Pending Industry Connections-South Zone

Total No. of Pending Due to


Sr. Pending Due to Shortage of LT/CT Sets 3-Phase
Circle Connections Shortage of
No. Meters
Pending 100/5 200/5 Total CT/PT Units
1 Patiala 37 5 0 5 5 0
2 Sangrur 38 11 2 13 7 7
3 Barnala 38 13 2 15 1 6
4 Ropar 27 7 3 10 0 0
5 Mohali 47 13 4 17 6 0
Total 187 49 11 60 19 13
Pending Industrial Connections-South Zone as on 13.09.23
Due date of
Date of Category Applied Release of
Sr.
Circle Divison Subdivision Name & Address of Applicant Receipt of SP-MS-LS- Load in connection as Reason for Pending connection
No.
Test Report BS-others (KW) per PSPCL
Schedule
As per feasibility condition connection can only be
released after stringing of 2nd ckt of 66 KV Kharar-
1 Ropar Kharar S U Morinda M/S Cheema Boilers Ltd, Banmajra 16-Mar-23 LS 1177 KW 30-Apr-23
Kurali line and Augmentation of 100 MVA P.TF
installed at 220 KV Kharar S/stn with 160 MVA.

As per feasibility condition connection can only be


M/S Rb Forging Pvt. Ltd, Focal Point released after stringing of 2nd ckt of 66 KV Kharar-
2 Ropar Kharar Kurali 3-Apr-23 LS 300 KW 18-May-23
Chanalon Kurali line and Augmentation of 100 MVA P.TF
installed at 220 KV Kharar S/stn with 160 MVA.
Anandpur Kulwinder Kumar S/O Ashok Kumar Vill
3 Ropar Nurpur Bedi 12-Apr-23 MS 44.85 27-May-23 Stay granted by Court regarding Right of Way
Sahib Saini Majra
4 Ropar Kharar City Morinda Sde Dwss Nanowal, Bassi Pathana 25-Apr-23 LS 450 KW 9-Jun-23 CEI clearence report Pending from Consumer.

5 Ropar Kharar S U Kharar M/S A G A Agrotech Vill. Bassian 16-May-23 MS 35 KW 30-Jun-23 LTCT Set100/5 & meter Required
M/S Managing Director Milk Plant Ind Area 2500 TO
6 Mohali Spl.Mohali Tech-1 1-Jun-23 LS TO LS 1-Jul-23 Feeder erection is in progress-11 kv verka
Ph-6 Mohali 3500 KW
M/S. Shaktimaan Rub Rolls (P) Ltd., Village 1850+350=
7 Mohali Lalru Saidpura 10-Jun-23 LS Ext. Test Report Awaited from consumers-Notice issued
Behra 2200
aup mMfl kilAwx ivKy ibnYkwr v`loN ilK ky id`qw igAw hY
Harpreet Singh S/O Gehna Singh Village ik Kyq ivc Psl KVI hox kwrx ieh kunyksn Psl dI
8 Patiala East Kalyan 14-Jun-23 SP 2.519 29-Jul-23
Fatehpur (Poultry Farm) ktweI qoN bwAd jwrI kIqw jwvy[ ies sbMDI mYnMu koeI
ieqrwj nhI hY[
Sh. Gopal Ji Oil & Fabrications Vill All Material drawn. Work order assigned to M/s
9 Ropar Kharar Kurali 15-Jun-23 MS 65 KW 30-Jul-23
Bhagowal Boparai Contractor on 30.08.23.
Almico (Artificial Limbs) Mfg. Corporation Back Reffered as consumer has not made payemnt
10 Ropar Kharar Kurali 15-Jun-23 MS 120 KW 30-Jul-23
Of India, A-1 To 4 , Fp Chanalon towards slow meter charges.
11 Sangrur Lehragaga Banga Bittu Singh S/O Prem Chand Dehla 19-Jun-23 MS 31.87 18-Jul-23 Req. of LT/CT 100/5
Sh. Sukhjit Singh S/O Sh. Charan Singh Vill.
12 Ropar Kharar S U Morinda 20-Jun-23 MS 44 KW 4-Aug-23 LTCT Set100/5 & meter Required
Marauli Kalan
Sub Urban
13 Barnala Bhadaur Gurpreet Singh Dhaliwal Talwandi 21-Jun-23 SP 13 07.08.2023 Pending due to Paddy crop
Barnala
99+200=
14 Mohali Lalru Saidpura M/S. Raj Gears Pvt. Ltd., Village Behra 21-Jun-23 MS to LS Test Report Awaited from consumers-Notice issued
299
Sub Urban Ramandeep Kaur W/O Gurpreet Singh
15 Barnala Tapa-1 23-Jun-23 SP to MS 20+21=41 09.08.2023 LTCT Pending
Barnala Maur Nabha
10.154 KW
16 Mohali Spl.Mohali Tech-2 Amitabh Sachdeva, P.No-F-343, I/A, Ph-8B 26-Jun-23 SP TO MS TO 29.984 2-Jul-23 LTCT Set100/5 & meter pending
KW
Due date of
Date of Category Applied Release of
Sr.
Circle Divison Subdivision Name & Address of Applicant Receipt of SP-MS-LS- Load in connection as Reason for Pending connection
No.
Test Report BS-others (KW) per PSPCL
Schedule
15.000 KW
17 Mohali Spl.Mohali Tech-2 Sunita Gupta, P.No-F-426, I/A, Ph-8B 26-Jun-23 SP TO MS TO 48.460 26-Jul-23 LTCT Set100/5 & meter pending
KW
M/S Veermdass S/O Makit Singh Vill.
18 Sangrur Dirba Nadampur 26-Jun-23 SP TO MS 48 25-Jul-23 Req. of LT/CT 100/5
Noorpura
19.646 to
19 Barnala Dhuri City Dhuri Mohmd Nasir S/O Fakriya(City Dhuri) 30-Jun-23 SP TO MS 29-Jul-23 LT CT not available
30.646
Sub Urban Naveen Kumar S/O Chaman Lal ,Baja Khana 18 KW TO
20 Barnala (S) Barnala 1-Jul-23 MS 16.08.2023 LTCT Pending
Barnala Road Barnala 27 KW
21 Mohali Lalru Mubarikpur M/S. Crop Care Pesticides, Mubarikpur 3-Jul-23 MS 99.98 4-Aug-23 WIP-- LT/CT Drawn
Parwinder Kaur / Harjinder Singh Vill.
22 Sangrur Dirba Sub Dirba 3-Jul-23 MS 30 31-Jul-23 Req. of LT/CT 100/5
Kadial
M/S. Arzoo Resort Pvt. Ltd.,Village
23 Mohali Lalru Mubarikpur 4-Jul-23 NRS Ext. 250 4-May-23 Work in progress and CT/PT Unit 10/5Amp.required
Mubarikpur
150 KW 90
Sub Urban Rekha Garg /Binder Kumar, Sekha Road
24 Barnala (S) Barnala 5-Jul-23 MS KW 20.08.2023 LTCT Pending
Barnala Near Kothe Rangiya Barnala
(100KVA)
Senior Case pending and Meter ,100/5 LT/CT Set
25 Mohali Lalru Mubarikpur M/S. Mayank Mahajan, Mubarikpur 6-Jul-23 MS 40 7-Aug-23
required.
Anandpur Avtar Singh S/O Sh. Ranjit Singh Village
26 Ropar Kiratpur Sahib 7-Jul-23 SP 6.841 21-Aug-23 Work in Progress
Sahib Lakher
Rohit Bansal S/O Parkash Chand Sanghera
27 Barnala City Barnala Sanghera 12-Jul-23 MS 35 26.08.2023 Work in Progress
Road Barnala
M/S Shri Ram Feed Industry Samuran Road
28 Sangrur Dirba City Dirba 12-Jul-23 MS 88 11-Aug-23 Req. of LT/CT 200/5
Dirba
Sub Urban Sanjeev Kumar C/O Guru Kirpa Bus Body
29 Barnala Bhadaur 14-Jul-23 SP 20 04.09.2023 3-Phase meter pending
Barnala Builder Jangiana
30 Sangrur Patran City Patran S/D Office Market Committee Patran 17-Jul-23 SP TO MS 19 TO 30 16-Aug-23 Req. of LT/CT 100/5
31 Sangrur Sangrur Bhawanigarh Nirmal Das, Panwa 17-Jul-23 MS 29.65 16-Aug-23 Req. of LT/CT 100/5
Sub Urban
32 Barnala Bhadaur Kuldeep Parkash C/O Jujaarv Body Builder 18-Jul-23 SP 20 KW 08.09.2023 3-Phase meter pending
Barnala
Sh. Darshan Singh S/O Sh. Santokh Singh
33 Ropar Kharar Kurali 18-Jul-23 MS 80 KW 1-Sep-23 LT CT Meter 200/5 Amp Required.
Vill.
Sh. Ramesh Monga S/O Sh. Gian Chand
34 Ropar Kharar Kurali 18-Jul-23 SP 27 KW 1-Sep-23 LT CT Meter 100/5 Amp Required.
Monga Vill. Focal Point Chanalon (Sp Extn).

35 Sangrur Patran Khanouri Vinod Kumar S/O Om Parkash 18-Jul-23 MS 28 17-Aug-23 Req. of LT/CT 100/5

36 Sangrur Patran Khanouri Om Parkash S/O Ran Singh 18-Jul-23 MS 28 17-Aug-23 Req. of LT/CT 100/5
Due date of
Date of Category Applied Release of
Sr.
Circle Divison Subdivision Name & Address of Applicant Receipt of SP-MS-LS- Load in connection as Reason for Pending connection
No.
Test Report BS-others (KW) per PSPCL
Schedule

As per feasibility condition connection can only be


released after Augmentation of existing single circuit
of 0.15 Sq Inch with equivalent HTLS conductor on
existing D/c towers (Approx 12.4 Ckt Km.SC) of 66
M/S Vibracoustic India Pvt. Ltd (Frcci Unit-
37 Ropar Kharar S U Morinda 24-Jul-23 LS 11000 KW 7-Sep-23 KV Kharar-Morinda line, Deloading of 66 KV Gharuan
1)
S/stn by augmenting exiting 10/12.5 MVA P/tf with
20 MVA P/tf &Extension of Control Building of 66 KV
Gharuan S/stn. WORK IN PROGRESS. 3/C XLPE 150
MM2=3900 mtr and 11 mtr poles=150 No.required,

As per feasibility condition connection can only be


released after Augmentation of existing single circuit
of 0.15 Sq Inch with equivalent HTLS conductor on
existing D/c towers (Approx 12.4 Ckt Km.SC) of 66
M/S Freudenberg Nok India Pvt. Ltd (Frcci
38 Ropar Kharar S U Morinda 24-Jul-23 LS 11000 KW 7-Sep-23 KV Kharar-Morinda line, Deloading of 66 KV Gharuan
Unit-2)
S/stn by augmenting exiting 10/12.5 MVA P/tf with
20 MVA P/tf &Extension of Control Building of 66 KV
Gharuan S/stn. WORK IN PROGRESS. 3/C XLPE 150
MM2=3900 mtr and 11 mtr poles=11 No.required

39 Barnala Malerkotla Sub Urban M/S Kamla Maitals Pvt.Ltd.Dhuri Roaf 25-Jul-23 MS 95.635 24.09.2023 LTCT 200/5
40 Patiala West North Mr. Bhusan Kumar, D-187, Focal Point 25-Jul-23 NEW MS 60 24-Aug-23 LT CT 100/5 A is required
41 Patiala West West Manpreet Singh 25-Jul-23 sp to ms 12.40 to 40 25-Aug-23 LT CT 100/5 A is required
M/S. Shri Sidhi Vinayak Enterprises Village 98.760+51= Pending due to non-availbility of CT/PT Unit
42 Mohali Lalru Saidpura 26-Jul-23 MS to LS 26-Aug-23
Kuranwala 149.760 10/5Amp.
Sh. Satish Jain S/O Sh. Hukum Chand Village 79.950+370 Pending due to non-availbility of CT/PT Unit
43 Mohali Lalru Saidpura 26-Jul-23 MS to LS 26-Aug-23
Rampur Sainian .050=450 10/5Amp.
Sh. Surinder Singh S/O Sh. Hardial Singh
44 Mohali Lalru Saidpura 26-Jul-23 SP 8 26-Aug-23 Pending due to 3 Phase meter
Village Kuranwala
Sh. Rohan Chuchra S/O Sh. Ajay Kumar Pending due to non-availbility of CT/PT Unit
45 Mohali Lalru Saidpura 27-Jul-23 MS to LS 99+41=140 27-Jul-23
Village Rampur Saini 10/5Amp.
M/S. Aradhya Enterprises Village
46 Mohali Lalru Saidpura 28-Jul-23 SP 19.97 28-Aug-23 Pending due to 3 Phase meter
Kuranwala
Sukhdev Singh S/O Bachan Singh
47 Barnala City Barnala Sanghera 1-Aug-23 MS 28 14.09.2023 LTCT 100/5
Karamgarh
Sub Urban Pending at Division Reminder-2 issued vide memo
48 Barnala Sehna Sachin Singla C/O M/S Singla Solvent Plant 2-Aug-23 GI 200 17-Aug-23
Barnala no.6392 dtd. 12/09/23
Senior Case pending and Meter ,100/5 LT/CT Set
49 Mohali Lalru Mubarikpur Smt. Sunita Mahajan, Mubarikpur 2-Aug-23 MS 39.95 3-Sep-23
required.
Anandpur Lovedeep Singh S/O Gurbhag Singh Vill
50 Ropar Kiratpur Sahib 2-Aug-23 SP 3.966 16-Sep-23 Work in Progress
Sahib Bhaowal
Due date of
Date of Category Applied Release of
Sr.
Circle Divison Subdivision Name & Address of Applicant Receipt of SP-MS-LS- Load in connection as Reason for Pending connection
No.
Test Report BS-others (KW) per PSPCL
Schedule
20 To 45
51 Sangrur Dirba Sub Dirba M/S Rm Agro Industry Kohrian Road Dirba 2-Aug-23 SP to MS 1-Sep-23 Req. of LT/CT 100/5
KW
52 Sangrur Patran City Patran Sita Ram S/O Jai Ram Hariou Khurad 2-Aug-23 SP TO MS 19 TO 27 1-Sep-23 Req. of LT/CT 100/5
Surjeet Singh S/O Jaswant Singh Village
53 Patiala East Cantt 2-Aug-23 SP 4.849 17-Sep-23 90% work completed
Rawas Brahmna
5.93 KW TO
54 Mohali Spl.Mohali Tech-1 S.K. Talwar, C-71, Ph-6, I/A, Mohali 3-Aug-23 SP TO MS 3-Sep-23 LTCT Set100/5 & meter pending
49.000 KW
55 Mohali Lalru Mubarikpur M/S. Chairman Gpwsc, Mubarikpur 4-Aug-23 MS 23.96 5-Sep-23 Work in progress
56 Patiala Samana City Samana Sanjay Kumar S/O Nattu Ram 4-Aug-23 LS 180 18-Sep-23 CTPT 20/5 AMP Req
Sandeep Kaur/Ramandeep Singh
57 Barnala Dhuri Bhalwan 6-Aug-23 SP(New) 15 5.9.23 Meter installation Pending-3 ph Meters
,Harchandpur (Bhakwan)
1499.99+10
M/S Saurav Chemicals Ltd.
58 Mohali Lalru Saidpura 7-Aug-23 LS Ext. 00= 8-Sep-23 Extenstion of Control room pending
Vill. Bhagwanpur
2499.99
885.76KW/ CEI clearance recevied on dt 11.09.2023. CTPT is
59 Patiala Sub Urban Ghanour-2 Sde Dwss Village Ghanour 7-Aug-23 LS 948.178KV 22-Sep-23 withdrawn from ME and connection will be released
A before due date
Sub Urban Amarjeet Singh S/O Mohinder Singh
60 Barnala Bhadaur 8-Aug-23 SP 19 23.09.2023 3-Phase meter pending
Barnala Bhadaur
61 Sangrur Sangrur Badrukhan Jai Maa Industries, Sangrur 8-Aug-23 LS 280 KW 22-Sep-23 CT/PT 20/5A Required
62 Sangrur Sangrur Sub Urban Kuldeep Singh Vill. Laddi 8-Aug-23 MS 99 7-Sep-23 Req. of LT/CT 200/5
63 Sangrur Sangrur Sub Urban Shree Radhe Krishan Agro Food Product 8-Aug-23 LS 250 22-Sep-23 CT/PT 20/5A Required
64 Patiala West West Pawan Kumar 8-Aug-23 SP TO MS 26.75 8-Sep-23 Contractor awaited & LT CT 100/5 A is required
Work in progress. Connection will be released before
65 Patiala East Rohar Jagir Krishna Rice Mill Village Dudhan Gujjran 8-Aug-23 LS 251 23-Sep-23
due date
M/S Empire Packages (P) Ltd.Vill. 495+155=
66 Mohali Lalru Saidpura 9-Aug-23 LS Ext. 10-Sep-23 Senior case Pending.
Mahiwala 650
18.000 KW
67 Mohali Spl.Mohali Tech-2 Devinder Singh Grewal, P.No-370, Ph-9,I/A 9-Aug-23 SP TO MS TO 49.980 9-Sep-23 LTCT Set100/5 & meter pending
KW
19.930 KW
68 Mohali Spl.Mohali Tech-2 Jaswinder Singh Prabh, Ph-9, I/A 9-Aug-23 SP TO MS TO 29.650 9-Sep-23 LTCT Set100/5 & meter pending
KW
19.140 KW
69 Mohali Spl.Mohali Tech-2 Narinder Singh, P.No-498,I/A, Ph-9, Mohali 9-Aug-23 SP TO MS TO 40.000 9-Sep-23 LTCT Set100/5 & meter pending
KW
Shivam Steels, P.No-D-93, C, I/A, Ph-7,
70 Mohali Spl.Mohali Tech-2 9-Aug-23 NEW MS 24.00 KW 9-Sep-23 LTCT Set100/5 & meter pending
Mohali
Anandpur Gagandeep Singh S/O Sh. Gurnam Singh Vill
71 Ropar Nurpur Bedi 9-Aug-23 SP 2 23-Sep-23 Work in Progress
Sahib Bassi
Due date of
Date of Category Applied Release of
Sr.
Circle Divison Subdivision Name & Address of Applicant Receipt of SP-MS-LS- Load in connection as Reason for Pending connection
No.
Test Report BS-others (KW) per PSPCL
Schedule

72 Sangrur Patran City Patran Shyam Steel Ind Duggal 9-Aug-23 MS 90 8-Sep-23 Req. of LT/CT 200/5

73 Sangrur Patran City Patran Hr Oversea Duggal 9-Aug-23 LS 570 23-Sep-23 CT/PT 50/5A Required
M/S Nirmal Pet 600+390=
74 Mohali Lalru Saidpura 10-Aug-23 LS Ext. 11-Sep-23 Senior case Pending.
Vill. Bhagwanpur 990
Ravinder Kaur W/O Davinder Pal Singh, #1
75 Mohali Lalru Saidpura 10-Aug-23 LS 170 11-Sep-23 Senior case Pending.
Cci Park, Behra
Anandpur Sub Div Engg Water Supply & Sanitation
76 Ropar Bhanupli 10-Aug-23 SP 12.45 25-Sep-23 Work in Progress
Sahib Vill -Thaloo
1 no. connection senior to this connection required
77 Ropar Samrala Khamano Gupta Agro Indus., Farour 10-Aug-23 MS New 99 24-Sep-23 LT/CT set 100/5 which is not issued by ME Lab. So
this connection is pending due to seniority.
1.999+28=2
78 Barnala Malerkotla City2 Avtar Singh 11-Aug-23 SP TO MS 11.09.2023 LTCT 100/5
9.999
Pending due to LT/CT set 200/5 not issued by ME
79 Ropar Samrala Kohara Lazo Gupta W/O Ravi Gupta, Mangarh 11-Aug-23 MS New 90 25-Sep-23
lab.
Hygen Bio Tech. Seeds Pvt. Ltd., Koom Pending due to LT/CT set 100/5 not issued by ME
80 Ropar Samrala Kohara 11-Aug-23 MS New 39.638 25-Sep-23
Kalan lab.
Mrs Shree Ganesh Industries, C-121, Focal
81 Patiala West North 11-Aug-23 NEW MS 24.98 10-Sep-23 LT CT 100/5 A is required
Point
82 Patiala Sub Urban Ghanour-1 Rdr Industries Village Samaspur 11-Aug-23 LS 155KW 25-Sep-23 work in progress
Meter installation Pending(3 p whole current meter
83 Barnala Dhuri City Dhuri Eo Municipal Committee Dhuri (C-Dhuri) 12-Aug-23 SP(New) 7.46 11.09.23
not available in ME)
84 Barnala City Barnala Dhanaula-1 Anu Bansal W/O Ajay Kumar 14-Aug-23 MS 70 27.09.2023 LTCT 200/5
Sub Urban
85 Barnala Sehna Harchand Singh S/O Harbans Singh Sehna 14-Aug-23 SP 4 29.09.2023 3-Phase meter pending
Barnala
Pending due to 3/c XLPE Cable 35mm (40 Mtr.) and
86 Mohali Lalru Mubarikpur M/S. Ark Health Care, Mubarikpur 14-Aug-23 LS 350 15-Sep-23
CT/PT Unit 20/5Amp.
87 Sangrur Sangrur Badrukhan M/S Rama Nutrition , Ubhawal Road 14-Aug-23 LS 650 KW 28-Sep-23 Release will be 14.09.23
88 Patiala Rajpura Gajjukhera Sde Banur At Rajpura Ips Gajjukhera 14-Aug-23 MS NEW 85 28-Sep-23 CTPT 10/5 AMP Req
89 Patiala Samana City Samana Atharva Food 14-Aug-23 LS 495 28-Sep-23 work in progress
29.840 KW
90 Mohali Spl.Mohali Tech-2 Commendent 3Rd Batalion, Ph-11 16-Aug-23 MS/EXT TO 33.610 16-Sep-23 LTCT Set100/5 & meter pending
KW
91 Sangrur Patran Khanouri Sunita Devi W/O Rajesh Kumar 16-Aug-23 SP 15 15-Sep-23 3 Phase Meter required
Saggu Shutter & Agriculture Works,
92 Sangrur Sangrur Bhawanigarh 16-Aug-23 SP 7.987 15-Sep-23 3 Phase Meter required
Bhawanigarh
93 Barnala Malerkotla Sherwanikot Subhan / Mohd. Bilal Malerkotla 17-Aug-23 SP 15 1-Oct-23 work in progress
94 Sangrur Lehragaga Moonak Vikash Singh S/O Begraj V. Balran 17-Aug-23 SP To MS 12 To 35 16-Sep-23 Req. of LT/CT 100/5
Due date of
Date of Category Applied Release of
Sr.
Circle Divison Subdivision Name & Address of Applicant Receipt of SP-MS-LS- Load in connection as Reason for Pending connection
No.
Test Report BS-others (KW) per PSPCL
Schedule

95 Sangrur Patran Shatrana Sukhmani Food Shatrana 17-Aug-23 LS 540 1-Oct-23 CT/PT 50/5A Required

96 Patiala West West Aman Kumar 17-Aug-23 sp 4.456 16-Sep-23 work completed, will be released before due date
Jashandeep Singh S/O Suba Singh Jawanda
97 Barnala City Barnala Dhanaula-1 18-Aug-23 SP 10 30.9.2023 WCM 3-phase required
Pindi
98 Barnala Malerkotla Sub Urban M/S Joti Saports Idustri Nodhrani Road 18-Aug-23 MS 29.981 2-Oct-23 LTCT Required
Sh. Vinod Kumar Gupta S/O Sh. Lal Ji Gupta
99 Mohali Lalru Saidpura 18-Aug-23 SP 19.8 19-Sep-23 Senior case Pending.
Village Bhagwanpur
100 Sangrur Sangrur Badrukhan Shree Shyam Ji Agro Products, Badrukhan 18-Aug-23 LS 170 KW 2-Oct-23 CT/PT Drawn

101 Patiala Samana City Samana Shree Narayan Foods Bamna Kangarh Road 18-Aug-23 LS 495 12-Oct-23 Work in progress

102 Barnala Malerkotla Sub Urban Hardeep Singh S/O Jaswinder Singh Sangali 21-Aug-23 SP 4.746 20-Sep-23 Site Dispute (Line Erection)
M/S Yash Enterprises C/O Yash Pal, A-7, B,
103 Ropar Kharar Kurali 21-Aug-23 MS 99 KW 21-Oct-23 WORK IN PROGRESS
Focal Point, Chanalon
104 Sangrur Lehragaga Moonak Shri Hans Rice Exports. 21-Aug-23 LS EOL 180 TO 378 4-Oct-23 Today will be released
Luxmi Cotton And Recycling Plant Patiala
105 Patiala Samana City Samana 21-Aug-23 MS TO LS 89 TO 166 5-Oct-23 Work in progress
Road
106 Barnala Malerkotla Sherwanikot Muhammad Ali S/O Jubair Ali Barktpura 22-Aug-23 SP 7.882 6-Oct-23 work in progress
Anandpur Anandpur Amritpal Singh S/O Harminder Singh Vill
107 Ropar 22-Aug-23 SP 7.232 9-Oct-23 Work in Progress
Sahib Sahib Agampur
108 Sangrur Lehragaga Moonak Hanu Enterprises Chural Kalan 22-Aug-23 SP 18 21-Sep-23 3 Phase Meter required
19.96 TO
109 Sangrur Patran City Patran Jaspal Singh So Gurnam Singh Patran 22-Aug-23 SP TO MS 21-Sep-23 Req. of LT/CT 100/5
49.96
110 Sangrur Patran City Patran Ganesh Cold Store Dugal Kalan 22-Aug-23 MS 95 21-Sep-23 CT/PT 10/5A Required
15 To
111 Sangrur Sangrur Bhawanigarh Jai Ambe Rice Mill, Bhawanigarh 22-Aug-23 LS/EOL 21-Sep-23 CT/PT 20/5A Required
300KW
4/c 25 MM2 not available in store, rest work
112 Patiala West North Mr. Gurkirat Singh, Vill. Hassanpura 22-Aug-23 NEW SP 19.872 21-Sep-23
completed
113 Patiala Nabha Sub Urban Ranjeet Singh 22-Aug-23 MS new 45 6-Oct-23 100/5A LTCT required
114 Patiala Rajpura Sub Sde Dwss Naushera 22-Aug-23 MS NEW 146.7 6-Oct-23 CTPT 10/5 AMP REQ.
115 Patiala Samana City Samana Sarswati Enterprises Sehajpura Road 22-Aug-23 MS 92 6-Oct-23 CTPT 10/5 AMP Req
116 Barnala Malerkotla City2 Uday Jain 23-Aug-23 SP 18.98 23.09.2023 work in progress
117 Barnala Malerkotla Sandaur Ishar Singh 23-Aug-23 SP 20 7-Oct-23 work in progress
95.66+124.
118 Barnala Malerkotla Sub Urban Jai Durga Krafi Pap 23-Aug-23 LS 7-Oct-23 CTPT 20/5 required
34=220
119 Mohali Lalru Mubarikpur Smt. Salindero Devi , Mubarikpur 23-Aug-23 SP 20 24-Sep-23 Work in progress
Due date of
Date of Category Applied Release of
Sr.
Circle Divison Subdivision Name & Address of Applicant Receipt of SP-MS-LS- Load in connection as Reason for Pending connection
No.
Test Report BS-others (KW) per PSPCL
Schedule

120 Ropar Kharar Kurali M/S J R Foods, Vill. Akalgarh 23-Aug-23 LS 180 KW 23-Oct-23 Work in Progress

121 Ropar Kharar Kurali M/S G Square Agro, Vill. Akalgarh 23-Aug-23 LS 180 KW 23-Oct-23 Work in Progress
Rohit Kumar S/O Ramesh Kumar V.
122 Sangrur Lehragaga Banga 23-Aug-23 SP 9.28 22-Sep-23 3 Phase Meter required
Ramgarh Gujjran
123 Sangrur Patran Khanouri Vedpal S/O Hari Singh 23-Aug-23 SP 3.5 22-Sep-23 Tommarow will be released
124 Barnala Malerkotla City2 Mohd Akram 24-Aug-23 SP 4.72 23.09.2023 LTCT 100/5
125 Barnala Malerkotla City2 Mohd Ashraf 24-Aug-23 SP 11.962 23.09.2023 LTCT 100/5
Due date of
Date of Category Applied Release of
Sr.
Circle Divison Subdivision Name & Address of Applicant Receipt of SP-MS-LS- Load in connection as Reason for Pending connection
No.
Test Report BS-others (KW) per PSPCL
Schedule
126 Barnala Malerkotla City2 Abdul Azieeg 24-Aug-23 MS 44.998 23.09.2023 LTCT 100/5
Sub Urban
127 Barnala (S) Barnala Gopal Krishan S/O Madan Lal Garcha Road 24-Aug-23 Ext. MS 49 to 95 KW 08.10.2023 work in progress
Barnala
128 Mohali Spl.Mohali Tech-3 Avneet Sodhi P/No/ 1031 Sec 82 Mohali 24-Aug-23 Ms new 25 KW 24-Sep-23 LTCT Set100/5 & meter pending
Pending due to LT/CT set 100/5 not issued by ME
129 Ropar Samrala Kohara Amarjit Singh S/O Harnam Singh Bhagpur 24-Aug-23 MS New 48.857 7-Oct-23
lab.
Pending due to LT/CT set 100/5 not issued by ME
130 Ropar Samrala Kohara Shareya Spinners Vill. Gadhowal 24-Aug-23 MS New 39.859 11-Oct-23
lab.
131 Sangrur Lehragaga C-Lehra Avtar Singh S/O Bant Singh V. Haryau 24-Aug-23 SP 4 23-Sep-23
132 Sangrur Patran City Patran Shiv Rice Mills Dugal 24-Aug-23 LS EOL 122 TO 385 7-Oct-23 CT/PT 30/5A Required
133 Patiala Rajpura Sub-Urban Mr. Angrej Singh Vill. Shuron 24-Aug-23 SP 19.952 23-Sep-23 WORK IN PROGRESS
Hariyansh Industries Bhwanigarh Road
134 Patiala Samana City Samana 24-Aug-23 LS 34 TO 249 8-Oct-23 Work in progress
Bamna
135 Barnala City Barnala Dhanaula-1 Hardev Singh S/O Sohan Singh Dhanaula 25-Aug-23 SP 9 08.10.2023 work in progress

136 Mohali Lalru Saidpura M/S. Bassi Tubes (P) Ltd., Village Saidpura 25-Aug-23 SP 18.994 26-Sep-23 Senior case Pending.
Pending due to LT/CT set 200/5 not issued by ME
137 Ropar Samrala Kohara Acme Steel And Wires, Mehlon 25-Aug-23 MS New 99 8-Oct-23
lab.
138 Sangrur Lehragaga Moonak Chairaman Water Supply And Sanitation 25-Aug-23 SP 6 24-Sep-23
139 Sangrur Patran Khanouri Jai Bhagwati Rice Gram Gudyog 25-Aug-23 LS 180 8-Oct-23 Enforcement Checking Pending
485 TO 885
140 Sangrur Patran Su Patran Ganpati Foods Nial 25-Aug-23 LS EOL 8-Oct-23 Enforcement Checking Pending
KW
141 Sangrur Sangrur Sub Urban Chairman Gpwsc, Nanakpura 25-Aug-23 SP 6.795 24-Sep-23 3 Phase Meter required
142 Sangrur Sunam Cheema Mander Farms C/O Nirmal Singh 25-Aug-23 SP 8 24-Sep-23 3 Phase Meter required
143 Sangrur Sunam Cheema Gupta Rice Mills 25-Aug-23 LS EOL 130 to 220 9-Oct-23 CT/PT Drawn
Himalayan Creamry Pvt. Ltd. Vill. Rohti
144 Patiala Nabha Ghamrouda 25-Aug-23 MS to LS ext. 99 to 190 9-Oct-23 CTPT 20/5 AMP Req
Mauran
145 Patiala Samana City Samana Patiala Packeging Industry Gajewas 25-Aug-23 MS 98 9-Oct-23 Work in progress
146 Ropar Ropar Sukhrampur Kang Food Industry 26-Aug-23 LS 170 10-Oct-23 Work in Progress
149.94KW/
147 Patiala Sub Urban Ghanour-2 M/S Vishnu Rice Mills Village Bahawalpur 26-Aug-23 LS 10-Oct-23 90% work completed
150KVA
Tikeshwar Sharma /Raghunandan Sharma
148 Barnala Dhuri City Dhuri 28-Aug-23 SP(New) 15 27.09.23 work in progress
Dhuri
149 Barnala Dhuri City Dhuri Harpreet Singh/Kala Singh ,Dhuri(C-Dhuri) 28-Aug-23 SP(New) 19 27.09.23 work in progress

M/S Hari Krisana Enterpris Dhuri Road 17.340+19.


150 Barnala Malerkotla Sub Urban 28-Aug-23 SP TO MS 12-Oct-23 LTCT
Ratolan 260=49.308