Document No.

Serial No.
SECMC-PROJ-CPSCHK-
CPS -
001
Inspector Name Date Time

Comprehensive Pumping Station

OPERATIONAL STATUS ( ✓ or X )

FW Tank (1,2) ( , ) PW Tanks (1,2) ( , )


FWI Network FWL Network
Jockey Pumps (1,2) ( , ) FWL Pumps (1,2,3) ( , , )
FWI Main Pumps (1,2,3) ( , , ) PW Pumps (1,2,4,5) ( , , , , )

RESERVOIRS WATER LEVELS (m)

FW Tank – 1 PW Tank – 1
FW Tank – 2 PW Tank – 2
Level Gauges
Level Gauges Verification
Verification

OPERATIONAL PARAMETERS

FWI P @ Comprehensive FWI P @ Diesel Storage


FWL P @ Comprehensive PW SP @ Comprehensive
Jockey Pump–1 (Cut In/Out) Jockey Pump–2 (Cut
In/Out)
FWI M . Pumps Interlocked? ( Y / N ) FWL Pumps Interlocked? ( Y / N )
PW Totalizer, 12 p.m.
Diesel Tank Level ___ Out of 1.2 m
(m3)

REMARKS

CREDENTIALS

Inspector Signature Area Owner / Area Manager