You are on page 1of 17

Name of Work : Construction of Balancing, Modernization, Renovation and Expansion of Existing

Clothe Processing Centre at Madhabdi, Narsingdi. (2q ms‡kvwaZ) kxl©K cÖK‡íi bZzb d¨v±ix feb Pvj„y Kivi
j‡ÿ¨ cvBcjvBb ¯’vcb, †Rbv‡iUi ¯’vc‡bi Rb¨ †em wbg©vY I †mvjvi c¨v‡bj ¯’vcb mn Ab¨vb¨ Avbymvsw½K
KvR| During the Financial Year 2018-2019)

Clot Item Description of Items of Works (specifications Unit Quantity Unit rates Total
he Code (If preferably built-in) or prices
Proc any) (in figures)
essi (BDT)
ng Supply and installation of black steel pipe ASTM
Cen A53 ERW, 40 schedule. The pipe work shall be
tre included with welded type tee, elbow, reducer
at etc. and also hangers / supports etc. completed.
Ma Pipe work (over ground) shall be painted with
dha red oxide primer. Underground pipes should be
bdi, laid after wrapping with PVC tape after using
Nar approved prior. Pipe wall thickness shall be as
sing per mentioned for different diameters.
1
di. 14.12
Country of origin: AUSTRALIA / CHINA / INDIA. /
(S.H JAPAN / SOUTH KOREA / VIETNAM.
:
eqjv
i
nvD
‡Ri
M¨v
s
I‡q , 150 mm (6 inch) dia., wall thickness: 7.1mm
wPg 14.12.ii ft. 50.00 2415.00 120750.00
wb ,
cyiv 100 mm (4 inch) dia., wall thickness: 6.0mm
14.12.iii ft. 376.00 1962.00 737712.00
Zb
d¨v
±wi 14.12.iv 80mm (3 inch) dia., wall thickness: 5.5mm ft. 528.00 1449.00 765072.00
fe‡
14.12.v 65 mm (2½ inch) dia., wall thickness: 5.2mm ft. 55.00 966.00 53130.00
bi
eR 14.12.vi 50 mm (2 inch) dia., wall thickness: 3.9mm ft. 55.00 604.00 33220.00
©
jvBb 32 mm (1.25 inch) dia., wall thickness: 3.6mm
Bw 14.12.viii ft. 400.00 440.00 176000.00
Uw
e 14.12.ix 25 mm (1inch) dia., wall thickness: 3.4mm ft. 80.00 423.00 33840.00
jvB‡ 20 mm (3/4 inch) dia., wall thickness: 2.9mm
b 14.12.x ft. 60.00 302.00 18120.00
ms‡
hv‡ 12 mm (1/2 inch) dia., wall thickness: 2.8mm
Mi 14.12.xi ft. 40.00 193.00 7720.00
Rb¨
†Wª Supply & installation of valves & fittings complies
bI with ANSI, flange / groove type, temperature
Af¨v range: 00C-800C; working pressure: 200 PSI
_© minimum, valve body as per ASTM A536, 65-45-
bv 12 standard, UL / FM approved. Country
K¶ of origin: MALAYSIA / SOUTH KOREA / TAIWAN /
wbg2 14.13 USA / European countries or their licensed
©vb manufacturing units located globally.
mn OS & Y GATE VALVES:
Ab¨
vbœ
Avb
ymv
sw½
K 14.13.ii 150 mm (6 inch) dia. each 1.00 42261.00 42261.00
KvR
| 14.13.iii 100 mm (4 inch) dia. each 2.00 27168.00 54336.00
Rdu
ring 14.13.iv 80 mm (3 inch) dia. each 1.00 21734.00 21734.00
the
Fina
Clot Item Description of Items of Works (specifications Unit Quantity Unit rates Total
he Code (If preferably built-in) or prices
Proc any) (in figures)
essi (BDT)
ng
Cen 14.18.i 65 mm (2½ inch) dia. each 1.00 9056.00 9056.00
tre 14.18.ii 50 mm (2 inch) dia. each 2.00 6641.00 13282.00
at
Ma 14.18.iii 40 mm (1½ inch) dia. each 46.00 3019.00 138874.00
dha
bdi, 14.18.iv 25 mm (1inch) dia. each 2.00 2234.00 4468.00
Nar 14.18.v 20 mm (¾ inch) dia. each 14.00 1751.00 24514.00
sing
di. 14.18.vi 12 mm (1½ inch) dia. each 1.00 942.00 942.00
(S.H
: Supplying, fitting and fixing of G.I. pipe with all
eqjv special fittings, such as bends, elbows, sockets,
i reducing sockets, Tee, unions, jam-nuts etc.
nvD including cutting trenches where necessary and
‡Ri fitting the same with earth duly rammed and
M¨v fixing in walls with holder bats and making hole
in floors, walls and consequent mending good
3s the damages etc. all complete in all respects
I‡q ,
wPg approved and accepted by the Engineer- in-
wb , charge.:-
cyiv
Zb
d¨v
±wi
fe‡ 12.5 mm dia G.I. pipe with wall thickness 2.65
bi mm, outside diameter min 17.8 mm, weight 1.31
eR
© 26.36.1 kg/m, can withstand min 50 kg/cm2 hydraulic
pressure.
jvBb
Bw
Uw 3 x 40'-0" = 120.00 Rft = 36.57 Rm meter 35.57 259.00 9212.63
e 20 mm dia G.I. pipe with wall thickness 2.65 mm,
jvB‡ outside diameter min 25.3 mm, weight 1.7 kg/m,
b
ms‡ 26.36.2 can withstand min 50 kg/cm2 hydraulic
pressure.
hv‡
Mi
Rb¨ 3 x 90'-0" =270.00 Rft = 82.29 Rm meter 82.29 336.00 27649.44
†Wª
bI 25 mm dia G.I. pipe with wall thickness 3.35 mm,
Af¨v outside diameter min 31.7 mm, weight 2.59
_© 26.36.3 kg/m, can withstand min 50 kg/cm2 hydraulic
bv pressure.

wbg 3 x 40'-6" = 120.50 Rft = 37.03 Rm meter 37.03 424.00 15700.72
©vb
mn 40 mm dia G.I. pipe with wall thickness 3.25 mm,
Ab¨ outside diameter min 46.5 mm, weight 3.83
vbœ 26.36.5 kg/m, can withstand min 50 kg/cm2 hydraulic
Avb pressure.
ymv
sw½ 3 x 115'-0" = 345.00 Rft = 105.15 Rm meter 37.03 669.00 24773.07
K
KvR 50 mm dia G.I. pipe with wall thickness 3.65 mm,
| outside diameter min 57.3 mm, weight 5.38
Rdu 26.36.6 kg/m, can withstand min 50 kg/cm2 hydraulic
ring pressure.
the
Fina 3 x 8'-0" = 24.00 Rft = 7.31m meter 7.31 860.00 6286.60
ncia
l
Year
201
7-
201
8)
Clot Item Description of Items of Works (specifications Unit Quantity Unit rates Total
he Code (If preferably built-in) or prices
Proc any) (in figures)
essi (BDT)
ng 75 -80 mm dia G.I. pipe with wall thickness 3.25
Cen mm, outside diameter min 86.5 mm, weight 7.22
tre 26.36.8 kg/m, can withstand min 50 kg/cm2 hydraulic
at pressure.
Ma
dha
bdi, 3 x 27'-4" = 88.03 Rft = 25.00 Rm meter 25.00 1526.00 38150.00
Nar
sing
di.
(S.H
:
eqjv
i
nvD
‡Ri
M¨v
s
I‡q ,
wPg
wb ,
cyiv
Zb
d¨v
±wi
fe‡
bi
eR
©
jvBb
Bw
Uw
e
jvB‡
b
ms‡
hv‡
Mi
Rb¨
†Wª
bI
Af¨v

bv

wbg
©vb
mn
Ab¨
vbœ
Avb
ymv
sw½
K
KvR
|
Rdu
ring
the
Fina
ncia
l
Year
201
7-
201
8)
Clot Item Description of Items of Works (specifications Unit Quantity Unit rates Total
he Code (If preferably built-in) or prices
Proc any) (in figures)
essi (BDT)
ng 100 mm dia G.I. pipe with wall thickness 3.65
Cen mm, outside diameter min 107.3 mm, weight
tre 26.36.9 10.42 kg/m, can withstand min 50 kg/cm2
at hydraulic pressure.
Ma
dha
bdi,
Nar 3 x33'-0" = 99.00 Rft =30.17 Rm meter 30.17 2262.00 68244.54
sing Supplying, fitting and fixing of G.I. Union with
di. sealant etc. complete in all respects approved
(S.H and accepted by the Engineer- in- charge.:-
4:
eqjv
i
nvD 26.46.1 12 mm dia G.I. Union each 6.00 125.00 750.00
‡Ri
M¨v 26.46.2 20 mm dia G.I. Union each 17.00 158.00 2686.00
s
I‡q , 26.46.3 25 mm dia G.I. Union each 2.00 195.00 390.00
wPg 26.46.5 40 mm dia G.I. Union each 29.00 356.00 10324.00
wb ,
cyiv Supplying, fitting and fixing of best quality G.I.
Zb gate valve with sealant etc. complete approved
d¨v
5 and accepted by the Engineer- in- charge.:- 0.00
±wi
fe‡
bi
eR 26.47.1 12 mm brass gate valve each 10.00 409.00 4090.00
©
jvBb 26.47.2 20 mm brass gate valve each 16.00 484.00 7744.00
Bw 26.47.3 25 mm brass gate valve each 8.00 650.00 5200.00
Uw
e 26.47.5 40 mm brass gate valve each 19.00 1072.00 20368.00
jvB‡
b 26.47.6 50 mm brass gate valve each 2.00 1714.00 3428.00
ms‡
hv‡ 26.47.8 75 mm brass gate valve each 4.00 4519.00 18076.00
Mi Supplying, fitting and fixing of best quality G.I.
Rb¨ globe valve, threaded joint with sealant etc.
†Wª complete approved and accepted by the
b6I 26.48.8 Engineer- in- charge.:- each 1.00 4760.00 4760.00
Af¨v 75 mm dia brass globe valve

bv

wbg
©vb
mn
Ab¨
vbœ
Avb
ymv
sw½
K
KvR
|
Rdu
ring
the
Fina
ncia
l
Year
201
7-
201
8)
Clot Item Description of Items of Works (specifications Unit Quantity Unit rates Total
he Code (If preferably built-in) or prices
Proc any) (in figures)
essi (BDT)
ng Supply & installation of Flange complies with
Cen ANSI, temperature range: 00C-800C ; working
tre pressure: 200 PSI minimum, flange body as per
at ASTM A536, 65-45-12 standard, UL / FM
Ma
dha7 28.6 approved. Country of origin: MALAYSIA /
SOUTH KOREA / TAIWAN / USA / European
bdi, countries or their licensed manufacturing units
Nar located globally.
sing
di.
(S.H A.R.-18 150 mm (6 inch) dia. each 2.00 13389.32 26778.64
:
eqjv A.R.-19 100 mm (4 inch) dia. each 9.00 10546.55 94918.97
i
nvD A.R.-20 75 mm (3 inch) dia. each 2.00 8654.97 17309.94
‡Ri 62 mm (2.5 inch) dia.
M¨v A.R.-21 each 2.00 7850.47 15700.94
s 28.6 50 mm (2 inch) dia. each 3.00 7304.93 21914.78
I‡q , 40mm (1.5 inch) dia.
wPg A.R.-23 each 50.00 6653.46 332673.01
wb , 25 mm (1 inch) dia.
cyiv A.R.-24 each 14.00 4568.67 63961.31
Zb A.R.-25 20 mm (0.75 inch) dia. each 2.00 3836.76 7673.52
d¨v
±wi A.R.-26 12 mm (0.50 inch) dia. each 1.00 2666.55 2666.55
fe‡ Total 3106461.65
bi
eR
©
jvBb
Bw (Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)
Uw Sub Assistant Engineer Sub Divisional Engineer
e Narsingdi PWD Sub-Division-1
jvB‡ Narsingdi PWD Sub-Division-1
b Narsingdi. Narsingdi.
ms‡
hv‡
Mi
Rb¨
†Wª
bI
Af¨v
_©(Md. Enamul Haque)
bv Assistant Engineer (Mohammad Moniruzzaman)
K¶Sub Assistant Engineer Executive Engineer
Narsingdi PWD Division
wbg Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
©vb Narsingdi. Narsingdi.
mn
Ab¨
vbœ
Avb
ymv
sw½
K
KvR
|
Rdu
ring
the
Fina
ncia
l
Year
201
7-
201
8)
Name of Work : Construction of Balancing, Modernization, Renovation and Expansion of Existing
Clothe Processing Centre at Madhabdi, Narsingdi. (2q ms‡kvwaZ) kxl©K cÖK‡íi bZzb d¨v±ix feb Pvj„y
Kivi j‡ÿ¨ †Rbv‡iUi ¯’vc‡bi Rb¨ †em wbg©vY KvR| During the Financial Year 2018-2019)

mvi-ms‡¶c
(1) cvBcjvBb ¯’vcb = Tk. 3106461.65
(2) †Rbv‡iUi ¯’vc‡bi Rb¨ †em wbg©vY KvR = Tk. 193871.16
(3) ‡mvjvi c¨v‡bj = Tk. 187280.00
(4) ‰e`¨wZK ms‡hvM wd = Tk. 50000.00
(5) AvÛvi MÖvDÛ IqvUvi wiRvf©vi = Tk. 595635.41
(6) wbqb mvBb †evW© = Tk. 365118.00
Total = Tk. 4498366.22

(Md Iqramul hasan chowdhury) ( A S M Musa)


Sub-Assistant Engineer Sub-Divisional Engineer
NarsingdiPWD Division Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Anamul Haque) (Muhammed Moniruzzman)


Sub-Assistant Engineer Assistant Engineer Executive Engineer
NarsingdiPWD Division Narsingdi PWD Division Narsingdi PWD Division
Narsingdi. Narsingdi. Narsingdi.
Name of Work : Construction of Balancing, Modernization, Renovation and Expansion of Existing
Clothe Processing Centre at Madhabdi, Narsingdi.(2q ms‡kvwaZ) kxl©K cÖK‡íi bZzb d¨v±ix feb Pvj„y
Kivi j‡ÿ¨ †Rbv‡iUi ¯’vc‡bi Rb¨ †em wbg©vY KvR| During the Financial Year 2018-2019)

1 Earth work in excavation in all kinds of soil for foundation trenches including layout, providing center lines,
CES-2.1 local bench-mark pillars, levelling, ramming and preparing the base, fixing bamboo spikes and marking layout
with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc.,
stacking, cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all
complete and accepted by the Engineer-in-charge, subject to submit method statement of carrying out
excavation work to the Engineer-in-charge for approval. However, engineer‟s approval shall not relieve the
contractor of his responsibilities and obligations under the contract.

CES-2.1.4 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in very stiff (hard)
clayey soil/ rubbish etc.
Floor 1x 1x 17 '- 0" x 6 '- 0" x 2 '- 9 " = 280.50 cft
= 7.94 cum
@ Tk. 189.00 /sqm = Tk. 1,501
2 Dismantling of plain concrete made of lime or cement and removal of debris to a safe distance.
RS-32.5.2

Floor 1x 1x 17 '- 0" x 6 '- 0" x 0 '- 6 " = 51.00 cft


= 1.44 cum
@ Tk. 1,325.00 /sqm = Tk. 1,913

3 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.5:3 having minimum
Ces-7.3 f'cr = 30 MPa, satisfying a specified compressive strength f‟c = 25 MPa at 28 days on standard cylinders as
per standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5
MPa) / ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm
down well graded stone chips conforming to ASTM C-33, making and placing shutter in position and
maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with
standard mixer machine with hopper, fed by standard measuring boxes or mixing in batching plant, casting in
forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after
specified time approved; including cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is
excluding the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering &
centering)

7.3.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level
raft/mat 1 x 1 x 17 '- 0 " x 6 '- 0 " x 2 '- 9 " = 280.50 cft
= 7.94 cum
@ Tk. 12,154.00 /cum = Tk. 96,537

FORMWORK (Wooden) for boundary wall, gate, centry post etc.


4 Centering and shuttering, including strutting, propping etc. and removal of form for:
CE-7.15
7.15.2 Foundation beam
FORMWORK 2 x 17 '- 0 " x 2 '- 9 " = 93.50 sft
(Wooden) for 2x 6 '- 0 " x 2 '- 9 " = 33.00 sft
= 126.50 sft
= 11.75 Sqm
@ Tk. 381.00 p/Sqm = Tk. 4,478

6 Supplying, fabrication and fixing to detail as per design : ribbed or deformed bar reinforcement for Reinforced
CE-8.1 cement concrete, produced and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning rust, if any, bending and binding in
position with supply of G.I. wires, necessary laboratory tests (excluding splices or laps) etc. complete in all
respect and accepted by the Engineer-in-charge (Measurement shall be recorded only on standard mass per
unit length of bars, while dia of bars exceeds its standard)
8.1.2 Grade 300 (RB 300 /RB 300W: complying BDS ISO 6935-2:2006) ribbed or deformed bar produced and
marked according to Bangladesh sandard, with minimum yield strength, fy (ReH)= 300 MPa but fy not
exceeding 330 MPa and whatever is the yield strength within allowable limit as per BNBC/ ACI 318, the ratio
of ultimate tensile strength fu to yield strength fy, shall be at least 1.25 and minimum elongation after fracture
and minimum total elongation at maximum force is 16% and 8% respectively : up to ground floor

Qty Bf item no-3=7.94 Cum @ 1.75% Reinforcement = 1,090.76 kg


@ Tk. 82.00 P/Kg = Tk. 89,442
Total = Tk. 193,871

(Md Iqramul hasan chowdhury) ( A S M Musa)


Sub-Assistant Engineer Sub-Divisional Engineer
NarsingdiPWD Division Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Anamul Haque) ( A S M Musa) (Muhammed Moniruzzman)


Sub-Assistant Engineer Assistant Engineer Executive Engineer
NarsingdiPWD Division Narsingdi PWD Division Narsingdi PWD Division
Narsingdi. Narsingdi. Narsingdi.
Item No.- 28.6
Supplying & fitting-fixing in position different dia I/F (Insulated Flang) all complete in all respect
as per specification of Titas Gas T & D Co. Ltd.
Considering 1 No.
(a) 150 mm dia insulation kits 1 No. @ $ 2,000.00 each = Tk. 2,000.00
(b) 150 mm flange W/N 150 R/F 2 Nos. @ $ 2,358.00 each = Tk. 4,716.00
(c) 5/8" x 3" long nut-bolt
with washer 10 Nos. @ $ 74.18 each = Tk. 741.80
(d) Carrying, welding & fitting-fixing L.S. = $ 3,000.00

Total = $ 10,457.80
Incidental charges 10.00% = $ 1,045.78

Profit 10.00% = Tk. 1,045.78


Overhead 3.50% = Tk. 36.60
= Tk. 12,585.96
Add VAT with adjustment factor 1.06383 6.00% = Tk. 803.36
Grand total = $ 13,389.32

Say, Tk. 13,389 .00 each

(Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)


Sub Assistant Engineer Sub Divisional Engineer
Narsingdi PWD Sub-Division-1 Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Md. Enamul Haque)


Assistant Engineer (Mohammad Moniruzzaman)
Sub Assistant Engineer
Narsingdi PWD Division Executive Engineer
Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
Narsingdi.
Narsingdi.
Item No.- 28.6
Supplying & fitting-fixing in position different dia I/F (Insulated Flang) all complete in all respect
as per specification of Titas Gas T & D Co. Ltd.
Considering 1 No.
(a) 100 mm dia insulation kits 1 No. @ $ 2,000.00 each = Tk. 2,000.00
(b) 100 mm flange W/N 150 R/F 2 Nos. @ $ 1,572.00 each = Tk. 3,144.00
(c) 5/8" x 3" long nut-bolt
with washer 8 Nos. @ $ 74.18 each = Tk. 593.44
(d) Carrying, welding & fitting-fixing L.S. = $ 2,500.00

Total = $ 8,237.44
Incidental charges 10.00% = $ 823.74

Profit 10.00% = Tk. 823.74


Overhead 3.50% = Tk. 28.83
= Tk. 9,913.76
Add VAT with adjustment factor 1.06383 6.00% = Tk. 632.79
Grand total = $ 10,546.55

Say, Tk. 10,547 .00 each

(Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)


Sub Assistant Engineer Sub Divisional Engineer
Narsingdi PWD Sub-Division-1 Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Md. Enamul Haque)


Assistant Engineer (Mohammad Moniruzzaman)
Sub Assistant Engineer
Narsingdi PWD Division Executive Engineer
Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
Narsingdi.
Narsingdi.
Item No.- 28.6
Supplying & fitting-fixing in position different dia I/F (Insulated Flang) all complete in all respect
as per specification of Titas Gas T & D Co. Ltd.
Considering 1 No.
(a) 75 mm dia insulation kits 1 No. @ $ 1,914.93 each = Tk. 1,914.93
(b) 75 mm flange W/N 150 R/F 2 Nos. @ $ 1,200.00 each = Tk. 2,400.00
(c) 5/8" x 3" long nut-bolt
with washer 6 Nos. @ $ 74.18 each = Tk. 445.08
(d) Carrying, welding & fitting-fixing L.S. = $ 2,000.00

Total = $ 6,760.01
Incidental charges 10.00% = $ 676.00

Profit 10.00% = Tk. 676.00


Overhead 3.50% = Tk. 23.66
= Tk. 8,135.67
Add VAT with adjustment factor 1.06383 6.00% = Tk. 519.30
Grand total = $ 8,654.97

Say, Tk. 8,655 .00 each

(Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)


Sub Assistant Engineer Sub Divisional Engineer
Narsingdi PWD Sub-Division-1 Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Md. Enamul Haque)


Assistant Engineer (Mohammad Moniruzzaman)
Sub Assistant Engineer
Narsingdi PWD Division Executive Engineer
Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
Narsingdi.
Narsingdi.
Item No.- 28.6
Supplying & fitting-fixing in position different dia I/F (Insulated Flang) all complete in all respect
as per specification of Titas Gas T & D Co. Ltd.
Considering 1 No.
(a) 62 mm dia insulation kits 1 No. @ $ 1,914.93 each = Tk. 1,914.93
(b) 62 mm flange W/N 150 R/F 2 Nos. @ $ 1,000.00 each = Tk. 2,000.00
(c) 5/8" x 3" long nut-bolt
with washer 4 Nos. @ $ 74.18 each = Tk. 296.72
(d) Carrying, welding & fitting-fixing L.S. = $ 1,920.00

Total = $ 6,131.65
Incidental charges 10.00% = $ 613.17

Profit 10.00% = Tk. 613.17


Overhead 3.50% = Tk. 21.46
= Tk. 7,379.44
Add VAT with adjustment factor 1.06383 6.00% = Tk. 471.03
Grand total = $ 7,850.47

Say, Tk. 7,850 .00 each

(Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)


Sub Assistant Engineer Sub Divisional Engineer
Narsingdi PWD Sub-Division-1 Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Md. Enamul Haque)


Assistant Engineer (Mohammad Moniruzzaman)
Sub Assistant Engineer
Narsingdi PWD Division Executive Engineer
Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
Narsingdi.
Narsingdi.
Item No.- 28.6
Supplying & fitting-fixing in position different dia I/F (Insulated Flang) all complete in all respect
as per specification of Titas Gas T & D Co. Ltd.
Considering 1 No.
(a) 50 mm dia insulation kits 1 No. @ $ 1,914.93 each = Tk. 1,914.93
(b) 50 mm flange W/N 150 R/F 2 Nos. @ $ 786.95 each = Tk. 1,573.90
(c) 5/8" x 3" long nut-bolt
with washer 4 Nos. @ $ 74.18 each = Tk. 296.72
(d) Carrying, welding & fitting-fixing L.S. = $ 1,920.00

Total = $ 5,705.55
Incidental charges 10.00% = $ 570.56

Profit 10.00% = Tk. 570.56


Overhead 3.50% = Tk. 19.97
= Tk. 6,866.63
Add VAT with adjustment factor 1.06383 6.00% = Tk. 438.30
Grand total = $ 7,304.93

Say, Tk. 7,305 .00 each

(Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)


Sub Assistant Engineer Sub Divisional Engineer
Narsingdi PWD Sub-Division-1 Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Md. Enamul Haque)


Assistant Engineer (Mohammad Moniruzzaman)
Sub Assistant Engineer
Narsingdi PWD Division Executive Engineer
Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
Narsingdi.
Narsingdi.
Item No.- 28.6
Supplying & fitting-fixing in position different dia I/F (Insulated Flang) all complete in all respect
as per specification of Titas Gas T & D Co. Ltd.
Considering 1 No.
(a) 40 mm dia insulation kits 1 No. @ $ 1,800.00 each = Tk. 1,800.00
(b) 40 mm flange W/N 150 R/F 2 Nos. @ $ 590.00 each = Tk. 1,180.00
(c) 5/8" x 3" long nut-bolt
with washer 4 Nos. @ $ 74.18 each = Tk. 296.72
(d) Carrying, welding & fitting-fixing L.S. = $ 1,920.00

Total = $ 5,196.72
Incidental charges 10.00% = $ 519.67

Profit 10.00% = Tk. 519.67


Overhead 3.50% = Tk. 18.19
= Tk. 6,254.25
Add VAT with adjustment factor 1.06383 6.00% = Tk. 399.21
Grand total = $ 6,653.46

Say, Tk. 6,653 .00 each

(Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)


Sub Assistant Engineer Sub Divisional Engineer
Narsingdi PWD Sub-Division-1 Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Md. Enamul Haque)


Assistant Engineer (Mohammad Moniruzzaman)
Sub Assistant Engineer
Narsingdi PWD Division Executive Engineer
Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
Narsingdi.
Narsingdi.
Item No.- 28.6
Supplying & fitting-fixing in position different dia I/F (Insulated Flang) all complete in all respect
as per specification of Titas Gas T & D Co. Ltd.
Considering 1 No.
(a) 25 mm dia insulation kits 1 No. @ $ 1,500.00 each = Tk. 1,500.00
(b) 25 mm flange W/N 150 R/F 2 Nos. @ $ 385.83 each = Tk. 771.66
(c) 5/8" x 3" long nut-bolt
with washer 4 Nos. @ $ 74.18 each = Tk. 296.72
(d) Carrying, welding & fitting-fixing L.S. = $ 1,000.00

Total = $ 3,568.38
Incidental charges 10.00% = $ 356.84

Profit 10.00% = Tk. 356.84


Overhead 3.50% = Tk. 12.49
= Tk. 4,294.55
Add VAT with adjustment factor 1.06383 6.00% = Tk. 274.12
Grand total = $ 4,568.67

Say, Tk. 4,569 .00 each

(Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)


Sub Assistant Engineer Sub Divisional Engineer
Narsingdi PWD Sub-Division-1 Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Md. Enamul Haque)


Assistant Engineer (Mohammad Moniruzzaman)
Sub Assistant Engineer
Narsingdi PWD Division Executive Engineer
Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
Narsingdi.
Narsingdi.
Item No.- 28.6
Supplying & fitting-fixing in position different dia I/F (Insulated Flang) all complete in all respect
as per specification of Titas Gas T & D Co. Ltd.
Considering 1 No.
(a) 20 mm dia insulation kits 1 No. @ $ 1,400.00 each = Tk. 1,400.00
(b) 20 mm flange W/N 150 R/F 2 Nos. @ $ 350.00 each = Tk. 700.00
(c) 5/8" x 3" long nut-bolt
with washer 4 Nos. @ $ 74.18 each = Tk. 296.72
(d) Carrying, welding & fitting-fixing L.S. = $ 600.00

Total = $ 2,996.72
Incidental charges 10.00% = $ 299.67

Profit 10.00% = Tk. 299.67


Overhead 3.50% = Tk. 10.49
= Tk. 3,606.55
Add VAT with adjustment factor 1.06383 6.00% = Tk. 230.21
Grand total = $ 3,836.76

Say, Tk. 3,837 .00 each

(Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)


Sub Assistant Engineer Sub Divisional Engineer
Narsingdi PWD Sub-Division-1 Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Md. Enamul Haque)


Assistant Engineer (Mohammad Moniruzzaman)
Sub Assistant Engineer
Narsingdi PWD Division Executive Engineer
Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
Narsingdi.
Narsingdi.
Item No.- 28.6
Supplying & fitting-fixing in position different dia I/F (Insulated Flang) all complete in all respect
as per specification of Titas Gas T & D Co. Ltd.
Considering 1 No.
(a) 12 mm dia insulation kits 1 No. @ $ 1,000.00 each = Tk. 1,000.00
(b) 12 mm flange W/N 150 R/F 2 Nos. @ $ 193.00 each = Tk. 386.00
(c) 5/8" x 3" long nut-bolt
with washer 4 Nos. @ $ 74.18 each = Tk. 296.72
(d) Carrying, welding & fitting-fixing L.S. = $ 400.00

Total = $ 2,082.72
Incidental charges 10.00% = $ 208.27

Profit 10.00% = Tk. 208.27


Overhead 3.50% = Tk. 7.29
= Tk. 2,506.55
Add VAT with adjustment factor 1.06383 6.00% = Tk. 159.99
Grand total = $ 2,666.55

Say, Tk. 2,667 .00 each

(Md. Iqramul Hasan Chowdhury) (A.S.M. Musa)


Sub Assistant Engineer Sub Divisional Engineer
Narsingdi PWD Sub-Division-1 Narsingdi PWD Sub-Division-1
Narsingdi. Narsingdi.

(Md. Enamul Haque)


Assistant Engineer (Mohammad Moniruzzaman)
Sub Assistant Engineer
Narsingdi PWD Division Executive Engineer
Narsingdi PWD Division
Narsingdi. Narsingdi PWD Division
Narsingdi.
Narsingdi.