You are on page 1of 13

TheProjectEstimate.com (https://www.theprojectestimate.

com/)

 (https://www.facebook.com/theprojectestimate%20)

HOME (https://theprojectestimate.com/) RATES  (https://www.theprojectestimate.com/category/rates/)

MAN-HOUR (https://www.theprojectestimate.com/category/man-hour/)

PRICE LIST  (https://www.theprojectestimate.com/category/price-list/)

REQUEST A QUOTE (https://www.theprojectestimate.com/request-for-quotation/)

ABOUT US (https://www.theprojectestimate.com/about-us/) CONTACT US (https://www.theprojectestimate.com/contact-us/) 

Blog  (https://www.theprojectestimate.com) > MAN-HOUR (https://www.theprojecte

Masonry Work Productivity Rate Search


Verse Of The Day
/
“For our struggle is not against flesh
and blood, but against the rulers,
against the authorities, against the
cosmic powers of this darkness,
against evil, spiritual forces in the
heavens.”

-Ephesians 6:12 CSB

Need help? Pray to God.

Recent Post

Window Price List


(https://www.theprojecte
stimate.com/windows-
Masonry Work Productivity Rate price-list/)
Window type varies differently
 info.projectestimate (https://www.theprojectestimate.com/author/info-projectestimate/) -  July 19, 2020 -
 MAN-HOUR (https://www.theprojectestimate.com/category/man-hour/) depending on the […]

Door Price List


The data written below for masonry work productivity rate are the average output per hour of the (https://www.theprojecte
task or activity. The described activity has a recommended list of teams for labor and equipment. stimate.com/door-price-
Please take note that these are suggested values and for reference only. Each project has a list/)
different approach. Factors, wastage and allowances should be considered while doing estimates. Door type material varies differently
depending on the […]

The list of activities indicated below are for placement of concrete blocks, installation of Masonry Work
reinforcement, grouting and mortar. Productivity Rate
(https://www.theprojecte
stimate.com/masonry-
For other civil works productivity rates, please check below the list of items: work-productivity-rate/)
– Rebar installation man-hours, please see the link: REBAR PRODUCTIVITY RATE The data written below for masonry 
(https://www.theprojectestimate.com/rebar-productivity-rate/) work productivity […]
/
– Concreting works and installation man-hours, please see the link: CONCRETE WORK Concrete Work
PRODUCTIVITY RATE (https://www.theprojectestimate.com/concrete-work-productivity-rate/) Productivity Rate
(https://www.theprojecte
stimate.com/concrete-
For other material price list, please check below the list of items: work-productivity-rate/)
– Reinforced concrete pipe, please see the link: RCP PIPE PRICE LIST The data written below for concrete
(https://www.theprojectestimate.com/reinforced-concrete-pipe-price-list/) work productivity […]

– Ready mixed concrete, please see the link: RMC PRICE LIST
Rebar Productivity Rate
(https://www.theprojectestimate.com/ready-mix-concrete-price-list/)
(https://www.theprojecte
– Rebar steel price list, please see the link: REBAR PRICE LIST
stimate.com/rebar-
(https://theprojectestimate.com/rebar-price-list/)
productivity-rate/)
– I beam price list, please see the link: I-BEAM PRICE LIST (https://theprojectestimate.com/i-
The data written below for rebar
beam-price-list/) productivity rate are […]

Subscribe To Blog Via Email

Enter your email address to subscribe


to this blog and receive notifications of
MASONRY PRODUCTIVITY WORK
new posts by email.

CONCRETE BLOCKS
Email Address
TEM ACTIVITY / SIZE / REMARKS UNIT TEAM AVE. OUTPUT - HOURS / UNIT
NO. DESCRIPTION DIMENSION COMPONENTS
SUBS C R I BE

LABOR EQUIPMENT UNIT

Popular Post
1 Concrete 100mm thick Square 0.250 Foreman 1.17 0.29 Hr /
Hollow Blocks, Meters 4.000 Mason SS Ball Valve Price List
Square
(https://www.theprojecte
tooled joints (2- 2.000 Laborer Meters
stimate.com/ss-ball-
sides) 0.375 Equip.
valve-price-list/)
Opt. 
/
Stainless steel ball valves are
TEM ACTIVITY / SIZE / REMARKS UNIT TEAM AVE. OUTPUT - HOURS / UNIT
commonly used on […]
NO. DESCRIPTION DIMENSION COMPONENTS

HDPE End Cap Price


0.250 Batch
2 Concrete 150mm thick Square 1.32 0.33 Hr /
List
Mixer
Hollow Blocks, Meters Square
(https://www.theprojecte
0.500 Power
tooled joints (2- Meters
stimate.com/hdpe-end-
Tools
sides) cap-price-list/)
0.125 Crane
HDPE end cap price list along with the
0.125 Fork Lift
3 Concrete 200mm thick Square 1.56 0.39 other price […]
Hr /
0.125 Truck
Hollow Blocks, Meters Square
0.500 Lifting Pipe Installation Man
tooled joints (2- Meters
Equipment Hours
sides)
(https://www.theprojecte
stimate.com/pipe-
4 Concrete 250mm thick Square 1.75 0.44 Hr /
installation-man-hours/)
Hollow Blocks, Meters Square
The following are man hour reference
tooled joints (2- Meters
for pipe laying, […]
sides)
Manual Transfer Switch
5 Concrete 300mm thick Square 2.04 0.51 Hr / List
Price
Hollow Blocks, Meters (https://www.theprojecte
Square
tooled joints (2- stimate.com/mts-price-
Meters
sides) list/)
Manual transfer switches source of

6 Concrete 100mm thick Square 1.06 0.26 power from grid


Hr to
/ […]
Hollow Blocks, Meters Square
Refrigeration Dryer
No tooled Meters
Price List
joints (2-sides) (https://www.theprojecte
stimate.com/refrigeratio
n-dryer-price-list/)
Refrigeration dryers are used in all

compressed air […]
/
Categories
TEM ACTIVITY / SIZE / REMARKS UNIT TEAM AVE. OUTPUT - HOURS / UNIT
NO. DESCRIPTION DIMENSION COMPONENTS MAN-HOUR
(https://www.theprojectestimate.com/ca
7 Concrete 150mm thick Square 1.19 0.30 tegory/man-hour/)
Hr /
Hollow Blocks, Meters Square
PRICE LIST
No tooled Meters
(https://www.theprojectestimate.com/ca
joints (2-sides)
tegory/price-list/)

COMMON
8 Concrete 200mm thick Square 1.41 0.35 Hr /
(https://www.theprojectestimate.com/ca
Hollow Blocks, Meters Square
tegory/price-list/common/)
No tooled Meters
joints (2-sides) ELECTRICAL
(https://www.theprojectestimate.com/ca
9 Concrete 250mm thick Square 1.58 0.40 tegory/price-list/electrical/)
Hr /
Hollow Blocks, Meters Square
MECHANICAL
No tooled Meters
(https://www.theprojectestimate.com/ca
joints (2-sides) tegory/price-list/mechanical/)

FIRE PROTECTION
(https://www.theprojectestimate.com/ca
tegory/price-list/mechanical/fire-
protection/)

HVAC
REINFORCEMENT (https://www.theprojectestimate.com/ca
tegory/price-list/mechanical/hvac/)

ITEM ACTIVITY / SIZE / REMARKS UNIT TEAM AVE. OUTPUT - HOURS / UNIT
PIPING AND PLUMBING
NO. DESCRIPTION DIMENSION COMPONENTS (https://www.theprojectestimate.com/ca
tegory/price-list/mechanical/piping-and-
LABOR EQUIPMENT
plumbing/) UNIT


/
ITEM ACTIVITY / SIZE / REMARKS UNIT TEAM STRUCTURAL/ARCHITECTURAL
AVE. OUTPUT - HOURS / UNIT
(https://www.theprojectestimate.com/ca
NO. DESCRIPTION DIMENSION COMPONENTS
tegory/price-list/structural-
architectural/)
1 Anchor bolts w/ 12mmDiameter, Piece 1.00 Mason 0.07 0.00 Hr / Piece
nuts and 200mm Length
RATES
washer (https://www.theprojectestimate.com/ca
tegory/rates/)
2 Anchor bolts w/ 12mmDiameter, Piece 0.08 0.00 Hr / Piece
nuts and 300mm Length
washer

3 Anchor bolts w/ 16mmDiameter, Piece 0.09 0.00 Hr / Piece


nuts and 300mm Length
washer

4 Anchor bolts w/ 20mmDiameter, Piece 0.10 0.00 Hr / Piece


nuts and 300mm Length
washer

5 Control Joint 100mm thick Linear 0.05 0.00 Hr /


(PVC or wall Meters Linear
Rubber) Meters

6 Control Joint 150mm thick Linear 0.06 0.00 Hr /


(PVC or wall Meters Linear
Rubber) Meters

7 Control Joint 200mm thick Linear 0.07 0.00 Hr /


(PVC or wall Meters Linear
Rubber) Meters

/
ITEM ACTIVITY / SIZE / REMARKS UNIT TEAM AVE. OUTPUT - HOURS / UNIT
NO. DESCRIPTION DIMENSION COMPONENTS

8 Control Joint 300mm thick Linear 0.10 0.00 Hr /


(PVC or wall Meters Linear
Rubber) Meters

9 Rebar Joint, ≤ 12mm bars Kilograms 1.00 Mason 0.05 0.00 Hr /


horizontal 2.00 Laborer Kilograms
placement

10 Rebar Joint, 16mm & 20mm Kilograms 0.03 0.00 Hr /


horizontal bars Kilograms
placement

11 Rebar Joint, ≤ 12mm bars Kilograms 0.07 0.00 Hr /


vertical Kilograms
placement

12 Rebar Joint, 16mm & 20mm Kilograms 0.04 0.00 Hr /


vertical bars Kilograms
placement

13 Reinforcing ≤ 150mm Wide Linear 0.01 0.00 Hr /


Wire Strip Meters Linear
Meters

14 Reinforcing ≥150mm & Linear 0.02 0.00 Hr /


Wire Strip ≤300mm Wide Meters Linear
Meters

/
ITEM ACTIVITY / SIZE / REMARKS UNIT TEAM AVE. OUTPUT - HOURS / UNIT
NO. DESCRIPTION DIMENSION COMPONENTS

15 Cavity Truss ≤ 150mm Wide Linear 0.01 0.00 Hr /


Meters Linear
Meters

16 Cavity Truss ≥150mm & Linear 0.02 0.00 Hr /


≤300mm Wide Meters Linear
Meters

GROUTING AND MORTAR

ITEM ACTIVITY / SIZE / REMARKS UNIT TEAM AVE. OUTPUT - HOURS / UNIT
NO. DESCRIPTION DIMENSION COMPONENTS

LABOR EQUIPMENT UNIT

1 Mortar w/ 1:1:6 Mix Cubic 0.125 Foreman 4.69 1.50 Hr /


masonry (type M) Meters 1.000 Mason Cubic
cement, field 2.000 Laborer Meters
mix 1.000 Batch
Mixer


/
ITEM ACTIVITY / SIZE / REMARKS UNIT TEAM AVE. OUTPUT - HOURS / UNIT
NO. DESCRIPTION DIMENSION COMPONENTS

2 Mortar w/ 1:3 Mix Cubic 4.69 1.50 Hr /


masonry (type N) Meters Cubic
cement, field Meters
mix

3 Mortar w/ 1:1/4:3 Mix Cubic 4.69 1.50 Hr /


portland (type M) Meters Cubic
cement and Meters
lime, field mix

4 Mortar w/ 1:1:16 Mix Cubic 4.69 1.50 Hr /


portland (type N) Meters Cubic
cement and Meters
lime, field mix

5 Grouting CHB 100mm thick Square 1.000 Mason 0.80 0.00 Hr /


by Hand Meters 1.000 Laborer Square
Meters

6 Grouting CHB 150mm thick Square 1.00 Mason 0.26 0.19 Hr /


by pump Meters 2.00 Laborer Square
1.00 Light Meters
Eqpt.
7 Grouting CHB 200mm thick Square Opt. 0.35 0.26 Hr /
by pump Meters 1.00 Grouting Square

Pump Meters
Set

/
ITEM ACTIVITY / SIZE / REMARKS UNIT TEAM AVE. OUTPUT - HOURS / UNIT
NO. DESCRIPTION DIMENSION COMPONENTS

8 Grouting CHB 300mm thick Square 0.60 0.45 Hr /


by pump Meters Square
Meters

9 Grouting cavity 50mm Square 0.18 0.13 Hr /


walls Space Meters Square
Meters

10 Grouting cavity 75mm Square 0.26 0.20 Hr /


walls Space Meters Square
Meters

11 Grouting cavity 100mm Square 0.35 0.26 Hr /


walls Space Meters Square
Meters

12 Grouting cavity 150mm Square 0.52 0.39 Hr /


walls Space Meters Square
Meters

13 Grouting door 900mm x Opening 0.49 0.37 Hr /


frames 2100mm Opening

14 Grouting door 1800mm x Opening 0.70 0.53 Hr /


frames 2100mm Opening


/
HELP US

We want to improve this website so we need your help. Please send us your recommendations,
suggestion, and request. Click this for the SUGGESTION FORM PAGE.
(https://theprojectestimate.com/about-us/)

Don’t forget to hit Like and Share if this blog helped you.

FOLLOW US!

Please like and follow our Facebook page for social media updates.

facebook.com/theprojectestimate (https://www.facebook.com/theprojectestimate)

Share this:

 Twitter (https://www.theprojectestimate.com/masonry-work-productivity-rate/?share=twitter&nb=1)
 Facebook (https://www.theprojectestimate.com/masonry-work-productivity-rate/?share=facebook&nb=1)

Like this:

Loading...

RELATED CONTENT


/
(https://www.theprojectestimat (https://www.theprojectestimat (https://www.theprojectestimat
e.com/rebar-productivity-rate/) e.com/concrete-work- e.com/nail-price-list/)
Rebar Productivity Rate productivity-rate/) Nail Price List
(https://www.theprojectestimat Concrete Work Productivity (https://www.theprojectestimat
e.com/rebar-productivity-rate/) Rate e.com/nail-price-list/)
In "MAN-HOUR" (https://www.theprojectestimat In "COMMON"
e.com/concrete-work-
productivity-rate/)
In "MAN-HOUR"

 YOU MIGHT ALSO LIKE

(https://www.theprojectestimate (https://www.theprojectestimate
.com/rebar-productivity-rate/) .com/pipe-installation-man-
(https://www.theprojectestimate
hours/)
Rebar Productivity .com/concrete-work-
Rate Pipe Installation Man productivity-rate/)
(https://www.theprojec Hours
testimate.com/rebar- (https://www.theprojec Concrete Work
productivity-rate/) testimate.com/pipe- Productivity Rate
installation-man- (https://www.theprojec
 July 5, 2020
hours/) testimate.com/concret
e-work-productivity-
 February 10, 2020
rate/)
 July 12, 2020


/
Window Price List Toilet Fixture Price List Royal Cord Price List Rebar Productivity Rate
(https://www.theprojectestimate. (https://www.theprojectestimate. (https://www.theprojectestimate. (https://www.theprojectestimate.
com/windows-price-list/) com/toilet-fixture-price-list/) com/royal-cord-price-list/) com/rebar-productivity-rate/)
Window type varies differently Toilet fixture price list include Royal cord price list ranges The data written below for rebar
depending on the […] common fixtures that […] from size 2.00 (two) […] productivity rate are […]

Copyright © 2020 TheProjectEstimate.com Privacy Policy (https://www.theprojectestimate.com/wpautoterms/privacy-policy-


2/) |
ABOUT US (https://www.theprojectestimate.com/about-us/) |
CONTACT US (https://www.theprojectestimate.com/contact-us/) |
Terms and Conditions (https://www.theprojectestimate.com/wpautoterms/terms-
and-conditions/)

Terms and Conditions (https://www.theprojectestimate.com/wpautoterms/terms-and-conditions/) - Privacy Policy


(https://www.theprojectestimate.com/wpautoterms/privacy-policy-2/)


/

You might also like