10/2020 N.O.W.: Reconstruction of with geometric improvement of existing intermediate lane to two lane with paved shoulder configuration from existing Km 28,600 to km 59.420 (Design Chainage 28.320 to 58.603) ‘of NH-94 in the state of Uttarakhand on Engineering, Procurement & Construction (EPC) Mode. Issued To: Mis Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana. Location: Chainage - 384290 (Upper) S.No. Parameters Test Value Method of Test T._| Dia of Anchor bar, em 32 2._| Radius of Grouted in hole, em a 26 3._| Length ofembedded bar in_em 600 IS-11309:1985 4 | Bond strength, kgf fom 1429 S.No. | Loadin KN Displacement | SNo. | Load in KN Method of Test In mm Inmm | 7 00 O71 i 1400) 12.04 2. 500 142 3. 60.0 237 4 70.0 394 =I 3 Be $55) IS-11309:1985 6 900 620 7. 1000 a4 8 1100 1078 9. 1200 Tis? 10. 1300 1267 Remark: Rock Anchor bar does complies at pulled applied load up to 14 Ton. s#0*4End of Report**###* mz @@—i TESTING & CALIBRATION Ee | + LABORATORY (ISO 9001:2015, 14001:2015 Certified & NABL Accredited Lab.) Harbanswala, Shimla By-Pass, Telpur Chowk, Dehradun-248171 (UK) India Mobile: +91 7535000490, 491 | Email: metclddn@gmailcom TEST REPORT Deseription of Sample: Anchor Bar Pullout Dia. 3.2 cm Report No.: METCL/DDN/051020/46 Letter Date: 05/10/2020 Date of Report: 07/10/2020 C. B No. CB/CD/PIUIDDN/RFP-09 Date of Testing: 05/10/2020 N.O.W.: Reconstruction of with geometric improvement of existing intermediate lanc to two lane with paved shoulder configuration from existing Km 28.600 to km 59.420 (Design Chainage 28.320 to 58.603) ‘of NH-94 in the state of Uttarakhand on Engineering, Procurement & Construction (EPC) Mode, Issued To: Mis Gawar Construction Limited, DSS-378, Sector 16-17, Hisar, Haryana. Location: Chainage ~ 38+255 (Upper) [Sno Parameters Test Value Method of Test [1 [Dia of Anchor bar, em 32 2.__| Radius of Grouted in hole, em 2.6 3.__| Length of embedded bar in em 600) t5-11309:1985. 4_| Bond strength, kgf vem" 1357 SNe] Loadin KN | Displacement | S.No. Displacement | Method of Test In mm | In mm T 00 112 i 1400 14.46, 2. 50.0 2.44 2. 1500 16.25 3. 00 347 4 700 +32 7 5. a0 an | 1s-1r309:1985 6 300 846 7. 100.0 oz & 110.0 1025 ri a 1300 124 10. 1300 13.98 Remark: Rock Anchor bar does complies at pulled applied load up to 15 Ton. +4044End of Report***#**

You might also like