A Prepare Material
1 Lighting Visual CAI-DWG-EL-DD-LT, CAI-TS-EP-01, CAI-
TS-ELV-01, The Brand, Size, Dimension,
2 Cable Visual QC-ME-GEN-002 Per as execution M W SW
kind of others material accordance to material
3 Conduit pipe Visual Approved
B Implementation Work
- MS-ME-EL-002,
- CAI-DWG-EL-DD-LT
1 Install the conduit pipe Visual - straight and tidy, QC-ME-INS-013 Daily
- the distance of conduit is the same
- tightly and fix on the concrete
- MS-ME-EL-002,
- CAI-DWG-EL-DD-LT
2 install the lighting cable Visual - put in the conduit Daily M W SW
- spare cable for connection to the lights must
be enough
QC-ME-INS-014
- MS-ME-EL-002,
3 Install lights - CAI-DWG-EL-DD-LT Daily
- tidy, leveling, and straight
4 Cleaning material after working Visual Place should be clean from residual material - Daily SW SW SW
C TESTING
Review, Visual,
1 Megger Test CAI-TS-EP-01, MS-ME-EL-010 QC-ME-TST-005 Per as execution SW W W
Measurement
Review, Visual,
2 Function test & Grouping accordance to shop drawing approved Wiring diagram & Layout Mapping Per as execution
Measurement
SW : Spot Witness Spot Witness, This activity may perform during perform during construction where interim measurements, and/or witness of activity normally take place, prior to final measurement or inspection being done
NAME : NAME :
SIGN : SIGN :
DATE: DATE:
PROJECT NAME PROJECT SYMBOL
ACTIVITY : DATE :
INSPECTION LEVEL
METHOD OF
NO. ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING DOCUMENT TIME INSPECTION/ FREQUENCY
INSPECTION Owner Contractor Consultant
FMR-QCL-09/R1
ECT SYMBOL
REMARK
0A
011-ITP-ME-2022
Inspection & Test Plan of Lighting Installation CHECKED Sheet: Of:
Project No. : MD - 2408 DATE PREPARED APPROVED BY
QC
Project : Cainiao Smart Logistic Warehouse 5/25/2022 Site QC Project Manager
Manager
Responsbility*
No Item Description/Inspection Activity & Test Plan Method of Inspection Acceptance Criteria / Reference Verifying Document Time Inspection / Frequency Remarks
Murinda BNBV CN
Lighting Installation
A Prepare Material
1 Lighting Visual CAI-DWG-EL-DD-LT, CAI-TS-EP-01, CAI-TS-
2 Cable Visual ELV-01, The Brand, Size, Dimension, kind of others QC-ME-GEN-002 Per as execution M W SW
3 Conduit pipe Visual material accordance to material Approved
B Implementation Work
- MS-ME-EL-002,
- CAI-DWG-EL-DD-LT
1 Install the conduit pipe Visual - straight and tidy, QC-ME-INS-013 Daily
- the distance of conduit is the same
- tightly and fix on the concrete
- MS-ME-EL-002,
- CAI-DWG-EL-DD-LT
2 install the lighting cable Visual - put in the conduit Daily M W SW
- spare cable for connection to the lights must be
enough
QC-ME-INS-014
- MS-ME-EL-002,
3 Install lights - CAI-DWG-EL-DD-LT Daily
- tidy, leveling, and straight
4 Cleaning material after working Visual Place should be clean from residual material - Daily SW SW SW
C TESTING
Review, Visual,
1 Megger Test CAI-TS-EP-01, MS-ME-EL-010 QC-ME-TST-005 Per as execution SW W W
Measurement
Review, Visual,
2 Function test & Grouping accordance to shop drawing approved Wiring diagram & Layout Mapping Per as execution
Measurement
* Legend :
Subject : Conduit Metal (GI) & PVC Installation Project No. MD2408
Location :
Reference Drawing :
RESULT
No. ITEM TO CHECKED REMARKS
YES NO
A General
1 Check the layout according to the shop drawing approved.
2 Check material of conduit pipe is in accordance with specifications
3 Check the size of the conduit pipe according to the shop drawing approved.
B Instalation
1 Check that the conduit pipe installed on the ladder / tray cable is appropriate
Check that the cable installed in the ladder is in accordance with its radius and
2
position
Check all conduit that comes out of the ladder must be from the side and use a
3
gland
Notes :
NAME
SIGNATURE
DATE
Attached : Date:
QC-ME-INS-014
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT
Doc.No. : Page: 00 of 00
Location :
Reference Drawing :
RESULT
No. ITEM TO CHECKED REMARKS
YES NO
1 Outlet position and cleanliness
2 Switch material
3 Contact stop material
4 Cable material
5 Cable rack material
6 Hangers and cable rack tidiness
7 Cable specifications according to specifications
8 Cable layout according to the drawing
9 All connectors are firmly attached
10 Grounding according to specifications
Notes :
NAME
SIGNATURE
DATE
Attached : Date:
QC-ME-GEN-002
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT Doc.No. : Page: 00 of 00
Ref. Drawing :
Remarks
No. Description Comments
Applicable (A) Not Applicable (NA)
8 Colour is appropriate
Notes :
NAME
SIGNATURE
DATE
Attached : Date:
QC-ME-TST-005
CAINIAO SMART LOGISTIC WAREHOUSE PROJECT
Doc.No. : Page: 00 of 00
Subject : Insulation Resistance Test / Megger Test Insulation - 1 Phase Project No. MD2408
Location :
Ref. Drawing :
Signature
Date