CASE HISTORY: LOGGING IN DIFFICULT HOLE CONDITIONS

Well Construction
Optimization
Cordax LWTTM

Background Operation Achievements Client Statement

l Fractured reservoirs result in an l The tectonically stressed area was l Logs were generated while the l “We were able to confirm well
unstable borehole, making them a conditioned for a total of 10 hrs operator safely rotated the drill placement in the high porosity
high risk for typical open hole with the LWT collars in the BHA pipe through the stressed area streak and accurately set casing
logging techniques as planned with out lost in hole
l Once on TD the tools were l With tools safely inside pipe the risk.”
l Operator wasn’t expecting to be deployed and rotation was operator risk for bridging or losing
able to acquire logs to accurately necessary while logs were tools in the stressed area was - Team Lead
locate the high porosity zone due gathered on the trip out of the well eliminated
to hole conditions

l LWT was mobilized to gather triple


combo data through the heel of
the well