ACTIVITY : DATE :
INSPECTION LEVEL
METHOD OF
NO. ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING DOCUMENT TIME INSPECTION/ FREQUENCY
INSPECTION Owner Contractor Consultant
- CAI-DWG-ME-DD-PL-GE-6001,
1 Irigation pumps Review, Visual - The Brand, Size, Dimension, kind of others
material accordance to material Approved
B Implementation Work
1 Install pipe Visual Daily
MS-ME-MECH-001, CAI-DWG-ME-DD-PL
2 Install the accessories Visual Daily
QC-ME-INS-006 M W SW
Visual, CAI-DWG-ME-DD-PL-P1-2001
3 Install pump Daily
Measurement
4 Cleaning material after working Visual Place should be clean from residual material - Daily SW SW SW
C TESTING
SW : Spot Witness Spot Witness, This activity may perform during perform during construction where interim measurements, and/or witness of activity normally take place, prior to final measurement or inspection being done
NAME : NAME :
SIGN : SIGN :
DATE: DATE:
FMR-QCL-09/R1
ECT SYMBOL
REMARK
0A
004-ITP-ME-2022
Inspection & Test Plan of Irigation Water Installation CHECKED Sheet: Of:
Project No. : MD - 2408 DATE PREPARED APPROVED BY
QC
Project : Cainiao Smart Logistic Warehouse 5/25/2022 Site QC Project Manager
Manager
Responsbility*
No Item Description/Inspection Activity & Test Plan Method of Inspection Acceptance Criteria / Reference Verifying Document Time Inspection / Frequency Remarks
Murinda BNBV CN
Irigation Water Installation
A Prepare Material
- CAI-DWG-ME-DD-PL-GE-6001,
1 Irigation pumps Review, Visual - The Brand, Size, Dimension, kind of others material
accordance to material Approved
B Implementation Work
1 Install pipe Visual Daily
MS-ME-MECH-001, CAI-DWG-ME-DD-PL
2 Install the accessories Visual QC-ME-INS-006 Daily M W SW
3 Install pump Visual, Measurement CAI-DWG-ME-DD-PL-P1-2001 Daily
4 Cleaning material after working Visual Place should be clean from residual material - Daily SW SW SW
C TESTING
Review, Visual, Pressure test on clean water pipe is 1.5 x 3.5 bar = 5,25
1 Pressure Test QC-ME-TST-002 Per as execution SW W W
Measurement bar = 6 bar
* Legend :
Location :
Ref. Drawing :
Start Finish
Installation : Installation :
Location : Location :
Date : Date :
Duration : Duration :
Time : WIB Time : WIB
Pressure : Bars Pressure : Bars
Weather : Weather :
Media test : Media test :
Note: Note:
Comments Conclusions:
Approved
Approved w/ comments
Not approved
Commented & Resubmitted
Signature
Date
Attached : Date:
QC-ME-TST-004
CAINIAO SMART LOGISTIC
WAREHOUSE PROJECT Doc.No. : Page: 00 of 00
Reference Drawing :
Result Result
No. Cable No. Remark No. Cable No. Remark
Pass Fail Pass Fail
Signature
Date
Attached : Date:
QC-ME-TST-005
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT
Doc.No. : Page: 00 of 00
Subject : Insulation Resistance Test / Megger Test Insulation - 1 Phase Project No. MD2408
Location :
Ref. Drawing :
Signature
Date
Attached : Date:
QC-ME-TST-006
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT Doc.No. : Page: 00 of 00
Subject : Insulation Resistance Test / Megger Test Insulation - 3 Phase Project No. MD2408
Location :
Reference Drawing :
Signature
Date
Attached : Date:
QC-ME-INS-006
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT Doc.No. : Page: 00 of 00
Ref. Drawing :
RESULT
No. ITEM TO CHECKED REMARKS
YES NO
INSTALLATION
1 Brand, dimensions and installation according to specifications
2 The installation of the pipe sparing & sleeve is according to the drawing.
3 Installation of piping does not leak, straight and parallel.
4 Installation & flange dimensions are according to specifications.
5 Valve installation (Gate valve, Check valve etc.)
6 The position of the pressure gauge has been installed properly and correctly
7 Installation of air venting is done
8 Installation of hanger/pipe support is sturdy and safe.
9 Painting / labeling the pipe is correct.
10 Grouting work is done.
Notes :
NAME
SIGNATURE
DATE
Attached : Date:
QC-ME-GEN-002
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT Doc.No. : Page: 00 of 00
Ref. Drawing :
Remarks
No. Description Comments
Applicable (A) Not Applicable (NA)
8 Colour is appropriate
Notes :
NAME
SIGNATURE
DATE