You are on page 1of 4

Simplex Infrastructure Limited

Name of the Site :Shriram Chirping woods, Bangalore


Monthly Plan for the Month of July"2014
Total Month
Target
Sl No Code Item Description Unit Rate
Plan Qty Plan Amount

Excavation

1 upto 1.05m depth cum 175.00 1 000.00 1 75 000.00


2 from 1.5m to 3.0m depth cum 189.00 50.00 9 450.00
3m to 4.5m cum 204.00 50.00 10 200.00
beyond 4.5m cum 219.00 50.00 10 950.00
Backfilling with available selected
3 cum 160.00 1 000.00 1 60 000.00
excavted earth from site premises
4 Dewattering HP/Hrs 44.00 200.00 8 800.00
Concrete
5 PCC with 1:3:6 cum 4 700.00 25.00 1 17 500.00
M25 grade concrete - footing for Col.
6 cum 5 150.00 1 000.00 51 50 000.00
Retaining wall, core walls
Flat slab,beam and slab and regular slab
7 cum 5 150.00 210.00 10 81 500.00
at all level
M25 grade concrete-Col. Retaining
8 cum 5 150.00 50.00 2 57 500.00
wall,core wall
Formwork
9 Shuttering for Col. At all lvl sqm 525.00 204.00 1 07 100.00
10 Shuttering for Corewall sqm 550.00 156.00 85 800.00
11 Formwork in Slab,beam sqm 550.00 1 470.00 8 08 500.00
12 Shuttering- footing for Col. sqm 475.00 1 500.00 7 12 500.00
Reinforcement
Supplying,collecting,fabricating & fixing
13 in position reinforcement for RCC work MT 55 750.00 115.00 64 11 250.00
work
B Superstructure
14 M25 SDC cum 5 450.00 300.00 16 35 000.00
15 Mivan Shuttering sqm 285.00 3 500.00 9 97 500.00
16 Reinforcement MT 56 000.00 30.00 16 80 000.00

Grand Total 1 94 18 550.00


Simplex Infrastructure Limited A
Name of the Site :Shriram Chirping woods, Bangalore c
Monthly Plan for the Month of Aug"2014 h
i
Total Month
e
Target v
Sl No Code Item Description Unit Rate
e
Plan Qty Plan Amount

Excavation a
m
o
1 upto 1.05m depth cum 175.00 0.00 0.00 ###
u
n
2 from 1.5m to 3.0m depth cum 189.00 0.00 0.00 ###
t
3m to 4.5m cum 204.00 0.00 0.00 ###
beyond 4.5m cum 219.00 0.00 0.00 ###
Backfilling with available selected
3 cum 160.00 3 000.00 4 80 000.00 ###
excavted earth from site premises
4 Dewattering HP/Hrs 44.00 200.00 8 800.00 ###
Concrete ###
5 PCC with 1:3:6 cum 4 700.00 0.00 0.00 ###
M25 grade concrete - footing for Col.
6 cum 5 150.00 0.00 0.00 ###
Retaining wall, core walls
Flat slab,beam and slab and regular slab
7 cum 5 150.00 420.00 21 63 000.00 ###
at all level
M25 grade concrete-Col. Retaining
8 cum 5 150.00 150.00 7 72 500.00 ###
wall,core wall
Formwork ###
9 Shuttering for Col. At all lvl sqm 525.00 680.00 3 57 000.00 ###
10 Shuttering for Corewall sqm 550.00 390.00 2 14 500.00 ###
11 Formwork in Slab,beam sqm 550.00 2 940.00 16 17 000.00 ###
12 Shuttering- footing for Col. sqm 475.00 0.00 0.00 ###
Reinforcement
Supplying,collecting,fabricating & fixing
13 in position reinforcement for RCC work MT 55 750.00 51.00 28 43 250.00 ###
work
B Superstructure
14 M25 SDC cum 5 450.00 900.00 49 05 000.00 ###
15 Mivan Shuttering sqm 285.00 10 500.00 29 92 500.00 ###
16 Reinforcement MT 56 000.00 90.00 50 40 000.00 ###
###
Grand Total 2 13 93 550.00 ###
Simplex Infrastructure Limited A
Name of the Site :Shriram Chirping woods, Bangalore c
Monthly Plan for the Month of Sept "2014 h
i
Total Month
e
Target v
Sl No Code Item Description Unit Rate
e
Plan Qty Plan Amount

Excavation a
m
o
1 upto 1.05m depth cum 175.00 0.00 0.00 ###
u
n
2 from 1.5m to 3.0m depth cum 189.00 0.00 0.00 ###
t
3m to 4.5m cum 204.00 0.00 0.00 ###
beyond 4.5m cum 219.00 0.00 0.00 ###
Backfilling with available selected
3 cum 160.00 6 000.00 9 60 000.00 ###
excavted earth from site premises
4 Dewattering HP/Hrs 44.00 0.00 0.00 ###
Concrete ###
5 PCC with 1:3:6 cum 4 700.00 0.00 0.00 ###
M25 grade concrete - footing for Col.
6 cum 5 150.00 0.00 0.00 ###
Retaining wall, core walls
Flat slab,beam and slab and regular slab
7 cum 5 150.00 210.00 10 81 500.00 ###
at all level
M25 grade concrete-Col. Retaining
8 cum 5 150.00 100.00 5 15 000.00 ###
wall,core wall
Formwork ###
9 Shuttering for Col. At all lvl sqm 525.00 408.00 2 14 200.00 ###
10 Shuttering for Corewall sqm 550.00 312.00 1 71 600.00 ###
11 Formwork in Slab,beam sqm 550.00 1 470.00 8 08 500.00 ###
12 Shuttering- footing for Col. sqm 475.00 0.00 0.00 ###
Reinforcement
Supplying,collecting,fabricating & fixing
13 in position reinforcement for RCC work MT 55 750.00 29.00 16 16 750.00 ###
work
B Superstructure
14 M25 SDC cum 5 450.00 1 200.00 65 40 000.00 ###
15 Mivan Shuttering sqm 285.00 14 000.00 39 90 000.00 ###
16 Reinforcement MT 56 000.00 120.00 67 20 000.00 ###
###
Grand Total 2 26 17 550.00 ###
Simplex Infrastructure Limited
Name of the Site :Shriram Chirping woods, Bangalore
Monthly Plan for the Month of Oct "2014
Total Month
Target
Sl No Code Item Description Unit Rate
Plan Qty Plan Amount

Excavation

1 upto 1.05m depth cum 175.00 0.00 0.00


2 from 1.5m to 3.0m depth cum 189.00 0.00 0.00
3m to 4.5m cum 204.00 0.00 0.00
beyond 4.5m cum 219.00 0.00 0.00
Backfilling with available selected
3 cum 160.00 3 000.00 4 80 000.00
excavted earth from site premises
4 Dewattering HP/Hrs 44.00 0.00 0.00
Concrete ###
5 PCC with 1:3:6 cum 4 700.00 0.00 0.00
M25 grade concrete - footing for Col.
6 cum 5 150.00 0.00 0.00
Retaining wall, core walls
Flat slab,beam and slab and regular slab
7 cum 5 150.00 210.00 10 81 500.00
at all level
M25 grade concrete-Col. Retaining
8 cum 5 150.00 0.00 0.00
wall,core wall
Formwork ###
9 Shuttering for Col. At all lvl sqm 525.00 680.00 3 57 000.00
10 Shuttering for Corewall sqm 550.00 390.00 2 14 500.00
11 Formwork in Slab,beam sqm 550.00 1 470.00 8 08 500.00
12 Shuttering- footing for Col. sqm 475.00 0.00 0.00
Reinforcement
Supplying,collecting,fabricating & fixing
13 in position reinforcement for RCC work MT 55 750.00 33.00 18 39 750.00
work
B Superstructure
14 M25 SDC cum 5 450.00 1 200.00 65 40 000.00
15 Mivan Shuttering sqm 285.00 14 000.00 39 90 000.00
16 Reinforcement MT 56 000.00 120.00 67 20 000.00
###
Grand Total 2 20 31 250.00