No. JOR/WO : Nama Peralatan : Kapal Draging PKN Tanggal/jam : 21 Oktober 2020 19:45:05.000
JOR/WO Number Equipment Date/Time
Uraian Pekerjaan : Dredging area Samping Dermaga 8
Work Description
Unit Kerja Pelaksana : Proyek Pengembangan Lokasi : Dept. Pelabuhan & Pengapalan - Lampiran / Attachment
Executor Work Unit Infrastruktur Area Samping area Dermaga 8
INFORMASI JENIS IZIN KERJA DINGIN / INFORMATION OF COLD WORK PERMIT TYPE ☐ Gambar Rekons/Rekons Drawing
☑ JRA/Job Risk Analysis
Permit Dingin / Cold Work Permit Scaffolding Installation / Demolish
☐ LOTO (Lock Out Tag Out )
Permit Pekerjaan Listrik Permit Pekerjaan Penggalian / Digging Work ☑ SHE Plan
Permit Kendaraan Masuk Area Proses / Vehicle Entry Permit Pekerjaan Masuk Ruang Terbatas / Confined S ☐ Prosedur Pekerjaan/Work
Procedure
Permit Pengoperasian Alat Berat / Heavy Equipment Permit Sampling Laboratorium / Lab Sampling Work ☐ Rigging Study
PENGAMANAN UMUM DAN TEMPAT KERJA / GENERAL AND WORKPLACE PRECAUTION
☑ Pekerja telah mendapatkan pengarahan K3/Safety Induction ☑ Inspeksi bersama dilakukan/Joint Inspection
☑ Kondisi aman di sekitar lokasi kerja/Safe all around ☑ Daerah dan peralatan diisolasi/Isolate item or equipment
☑ Aliran energi telah dibatasi/Energy line isolated ☑ Penanda keselamatan telah dipasang/Safety tag applied
☑ Penerangan area kerja memadai/Sufficient lighting at working area ☑ Peralatan dingin dan tidak bertekanan/Cold and unpressed equipment
☑ Telah dipasang tali pembatas area/Safety line has been installed ☑ Telah dipasang rambu-rambu K3/Warning sign has been set
PENGAMANAN KHUSUS / SPECIAL PRECAUTION
☑ APD Standart/Safety Shoes, Safety Helmet, Safety Glasses ☑ Pelindung Telinga/Ear plug/ Ear Muff/ Combination
☐ Pelindung Wajah/Face Shield/ Welding Cap ☐ Pelindung Tangan/Cotton/ Rubber/ Welding Gloves
☑ Pelindung Pernafasan/Dust Mask/ Gas Mask/ Respirator ☐ Penahan Jatuh/Body Harness/ Life Line
☐ Pelindung Tubuh/Chemical Suit/ Heat Resistant Suit/ Hazmat Suit ☐ Lainnya/Others
INSTRUKSI KHUSUS / SPECIAL INSTRUCTION
PENERBITAN / ISSUE
Pekerjaan Dinyatakan Selesai Apabila isian berikut ini dipenuhi / Work has been declared completed when the following checklists are complete