Professional Documents
Culture Documents
ROAD FACILITY FROM DAROGHAWALA TO WAGHA BORDER WITH SERVICE ROAD AND DRAINS IN THE BUILT UP AREA (KM
11.88 TO KM 28.33) LENGTH 16.365 KM I.C CANAL BANK ROAD ANLONG BRB CANAL LENGTH 1.20 KM
Sr Amount
Description Qty Unit Rate (Rs.)
# (Rs.)
1 Columns Bracing
Bottom Chord
Top Chord
5 Platform
Sides
a-M.S Channel (250x75x8x10 mm)
04 Nos x 24.6 ' = 98.40 Rft
04 Nos x 22.06 ' = 88.24 Rft
186.64
@ 8 kg/ft = 1,493.1 Kg
Add 5 % wastage = 74.66 Kg
1,567.78 Kg 1567.78 Kg 72.3 113,350.20
Stairs Platform
a-M.S Channel (250x75x8x10 mm)
04 Nos x 6.97 ' = 27.88 Rft
08 Nos x 5.9 ' = 47.20 Rft
75.08 Rft
@ 8 kg/ft = 600.6 Kg
Add 5 % wastage = 30.03 Kg
630.67 Kg 630.67 Kg 72.3 45,597.59
b-M.S Angle Iron (50 x 50 x 6 mm)
12 Nos x 2.33 ' = 27.96 Rft
@ 1.4 kg/ft = 39.14 Kg
Add 5 % wastage = 1.96 Kg
41.10 Kg 41.10 Kg 65.3 2,683.91
c-MS Chequrd Plate 6 mm Thk
02 No x 2 m x 1.8 m = 7.20 m2
OR 77.501 Sft
@ 4.377 kg/Sft = 339.25 Kg
Add 10 % wastage = 33.92 Kg
373.17 Kg 373.17 Kg 87.3 32,577.80
Steps
a-M.S Angle Iron (50 x 50 x 6 mm)
86 Nos x 5.91 ' = 508.26 Rft
@ 1.4 kg/ft = 711.56 Kg
Add 5 % wastage = 35.58 Kg
747.14 Kg 747.14 Kg 65.3 48,788.39
b-MS Chequrd Plate 6 mm Thk
2
86 No x 1.8 m x 0.43 m = 66.56 m
OR 716.495 Sft
@ 4.377 kg/Sft = 3,136.33 Kg
Add 10 % wastage = 313.63 Kg
3,449.96 Kg 3449.96 Kg 87.3 301,181.76
7 Stairs Railing
Top Railing
a-M.S Angle Iron (50 x 50 x 6 mm)
08 Nos x 24.47 ' = 195.76 Rft
08 Nos x 6.84 ' = 54.72 Rft
08 Nos x 22.11 ' = 176.88 Rft
12 Nos x 3.71 ' = 44.52 Rft
471.88 Rft
@ 1.4 kg/ft = 660.6 Kg
Add 5 % wastage = 33.03 Kg
693.66 Kg 693.66 Kg 65.3 45,296.23
Vertical Posts
a-M.S Angle Iron (50 x 50 x 6 mm)
116 Nos x 3.17 ' = 367.72 Rft
@ 1.4 kg/ft = 514.8 Kg
Add 5 % wastage = 25.74 Kg
540.55 Kg 540.55 Kg 65.3 35,297.81
Diagonals
a-M.S Angle Iron (50 x 50 x 6 mm)
36 Nos x 3.1 ' = 111.60 Rft
@ 1.4 kg/ft = 156.2 Kg
Add 5 % wastage = 7.81 Kg
164.05 Kg 164.05 Kg 65.3 10,712.60
Retaining Bars
a-M.S Flat Bar (30 x 5 mm)
12 Nos x 53.6 ' = 643.2 Rft
@ 0.36 kg/ft = 231.55 Kg
Add 5 % wastage = 11.58 Kg
243.13 Kg 243.13 Kg 65.3 15,876.36
8 Columns
Main Bridge
a-M.S H-Beam (250 x 250 x 13 x 14)
12 Nos x 16.84 ' = 202.08 Rft
@ 23.01 kg/ft = 4,649.86 Kg
Add 5 % wastage = 232.49 Kg
4,882.35 Kg 4882.35 Kg 84.3 411,582.43
For Stairs
a-M.S H-Beam (250 x 250 x 13 x 14)
04 Nos x 7.31 ' = 29.24 Rft
@ 23.01 kg/ft = 672.81 Kg
Add 5 % wastage = 33.64 Kg
706.45 Kg 706.45 Kg 84.3 59,553.99
G.Total 9,172,272
Deduct cost of waste material (-) 2900.00 Per Kg 25 (72,500.00)
Net 9,099,772
Say 9,099,000
130.64
585.71
134.69
135.79
10.49
68.87
13.81
94.54
56.83
7.46
16.27
3.02
35.42
19.22
61.98
27.95
422.93
74.66
30.03
1.96
33.92
35.58
313.63
33.03
25.74
7.81
11.58
232.49
33.64
58.30
15.71
78.53
90.47
13.74
wastage 2916.44449
5105301
Sum
3,535,002.81 Price/litre + Tax
Sum 5111133.89 Kgs 519.2
Galons Litre
Z 97.44 389.76 135.2222
P 85.26 341.04
P 73.08 292.32
1.35 lite/9SM
17100