Professional Documents
Culture Documents
3. Finish reference
exterior signage 5
Demo scope highlights:
1. Replace glazing/drive thru window
2. “Square” sloped piers
3. Widen workroom entry 6” +/-
4. Relocate entry
5. Demo restrooms/doors
6. Replace workroom door
7. Demo walk-in coolers
8. Replace electrical service (outside)
9. Existing columns to remain, but
demo furring
Demo Plan
Art
Backbar wall tile
Column/bearing wall
Seating Template
Existing New
Soft Seating 0 0
Café
0 6
Height
Banquette 0 0
Total 0 20
Proposed floorPage
plan
6
Backline: Frontline:
5. Brew XBRW 12 1. Espresso Bar XESP-43
6. Warming-dbl WRM 05-01 2. POS 13-01 Cubbies
7. CBS 11-01 WT 3. A foodcase Cup holders
8. DT POS-X35 4. Scale cabinet Trash
9. Backbar tile, cubbies,
menu boards, valance, and
under-cubby task lighting POS
• Dbl POS
• UC cup holders
1
LOWERED
HAND-OFF
PLANE
SCALE
• Safe
ESPRESSO • Scale
• (2) Mastrenas
• (2) Combo sinks 2 3 4
• (2) UC 1-dr fridge BREW
• (2) 45# ice bin • (3) Shuttles
• (2) cup labelers • Double brewer
• u/c cup holders • Grinder
• Trash drop
• Work sink
5 6
9 9
7 WARMING
CBS
• (2) Ovens on
• (2) Blenders
lowered cart
• 90lb. Ice bin
• UC Trash drop
DT POS • Blender pitcher rinser
• UC 1-dr fridge
• Dbl POS • (2) UC 1-dr fridge
• UC cup holders • Water tower
8
• UC 1-dr refrig
• Raised staging
• (4) outlets for
future carbonized
station
enlarged engine 7