I. TITLE: REPAINTING AND REPLACEMENT OF DILAPIDATED ROOFING


SHEETS

II. PROPONENT: ANA LIZA M. TONGSON

III. PROPOSED DATE: APRIL 2020

IV. PROPOSED VENUE: Sta. Cruz South Central Elementary School

V. RATIONALE:

The maintenance and repair of roofs is one of the most common costly items associated with school
buildings. Careful analysis is carried out to ensure that appropriate repairs or renewals are undertaken.

VI. OBJECTIVE/S:

This proposal aims to protect the health and safety of the pupils, teachers and non-teaching personnel
of the building by preventing or reducing deterioration of dilapidated roofing sheets

VII. TARGET PARTICIPANTS:

TARGET PARTICIPANTS
Pupils
Teachers
School Head
Parents

VIII. BUDGETARY REQUIREMENTS

The total estimated cost for the project from start to completion to meet the standard is Php 25,000.00

IX. SOURCE OF FUNDS: Repair and Maintenance Allocated Budget, which is 15% from School
MOOE Fund
Annual MOOE Budget Allocation
FY 2019 Repair and
Maintenance (15%)
Php 677,000.00 Php 101,550.00

PROJECT IMPLEMENTATION SCHEME

Roof structure and sheeting will be repaired as necessary, maintaining existing configuration. Warped
and poorly-fitting to be removed, reworked, and re-installed. Dilapidated Roofing Sheets to be replaced.
QM - Page 1 of 2
Republic of the Philippines Document Code: SDO-GQF-013
Department of Education
Region III Revision: 00
SCHOOLS DIVISION OF ZAMBALES
Zone 6, Iba, Zambales Effectivity date: 06-01-2018
Tel./Fax No. (047) 602 1391
E-mail Address: zambales@deped.gov.ph
website: www.depedzambales.ph Name of Office:
Sta. Cruz South Central ES
PROJECT PROPOSAL

Impact will be the preservation of the original roof configuration and protection of the building’s structural
integrity.

Implementation of the above proposed project is during the school’s summer vacation.

Prepared by:

ANA LIZA M. TONGSON


School Principal IV
Reviewed by:

AILYN C. EAY
SGOD Chief Education Supervisor
Recommending Approval:

MAYLENE M. MANUEL, Ed.D.


Assistant Schools Division Superintendent

APPROVED:

LEONARDO D. ZAPANTA, Ed.D., CESO VI


Schools Division Superintendent

QM - Page 2 of 2