To,
Executive Engineer
HVPNL
Panchkula & Ambala
Subject:- Regarding Charging of 66kv S/s 12 th cross road Ambala cantt & Raipur Rani
Taparian (66 kv Sub-Station)
Dear Sir,
With respect to above mentioned subject we want to bring in your consideration that
the 1X25 31.5 MVA (Ambala Cant) & 1X 12.5/16 MVA (Taparian) 66/11 KV T/F
alongwith allied equipments. The Site was also inspected by CEI Haryana and
clearance had been given to us on 31.10.2020. The Site had been tested and
commissioned by us and the same was witnessed by M&P team on 31.10.2020
So it is again requested that please provide 66 Kv Line so that Transformer along with
allied equipments can be enerzied as we will not be able to re-centrifuze the
transformer again. Further delay regarding LD Deduction will be not be borne by us.
Thanking you
Thanking you