BILL OF QUANTITIES
2. Quotation given by the contractor on this BOQ are to cover any and all
additional materials, labor or associated costs to complete the works as
documented on the complete project documents.
Currency: US Dollars
Tender No: 04
Tender Title: Customs and Police Office Buildings
Original Issue: February 25, 2010
Ai Khanem Border Crossing Point Facilities
Takhar, Afghanistan
Customs Office Building
UNOPS
Vertical Structures Unit
DETAILS OF COMPONENT
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
1. General
1.1 Preliminaries 1.1 Occupied Areas, 1.1 Existing
Services Schedule and 1.1 Items
to be supplied schedules
2. Site
2.3 Earthwork 2.1 Identified hazardous materials
and 2.3 Earthwork schedules
3. Structure
3.1 Concrete-General 3.1 Non reinforced concrete, 3.1
Reinforced concrete and 3.2
Concrete- Integral Finishes
schedules
NOTE: Cost for concrete items in this section
includes reinforcement, steel anchorage embedded
in concrete, shuttering, concrete, concrete curing
and all to the complete job.
1 PCC lean concrete (10 Mpa) under the RCC
foundations. CU.M 13.00 -
2 RCC (20 Mpa) foundations, rectangular and
trapezoidal foundation beams. CU.M 140.00 -
3 PCC, 40mm thick, lean concrete (10 Mpa) at
the floor over the gravel compaction. CU.M 19.00 -
3/24
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
4 PCC concrete, 100mm thick, (20 Mpa) at the
floor over the water-proofing layer. This item
includes the stairs steps at the entrances and
the ramps. CU.M 47.00 -
5 RCC Columns, includes all columns (from -1.65
to +3.55) and supporting columns/ring beams
for trusses on the roof. CU.M 82.00 -
6 RCC (20 Mpa) slabs and beams. The items
covers all slabs, beams and RCC floor for the
bank. CU.M 86.00 -
7 RCC Pavement (20 Mpa), for 1000mm-wide
side walks. This includes entrances and ramps.
The cost includes expansion joint on side walk
surface as shown and as well as the broom
finish to the side walk/ ramp surfaces.
CU.M 15.00 -
3.3 Pre-cast RC Concrete 3.3 Precast Concrete Prototypes
Schedule
1 Precast RCC (20 Mpa) exterior window sill for
all windows as per drawings. This includes all
work need for complete installation.
Lin M 29.00 -
3.5 Brickwork 3.5 Brickwork construction
schedule
1 Second Class Brick masonry with mortar. This
includes all brick walls/ brick masonry in the
entire building. The cost includes steel bars
shown in the walls and their connection to the
perimeter RCC elements. CU.M 60.00 -
3.9 Light Timberwork 3.9 Light Timberwork schedule,
6.6 Interior painting and 6.6
Exterior painting schedules
1 Roof timber structure on the trusses. The cost
includes 30mm thick wooden planks as shown
on the drawing. This also cover all auxiliary and
needed materials and supplying and installation
of members including painting to make the
surface ready for folded metal sheet roofing
according to the drawing, schedule and
specifications. SQ.M 680.00 -
3.10 Concrete Unit Masonry 3.10 Concrete Unit Masonry
4/24
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
5 Steel truss (TRUSS 4) at the roof. See drawing
for details. No 8.00 -
6 Steel truss (TRUSS 5) at the roof. See drawing
for details. No 2.00 -
7 Steel truss (TRUSS 6) at the roof. See drawing
for details. No 2.00 -
8 Steel truss (TRUSS 7) at the roof. See drawing
for details. No 8.00 -
9 Steel truss (TRUSS 8) at the roof. See drawing
for details. No 2.00 -
10 Steel truss (TRUSS 9) at the roof. See drawing
for details. No 4.00 -
11 Steel truss (TRUSS 10) at the roof. See
drawing for details. No 4.00 -
12 Steel truss (TRUSS 11) at the roof. See
drawing for details. No 1.00 -
13 Steel frame fixed ladder inside the toilet as the
access way to the roof. The work and the cost
includes construction of fixed later to the wall
and the opening pane, its hardware and other
accessories to complete the installation as per
drawing and schedule. This also includes
painting according to the schedules and
specifications for steel surfaces painting.
LS 1.00 -
Subtotal Structure
-
4. Enclosure
4.1 Waterproofing 4.1 Waterproofing system
schedule
1 Bitumen water-proofing coat. This is a 3-5mm
thick hot bitumen painting coats on dried PCC
surface. The item applies on 40mm PCC at the
floor beneath the 20 Mpa, 100mm thick PCC
layer. This cost includes supplying and applying
the coats with all needed accessories and work
to do the job as per manufacturer's data and to
the full satisfaction of UNOPS engineer.
SQ.M 470.00 -
2 Single layer bitumen membrane at the floor and
walls of toilets/kitchen. This includes
preparation of base layers shown on the
drawings. Refer to schedule/drawing for details.
SQ.M 55.00 -
4.2 Roofing 4.2 Roofing materials, and 4.2
Gutter and Down pipe Schedules
1 Standing seam metal roofing (using GI sheet
gauge 24). This includes all accessories
required for installation of roof on the prepared
timber plank (see item 3.9.1 for the cost of
timber plank on roof). The cost also includes all
flashings, capping etc needed on the metal roof.
SQ.M 680.00 -
2 Metallic gutter around the roof (using GI sheet
gauge 20). The cost includes all accessories
required for complete installation of gutter such
as supplying, fixing and others as per drawing
and schedules.
Lin M 116.00 -
3 Down pipes, PVC pipe class-B. This includes
all accessories required for complete installation
such as supplying, fixing and others as per
drawing and schedules.
Lin M 45.00 -
5/24
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
4.3 Windows and Window Hardware 4.3 Window, 4.3 Window
Hardware, 4.5 Annealed Glasses,
and 4.6 Glassblock work
schedules
NOTE: Prior to work, samples must be approved by
UNOPS Engineer.
1 Wooden frame windows. The work includes
making, transportation, installation, hardware,
glazing, glass-block work around window,
insect screen, 3 coats of oil-based painting, and
other accessories required for complete
installation as per drawings and schedule.
SQ.M 63.00 -
4.4 Doors and Door Hardware 4.4 Joinery doors 4.4 PVC doors,
4.4 Steel doors and 4.5 Annealed
Glasses schedules
NOTE: Prior to work, samples must be approved by
UNOPS Engineer.
1 Wooden frame doors. The work includes
making, transportation, installation, hardware,
glazing, and other accessories required for
complete installation as per drawings and
schedule. SQ.M 76.00 -
2 PVC frame doors. The work includes making,
transportation, installation, hardware, glazing,
and other accessories required for complete
installation as per drawings and schedule.
SQ.M 6.00 -
3 Steel frame doors. The work includes making,
transportation, installation, hardware, glazing, 1
coat of anti-rust followed by 2 other coats of oil-
based painting, and other accessories required
for complete installation as per drawings and
schedule.
SQ.M 2.00 -
4.5 Glazing 4.5 Mirrors schedules
5. Interior
5.4 Suspended Ceiling 5.4 Suspended Ceiling Schedule
6/24
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
1 Lasani wooden board, 16mmm, fixed ceiling for
all soffits around the building. The cost includes
all framing, fixing, oil based painting and
needed work for a complete job to the full
satisfaction of Engineer. SQ M 152.00 -
2 Gypsum board, 16mmm, reflected ceiling for
the side entrances of the building. The cost
includes all framing, fixing, and needed work for
complete job. SQ M 4.00 -
5.5 Joinery 5.5 Joinery fixtures schedule
6. Finish
6.1 Plastering 6.1 Plastering Schedule
7/24
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
1 In situ colored chips, colored mortar terrazzo,
including marble trims for joints, for all floors as
shown on the drawing. See schedule for details.
The cost also includes stainless steel nosing at
the outer edges of the stair steps at the
entrances. SQ.M 510.00 -
6.3 Tiling 6.3 Wall tiling and 6.3 Floor tiling
schedules
NOTE: Prior to work, samples must be approved by
UNOPS Engineer.
1 Ceramic wall tiles for toilets, kitchen, around the
drinking water fountain and any place shown.
The cost includes bed preparation, bedding and
grout. SQ.M 70.00 -
2 Ceramic floor tiles for toilets including bed
preparation, bedding and grout. SQ.M 35.00 -
3 Marble skirting for all rooms and halls where did
not receive ceramic tiles. The cost includes
bedding and grout. Lin M 450.00 -
6.6 Painting 6.6 Interior/Exterior painting
schedule
NOTE: Prior to work, samples must be approved by
UNOPS Engineer.
Internal surfaces
8. Water Services
8.1 Water Services 8.1 Water services samples, 8.1
Water system piping, 8.1 Sanitary
fixtures, 8.1 Water heater
schedules and 8.1 Water
Services Testing schedules
8/24
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
Sanitation Piping
9. Electrical Services
9.1 Electrical Services 9.1 Electrical systems, 9.1
Electrical supply mains, 9.1
Electrical switchboard design, 9.1
Main 380VAC Distribution
System, 9.1 Panel Construction,
9.1 Power accessories, 9.1
Lighting control and fittings, 9.1
Fire Detection Equipment
Schedule Schedules and the
Attachments
9/24
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
Note: for all items below the cost includes
complete/installations with all needed
accessories and works.
Switchboard and sub boards
1 Sub distribution panel, 750x500x250 mm,
powder coated, weatherproof, outdoor mounted
metal. With Digital Measurement equipments.
No. 1.00 -
2 Main circuit breaker, MCCB, 3x160Amps, Type-
C. No. 1.00 -
3 Circuit breaker, MCB, 1x32Amps, Type-C
No. 16.00 -
4 Circuit breaker, MCB, 1x20Amps, Type-C
No. 38.00 -
Distribution wiring
10/24
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
25 Lightening protection as mentioned in lightening
protection drawing with air terminal, electrodes,
tape, connectors, clamp and grounding cable
Set 1.00 -
26 Grounding system as mentioned in grounding
drawing with electrodes, tape, connectors,
clamp and grounding cable Set 1.00 -
Labeling
11/24
UNOPS
Vertical Structures Unit
SUMMARY OF COMPONENT
Currency: US Dollars
Tender No: 04
Component: Customs Office Building
Original Issue: February 25, 2010
Work Type
Total for General 0.00
Total for Site 0.00
Total for Structure 0.00
Total for Enclosure 0.00
Total for Interior 0.00
Total for Finish 0.00
Total for Water Supply Services 0.00
Total for Electrical Services 0.00
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
2. Site
2.3 Earthwork 2.1 Identified hazardous materials and
2.3 Earthwork schedules
1 Excavation (any soil type) for foundation.
This item includes all excavations, disposal
and temporary support or shoring if needed.
See drawing and schedule for details.
CU.M 190.00 -
2 Ground improvement under foundations.
This includes supplying of filling materials and
compacting the layers according to schedule
and drawings. CU.M 85.00 -
3 Soil backfilling on RCC math foundation up
to ground level. This includes supplying of
needed materials. See drawings and
schedules for levels/dimensions and details.
CU.M 147.00 -
4 Gravel compaction, Class 2, at any places
under the PCC/RCC shown inside the building
or at sidewalk/ramp. This includes supplying
of needed materials. See drawing and project
schedules for dimensions and details.
CU.M 60.00 -
Subtotal Site
-
3. Structure
3.1 Concrete-General 3.1 Non reinforced concrete, 3.1
Reinforced concrete and 3.2 Concrete-
Integral Finishes schedules
NOTE: Cost for concrete items in this section
includes reinforcement, steel anchorage embedded
in concrete, shuttering, concrete, concrete curing
and all to the complete job.
1 PCC lean concrete (10 Mpa) under the RCC
foundations. CU.M 10.00 -
2 RCC (20 Mpa) foundations, rectangular and
trapezoidal foundation beams. CU.M 108.00 -
3 PCC, 40mm thick, lean concrete (10 Mpa) at
the floor over the gravel compaction. CU.M 15.00 -
14/24
Currency: US Dollars
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
15/24
Currency: US Dollars
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
NOTE: Cost for steel related items in this section 3.7 Light Steelwork Schedule
includes supplying materials and installation to the
complete condition for all members, gussets,
fasteners, connections, welding and other
accessories and works needed to complete the
job. The cost also includes painting according to
the schedules and specifications for steel member
painting, which is at least on coat of anti-rust
followed by 2 other coats of oil-based painting for
all surfaces and sides of the steel members.
4. Enclosure
4.1 Waterproofing 4.1 Waterproofing system schedule
1 Bitumen water-proofing coat. This is a 3-5mm
thick hot bitumen painting coats on dried PCC
surface. The item applies on 40mm PCC at
the floor beneath the 20 Mpa, 100mm thick
PCC layer. This cost includes supplying and
applying the coats with all needed accessories
and work to do the job as per manufacturer's
data and to the full satisfaction of UNOPS
engineer. SQ.M 360.00 -
16/24
Currency: US Dollars
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
17/24
Currency: US Dollars
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
5. Interior
5.4 Suspended Ceiling 5.4 Suspended Ceiling Schedule
6. Finish
6.1 Plastering 6.1 Plastering Schedule
NOTE: Prior to work, samples must be approved by
UNOPS Engineer.
18/24
Currency: US Dollars
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
8. Water Services
8.1 Water Services 8.1 Water services samples, 8.1 Water
system piping, 8.1 Sanitary fixtures, 8.1
Water heater schedules and 8.1 Water
Services Testing schedules
19/24
Currency: US Dollars
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
20/24
Currency: US Dollars
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
9. Electrical Services
9.1 Electrical Services 9.1 Electrical systems, 9.1 Electrical
supply mains, 9.1 Electrical switchboard
design, 9.1 Main 380VAC Distribution
System, 9.1 Panel Construction, 9.1
Power accessories, 9.1 Lighting control
and fittings, 9.1 Fire Detection
Equipment Schedule Schedules and the
Attachments
21/24
Currency: US Dollars
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
22/24
UNOPS
Vertical Structures Unit
SUMMARY OF COMPONENT
Currency: US Dollars
Tender No: 04
Component: Police Office Building
Original Issue: February 25, 2010
Work Type
Total for General 0.00
Total for Site 0.00
Total for Structure 0.00
Total for Enclosure 0.00
Total for Interior 0.00
Total for Finish 0.00
Total for Water Supply Services 0.00
Total for Electrical Services 0.00
Currency: US Dollars
Tender No: 04
Tender Title: Customs and Police Office Buildings
Original Issue: February 25, 2010
CONTRACT COMPONENTS
Total for Customs Office Building
Total for Police Office Building
Position Position
Signature Signature
Address and
Mobile Number