When calculating project crashing, the ranking (crash sequence) of the activities is based
1 2
on? (a)Duration (b)Cost (c)Cost Slope (d)Criticality
A ____ is a set of activities which are networked in an order and aimed towards achieving the
2 1
goals of a project: a) Project b) Process c) Project management d) Project cycle

Organization structure suitable for project companies with diverse projects is: (a) Product
3 organization (b) Functional organization (c) Matrix organization (d) Projectised Organization 4

Which of the following is not considered a RISK in project management?


4 a)Change request b)Unclear requirements c)Flood/Fire d)Lack of communication 3
The authorized budget assigned for a scheduled work is called as - (a) Earned Value (b)
5 Planned Value (c) Budget (d) Cost 5

If sum of the variance along critical path is 25, then what should be the standard deviation: a)
6 3
1 b) 5 c) 15 d) 50
Which of the following is not a rule of network construction? (a) Each defined activity is
represented by one and only one arrow (b) A network should have only initial and one
7 terminal node (c) Identical initial and final nodes can identify two activities (d) D. Only as few 2
dummy activities should be included as is warranted.

Q4) The three phases involved in the management of large projects are (a) scheduling,
operating, evaluating (b) planning, scheduling, controlling (c) scheduling, designing,
8 1
operating (d) planning, scheduling, evaluating.

From the following calculate CPM in days :


Activity: 1-2 2-3 2-4 3-5 4-6 5-6
9 Duration : 4 4 3 3 1 2 a) 13 days b) 8 days c) 11 days d) 2
None of these
The probability of completing the project can be estimated based upon the _______ : a)
10 Uniform distribution curve b) Exponential distribution curve. c) U-shaped distribution curve d) 3
Normal distribution curve
Most conflicts have their roots in uncertainty and negotiation is a way of managing the (a)
11 4
Failure (b) Resultant Risk (c) Uncertainty (d) Inputs
If the Budgeted cost of a project is $200,000 and the total duration to complete is 10 months.
12 By end of 2 month, 10% of the project is completed with expenses of $60,000. What is the 5
SV? a)10,000 b)20,000 c)-10,0000 d)-20,000
Estimators for a project reports that the most optimistic time they feel that a task can be
completed is five days, the longest that they feel the task will take is fifteen days, the most
likely time the task will take is ten days, the average time for completing the task, based on
13 3
past experience is eight days. Using the PERT concept, calculate the expected duration of
the task.
a) Ten days b) Eight and one-half days c) Eight days d) Eleven days
If a stakeholder has high interest in your project and high power, then such stakeholders
14 should be managed with following action plan - (a) Keep Satisfied (b) Keep Informed (c) 1
Monitor Closely (d) Manage Closely
Representation of a project on paper is based on: (a) first-in-first out (b) work break down
15 structure (c) Pareto’s rule (d) Precedence logic 2
 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Home » Engineering » Civil Engineering » Construction Management » Section 1

Densification, Inc.

Dynamic Compaction Experts

Improving America, One Drop at a Time


densification.com

OPEN

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

41. If the total float and duration of an activity are 5 and 10 days respectively, the particular
activity can be
A.started 5 days later
B.completed 5 days later
C.performed at slower rate in 15 days
D.all the above.

Answer: Option D

Explanation:
No answer description available for this question. Let us discuss.
Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

42.  Works costing less than Rs. 20,000 are treated as


A.projects
B.major projects
C.minor projects
D.all the above.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

43.  A critical ratio scheduling


A.establishes the relative priorities among various activities on a common basis
B.determines the status of each activity
C.adjusts automatically changes in activity progress
D.is a dynamic system
E.none of these.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

44.  Bar charts are suitable for


A.minor works
B.major works
C.large projects
D.all the Above.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

45.  The first method invented for planning projects, was


A.Bar chart method
B.Milestone chart
C.Critical path method (CPM)
D.Programme Evaluation and Review Technique (PERT)

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

« Prev   1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
schuchart.com

Dynamic Compaction Contractors -


Signature Projects
Ad densification.com

Log, Post & Beam,


Timber Kit s
Ad Walston Tim ber Fram e

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

Top Civil Engg Courses -


Learn Cut t ing Edge
Learn Cut t ing-Edge
Skills
Ad skill-lync.com

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

Est imat ing and Cost ing


- Civil Engineering
Quest ions and…
indiabix.com

Est imat ing and Cost ing


- Civil Engineering
Quest ions and…
indiabix.com

Est imat ing and Cost ing


- Civil Engineering
Quest ions and…
indiabix.com

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

St rengt h of Mat erials -


Civil Engineering
Quest ions and…
indiabix.com

Ad
1. Const ruct ion Management Programs
2. Best Civil Engineering MCQ Book
3. Building Est imat ion & Cost ing

Read more:
Construction Management - Section 2

Current Affairs 2019, 2020

Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com


 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Home » Engineering » Civil Engineering » Construction Management » Section 1

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

36.  An Executive Engineer may have powers upto


A.Rs. 25,000
B.Rs. 50,000
C.Rs. 100,000
D.Rs. 200,000
E.Rs. 500,000

Answer: Option A

Explanation:
No answer description available for this question. Let us discuss.
Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

37.  The main principle of an organisation, is


A.unity of command
B.cohegency
C.effective control at all levels
D.delegation of authority
E.all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

38.  The estimated time required to perform an activity, is known as


A.event
B.dummy
C.duration
D.float.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

39.  A CPM family includes


A.CPA (Critical Path Analysis)
B.CPP (Critical Path Plotted)
C.MCE (Minimum Cost Expenditure)
D.CPS (Critical Path Scheduling)
E.All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

40.  The time which results in the leasi, possible construction cost of an activity, is known
A.normal time
B.slow time
C.crash time
D.standard time.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

« Prev   1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
schuchart.com

Highbridge - Historic Mortar Analysis


Ad highbridgem aterials.com

Trust ed Engineer
Consult ing
Ad MT Mechanical Group, LLC

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

Project Design and


Engineering
Ad TKO Engineering Solutions

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

Line Chart s - Dat a


Int erpret at ion Quest ions
and Answers
indiabix.com

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

St rengt h of Mat erials -


Civil Engineering
Quest ions and…
indiabix.com

St ruct ural Analysis -


Engineering Mechanics
Quest ions and Answers
indiabix.com

Est imat ing and Cost ing


- Civil Engineering
Quest ions and…
indiabix.com

Ad
1. Exam Answers Sit e
2. Civil Engineering MCQ App
3. Const ruct ion Management Curriculum

Read more:
Construction Management - Section 2

Current Affairs 2019, 2020

Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com


 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Home » Engineering » Civil Engineering » Construction Management » Section 1
Seattle Foundation Repair - Call Us for
Details
Seattle Foundation Repair

We Provide Basement Waterproofing and


Foundation Repair Services.

WEBSITE CALL

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

31.  Critical path lies along the activities having total float
A.positive
B.negative
C. zero
D.same.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

32.  Construction team means


A.an engineer
B.an architect
C. an owner
D.a contractor
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

33. Pick up the correct network for the activities of pouring concrete, erection of form work,
removal of form work and curing of concrete from the following:
A.1. Pouring of Concrete
2. Erection of form work
3. Curing of concrete
4. Removal of form work
1. Erection of form work
2. Pouring of concrete
B.
3. Curing of concrete
4. Removal of form work
1. Removal of form work
2. Erection of form work
C.
3. Pouring of concrete
4. Curing of concrete
1. Pouring of concrete
2. Curing of concrete
D.
3. Erection of form work
4. Removal of form work

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

34.  A construction schedule is prepared after collecting


A.number of operations
B.output of labour
C. output of machinery
D.quantity of various items
E. all the above.

Answer: Option E

Explanation:
No answer description available for this question. Let us discuss.
Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

35.  Site order book is used for recording


A.instructions by the executive engineers
B.construction measurements
C. issue of store equipments
D.names of the casual labour.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

« Prev   1 2 3 4 5 6 7 8 9 10 Next »
Call Us for Details
We Provide Our Services
to Both Residential and
Commercial Properties.

Ad

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Estimating and Costing


Section 2 - Civil
Section 2 - Civil
Engineering Questions…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

UPSC Civil Service Exam


Questions Section 24 -
Civil Engineering…
indiabix.com

UPSC Civil Service Exam


Questions Section 14 -
Civil Engineering…
indiabix.com

Industrial Engineering
and Production
Management -…
indiabix.com

Estimating and Costing -


Civil Engineering
Questions and Answers…
indiabix.com

Structural Analysis -
Engineering Mechanics
Questions and Answers
indiabix.com

Strength of Materials -
Civil Engineering
Questions and Answers…
indiabix.com

Ad
1. Construction Management Textbook
2. Civil Engineering MCQ for Practice
3. Exam Answers Site

Read more:

Construction Management - Section 2


Current Affairs 2019, 2020

Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com


 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Home » Engineering » Civil Engineering » Construction Management » Section 1

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

26. The difference between the time avail-to do a job and the time required to do the job, is
known as
A.event
B.float
C. duration
D.constraint.

Answer: Option B

Explanation:
No answer description available for this question. Let us discuss.
Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

27.  The object of technical planning, is


A.preparation of specifications
B.preparation of estimates
C. initiating the procurement action of resources
D.taking remedial action for likely bottleneck in the execution
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

28.  The salient feature of functional organisation is


A.strict adherence to specifications
B.separation of planning and design part
C. each individual maintains functional efficiency
D.work is properly planned and distributed
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

29. Critical path method


A.is an improvement upon bar chart method
B.provides a realistic approach to daily problems
C. avoids delays which are very common in bar charts
was invented by Morgan R. Walker of Dupot and James E. Kalley or Remington U.S.A. in
D.
1957
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace
Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

30.  CPM is
A.synthesising in concepts
B.is built of activities oriented programme
C. is based on time estimate
D.is used for repetitive works
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

« Prev   1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
nyserda.ny.gov

Ad

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com
Estimating and Costing
Section 2 - Civil
Engineering Questions…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Structural Analysis -
Engineering Mechanics
Questions and Answers
indiabix.com

Industrial Engineering
and Production
Management -…
indiabix.com

Strength of Materials -
Civil Engineering
Questions and Answers…
indiabix.com

Engineering Questions
and Answers
indiabix.com

Estimating and Costing -


Civil Engineering
Questions and Answers…
indiabix.com

GATE Exam Questions


Section 6 - Civil
Engineering Questions…
indiabix.com

Ad
1. Civil Engineering MCQ for Practice
2. Exam Answers Site
3. Construction Management Textbook

Read more:
Construction Management - Section 2

Current Affairs 2019, 2020

Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com


(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F)

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

1. The normal time required for the completion of project in the above problem is

A. 9 days

B. 13 days
Ad Historic Mortar Analysis
C. 14 days highbridgematerials.com Visit Site
D. 19 days

Answer & Solution Discuss in Board (https://www.examveda.com/the-normal-time-required-for-the-completion-of-project-in-the-above-problem-is-53239) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-normal-time-required-for-the-completion-of-project-in-
the-above-problem-is-53239)

2. If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the
expected time t of the activity will be

A. to + 3tm+ tp/3

B. to + 4tm+ tp/4

C. to + 4tm+ tp/5

D. to + 4tm+ tp/6

Answer & Solution

Discuss in Board (https://www.examveda.com/if-to-tp-and-tm-are-the-optimistic-pessimistic-and-most-likely-time-estimates-of-an-activity-respectively-the-expected-time-t-of-the-activity-will-


be-53240)

Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-to-tp-and-tm-are-the-optimistic-pessimistic-and-most-
likely-time-estimates-of-an-activity-respectively-the-expected-time-t-of-the-activity-will-be-53240)

3. A construction schedule is prepared after collecting

A. Number of operations

B. Output of labour

C. Output of machinery

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/a-construction-schedule-is-prepared-after-collecting-53241) Save for Later


Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-construction-schedule-is-prepared-after-collecting-53241)

4. If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time
and variance are respectively

A. 3.5 and 5/6

B. 5 and 25/36

C. 3.5 and 25/36

D. 4 and 5/6

Answer & Solution

Discuss in Board (https://www.examveda.com/if-an-activity-has-its-optimistic-most-likely-and-pessimistic-times-as-2-3-and-7-respectively-then-its-expected-time-and-variance-are-


respectively-53242)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-an-activity-has-its-optimistic-most-likely-and-pessimistic-
times-as-2-3-and-7-respectively-then-its-expected-time-and-variance-are-respectively-53242)
5. Bar charts are suitable for

A. Minor works

B. Major works

C. Large projects

D. All the Above

Answer & Solution Discuss in Board (https://www.examveda.com/bar-charts-are-suitable-for-53243) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/bar-charts-are-suitable-for-53243)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Onorati Construction - Established in


1918
Onorati Construction Co., Inc.

We Are a Premier Civil Construction


Company.Contact Us for Details.

WEBSITE DIRECTIONS

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

6. The first stage of a construction, is

A. Preparation of estimate

B. Survey of the site

C. Initiation of proposal
Ad Federal Proposal Writers

D. Preparation of tender richardwagnerco.com Visit Site


Answer & Solution Discuss in Board (https://www.examveda.com/the-first-stage-of-a-construction-is-53244) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-first-stage-of-a-construction-is-53244)

7. A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and
som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these
phone calls were an activity in PERT project, then phone calls expected duration will be

A. 15 minutes

B. 20.143 minutes

C. 21 minutes

D. 27 minutes

Answer & Solution

Discuss in Board (https://www.examveda.com/a-father-notes-that-when-his-teenage-daughter-uses-the-telephone-she-takes-not-less-than-6-minutes-for-a-call-and-som-times-as-much-as-


an-hour-fifteen-53245)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-father-notes-that-when-his-teenage-daughter-uses-the-
telephone-she-takes-not-less-than-6-minutes-for-a-call-and-som-times-as-much-as-an-hour-fifteen-53245)

8. The probability of completion of any activity within its expected time is

A. 50 %

B. 84.1 %

C. 99.9 %

D. 100 %

Answer & Solution Discuss in Board (https://www.examveda.com/the-probability-of-completion-of-any-activity-within-its-expected-time-is-53246) Save for Later

Answer & Solution


Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-probability-of-completion-of-any-activity-within-its-
expected-time-is-53246)

9. For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5, 17 and 8 days
respectively, The expected time is

A. 8 days

B. 9 days

C. 10 days

D. 15 days

Answer & Solution

Discuss in Board (https://www.examveda.com/for-a-given-activity-the-optimistic-time-pessimistic-time-and-the-most-probable-estimates-are-5-17-and-8-days-respectively-the-expected-time-


is-53247)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-a-given-activity-the-optimistic-time-pessimistic-time-
and-the-most-probable-estimates-are-5-17-and-8-days-respectively-the-expected-time-is-53247)
10. For the network shown in the given figure, the expected time for the activity

A. 1-2 is 4

B. 2-3 is 7

C. 3-4 is 8

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/for-the-network-shown-in-the-given-figure-the-expected-time-for-the-activity-53248) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-the-network-shown-in-the-given-figure-the-expected-
time-for-the-activity-53248)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)

(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Ad

Get a Quote Today


We Specialize in Helical Pier Systems for Foundation
Repairs.

Seattle Foundation Repair Open

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

11. Time and progress chart of a construction, is also known as

A. Bar chart

B. Gantt chart
Ad Historic Mortar Analysis
C. Modified Mile stone chart highbridgematerials.com Visit Site
D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/time-and-progress-chart-of-a-construction-is-also-known-as-53249) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/time-and-progress-chart-of-a-construction-is-also-known-as-
53249)

12. The difference between the time avail-to do a job and the time required to do the job, is known as

A. Event

B. Float

C. Duration

D. Constraint

Answer & Solution Discuss in Board (https://www.examveda.com/the-difference-between-the-time-avail-to-do-a-job-and-the-time-required-to-do-the-job-is-known-as-53250)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-difference-between-the-time-avail-to-do-a-job-and-the-
time-required-to-do-the-job-is-known-as-53250)

13. The Overall in-charge of an organization at the site responsible for the execution of the works, is

A. Executive Engineer

B. Engineer

C. Junior Engineer

D. Assistant Engineer

Answer & Solution Discuss in Board (https://www.examveda.com/the-overall-in-charge-of-an-organization-at-the-site-responsible-for-the-execution-of-the-works-is-53251)

Save for Later

Answer & Solution


Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-overall-in-charge-of-an-organization-at-the-site-
responsible-for-the-execution-of-the-works-is-53251)

Ad

Onorati Construction - Established in 1918

onoraticonstruction.com Visit Site

14. For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and
curing of concrete, number of bar(s) required on bar chart, is

A. 1

B. 2

C. 3

D. 4

Answer & Solution

Discuss in Board (https://www.examveda.com/for-the-supply-of-materials-for-concrete-form-work-reinforcing-and-placing-of-concrete-removal-of-form-work-and-curing-of-concrete-number-


of-bars-required-on-bar-chart-is-53252)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-the-supply-of-materials-for-concrete-form-work-
reinforcing-and-placing-of-concrete-removal-of-form-work-and-curing-of-concrete-number-of-bars-required-on-bar-chart-is-53252)

15. Various activities of a project, are shown on bar charts by

A. Vertical lines

B. Horizontal lines

C. Dots
D. Crosses

Answer & Solution Discuss in Board (https://www.examveda.com/various-activities-of-a-project-are-shown-on-bar-charts-by-53253) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/various-activities-of-a-project-are-shown-on-bar-charts-by-
53253)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Ad

Custom homes
We Work to Deliver Exactly What You Want out of Your
Bathroom Remodel. Call Now.

pueblodevelopmentllc.com Visit Site

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

16. The main disadvantage of line organization, is

A. Rigid structure

B. Extraordinary delay in communications


Ad Historic Mortar Analysis
C. Top level executions over work highbridgematerials.com Visit Site
D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/the-main-disadvantage-of-line-organization-is-53254) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-main-disadvantage-of-line-organization-is-53254)

17. The main principle of an organization, is

A. Unity of command

B. Effective control at all levels

C. Delegation of authority

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/the-main-principle-of-an-organization-is-53255) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-main-principle-of-an-organization-is-53255)

18. A critical ratio scheduling

A. Determines the status of each activity

B. Adjusts automatically changes in activity progress

C. Is a dynamic system

D. None of these

Answer & Solution Discuss in Board (https://www.examveda.com/a-critical-ratio-scheduling-53256) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-critical-ratio-scheduling-53256)
19. A golden rule for the procurement of construction stones, suggests

A. 100% at the site

B. 67% at the site and 33% under procurement

C. 50% at the site and 50% under procurement

D. 33% at the site and 67% under procurement

Answer & Solution Discuss in Board (https://www.examveda.com/a-golden-rule-for-the-procurement-of-construction-stones-suggests-53257) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-golden-rule-for-the-procurement-of-construction-stones-
suggests-53257)

20. If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the
activity, is

A. (a + m + b)/6

B. (a + 2m + b)/6

C. (a + 4m + b)/6

D. (a + 5m + b)/6
Answer & Solution

Discuss in Board (https://www.examveda.com/if-a-is-the-optimistic-time-b-is-the-pessimistic-time-and-m-is-most-likely-time-of-an-activity-the-expected-time-of-the-activity-is-53258)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-a-is-the-optimistic-time-b-is-the-pessimistic-time-and-m-
is-most-likely-time-of-an-activity-the-expected-time-of-the-activity-is-53258)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)

(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

21. A four wheel truck or whose operating weight is 12000 kg is pulled along a road having a rising slope of 2% at a
uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the tow cable is 720 kg. The rolling
resistance of the road will be
Ad Get Your Dream Home Interiors
Bonito Designs Open
A. 20 kg/tonne

B. 30 kg/tonne

C. 40 kg/tonne

D. 50 kg/tonne

Answer & Solution

Discuss in Board (https://www.examveda.com/a-four-wheel-truck-or-whose-operating-weight-is-12000-kg-is-pulled-along-a-road-having-a-rising-slope-of-2-percent-at-a-uniform-speed-


assume-grade-resistance-factor-53259)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-four-wheel-truck-or-whose-operating-weight-is-12000-kg-
is-pulled-along-a-road-having-a-rising-slope-of-2-percent-at-a-uniform-speed-assume-grade-resistance-factor-53259)

22. A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road having a rolling
resistance of 30 kg per tonne. If this tractor is operated on a level road having a rolling resistance of 40 kg per
tonne, then the drawbar pull of the tractor will

A. Reduce by 200 kg

B. Increase by 200 kg

C. Increase by 250 kg

D. Reduce by 250 kg

Answer & Solution

Discuss in Board (https://www.examveda.com/a-tractor-whose-weight-is-20-tonnes-has-a-drawbar-pull-of-2500-kg-when-operated-on-a-level-road-having-a-rolling-resistance-of-30-kg-per-


tonne-if-53260)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-tractor-whose-weight-is-20-tonnes-has-a-drawbar-pull-of-
2500-kg-when-operated-on-a-level-road-having-a-rolling-resistance-of-30-kg-per-tonne-if-53260)

23. The time with which direct cost does not reduce with the increase in time is known as
A. Crash time

B. Normal time

C. Optimistic time

D. Standard time

Answer & Solution Discuss in Board (https://www.examveda.com/the-time-with-which-direct-cost-does-not-reduce-with-the-increase-in-time-is-known-as-53261) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-with-which-direct-cost-does-not-reduce-with-the-
increase-in-time-is-known-as-53261)

24. If the gross vehicle weight of a truck is 30 tonne and rolling resistance is 30 kg/tonne, then the tractive effort
required to keep the truck moving at a uniform speed is

A. 30 kg

B. 300 kg

C. 900 kg

D. 1000 kg

Answer & Solution

Discuss in Board (https://www.examveda.com/if-the-gross-vehicle-weight-of-a-truck-is-30-tonne-and-rolling-resistance-is-30-kgtonne-then-the-tractive-effort-required-to-keep-the-truck-


moving-at-a-uniform-53262)
Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-gross-vehicle-weight-of-a-truck-is-30-tonne-and-
rolling-resistance-is-30-kgtonne-then-the-tractive-effort-required-to-keep-the-truck-moving-at-a-uniform-53262)

25. For a given size of bucket, the ideal output of a dragline will be least in

A. Moist loam

B. Sand and gravel

C. Good common earth

D. Wet sticky clay

Answer & Solution Discuss in Board (https://www.examveda.com/for-a-given-size-of-bucket-the-ideal-output-of-a-dragline-will-be-least-in-53263) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-a-given-size-of-bucket-the-ideal-output-of-a-dragline-
will-be-least-in-53263)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)

5
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

BP Excavation - Contact Us for Details


BP Excavation

For anything excavation related, we're here to


help!

WEBSITE CALL

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

26. Frederick W. Taylor introduced a system of working known as

A. Line organization

B. Line and staff organization

C. Functional organization
Ad A&D Construction

D. Effective organization business.google.com Visit Site


Answer & Solution Discuss in Board (https://www.examveda.com/frederick-w-taylor-introduced-a-system-of-working-known-as-53264) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/frederick-w-taylor-introduced-a-system-of-working-known-
as-53264)

27. For the execution of a project, a contractor is

A. A person

B. A firm

C. An agency

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/for-the-execution-of-a-project-a-contractor-is-53265) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-the-execution-of-a-project-a-contractor-is-53265)

28. An earth moving equipment costs Rs. 5,00,000 and has an estimated life of 10 years and a salvage value of Rs.
50,000. What uniform annual amount must be set aside at the end of each of the 10 years for replacement if the
interest rate is 8% per annum and if the sinking fund factor at 8% per annum interest rate for 10 years is 0.069?

A. Rs. 31050

B. Rs. 34500

C. Rs. 37950

D. Rs. 50000

Answer & Solution

Discuss in Board (https://www.examveda.com/an-earth-moving-equipment-costs-rs-500000-and-has-an-estimated-life-of-10-years-and-a-salvage-value-of-rs-50000-what-uniform-annual-


amount-must-be-set-aside-53266)

Save for Later

Answer & Solution


Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/an-earth-moving-equipment-costs-rs-500000-and-has-an-
estimated-life-of-10-years-and-a-salvage-value-of-rs-50000-what-uniform-annual-amount-must-be-set-aside-53266)

Ad

Pro Engineering Consulting - Engineering MEP


Consultants

proengc.com Visit Site

29. Works costing less than Rs. 20,000 are treated as

A. Any project

B. Major projects

C. Minor projects

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/works-costing-less-than-rs-20000-are-treated-as-53267) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/works-costing-less-than-rs-20000-are-treated-as-53267)

30. If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the expected time
of completion of the project with 99.9% probability is

A. 4 days

B. 6 days

C. 10 days

D. 16 days
Answer & Solution

Discuss in Board (https://www.examveda.com/if-the-expected-time-for-completion-of-a-project-is-10-days-with-a-standard-deviation-of-2-days-the-expected-time-of-completion-of-the-


project-with-999-percent-probability-53268)

Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-expected-time-for-completion-of-a-project-is-10-days-
with-a-standard-deviation-of-2-days-the-expected-time-of-completion-of-the-project-with-999-percent-probability-53268)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Ad

Custom homes
We Work to Deliver Exactly What You Want out of Your
Bathroom Remodel. Call Now.

pueblodevelopmentllc.com Visit Site

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

31. A dummy activity

A. Is artificially introduced

B. Is represented by a dotted line

C. Does not consume time 8AM–4PM Boonton


D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/a-dummy-activity-53269) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-dummy-activity-53269)

32. A Milestone chart

A. Shows the interdependencies of various jobs

B. Depicts the delay of jobs, if any

C. Points outgoing ahead of schedule of jobs, if any

D. None of these

Answer & Solution Discuss in Board (https://www.examveda.com/a-milestone-chart-53270) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-milestone-chart-53270)

33. Consider the following features/factors:


1. Projects are of the non-repetitive type
2. Time required need not be known
3. Time required is known precisely
4. Events have been established for planning
5. Emphasis is given to activities of project
PERT is preferred for planning because of

A. 1, 2 and 4

B. 3, 4 and 5

C. 1, 3 and 4

D. 1, 2 and 5
Answer & Solution

Discuss in Board (https://www.examveda.com/consider-the-following-featuresfactors-1-projects-are-of-the-non-repetitive-type-2-time-required-need-not-be-known-3-time-required-is-known-


precisely-4-events-have-been-established-for-53271)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-featuresfactors-1-projects-are-of-the-
non-repetitive-type-2-time-required-need-not-be-known-3-time-required-is-known-precisely-4-events-have-been-established-for-53271)

34. Consider the following statements:


In the bar chart planning
1. Interdependence of the operations cannot be portrayed.
2. Progress of work can be measured.
3. Spare time of the activities can be determined.
4. Schedule cannot be updated.

A. 1, 2 and 3 are correct

B. 1 and 4 are correct

C. 2, 3 and 4 are correct

D. 1, 2 and 4 are correct

Answer & Solution

Discuss in Board (https://www.examveda.com/consider-the-following-statements-in-the-bar-chart-planning-1-interdependence-of-the-operations-cannot-be-portrayed-2-progress-of-work-


can-be-measured-3-spare-time-of-the-activities-53272)

Save for Later

Answer & Solution


Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-statements-in-the-bar-chart-planning-
1-interdependence-of-the-operations-cannot-be-portrayed-2-progress-of-work-can-be-measured-3-spare-time-of-the-activities-53272)

35. Batching refers to

A. Controlling the total quantity at each batch

B. Weighing accurately, the quantity of each material for a job before mixing

C. Controlling the quantity of each material into each batch

D. Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch

Answer & Solution Discuss in Board (https://www.examveda.com/batching-refers-to-53273) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/batching-refers-to-53273)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)

7
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Ad

Historic Mortar Analysis


Highbridge Performs Analysis On A Variety Of Building
Materials.

highbridgematerials.com Visit Site

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

36. Military organization is known as

A. Line organization

B. Line and staff organization


Ad Highbridge - Historic Mortar Analysis
C. Functional organization highbridgematerials.com Visit Site
D. None of these

Answer & Solution Discuss in Board (https://www.examveda.com/military-organization-is-known-as-53274) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/military-organization-is-known-as-53274)

37. Critical path lies along the activities having total float

A. Positive

B. Negative

C. Zero

D. Same

Answer & Solution Discuss in Board (https://www.examveda.com/critical-path-lies-along-the-activities-having-total-float-53275) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/critical-path-lies-along-the-activities-having-total-float-
53275)

38. An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It has no salvage value at the end of 8
years. The book value of the excavator at the end of 3 years using general double declining balance method is

A. Rs. 8,43,750

B. Rs. 8,75,000

C. Rs. 10,50,000

D. Rs. 11,56,250   

Answer & Solution

Discuss in Board (https://www.examveda.com/an-excavator-costs-rs-2000000-and-has-an-estimated-life-of-8-years-it-has-no-salvage-value-at-the-end-of-8-years-the-book-value-of-the-


excavator-53276)

Save for Later


Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/an-excavator-costs-rs-2000000-and-has-an-estimated-life-
of-8-years-it-has-no-salvage-value-at-the-end-of-8-years-the-book-value-of-the-excavator-53276)

39. Slack time refers to

A. An activity

B. An event

C. Both event and activity

D. None of the above

Answer & Solution Discuss in Board (https://www.examveda.com/slack-time-refers-to-53277) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/slack-time-refers-to-53277)

40. The most suitable type of equipment for compaction of cohesive soils is

A. Smooth-wheeled rollers
B. Vibratory rollers

C. Sheep foot rollers

D. Tampers

Answer & Solution Discuss in Board (https://www.examveda.com/the-most-suitable-type-of-equipment-for-compaction-of-cohesive-soils-is-53278) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-most-suitable-type-of-equipment-for-compaction-of-
cohesive-soils-is-53278)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

41. The most popular type of organization used for Civil Engineering Constructions, is

A. Line organization
Ad 2AL Handyman Services
2alproconstruction.com Visit Site
B. Line and staff organization

C. Functional organization

D. Effective organization

Answer & Solution Discuss in Board (https://www.examveda.com/the-most-popular-type-of-organization-used-for-civil-engineering-constructions-is-53279) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-most-popular-type-of-organization-used-for-civil-
engineering-constructions-is-53279)

42. CPM is

A. Synthesising in concepts

B. Is built of activities oriented programme

C. Is based on time estimate

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/cpm-is-53280) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/cpm-is-53280)

43. In time-cost optimization of a project, crashing is done.

A. On all the activities

B. On all the activities lying on the critical path

C. Only on activities lying on the original critical path and having flatter cost slopes

D. On original critical activities and those that become critical at any stage of crashing in the order of ascending cost slope

Answer & Solution Discuss in Board (https://www.examveda.com/in-time-cost-optimization-of-a-project-crashing-is-done-53281) Save for Later

Answer & Solution


Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-time-cost-optimization-of-a-project-crashing-is-done-
53281)

Ad

Integrated Corrosion Companies - Over 88 Years Of


Innovation

integratedcorrosion.com Visit Site

44. Critical path

A. Is always longest

B. Is always shortest

C. May be longest

D. May be shortest

Answer & Solution Discuss in Board (https://www.examveda.com/critical-path-53282) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/critical-path-53282)

45. Earliest finish of an activity is always

A. Greater than earliest event time of the following node

B. Less than earliest event time of the following node

C. Less than or equal to earliest event time of the following node

D. Greater than or equal to earliest event time of the following node

Answer & Solution Discuss in Board (https://www.examveda.com/earliest-finish-of-an-activity-is-always-53283) Save for Later


Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/earliest-finish-of-an-activity-is-always-53283)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Overhead Crane Services - Contact Us


Today
The Bartholomew Co

We Have the Experience and Flexibility to


Perform Heavy Lift Testing.

WEBSITE CALL

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

46. Latest start of an activity is always

A. greater than or equal to latest event time of preceding node



B. less than or equal to latest event time of preceding node

C. equal to latest event time of preceding node


Ad HBH Construction Inc

D. less than latest event time of preceding node hbhconstructioninc.com Visit Site
Answer & Solution Discuss in Board (https://www.examveda.com/latest-start-of-an-activity-is-always-53284) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/latest-start-of-an-activity-is-always-53284)

47. The rated loads of lifting cranes, as percentage of tipping load at specified radius, for crawler-mounted and
pneumatic tyre-mounted machines would be respectively

A. 80 and 90

B. 90 and 80

C. 85 and 75

D. 75 and 83

Answer & Solution

Discuss in Board (https://www.examveda.com/the-rated-loads-of-lifting-cranes-as-percentage-of-tipping-load-at-specified-radius-for-crawler-mounted-and-pneumatic-tyre-mounted-


machines-would-be-respectively-53285)

Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-rated-loads-of-lifting-cranes-as-percentage-of-tipping-
load-at-specified-radius-for-crawler-mounted-and-pneumatic-tyre-mounted-machines-would-be-respectively-53285)

48. In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the
critical path is done starting with the activity having

A. Longest duration

B. Highest cost slope

C. Least cost slope

D. Shortest duration 

Answer & Solution

Discuss in Board (https://www.examveda.com/in-the-time-cost-optimisation-using-cpm-method-for-network-analysis-the-crashing-of-the-activities-along-the-critical-path-is-done-starting-


with-the-activity-having-53286)
Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-the-time-cost-optimisation-using-cpm-method-for-
network-analysis-the-crashing-of-the-activities-along-the-critical-path-is-done-starting-with-the-activity-having-53286)

Crane & Hoist Service - The


Bartholomew Co.
The Bartholomew Co

Crane & Hoist service, repairs, inspections,


load testing and installs.

WEBSITE CALL

49. A machine costs Rs. 20000 and its useful life is 8 years. The money is borrowed at 8% interest per annum. The
capital recovery factor at 8% interest per annum for 8 years is 0.174. The annual equipment cost of the machine
will be

A. Rs. 1740

B. Rs. 3480

C. Rs. 5220

D. Rs. 6960

Answer & Solution

Discuss in Board (https://www.examveda.com/a-machine-costs-rs-20000-and-its-useful-life-is-8-years-the-money-is-borrowed-at-8-percent-interest-per-annum-the-capital-recovery-factor-at-


8-percent-interest-per-annum-53287)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-machine-costs-rs-20000-and-its-useful-life-is-8-years-the-

money-is-borrowed-at-8-percent-interest-per-annum-the-capital-recovery-factor-at-8-percent-interest-per-annum-53287)
50. Consider the following statements for a power shovel:
(i) Output can be increased by reducing the angle of swing for a given depth of cut.
(ii) For a given angle of swing, output will be maximum at optimum depth of cut.
(iii) Output can be increased by keeping the depth of cut less than optimum depth.
(iv) Output can be increased by increasing the size of shovel.

A. (ii), (iii) and (iv) are correct

B. (i), (ii) and (iv) are correct

C. (i), (iii) and (iv) are correct

D. (i) and (iv) are correct

Answer & Solution

Discuss in Board (https://www.examveda.com/consider-the-following-statements-for-a-power-shovel-i-output-can-be-increased-by-reducing-the-angle-of-swing-for-a-given-depth-of-cut-ii-for-


a-given-angle-53288)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-statements-for-a-power-shovel-i-
output-can-be-increased-by-reducing-the-angle-of-swing-for-a-given-depth-of-cut-ii-for-a-given-angle-53288)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4) 

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)

10

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)

(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

51. For which of the following materials, the output of power shovels for a fixed shovel size will be maximum

A. Moist loam
Ad Historic Mortar Analysis
highbridgematerials.com Visit Site
B. Good common earth

C. Well blasted rock

D. Wet sticky clay

Answer & Solution Discuss in Board (https://www.examveda.com/for-which-of-the-following-materials-the-output-of-power-shovels-for-a-fixed-shovel-size-will-be-maximum-53289)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-which-of-the-following-materials-the-output-of-power-
shovels-for-a-fixed-shovel-size-will-be-maximum-53289)

52. The original cost of an equipment is Rs.10,000. Its salvage value at the end of its total useful life of five years is
Rs. 1,000. Its book value at the end of two years of its useful life (as per straight line method of evaluation of
depreciation) will be

A. Rs. 8,800

B. Rs. 7,600

C. Rs. 6,400

D. Rs. 5,000

Answer & Solution

Discuss in Board (https://www.examveda.com/the-original-cost-of-an-equipment-is-rs10000-its-salvage-value-at-the-end-of-its-total-useful-life-of-five-years-is-rs-1000-its-book-value-at-the-


53290)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-original-cost-of-an-equipment-is-rs10000-its-salvage-
value-at-the-end-of-its-total-useful-life-of-five-years-is-rs-1000-its-book-value-at-the-53290)

53. Crash project duration is obtained by summing the

A. Normal durations for all the activities

B. Crash durations for all activities


C. Crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the
activities

D. Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the
activities

Answer & Solution Discuss in Board (https://www.examveda.com/crash-project-duration-is-obtained-by-summing-the-53291) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/crash-project-duration-is-obtained-by-summing-the-53291)

Ad

Onorati Construction - Asphalt Resurfacing Services

onoraticonstruction.com Visit Site

54. Mile Stone charts were invented in the year of

A. 1910

B. 1920

C. 1930

D. 1940

Answer & Solution Discuss in Board (https://www.examveda.com/mile-stone-charts-were-invented-in-the-year-of-53292) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/mile-stone-charts-were-invented-in-the-year-of-53292)

55. Which one of the following represents an activity?


A. Excavation for foundation

B. Curing of concrete

C. Setting of question paper

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/which-one-of-the-following-represents-an-activity-53293) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-one-of-the-following-represents-an-activity-53293)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)

11

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Ad

Historic Mortar Analysis


Highbridge Performs Analysis On A Variety Of Building
Materials.

highbridgematerials.com Visit Site

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

56. The part of a derrick crane include


(i) Mast
(ii) Boom
(iii) Bull wheel
(iv) Jack
which of these statements are correct? We Specialize in All Aspects of Road
Construction.
A. (i), (ii) and (iv) are correct

B. (ii), (iii) and (iv) are correct

C. (i), (iii) and (iv) are correct

D. (i), (ii) and (iii) are correct

Answer & Solution Discuss in Board (https://www.examveda.com/the-part-of-a-derrick-crane-include-i-mast-ii-boom-iii-bull-wheel-iv-jack-which-of-these-statements-are-correct-53294)

Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-part-of-a-derrick-crane-include-i-mast-ii-boom-iii-bull-
wheel-iv-jack-which-of-these-statements-are-correct-53294)

57. For excavating utility trenches with precise control of depth, the excavation equipment used is

A. Hoe

B. Shovel

C. Dragline

D. None of the above

Answer & Solution Discuss in Board (https://www.examveda.com/for-excavating-utility-trenches-with-precise-control-of-depth-the-excavation-equipment-used-is-53295)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-excavating-utility-trenches-with-precise-control-of-depth-
the-excavation-equipment-used-is-53295)

58. Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?

A. Concrete

B. Loose sand

C. Asphalt

D. Firm earth
Answer & Solution Discuss in Board (https://www.examveda.com/which-of-the-following-surfaces-will-give-highest-rolling-resistance-for-a-rubber-tyred-vehicle-53296) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-surfaces-will-give-highest-rolling-
resistance-for-a-rubber-tyred-vehicle-53296)

59. Power stations are generally treated as

A. Light construction

B. Heavy construction

C. Industrial construction

D. Electrical construction

Answer & Solution Discuss in Board (https://www.examveda.com/power-stations-are-generally-treated-as-53297) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/power-stations-are-generally-treated-as-53297)

60. If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for
activity B are 5, 5.5 and 9 respectively, then
A. expected time of activity A is greater than the expected time of activity B

B. expected time of activity B is greater than the expected time of activity A

C. expected time of both activities A and B are same

D. none of the above

Answer & Solution

Discuss in Board (https://www.examveda.com/if-the-optimistic-time-most-likely-time-and-pessimistic-time-for-activity-a-are-4-6-and-8-respectively-and-for-activity-b-are-5-55-and-9-


respectively-then-53298)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-optimistic-time-most-likely-time-and-pessimistic-time-
for-activity-a-are-4-6-and-8-respectively-and-for-activity-b-are-5-55-and-9-respectively-then-53298)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)

12

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)

(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

61. Which of the following is a weakness of bar chart?

A. Interdependencies of activities
Ad Highbridge - Historic Mortar Analysis
highbridgematerials.com Visit Site
B. Project progress

C. Uncertainties

D. All of the above

Answer & Solution Discuss in Board (https://www.examveda.com/which-of-the-following-is-a-weakness-of-bar-chart-53299) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-is-a-weakness-of-bar-chart-53299)

62. For completion of a project, the critical path of the network represents

A. Minimum time

B. Maximum time

C. Maximum cost

D. Minimum cost

Answer & Solution Discuss in Board (https://www.examveda.com/for-completion-of-a-project-the-critical-path-of-the-network-represents-53300) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-completion-of-a-project-the-critical-path-of-the-network-
represents-53300)

63. A machine is purchased for Rs. 10,000,00 and has an estimated life of 10 years. The salvage value at the end of
10 years is Rs. 1,50,000. The book value of the machine at the end of 5 years using general straight line method of
evaluation of depreciation is

A. Rs. 4,75,000

B. Rs. 5,75,000

C. Rs. 6,50,000

D. Rs. 8,50,000
Answer & Solution

Discuss in Board (https://www.examveda.com/a-machine-is-purchased-for-rs-1000000-and-has-an-estimated-life-of-10-years-the-salvage-value-at-the-end-of-10-years-is-rs-150000-the-book-


value-53301)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-machine-is-purchased-for-rs-1000000-and-has-an-
estimated-life-of-10-years-the-salvage-value-at-the-end-of-10-years-is-rs-150000-the-book-value-53301)

Ad

Onorati Construction - Asphalt Resurfacing Services

onoraticonstruction.com Visit Site

64. Which of the following excavators is most suitable for digging under water?

A. Drag line

B. Hoe

C. Clam shell

D. Dipper shovel

Answer & Solution Discuss in Board (https://www.examveda.com/which-of-the-following-excavators-is-most-suitable-for-digging-under-water-53302) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-excavators-is-most-suitable-for-
digging-under-water-53302)
65. Rolling resistance of a wheel depends upon
(i) Vehicle load
(ii) Grade
(iii) Ground conditions

A. Only (i) is correct

B. (i) and (ii) are correct

C. (i) and (iii) are correct

D. (ii) and (iii) are correct

Answer & Solution Discuss in Board (https://www.examveda.com/rolling-resistance-of-a-wheel-depends-upon-i-vehicle-load-ii-grade-iii-ground-conditions-53303) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/rolling-resistance-of-a-wheel-depends-upon-i-vehicle-load-ii-
grade-iii-ground-conditions-53303)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)

13

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)

Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Crane & Hoist Service - The


Bartholomew Co.
The Bartholomew Co

Crane & Hoist service, repairs, inspections,


load testing and installs.

WEBSITE CALL

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

66. Residential buildings are treated as

A. Light construction

B. Heavy construction

C. Industrial construction
8AM–4PM Boonton
D. Private construction
Answer & Solution Discuss in Board (https://www.examveda.com/residential-buildings-are-treated-as-53304) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/residential-buildings-are-treated-as-53304)

67. Output of a bulldozer is


(i) Increased if drawbar HP of the tractor is increased for a given hauling distance
(ii) Decreased if drawbar HP of the tractor is increased for a given hauling distance
(iii) Increased if the hauling distance is increased for a given drawbar HP of the tractor
(iv) Decreased if the hauling distance is increased for a given drawbar HP of the tractor

A. (i) and (iii) are correct

B. (i) and (iv) are correct

C. (ii) and (iii) are correct

D. (ii) and (iv) are correct

Answer & Solution

Discuss in Board (https://www.examveda.com/output-of-a-bulldozer-is-i-increased-if-drawbar-hp-of-the-tractor-is-increased-for-a-given-hauling-distance-ii-decreased-if-drawbar-hp-of-the-


tractor-is-increased-53305)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/output-of-a-bulldozer-is-i-increased-if-drawbar-hp-of-the-
tractor-is-increased-for-a-given-hauling-distance-ii-decreased-if-drawbar-hp-of-the-tractor-is-increased-53305)

68. The critical activity has

A. Maximum float

B. Minimum float

C. Zero float

D. None of these

Answer & Solution Discuss in Board (https://www.examveda.com/the-critical-activity-has-53306) Save for Later


Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-critical-activity-has-53306)

Overhead Crane Services - Contact Us


Today
The Bartholomew Co

We Have the Experience and Flexibility to


Perform Heavy Lift Testing.

WEBSITE CALL

69. The object of technical planning, is

A. Preparation of specifications

B. Preparation of estimates

C. Initiating the procurement action of resources

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/the-object-of-technical-planning-is-53307) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-object-of-technical-planning-is-53307)

70. Total float for any activity is defined as the difference between

A. Its latest finish time and earliest start time for its successor activity

B. Its latest start time and earliest start time

C. Its latest start time and earliest finish time

D. Its earliest finish time and earliest start time for its successor activity
Answer & Solution Discuss in Board (https://www.examveda.com/total-float-for-any-activity-is-defined-as-the-difference-between-53308) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/total-float-for-any-activity-is-defined-as-the-difference-
between-53308)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)

14

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)

Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Onorati Construction - Asphalt


Resurfacing Services
Onorati Construction Co., Inc.

We Specialize in All Aspects of Road


Construction.

WEBSITE DIRECTIONS

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

1. Interfering float is the difference between

A. Total float and free float

B. Total float and independent float

C. Free float and independent float


Ad Historic Mortar Analysis

D. None of the above highbridgematerials.com Visit Site


Answer & Solution Discuss in Board (https://www.examveda.com/interfering-float-is-the-difference-between-53309) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/interfering-float-is-the-difference-between-53309)

2. Free float for any activity is defined as the difference between

A. its earliest finish time and earliest start time for its successor activity

B. its latest start time and earliest start time

C. its latest finish time and earliest start time for its successor activity

D. its earliest finish time and latest start time for its successor activity

Answer & Solution Discuss in Board (https://www.examveda.com/free-float-for-any-activity-is-defined-as-the-difference-between-53310) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/free-float-for-any-activity-is-defined-as-the-difference-
between-53310)

3. Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of
swing.
Reason R: If the angle of swing is decreased, the cycle time will be decreased.

A. Both A and R is true and R is the correct explanation of A

B. Both A and R is true but R is not the correct explanation of A

C. A is true but R is false

D. A is false but R is true

Answer & Solution

Discuss in Board (https://www.examveda.com/assertion-a-for-a-given-depth-of-cut-the-output-of-a-power-shovel-can-be-increased-by-decreasing-the-angle-of-swingreason-r-if-the-angle-of-


swing-is-53311)

Save for Later

Answer & Solution


Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/assertion-a-for-a-given-depth-of-cut-the-output-of-a-power-
shovel-can-be-increased-by-decreasing-the-angle-of-swingreason-r-if-the-angle-of-swing-is-53311)

Ad

Onorati Construction - Established in 1918

onoraticonstruction.com Visit Site

4. Consider the following statements:


In the critical path method of construction planning, Free Float can be.
1. Greater than Total Float.
2. Greater than Independent Float
3. Equal to Total Float.
4. Less than Independent Float

A. 1 and 4 are correct

B. 2 and 3 are correct

C. 1 and 4 are correct

D. 1 and 2 are correct

Answer & Solution

Discuss in Board (https://www.examveda.com/consider-the-following-statements-in-the-critical-path-method-of-construction-planning-free-float-can-be-1-greater-than-total-float-2-greater-


than-independent-float-3-equal-to-total-53312)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-statements-in-the-critical-path-
method-of-construction-planning-free-float-can-be-1-greater-than-total-float-2-greater-than-independent-float-3-equal-to-total-53312)

5. Updating may result in


A. Change of critical path

B. Decrease of project completion time

C. Increase of project completion time

D. All of the above

Answer & Solution Discuss in Board (https://www.examveda.com/updating-may-result-in-53313) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/updating-may-result-in-53313)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Ad

Register for Engage Everywhere


Join Jeff Lawson and Yuval Noah Harari for an Online Event

Twilio Open

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

6. The first method invented for planning projects, was


A. Bar chart method

B. Milestone chart
Ad Highbridge - Historic Mortar Analysis
C. Critical path method (CPM) highbridgematerials.com Visit Site
D. Programme Evaluation and Review Technique (PERT)

Answer & Solution Discuss in Board (https://www.examveda.com/the-first-method-invented-for-planning-projects-was-53314) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-first-method-invented-for-planning-projects-was-53314)

7. A contractor has two options;(l) : Invest his money in project A or (II) : Invest his money in project B. If he decides
to invest in A, for every rupee invested, he is assured of doubling his money in ten years. If he decides to invest in
B, he is assured of making his money 1.5 times in 5 years. If the contractor values his money at 10% interest rate,
he

A. should invest in neither of the two projects

B. could invest in either of the two projects

C. should invest in project A

D. should invest in project B

Answer & Solution

Discuss in Board (https://www.examveda.com/a-contractor-has-two-optionsl-invest-his-money-in-project-a-or-ii-invest-his-money-in-project-b-if-he-decides-to-invest-in-a-for-every-53315)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-contractor-has-two-optionsl-invest-his-money-in-project-a-
or-ii-invest-his-money-in-project-b-if-he-decides-to-invest-in-a-for-every-53315)

8. Free float is mainly used to

A. Identify the activities which can be delayed without affecting the total float of preceding activity

B. Identify the activities, which can be delayed without affecting the total float of succeeding activity

C. Establish priorities 

D. Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities

Answer & Solution Discuss in Board (https://www.examveda.com/free-float-is-mainly-used-to-53316) Save for Later


Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/free-float-is-mainly-used-to-53316)

Ad

Register for Engage Everywhere

Twilio Open

9. The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is
known as

A. Total float

B. Free float

C. Interfering float

D. Independent float

Answer & Solution

Discuss in Board (https://www.examveda.com/the-time-by-which-a-particular-activity-can-be-delayed-without-affecting-the-preceding-and-succeeding-activities-is-known-as-53317)

Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-by-which-a-particular-activity-can-be-delayed-
without-affecting-the-preceding-and-succeeding-activities-is-known-as-53317)

10. Preliminary project report for a road project must contain 

A. The detailed estimated cost based on detailed design

B. The several alternatives of the project that have been considered


C. The soil survey, traffic survey, concept design and approximate cost

D. The contract documents for inviting tenders

Answer & Solution Discuss in Board (https://www.examveda.com/preliminary-project-report-for-a-road-project-must-contain-53318) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/preliminary-project-report-for-a-road-project-must-contain-
53318)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)


(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Ad

Highbridge
Our Team Of Materials Scientists Bring Many Years Of
Specialized Expertise.

highbridgematerials.com Visit Site

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

11. Consider the following operations:


1. Drilling
2. Blasting
3. Mucking

Ad Custom homes
pueblodevelopmentllc.com Visit Site
4. Placing steel
5. Placing concrete
The correct sequence of these operations in tunnel construction is

A. 1, 2, 4, 3, 5

B. 1, 3, 2, 4, 5

C. 1, 2, 3, 4, 5

D. 1, 3, 4, 2, 5

Answer & Solution

Discuss in Board (https://www.examveda.com/consider-the-following-operations-1-drilling-2-blasting-3-mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-


operations-in-tunnel-construction-is-53319)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-operations-1-drilling-2-blasting-3-
mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-53319)

12. The salient feature of functional organization is

A. Strict adherence to specifications

B. Separation of planning and design part

C. Each individual maintains functional efficiency

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/the-salient-feature-of-functional-organization-is-53320) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-salient-feature-of-functional-organization-is-53320)

13. The time corresponding to minimum total project cost is

A. Crash time
B. Normal time

C. Optimistic time

D. Between normal time and crash time

Answer & Solution Discuss in Board (https://www.examveda.com/the-time-corresponding-to-minimum-total-project-cost-is-53321) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-corresponding-to-minimum-total-project-cost-is-
53321)

Ad

Highbridge - Historic Mortar Analysis

highbridgematerials.com Visit Site

14. The process of incorporating changes and rescheduling or replanning is called

A. Resource levelling

B. Resource smoothening

C. Updating

D. Critical path scheduling

Answer & Solution Discuss in Board (https://www.examveda.com/the-process-of-incorporating-changes-and-rescheduling-or-replanning-is-called-53322) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-process-of-incorporating-changes-and-rescheduling-or-
replanning-is-called-53322)
15. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then
the following relation holds good

A. EF = ES + D

B. LS = LF - D

C. LF = LS + D

D. All the above

Answer & Solution

Discuss in Board (https://www.examveda.com/if-d-is-the-duration-es-and-ef-are-the-earliest-start-and-finish-ls-and-lf-are-latest-start-and-latest-finish-time-then-the-following-relation-holds-


good-53323)

Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-d-is-the-duration-es-and-ef-are-the-earliest-start-and-
finish-ls-and-lf-are-latest-start-and-latest-finish-time-then-the-following-relation-holds-good-53323)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)


16. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is
complete, is known as

Ad Highbridge - Historic Mortar Analysis


A. Event highbridgematerials.com Visit Site
B. Free float

C. Dummy

D. Constraint

Answer & Solution

Discuss in Board (https://www.examveda.com/the-artificial-activity-which-indicates-that-an-activity-following-it-cannot-be-started-unless-the-preceding-activity-is-complete-is-known-as-


53324)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-artificial-activity-which-indicates-that-an-activity-
following-it-cannot-be-started-unless-the-preceding-activity-is-complete-is-known-as-53324)

17. The independent float affects only

A. Preceding activities

B. Succeeding activities

C. The particular activity involved

D. None of the above

Answer & Solution Discuss in Board (https://www.examveda.com/the-independent-float-affects-only-53325) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-independent-float-affects-only-53325)

18. PERT analysis is based on

A. Optimistic time

B. Pessimistic time

C. Most likely time

D. All the above


Answer & Solution Discuss in Board (https://www.examveda.com/pert-analysis-is-based-on-53326) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pert-analysis-is-based-on-53326)

Onorati Construction - Established in


1918
Onorati Construction Co., Inc.

We Are a Premier Civil Construction


Company.Contact Us for Details.

WEBSITE DIRECTIONS

19. Pick up the correct statement from the following with regards to C.P.M. network analysis of projects

A. The latest occurrence time of the node of which the activity arrow terminates minus the duration of the activity, is called
latest start time

B. The latest occurrence time for the node at which the activity arrow terminates, is called latest finish time

C. Earliest occurrence time of the event from which the activity arrow' originates, is called earliest start time of the activity

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-with-regards-to-cpm-network-analysis-of-projects-53327)

Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-with-
regards-to-cpm-network-analysis-of-projects-53327)


20. A CPM family includes

A. CPA (Critical Path Analysis)


B. CPP (Critical Path Plotted)

C. MCE (Minimum Cost Expenditure)

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/a-cpm-family-includes-53328) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-cpm-family-includes-53328)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-

management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)


(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Onorati Construction - Asphalt


Resurfacing Services
Onorati Construction Co., Inc.

We Specialize in All Aspects of Road


Construction.

WEBSITE DIRECTIONS

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

21. PERT technique of network analysis is mainly useful for

A. Small projects

B. Large and complex projects

C. Research and development projects


Ad Seattle Foundation Repair

D. Deterministic activities Seattle Foundation Repair Open


Answer & Solution Discuss in Board (https://www.examveda.com/pert-technique-of-network-analysis-is-mainly-useful-for-53329) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pert-technique-of-network-analysis-is-mainly-useful-for-
53329)

22. In India, are prefabricated components costlier than those of traditional cast-in-situ items that the prefabricated
components replace?

A. Yes, because of heavier overheads and handling cost

B. Yes, because of the very high order of quality control for the factory made components

C. No, because of repetitive manufacture of a number of elements

D. No, because of savings in site labour

Answer & Solution

Discuss in Board (https://www.examveda.com/in-india-are-prefabricated-components-costlier-than-those-of-traditional-cast-in-situ-items-that-the-prefabricated-components-replace-53330)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-india-are-prefabricated-components-costlier-than-those-
of-traditional-cast-in-situ-items-that-the-prefabricated-components-replace-53330)

23. What estimate would you give for the variance in above problem ?

A. 81

B. 54

C. 36

D. 9

Answer & Solution Discuss in Board (https://www.examveda.com/what-estimate-would-you-give-for-the-variance-in-above-problem-53331) Save for Later

Answer & Solution


Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/what-estimate-would-you-give-for-the-variance-in-above-
problem-53331)

Ad

Onorati Construction - Asphalt Resurfacing Services

onoraticonstruction.com Visit Site

24. Mobilization advance up to 10% of the cost of work is given to a contractor

A. On commencement of work at site for payment of loan taken by him

B. For the purchase of construction materials

C. For the payment of advances to labour and other staff

D. For all activities required to start the work at site on finalization of the contract document

Answer & Solution Discuss in Board (https://www.examveda.com/mobilization-advance-up-to-10-percent-of-the-cost-of-work-is-given-to-a-contractor-53332) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/mobilization-advance-up-to-10-percent-of-the-cost-of-work-
is-given-to-a-contractor-53332)

25. Which of the following is not a PERT event?

A. Site investigation started

B. Sessional work completed

C. Bus starts from Jaipur

D. Class is being attended

Answer & Solution Discuss in Board (https://www.examveda.com/which-of-the-following-is-not-a-pert-event-53333) Save for Later


Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-is-not-a-pert-event-53333)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Onorati Construction - Established in


1918
Onorati Construction Co., Inc.

We Are a Premier Civil Construction


Company.Contact Us for Details.

WEBSITE DIRECTIONS

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

26. During the construction period, price variation clause in contracts caters to

A. Increase in rates of only important materials

B. Variation in cost in materials element, labour element and petrol-oil-lubricant element

C. Variation in total cost of the project on an ad hoc basis


Ad Highbridge - Historic Mortar Analysis

D. Rate of inflation highbridgematerials.com Visit Site


Answer & Solution Discuss in Board (https://www.examveda.com/during-the-construction-period-price-variation-clause-in-contracts-caters-to-53334) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/during-the-construction-period-price-variation-clause-in-
contracts-caters-to-53334)

27. In PERT analysis, the time estimates of activities and probability of their occurrence follow

A. Normal distribution curve

B. Poisson's distribution curve

C. Beta distribution curve

D. None of the above

Answer & Solution Discuss in Board (https://www.examveda.com/in-pert-analysis-the-time-estimates-of-activities-and-probability-of-their-occurrence-follow-53335) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-pert-analysis-the-time-estimates-of-activities-and-
probability-of-their-occurrence-follow-53335)

28. At a work site, statistical quality control of concrete means

A. Measurement of risks to eliminate failures

B. Applying the theory' of probability to sample testing or inspection

C. Reduction in wastage of inspection costs

D. Reduction in costs for the removal of defects

Answer & Solution Discuss in Board (https://www.examveda.com/at-a-work-site-statistical-quality-control-of-concrete-means-53336) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/at-a-work-site-statistical-quality-control-of-concrete-means-
53336)
Ad

Onorati Construction - Asphalt Resurfacing Services

onoraticonstruction.com Visit Site

29. Pick up the incorrect statement from the following:

A. An activity of a project is denoted by an arrow on the net work

B. The tail of the arrow indicates the start of the activity

C. The head of the arrow indicates the end of the activity

D. The arrows are drawn to scale from left to right

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53337) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53337)

30. Pick up the PERT event from the following:

A. Digging of foundation started

B. Digging of foundation completed

C. Laying of concrete started

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-pert-event-from-the-following-53338) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-pert-event-from-the-following-53338)
 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)

Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)


31. Pick up the correct statement from the following:

A. Earliest expected time is denoted by TE


Ad DEISER Enterprise Day 2020
DEISER Open
B. Latest occurrence time is denoted by TL

C. Contractual obligation time is denoted by Ts

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53339) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53339)

32. Pick up the correct statement from the following:

A. Forward pass is used for calculating earliest expected time

B. Backward pass is used for calculating the latest occurrence time

C. Maximum value of earliest expected time is used if there is more than one value of any event

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53340) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53340)

33. Pick up the correct statement from the following:

A. Optimistic time estimate refers to activities

B. Pessimistic time estimate refers to activities

C. Most likely time estimate refers to activities

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53341) Save for Later 

Answer & Solution


Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53341)

34. Pick up the correct statement from the following:

A. Programme Evaluation and Review Technique, is event oriented

B. Programme Evaluation and Review Technique is not event oriented

C. Critical Path Method is event oriented

D. Critical Path Method is not event oriented

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53342) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53342)

35. Pick up the incorrect statement from the following:

A. The activity is the time consuming part of a project



B. The beginning and end of a job, are called events

C. The activity which consumes maximum time, is called a node

D. Logically and sequentially connected activities and events form a network


Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53343) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53343)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and- 
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)


(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Onorati Construction - Established in


1918
Onorati Construction Co., Inc.

We Are a Premier Civil Construction


Company.Contact Us for Details.

WEBSITE DIRECTIONS

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

36. Pick up the incorrect statement from the following:

A. The difference between the earliest start time and latest finish time of any activity, is the maximum time available for the
activity

B. The difference between the maximum time available for the job and actual time it consumes, is called total float

C. The difference between the latest start time and earliest start time of an activity, is called total float
D. None of these

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53344) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53344)

37. Pick up the correct statement from the following:

A. The difference of latest occurrence time and earliest expected time, is called slack

B. The activities connecting the events having zero slack, lie on the critical path

C. The critical path consumes the maximum time

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53345) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53345)

38. Pick up the correct statement from the following:

A. The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called
'float'

B. The duration of time by which an activity can be delayed without affecting the succeeding activity, is called free float

C. The difference between total float and free float, is called interfering float

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53346) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53346)
39. Pick up the correct statement from the following:

A. The float may be positive, zero or negative

B. If the float is positive and the activity is delayed by a period equal to its total float, the completion of project is not delayed

C. If the float of an activity is negative, delay in its performance is bound to delay the completion of project

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53347) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53347)

40. Pick up the incorrect statement from the following:

A. The various functions under each activity, are shown by one bar on Bar Charts

B. Bar chart establishes the interdependency of one event on another

C. Only approximate percentage of the completed work is reported

D. None of these

Answer & Solution Discuss in Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53348) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53348)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)

Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Onorati Construction - Established in


1918
Onorati Construction Co., Inc.

We Are a Premier Civil Construction


Company.Contact Us for Details.

WEBSITE DIRECTIONS

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

41. Select the correct statement.

A. Activity arrows in a CPM network are drawn to scale

B. The tail of an arrow represents the finish of an activity

C. Arrow bead represents the start of an activity


Ad HBH Construction Inc

D. None of the above hbhconstructioninc.com Visit Site


Answer & Solution Discuss in Board (https://www.examveda.com/select-the-correct-statement-53349) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/select-the-correct-statement-53349)

42. Select the incorrect statement.

A. Earliest start of an activity is the early event time of the node it leaves

B. Latest finish of an activity is the late event time of the node it enters

C. Latest start of an activity is its latest finish minus its duration

D. None of the above

Answer & Solution Discuss in Board (https://www.examveda.com/select-the-incorrect-statement-53350) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/select-the-incorrect-statement-53350)

43. Select the incorrect statement.

A. Start float and finish float are always equal

B. Total float can be either start float or finish float

C. Start float and finish float need not be equal

D. Start float and finish float are the differences between activity times and not event times

Answer & Solution Discuss in Board (https://www.examveda.com/select-the-incorrect-statement-53351) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/select-the-incorrect-statement-53351)
44. Select the incorrect statement.

A. A critical path always begins at the very first event.

B. A critical path always terminates at the last event.

C. Critical activities control the project duration.

D. Critical activity is the one for which free float is zero.

Answer & Solution Discuss in Board (https://www.examveda.com/select-the-incorrect-statement-53352) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/select-the-incorrect-statement-53352)

45. Wheeled tractors are replacing crawler tractors because


1. Wheeled tractors travel faster.
2. Crawler tractors are more expensive.
3. Track parts of a crawler wear out quickly.
4. Crawler tractors have stick control.
of following statements

A. 1, 3 and 4 are correct

B. 2, 3 and 4 are correct

C. 1, 2 and 3 are correct


D. 1, 2 and 4 are correct

Answer & Solution

Discuss in Board (https://www.examveda.com/wheeled-tractors-are-replacing-crawler-tractors-because-1-wheeled-tractors-travel-faster-2-crawler-tractors-are-more-expensive-3-track-parts-


of-a-crawler-wear-out-quickly-4-crawler-tractors-53353)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/wheeled-tractors-are-replacing-crawler-tractors-because-1-
wheeled-tractors-travel-faster-2-crawler-tractors-are-more-expensive-3-track-parts-of-a-crawler-wear-out-quickly-4-crawler-tractors-53353)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Onorati Construction - Asphalt


Resurfacing Services
Onorati Construction Co., Inc.

We Specialize in All Aspects of Road


Construction.

WEBSITE DIRECTIONS

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

46. The maximum rimpull in the first gear of a tractor while towing a load is 6300 kg. The tractor weighs 12.5 tonnes
and is operating along a 2 percent upgrade and the rolling resistance is 45 kg/tonne. Pull available for towing the
load is

A. 3425 kg

B. 5515 kg
8AM–4PM Boonton
C. 4350 kg

D. 2975 kg

Answer & Solution

Discuss in Board (https://www.examveda.com/the-maximum-rimpull-in-the-first-gear-of-a-tractor-while-towing-a-load-is-6300-kg-the-tractor-weighs-125-tonnes-and-is-operating-along-a-2-


percent-upgrade-53354)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-maximum-rimpull-in-the-first-gear-of-a-tractor-while-
towing-a-load-is-6300-kg-the-tractor-weighs-125-tonnes-and-is-operating-along-a-2-percent-upgrade-53354)

47. The basic action involved in sheep foot rolling is

A. Kneading

B. Pressing

C. Tamping

D. Vibration

Answer & Solution Discuss in Board (https://www.examveda.com/the-basic-action-involved-in-sheep-foot-rolling-is-53355) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-basic-action-involved-in-sheep-foot-rolling-is-53355)

48. If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of
completing the project in 50 weeks and 65 weeks respectively will be

A. 2.3% and 84.1%

B. 97.7% and 84.1%

C. 97.7 % and 15.9%

D. 15.9% and 97.7%


Answer & Solution

Discuss in Board (https://www.examveda.com/if-the-expected-time-of-completion-of-a-project-is-60-weeks-with-a-standard-deviation-of-5-weeks-the-probability-of-completing-the-project-in-


50-weeks-and-65-53356)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-expected-time-of-completion-of-a-project-is-60-
weeks-with-a-standard-deviation-of-5-weeks-the-probability-of-completing-the-project-in-50-weeks-and-65-53356)

49. The constraints in case of resource smoothening operation would be

A. Resources

B. Project duration time

C. Both resources and project duration time

D. None of the above

Answer & Solution Discuss in Board (https://www.examveda.com/the-constraints-in-case-of-resource-smoothening-operation-would-be-53357) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-constraints-in-case-of-resource-smoothening-operation-
would-be-53357)

50. PERT is
A. An analytic in concept

B. Limited of event oriented diagrams

C. Used for research and development projects

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/pert-is-53358) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pert-is-53358)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Onorati Construction - Asphalt


Resurfacing Services
Onorati Construction Co., Inc.

We Specialize in All Aspects of Road


Construction.

WEBSITE DIRECTIONS

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

51. While scheduling a project by C.P.M.

A. A project is divided into various activities



B. Required time for each activity is established

C. Net work is drawn by connecting the activities and the events


Ad Highbridge - Historic Mortar Analysis

D. All the above highbridgematerials.com Visit Site


Answer & Solution Discuss in Board (https://www.examveda.com/while-scheduling-a-project-by-cpm-53359) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/while-scheduling-a-project-by-cpm-53359)

52. Final technical authority of a project lies with

A. Assistant Engineer

B. Executive Engineer

C. Superintending Engineer

D. Chief Engineer

Answer & Solution Discuss in Board (https://www.examveda.com/final-technical-authority-of-a-project-lies-with-53360) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/final-technical-authority-of-a-project-lies-with-53360)

53. The technique for establishing and maintaining priorities among the various jobs of a project, is known

A. Event flow scheduling technique

B. Critical ratio scheduling

C. Slotting technique for scheduling

D. Short interval scheduling   

Answer & Solution Discuss in Board (https://www.examveda.com/the-technique-for-establishing-and-maintaining-priorities-among-the-various-jobs-of-a-project-is-known-53361)

Save for Later

Answer & Solution



Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-technique-for-establishing-and-maintaining-priorities-
among-the-various-jobs-of-a-project-is-known-53361)
Ad

Highbridge - Historic Mortar Analysis

highbridgematerials.com Visit Site

54. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be

A. Started 5 days later

B. Completed 5 days later

C. Performed at slower rate in 15 days

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/if-the-total-float-and-duration-of-an-activity-are-5-and-10-days-respectively-the-particular-activity-can-be-53362)

Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-total-float-and-duration-of-an-activity-are-5-and-10-
days-respectively-the-particular-activity-can-be-53362)

55. Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written
above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event
2, is

A. 20

B. 25 

C. 35

D. 15
Answer & Solution

Discuss in Board (https://www.examveda.com/optimistic-time-most-likely-time-and-pessimistic-times-for-the-activities-of-a-network-in-the-given-figure-are-written-above-their-arrows-if-the-


contractual-obligation-time-for-the-53363)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/optimistic-time-most-likely-time-and-pessimistic-times-for-
the-activities-of-a-network-in-the-given-figure-are-written-above-their-arrows-if-the-contractual-obligation-time-for-the-53363)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-

management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)

About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)


Contact Us (https://www.examveda.com/contact-us/)


(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

56. The three time estimates for the activities of the network shown in the given figure are shown above their arrows.
The earliest expected time for the event 4, is

Ad Highbridge - Historic Mortar Analysis


highbridgematerials.com Visit Site
A. 19

B. 14

C. 24

D. None of these

Answer & Solution

Discuss in Board (https://www.examveda.com/the-three-time-estimates-for-the-activities-of-the-network-shown-in-the-given-figure-are-shown-above-their-arrows-the-earliest-expected-time-


for-the-event-4-is-53364)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-three-time-estimates-for-the-activities-of-the-network-
shown-in-the-given-figure-are-shown-above-their-arrows-the-earliest-expected-time-for-the-event-4-is-53364)

57. Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?

A. Ice

B. Concrete

C. Loose sand

D. Earth

Answer & Solution Discuss in Board (https://www.examveda.com/which-one-of-the-following-surfaces-will-give-highest-coefficient-of-traction-while-using-crawler-track-tractors-53365)

Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-one-of-the-following-surfaces-will-give-highest-
coefficient-of-traction-while-using-crawler-track-tractors-53365)

58. Which one of the following represents an event?

A. Concrete cured

B. Fixing of door
C. Plastering of walls

D. Selecting sites

Answer & Solution Discuss in Board (https://www.examveda.com/which-one-of-the-following-represents-an-event-53366) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-one-of-the-following-represents-an-event-53366)

59. The reduction in project time normally results in

A. Decreasing the direct cost and increasing indirect cost

B. Increasing the direct cost and decreasing the indirect cost

C. Increasing the direct cost and indirect cost both

D. Decreasing the direct cost and indirect cost both

Answer & Solution Discuss in Board (https://www.examveda.com/the-reduction-in-project-time-normally-results-in-53367) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-reduction-in-project-time-normally-results-in-53367)
60. In the given figure, the network of a project represents

A. Activity of an excavation of a footing

B. Activity of an excavation which starts at event No. 1 and ends at even No. 2

C. Activity of excavation which takes 8 units of time

D. None of these

Answer & Solution Discuss in Board (https://www.examveda.com/in-the-given-figure-the-network-of-a-project-represents-53368) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-the-given-figure-the-network-of-a-project-represents-
53368)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)

(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

HOT

Broken Tractor

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

61. Which of the following earth moving machines has the shortest cycle time?

A. Drag line
Ad Flat Roofs Done Right - Residential
lifetimeflatroofs.com Visit Site
B. Hoe

C. Clam shell

D. Dipper shovel

Answer & Solution Discuss in Board (https://www.examveda.com/which-of-the-following-earth-moving-machines-has-the-shortest-cycle-time-53369) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-earth-moving-machines-has-the-
shortest-cycle-time-53369)

62. A tractor shovel has a purchase price of Rs. 4.7 lacs and could save the organization an amount of rupees one lac
per year on operating costs. The salvage value after the amortization period is 10% of the purchase price. The
capital recovery period will be

A. 3.7 years

B. 4.23 years

C. 5 years

D. 7.87 years

Answer & Solution

Discuss in Board (https://www.examveda.com/a-tractor-shovel-has-a-purchase-price-of-rs-47-lacs-and-could-save-the-organization-an-amount-of-rupees-one-lac-per-year-on-operating-costs-


the-salvage-value-53370)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-tractor-shovel-has-a-purchase-price-of-rs-47-lacs-and-
could-save-the-organization-an-amount-of-rupees-one-lac-per-year-on-operating-costs-the-salvage-value-53370)

63. Completion of an activity on CPM network diagram, is generally known

A. Event

B. Node

C. Connector
D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/completion-of-an-activity-on-cpm-network-diagram-is-generally-known-53371) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/completion-of-an-activity-on-cpm-network-diagram-is-
generally-known-53371)

HOT

Broken Tractor

64. Grader is used mainly for

A. Trimming and finishing

B. Shaping and trimming

C. Finishing and shaping

D. Finishing, shaping and trimming

Answer & Solution Discuss in Board (https://www.examveda.com/grader-is-used-mainly-for-53372) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/grader-is-used-mainly-for-53372)
65. Consider the following activities in a building construction:
1. Concreting of roof slabs
2. Brick-jelly lime concrete terracing
3. Erection of form work for slab
4. Construction of parapet wall in terrace
The correct sequence of these activities is

A. 1, 3, 2, 4

B. 3, 1, 4, 2

C. 3, 1, 2, 4

D. 1, 3, 4, 2

Answer & Solution

Discuss in Board (https://www.examveda.com/consider-the-following-activities-in-a-building-construction-1-concreting-of-roof-slabs-2-brick-jelly-lime-concrete-terracing-3-erection-of-form-


work-for-slab-4-construction-of-parapet-wall-53373)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-activities-in-a-building-construction-
1-concreting-of-roof-slabs-2-brick-jelly-lime-concrete-terracing-3-erection-of-form-work-for-slab-4-construction-of-parapet-wall-53373)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)

12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13

14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.
Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-
and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)

(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Onorati Construction - Established in


1918
Onorati Construction Co., Inc.

We Are a Premier Civil Construction


Company.Contact Us for Details.

WEBSITE DIRECTIONS

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

1. Frequency distribution curves

A. Having a single lump, are called uninodal curves

B. If symmetrical, are called normal curves

C. If not symmetrical, are called skew curves


Ad Spray Foam Insulation USA

D. All the above Spray Foam Insulation USA Visit Site


Answer & Solution Discuss in Board (https://www.examveda.com/frequency-distribution-curves-53379) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/frequency-distribution-curves-53379)

2. Economic saving of time results by crashing

A. Cheapest critical activity

B. Cheapest noncritical activity

C. Costliest critical activity

D. Costliest noncritical activity

Answer & Solution Discuss in Board (https://www.examveda.com/economic-saving-of-time-results-by-crashing-53380) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/economic-saving-of-time-results-by-crashing-53380)

3. If the output of a drag-line for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of
swing at 120 % of optimum depth of cut will be

A. Equal to X

B. More than X

C. Less than X

D. Any of the above

Answer & Solution

Discuss in Board (https://www.examveda.com/if-the-output-of-a-drag-line-for-90-angle-of-swing-at-optimum-depth-of-cut-is-x-then-the-output-for-120-angle-of-swing-at-120-percent-of-


53381)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-output-of-a-drag-line-for-90-angle-of-swing-at-
optimum-depth-of-cut-is-x-then-the-output-for-120-angle-of-swing-at-120-percent-of-53381)

Ad

Onorati Construction - Asphalt Resurfacing Services

onoraticonstruction.com Visit Site

4. A wheeled tractor hauling unit is working on firm earth. The total loaded weight distribution of this unit is:
Drive wheels: 25000 kg
Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the rimpull which this tractor can exert without
slipping is

A. 10000 kg

B. 12500 kg

C. 22500 kg

D. 5000 kg

Answer & Solution

Discuss in Board (https://www.examveda.com/a-wheeled-tractor-hauling-unit-is-working-on-firm-earth-the-total-loaded-weight-distribution-of-this-unit-is-drive-wheels-25000-kg-scraper-


wheels-10000-kgif-the-coefficient-of-53382)

Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-wheeled-tractor-hauling-unit-is-working-on-firm-earth-the-
total-loaded-weight-distribution-of-this-unit-is-drive-wheels-25000-kg-scraper-wheels-10000-kgif-the-coefficient-of-53382)

5. Critical path method

A. Is an improvement upon bar chart method


B. Provides a realistic approach to daily problems

C. Avoids delays which are very common in bar charts

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/critical-path-method-53383) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/critical-path-method-53383)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=4)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

HOT

Broken Tractor

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

66. Site order book is used for recording

A. Instructions by the executive engineers


Ad Highbridge - Historic Mortar Analysis
highbridgematerials.com Visit Site
B. Construction measurements

C. Issue of store equipments

D. Names of the casual labour

Answer & Solution Discuss in Board (https://www.examveda.com/site-order-book-is-used-for-recording-53374) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/site-order-book-is-used-for-recording-53374)

67. Which of the following does not represent an activity?

A. Site located

B. Foundation is being dug

C. The office area is being cleaned

D. The invitations are being sent

Answer & Solution Discuss in Board (https://www.examveda.com/which-of-the-following-does-not-represent-an-activity-53375) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-does-not-represent-an-activity-53375)

68. Sinking fund is

A. The fund for rebuilding a structure when its economic life is over

B. Raised to meet maintenance costs

C. The total sum to be paid to the municipal authorities by the tenants

D. A part of the money kept in reserve for providing additional structures and structural modifications

Answer & Solution Discuss in Board (https://www.examveda.com/sinking-fund-is-53376) Save for Later

Answer & Solution


Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/sinking-fund-is-53376)

HOT

Broken Tractor

69. Sensitivity analysis is a study of

A. Comparison of profit and loss

B. Comparison of assets and liabilities

C. Change in output due to change in input

D. Economics of cost and benefits of the project

Answer & Solution Discuss in Board (https://www.examveda.com/sensitivity-analysis-is-a-study-of-53377) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/sensitivity-analysis-is-a-study-of-53377)

70. In resources levelling

A. Total duration of project is reduced

B. Total duration of project is increased

C. Uniform demand of resources is achieved


D. Cost of project is controlled

Answer & Solution Discuss in Board (https://www.examveda.com/in-resources-levelling-53378) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-resources-levelling-53378)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)

5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)

6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)

7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)

8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)

9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)

10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)

11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)

13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)

14

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=3)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)


(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)

Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Ad

Historic Mortar Analysis


Highbridge Performs Analysis On A Variety Of Building
Materials.

highbridgematerials.com Visit Site

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

6. The time by which activity completion time can be delayed without affecting the start of succeeding activities, is
known as

A. Duration

B. Total float
8AM–4PM Boonton
C. Free float

D. Interfering float

Answer & Solution

Discuss in Board (https://www.examveda.com/the-time-by-which-activity-completion-time-can-be-delayed-without-affecting-the-start-of-succeeding-activities-is-known-as-53384)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-by-which-activity-completion-time-can-be-delayed-
without-affecting-the-start-of-succeeding-activities-is-known-as-53384)

7. If the scheduled completion time of a project is more than the earliest expected time for completion of the project,
then the probability of completion of the project within the scheduled completion time will be

A. 50 %

B. Less than 50 %

C. More than 50 %

D. 100 %

Answer & Solution

Discuss in Board (https://www.examveda.com/if-the-scheduled-completion-time-of-a-project-is-more-than-the-earliest-expected-time-for-completion-of-the-project-then-the-probability-of-


completion-of-the-project-within-the-53385)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-scheduled-completion-time-of-a-project-is-more-than-
the-earliest-expected-time-for-completion-of-the-project-then-the-probability-of-completion-of-the-project-within-the-53385)

8. The direct cost of a project with respect to normal time is

A. Minimum

B. Maximum

C. Zero
D. Infinite

Answer & Solution Discuss in Board (https://www.examveda.com/the-direct-cost-of-a-project-with-respect-to-normal-time-is-53386) Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-direct-cost-of-a-project-with-respect-to-normal-time-is-
53386)

Ad

Highbridge - Historic Mortar Analysis

highbridgematerials.com Visit Site

9. Whenever an activity has zero total float, then

A. Free float of the activity must be zero but independent float need not be zero

B. Independent float must be zero but free float need not be zero

C. Free float and independent float both must be zero

D. Free float and independent float both need not be zero

Answer & Solution Discuss in Board (https://www.examveda.com/whenever-an-activity-has-zero-total-float-then-53387) Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/whenever-an-activity-has-zero-total-float-then-53387)

10. While filling the tender for any work, the contractor considers

A. Site survey

B. Availability of construction materials


C. Availability of labour

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/while-filling-the-tender-for-any-work-the-contractor-considers-53388) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/while-filling-the-tender-for-any-work-the-contractor-
considers-53388)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=4)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Copyright © 2020   Examveda.com (https://www.examveda.com/)   Shemale escort (https://www.uescort.com/escorts/trans/)


  
(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)

Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

11. Railway projects are treated as

A. Light construction

B. Heavy construction

C. Industrial construction

D. None of these

Answer & Solution Discuss in Board (https://www.examveda.com/railway-projects-are-treated-as-53389) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/railway-projects-are-treated-as-53389)
12. If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of
Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine
will be equal to the cost of manual excavation is

A. 500 cum

B. 1000 cum

C. 1500 cum

D. 2000 cum

Answer & Solution

Discuss in Board (https://www.examveda.com/if-the-excavation-of-earth-is-done-manually-then-it-costs-rs-10-per-cum-a-machine-can-excavate-at-a-fixed-cost-of-rs-4000-plus-a-variable-


cost-53390)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-excavation-of-earth-is-done-manually-then-it-costs-rs-
10-per-cum-a-machine-can-excavate-at-a-fixed-cost-of-rs-4000-plus-a-variable-cost-53390)

13. Construction team means

A. An engineer

B. An architect

C. An owner

D. All the above

Answer & Solution Discuss in Board (https://www.examveda.com/construction-team-means-53391) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/construction-team-means-53391)
14. Assertion (A): Activity 57 is critical.
Reason (R): Earliest finish time and latest finish time for events 57 are same

A. A is correct but R is not correct

B. R is correct but A is not correct

C. Both A and R is correct

D. Both A and R is incorrect

Answer & Solution Discuss in Board (https://www.examveda.com/assertion-a-activity-57-is-criticalreason-r-earliest-finish-time-and-latest-finish-time-for-events-57-are-same-53392)

Save for Later

Answer & Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/assertion-a-activity-57-is-criticalreason-r-earliest-finish-
time-and-latest-finish-time-for-events-57-are-same-53392)

15. The time which results in the least possible construction cost of an activity, is known as

A. Normal time

B. Slow time

C. Crash time

D. Standard time

Answer & Solution Discuss in Board (https://www.examveda.com/the-time-which-results-in-the-least-possible-construction-cost-of-an-activity-is-known-as-53393) Save for Later

Answer & Solution

Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-which-results-in-the-least-possible-construction-
cost-of-an-activity-is-known-as-53393)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)

4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=4)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=4)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)

(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/)  Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3

Home (https://www.examveda.com/) Aptitude (https://www.examveda.com/mcq-question-on-arithmetic-ability/)

English (https://www.examveda.com/mcq-question-on-competitive-english/)

Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)

DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)

Current Affairs (https://www.examveda.com/daily-current-affairs/) Interview (https://www.examveda.com/interview/) Computer 

Programming  Engineering  More  Ask Question (https://www.examveda.com/ask-question/)

Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management

BP Excavation - Contact Us for Details


BP Excavation

For anything excavation related, we're here to


help!

WEBSITE CALL

Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)

Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)

Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)

16. The area under the Beta distribution curve is divided into two equal parts by

A. Most likely time

B. Optimistic time

C. Pessimistic time
We Specialize in All Aspects of Road
D. Expected time Construction.
Answer & Solution Discuss in Board (https://www.examveda.com/the-area-under-the-beta-distribution-curve-is-divided-into-two-equal-parts-by-53394) Save for Later

Answer & Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-area-under-the-beta-distribution-curve-is-divided-into-
two-equal-parts-by-53394)

17. The grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a
factor approximately equal to

A. 2 kg/tonne

B. 6 kg/tonne

C. 9 kg/tonne

D. 20 kg/tonne

Answer & Solution

Discuss in Board (https://www.examveda.com/the-grade-resistance-factor-for-an-earth-moving-machine-can-be-obtained-by-multiplying-grade-percentage-by-a-factor-approximately-equal-


to-53395)

Save for Later

Answer & Solution

Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-grade-resistance-factor-for-an-earth-moving-machine-
can-be-obtained-by-multiplying-grade-percentage-by-a-factor-approximately-equal-to-53395)

18. Which one of the following is not an excavating and moving type of equipment?

A. Bulldozer

B. Clam shell

C. Scraper

D. Dump truck   

Answer & Solution Discuss in Board (https://www.examveda.com/which-one-of-the-following-is-not-an-excavating-and-moving-type-of-equipment-53396) Save for Later

Answer & Solution


Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-one-of-the-following-is-not-an-excavating-and-
moving-type-of-equipment-53396)

 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)

1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3)

2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)

3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)

Read More Section(Construction Planning And Management)

Each Section contains maximum 70 questions. To get more questions visit other sections.

Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=1)

Construction Planning and Management - Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-


and-management/?section=2)

Copyright © 2020   Examveda.com (https://www.examveda.com/)      Shemale escort (https://www.uescort.com/escorts/trans/)

(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)

Contact Us (https://www.examveda.com/contact-us/)
Ads by
Grayhill CANbus Displays Text to Search...
Built for harsh
Stopenvironments
seeing thiscommon
ad Why in this ad?  OPEN
agriculture, construction, and mining vehicles.
Grayhill Inc.

Home About Contact Submit Project Affiliate Program Free Books

Update your Android App - Live on Google Play Store

Home MCQ Construction Construction Planning and Management Objective


Mechanical Engineering

Construction Planning and Manageme


1. MCQ Practice Tests

2. Timed Mock Tests

3. Online Quizzes Questions and Answers - Set 01


4. Technical Terms
 MCQ Construction
5. Mechanical Projects

6. Engineering Notes

7. Mechanical Interview

4. Piping Engg. Interview

Automobile Engineering

1. MCQ Practice Tests

3. Mock Test (Level I)



4. Mock Test (Level II) Practice Test: Question Set - 01
3. Online Quizzes
1. In time-cost optimization of a project, crashing is done.
4. Technical Terms Text to Search...
(A) On all the activities
5. Automobile Projects
(B) On all the activities lying on the critical path

6. Automobile Interview (C) Only on activities lying on the original critical path and having flat

(D) On original critical activities and those that become critical at any
order of ascending cost slope
Civil Engineering Correct Answer
Answer: Option D
1. MCQ Practice Tests

2. Mock Tests (Level I)


2. Which of the following does not represent an activity?

3. Mock Tests (Level II) (A) Site located

(B) Foundation is being dug


4. Online Quizzes
(C) The office area is being cleaned

5. Technical Terms (D) The invitations are being sent

Correct Answer
6. Civil Interview

3. In resources levelling
Electrical Engineering
(A) Total duration of project is reduced

1. MCQ Practice Tests (B) Total duration of project is increased

(C) Uniform demand of resources is achieved


2. Mock Tests (Level I)
(D) Cost of project is controlled

3. Mock Tests (Level II) Correct Answer

4. Online Quizzes
4. Sensitivity analysis is a study of
5. Electrical GK MCQ
(A) Comparison of profit and loss

6. Electrical Lab Viva (B) Comparison of assets and liabilities

(C) Change in output due to change in input

(D) Economics of cost and benefits of the project


Chemical Engineering
Correct Answer
1. MCQ Practice Tests

5. Preliminary project report for a road project must contain


2. Mock Tests (Level I)
(A) The detailed estimated cost based on detailed design 
3. Mock Tests (Level II)
(B) The several alternatives of the project that have been considered

4. Online Quizzes (C) The soil survey, traffic survey, concept design and approximate cos
(D) The contract documents for inviting tenders
Computer Science Text to Search...
Correct Answer
1. MCQ Practice Tests

2. Mock Tests (Level I) 6. For which of the following materials, the output of power shovels for a
maximum
3. Mock Tests (Level II) (A) Moist loam

(B) Good common earth


4. Online Quizzes
(C) Well blasted rock

(D) Wet sticky clay


GK National MCQ : India
Correct Answer

1. Basic National GK
7. If the output of a drag-line for 90° angle of swing at optimum depth of c
2. Ancient India 120° angle of swing at 120 % of optimum depth of cut will be

3. History of India (A) Equal to X

(B) More than X


4. Books and Authors
(C) Less than X

5. Economics and Indian Economy (D) Any of the above

Correct Answer
6. Famous Places in India

7. Indian Culture
8. In PERT analysis, the time estimates of activities and probability of thei

8. Famous Personalities (A) Normal distribution curve

(B) Poisson's distribution curve


9. National Days and Years
(C) Beta distribution curve
10. Research and Developments (D) None of the above

Correct Answer
11. Constitution of India & Indian
Politics

9. Free float is mainly used to


12. Honours and Awards

13. Indian Geography

GK MCQ : Indian Railways



1. Basic GK about Indian Railways
2. Departmental Interview Text to Search...
Questions Practice Tests

GK International MCQ

1. Basic International GK

2. Books and Authors


Grayhill CANbus Displays
3. World Organizations Built for harsh environments common in agricultu
construction, and mining vehicles.
4. International Days & Years
Grayhill Inc. Open
5. World Famous Personality
(A) Identify the activities which can be delayed without affecting the to
6. Worlds Honours and Awards activity

(B) Identify the activities, which can be delayed without affecting the t


7. World Geography activity

(C) Establish priorities

(D) Identify the activities which can be delayed without affecting the t
preceding or succeeding activities

Correct Answer

10. Grader is used mainly for

(A) Trimming and finishing

(B) Shaping and trimming

(C) Finishing and shaping

(D) Finishing, shaping and trimming

Correct Answer

11. Which of the following surfaces will give highest rolling resistance for

(A) Concrete

(B) Loose sand

(C) Asphalt

(D) Firm earth

Correct Answer 

12. Which of the following earth moving machines has the shortest cycle t
(A) Drag line
Text to Search...
(B) Hoe

(C) Clam shell

(D) Dipper shovel

Correct Answer

13. Updating may result in

(A) Change of critical path

(B) Decrease of project completion time

(C) Increase of project completion time

(D) All of the above

Correct Answer

14. The time by which a particular activity can be delayed without affectin
succeeding activities is known as

(A) Total float

(B) Free float

(C) Interfering float

(D) Independent float

Correct Answer

15. During the construction period, price variation clause in contracts cat

(A) Increase in rates of only important materials

(B) Variation in cost in materials element, labour element and petrol-o

(C) Variation in total cost of the project on an ad hoc basis

(D) Rate of inflation

Correct Answer

View All Answers


01. Answer: Option D 02. Answer: Option A 03. Answer: Option C 04. Answer: Option
Answer: Option A 07. Answer: Option C 08. Answer: Option C 09. Answer: Option B 1
Option B 12. Answer: Option D 13. Answer: Option D 14. Answer: Option D 15. Answe
Show/hide 

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08


Set 11 Text to Search...

   

Related Test Series ...

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Civil Construction Planning Objective Questions - Set 10

 Construction Management Objective Questions and Answers - Set 09

 Construction Planning Objective Questions and Answers - Set 08

 Construction Planning and Management MCQ - Set 07

 Study Materials Construction Planning and Management - Set 06

 Blogger Comment  Facebook Comm

     

Grayhill CANbus Displays

Built for harsh environments common in agriculture, construction, and mining


vehicles.

Grayhill Inc. Open


Text to Search...

PL/SQL Programs

Download Full Trial Version

Full-featured Oracle PL/SQL Development tool.


30-day trial version available.
allroundautomations.com

OPEN

1. Objective Mechanical Engineering & Technical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical Technical Interview

4. Civil Engineering MCQ with Interview Questions and


Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **


Engineering Solutions - Consulting Engineering Text to Search...

Firm
Ad engsolu.com

Multifamily Renovations - Apartment Unit Interiors


Ad onecallconstructionservice.com

Construction Planning MCQ Practice Test - Set 03


objectivebooks.com

Six Sigma Black Belt


Ad MT Mechanical Group, LLC

Civil Construction Multiple Choice Questions - Set


02
objectivebooks.com

Construction Planning Objective Questions and


Answers - Set 08
objectivebooks.com

Civil Engineering Construction Management


Questions - Set 05
objectivebooks.com

Construction Management Objective Questions


and Answers - Set 09
objectivebooks.com

Civil Construction Planning Objective Questions -


Set 10
objectivebooks.com

Construction Planning and Management Practice


Test
objectivebooks.com

Construction Planning and Management MCQ


Quiz - Set 04
objectivebooks.com


Popular Posts Category
Strength of Materials Objective Text to Search...
Questions with Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric
stress and volumetric strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and Answers


- Set 01
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...

Structural Analysis Objective Type Questions and


Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid Mechanics


MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the... 

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles Text to Search...
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective Type Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amazon.in KDP Books
1 4 0 0 Type your Ema
Amazon.com KDP & Paperback
1 0 2 2

© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | Terms of use | Privacy Policy


Advertise with Google Ads Text to Search...
With Google Ads, keep quality SIGN UP
customers coming and your business
going

Home About Cont act Submit Project Affiliat e Program Free Books

Update your Android App - Live on Google Play Store

Home MCQ Construction Civil Construction Multiple Choice Questions - S


Mechanical Engineering

Civil Construction Multiple Choice Qu


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es 02
4. T echnical T erms
 MCQ Construction
5. Mechanical Projects
Onorati Construction - Asphalt
6. Engineering Notes Resurf acing Services
Onorati Construction Co., Inc.
7. Mechanical Interview

We Specialize in All Aspects of Road


4. Piping Engg. Interview Construction.

Automobile Engineering

1. MCQ Practice T ests

3. Mock T est (Level I) WEBSITE DIRECTIONS



4. Mock T est (Level II)
Practice Test: Question Set - 02
3. Online Quiz z es
1. Critical path method
4. T echnical T erms Text to Search...
(A) Is an improvement upon bar chart method
5. Automobile Projects
(B) Provides a realistic approach to daily problems

6. Automobile Interview (C) Avoids delays which are very common in bar charts

(D) All the above

Correct Answer
Civil Engineering

1. MCQ Practice T ests 2. At a work site, statistical quality control of concrete means

(A) Measurement of risks to eliminate failures


2. Mock T ests (Level I)
(B) Applying the theory' of probability to sample testing or inspection
3. Mock T ests (Level II)
(C) Reduction in wastage of inspection costs

4. Online Quiz z es (D) Reduction in costs for the removal of defects

Correct Answer
5. T echnical T erms

6. Civil Interview 3. For the network shown in the g iven fig ure, the expected time for the ac

Electrical Engineering

(A) 1-2 is 4
1. MCQ Practice T ests
(B) 2-3 is 7
2. Mock T ests (Level I)
(C) 3-4 is 8

3. Mock T ests (Level II) (D) All the above

Correct Answer
4. Online Quiz z es

5. Electrical GK MCQ
4. A critical ratio scheduling

6. Electrical Lab Viva (A) Determines the status of each activity

(B) Adjusts automatically changes in activity progress

(C) Is a dynamic system


Chemical Engineering
(D) None of these

1. MCQ Practice T ests Correct Answer

2. Mock T ests (Level I)


5. For a g iven activity, the optimistic time, pessimistic time and the most p
3. Mock T ests (Level II) and 8 days respectively, T he expected time is

(A) 8 days
4. Online Quiz z es
(B) 9 days
(C) 10 days
Computer Science Text to Search...
(D) 15 days

1. MCQ Practice T ests Correct Answer

2. Mock T ests (Level I)


6. Pick up the correct statement from the following :
3. Mock T ests (Level II)
(A) Optimistic time estimate refers to activities

4. Online Quiz z es (B) Pessimistic time estimate refers to activities

(C) Most likely time estimate refers to activities

(D) All the above


GK National MCQ : India
Correct Answer
1. Basic National GK

7. In the time-cost optimisation, using CPM method for network analysis,


2. Ancient India
along the critical path is done starting with the activity having

3. History of India (A) Longest duration

(B) Highest cost slope


4. Books and Authors
(C) Least cost slope
5. Economics and Indian (D) Shortest duration
Economy
Correct Answer
6. Famous Places in India

7. Indian Culture 8. A g olden rule for the procurement of construction stones, sug g ests

(A) 100% at the site


8. Famous Personalities
(B) 67% at the site and 33% under procurement

9. National Days and Years (C) 50% at the site and 50% under procurement

(D) 33% at the site and 67% under procurement


10. Research and Developments
Correct Answer
11. Constitution of India &
Indian Politics
9. T he time with which direct cost does not reduce with the increase in tim
12. Honours and Awards

13. Indian Geography

GK MCQ : Indian Railways



1. Basic GK about Indian
Railways
2. Departmental Interview Onorati Construction - Asphalt
Text to Search...
Questions Practice T ests Resurf acing Services
Onorati Construction Co., Inc.

GK International MCQ We Specialize in All Aspects of Road


Construction.
1. Basic International GK

2. Books and Authors

3. World Organiz ations

4. International Days & Years WEBSITE DIRECTIONS

5. World Famous Personality


(A) Crash time
6. Worlds Honours and Awards
(B) Normal time

7. World Geography (C) Optimistic time

(D) Standard time

Correct Answer

10. Pick up the correct statement from the following with reg ards to C.P.M
projects

(A) The latest occurrence time of the node of which the activity arrow te
duration of the activity, is called latest start time

(B) The latest occurrence time for the node at which the activity arrow t
finish time

(C) Earliest occurrence time of the event from which the activity arrow
earliest start time of the activity

(D) All the above

Correct Answer

11. Interfering float is the difference between

(A) Total float and free float

(B) Total float and independent float

(C) Free float and independent float

(D) None of the above

Correct Answer 

12. While filling the tender for any work, the contractor considers
(A) Site survey
Text to Search...
(B) Availability of construction materials

(C) Availability of labour

(D) All the above

Correct Answer

13. An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It
end of 8 years. T he book value of the excavator at the end of 3 years usin
balance method is

(A) Rs. 8,43,750

(B) Rs. 8,75,000

(C) Rs. 10,50,000

(D) Rs. 11,56,250

Correct Answer

14. Pick up the incorrect statement from the following :

(A) The various functions under each activity, are shown by one bar on

(B) Bar chart establishes the interdependency of one event on another

(C) Only approximate percentage of the completed work is reported

(D) None of these

Correct Answer

15. A wheeled tractor hauling unit is working on firm earth. T he total load
unit is:
    Drive wheels: 25000 kg
    Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the ri
exert without slipping is

(A) 10000 kg

(B) 12500 kg

(C) 22500 kg

(D) 5000 kg

Correct Answer
Answer: Option B

View All Answers


01. Answer: Option D 02. Answer: Option B 03. Answer: Option D 04. Answer: Option
Text to Search...
Option D 07. Answer: Option C 08. Answer: Option B 09. Answer: Option B 10. Answer
12. Answer: Option D 13. Answer: Option A 14. Answer: Option B 15. Answer: Option B
Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   

Relat ed Test Series ...

 Study Materials Construction Planning and Management - Set 06

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Civil Construction Planning Objective Questions - Set 10

 Construction Management Objective Questions and Answers - Set 0

 Construction Planning Objective Questions and Answers - Set 08

 Construction Planning and Management MCQ - Set 07

 Blogger Comment  Facebook Comm

     


Text to Search...

Sponsored by
Open
ledwell.com

Quality Craftsmanship
We Help You with All Your Kitchen
Remodeling Services.
GENPRO Remodeling

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview 

4. Civil Engineering MCQ with Interview Questions


and Answers
5. Objective Electrical Engineering with Interview
Text to Search...
Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **


Pro Engineering Consulting - Over 25 Years of Text to Search...
Experience
Ad proengc.com

Civil Engineering Consulting - Development and


Utilities
Ad valorcivilengineeringpllc.com

Civil Engineering MCQ Practice Tests


objectivebooks.com

HBH Construction Inc - NYC Bathroom


Remodeling
Ad hbhconstructioninc.com

Construction Management Objective Questions


and Answers - Set 09
objectivebooks.com

Civil Construction Planning Objective Questions -


Set 10
objectivebooks.com

Construction Planning and Management Objective


Questions and Answers - Set 01
objectivebooks.com

Construction Planning Objective Questions and


Answers - Set 08
objectivebooks.com

Civil Engineering Construction Management


Questions - Set 05
objectivebooks.com

Construction Planning MCQ Practice Test - Set 0


objectivebooks.com

Construction Planning and Management Practice


Test
objectivebooks.com


Popular Post s Cat egor y
Strength of Materials Text to Search...
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...

Structural Analysis Objective T ype Questions and


Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with Text to Search...
Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 1 3

© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy


Text to Search...
Round Table Pizza
INSTALL
Rewards

Home About Cont act Submit Project Affiliat e Program Free Books

Update your Android App - Live on Google Play Store

Home MCQ Construction Construction Management Objective Questions


Mechanical Engineering

Construction Management Objective


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es Answers - Set 09


4. T echnical T erms
 MCQ Construction
5. Mechanical Projects
Bluelam - Site Preparation Servic
6. Engineering Notes
Bluelam LLC
7. Mechanical Interview
We Help Builders Bring Quality and
4. Piping Engg. Interview Consistency to New Construction Projec

Automobile Engineering

1. MCQ Practice T ests

3. Mock T est (Level I) WEBSITE CALL



4. Mock T est (Level II)
Practice Test: Question Set - 09
3. Online Quiz z es
1. Consider the following statements:
4. T echnical T erms Text to Search...
    Wheeled tractors are replacing crawler tractors because

5. Automobile Projects     1. Wheeled tractors travel faster.


    2. Crawler tractors are more expensive.
6. Automobile Interview     3. T rack parts of a crawler wear out quickly.
    4. Crawler tractors have stick control.
    Of these statements

Civil Engineering (A) 1, 3 and 4 are correct

(B) 2, 3 and 4 are correct


1. MCQ Practice T ests
(C) 1, 2 and 3 are correct

2. Mock T ests (Level I) (D) 1, 2 and 4 are correct

Correct Answer
3. Mock T ests (Level II)
Answer: Option C

4. Online Quiz z es

2. T he difference between the time avail-to do a job and the time required
5. T echnical T erms
(A) Event
6. Civil Interview
(B) Float

(C) Duration

Electrical Engineering (D) Constraint

Correct Answer
1. MCQ Practice T ests

2. Mock T ests (Level I) 3. T he g rade resistance factor for an earth moving machine can be obtain
percentag e by a factor approximately equal to
3. Mock T ests (Level II)
(A) 2 kg/tonne

4. Online Quiz z es (B) 6 kg/tonne

(C) 9 kg/tonne
5. Electrical GK MCQ
(D) 20 kg/tonne
6. Electrical Lab Viva Correct Answer

Chemical Engineering 4. A dummy activity

(A) Is artificially introduced


1. MCQ Practice T ests
(B) Is represented by a dotted line

2. Mock T ests (Level I) (C) Does not consume time

(D) All the above


3. Mock T ests (Level II) 
Correct Answer
4. Online Quiz z es

5. T he reduction in project time normally results in


(A) Decreasing the direct cost and increasing indirect cost
Computer Science Text to Search...
(B) Increasing the direct cost and decreasing the indirect cost

1. MCQ Practice T ests (C) Increasing the direct cost and indirect cost both

(D) Decreasing the direct cost and indirect cost both


2. Mock T ests (Level I)
Correct Answer
3. Mock T ests (Level II)

4. Online Quiz z es 6. Frederick W. Taylor introduced a system of working known as

(A) Line organization

(B) Line and staff organization


GK National MCQ : India
(C) Functional organization

1. Basic National GK (D) Effective organization

Correct Answer
2. Ancient India

3. History of India
7. T he area under the Beta distribution curve is divided into two equal pa

4. Books and Authors (A) Most likely time

(B) Optimistic time
5. Economics and Indian
(C) Pessimistic time
Economy
(D) Expected time
6. Famous Places in India
Correct Answer

7. Indian Culture

8. CPM is
8. Famous Personalities
(A) Synthesising in concepts
9. National Days and Years
(B) Is built of activities oriented programme

10. Research and Developments (C) Is based on time estimate

(D) All the above


11. Constitution of India &
Correct Answer
Indian Politics

12. Honours and Awards


9. A four wheel truck or whose operating weig ht is 12000 kg is pulled alon
of 2% at a uniform speed. Assume g rade resistance factor = 10 kg /tonne. T
13. Indian Geography
720 kg . T he rolling resistance of the road will be

GK MCQ : Indian Railways



1. Basic GK about Indian
Railways
2. Departmental Interview
Bluelam - SiteText
Preparation
to Search... Servic
Questions Practice T ests
Bluelam LLC

GK International MCQ We Help Builders Bring Quality and


Consistency to New Construction Projec
1. Basic International GK

2. Books and Authors

3. World Organiz ations

4. International Days & Years WEBSITE CALL

5. World Famous Personality

(A) 20 kg/tonne
6. Worlds Honours and Awards
(B) 30 kg/tonne
7. World Geography (C) 40 kg/tonne

(D) 50 kg/tonne

Correct Answer

10. T he Overall in-charg e of an org anization at the site responsible for th

(A) Executive Engineer

(B) Engineer

(C) Junior Engineer

(D) Assistant Engineer

Correct Answer

11. Consider the following features/factors:


     1. Projects are of the non-repetitive type
     2. T ime required need not be known
     3. T ime required is known precisely
     4. Events have been established for planning
     5. Emphasis is g iven to activities of project
     PERT is preferred for planning because of

(A) 1, 2 and 4

(B) 3, 4 and 5

(C) 1, 3 and 4 
(D) 1, 2 and 5

Correct Answer
Text to Search...
12. T he first stag e of a construction, is

(A) Preparation of estimate

(B) Survey of the site

(C) Initiation of proposal

(D) Preparation of tender

Correct Answer

13. Crash project duration is obtained by summing the

(A) Normal durations for all the activities

(B) Crash durations for all activities

(C) Crash durations for all the activities along the critical path obtained
normal duration for all the activities

(D) Crash durations for all the activities along the critical path obtained
crash duration for all the activities

Correct Answer

14. Pick up the correct statement from the following :

(A) Forward pass is used for calculating earliest expected time

(B) Backward pass is used for calculating the latest occurrence time

(C) Maximum value of earliest expected time is used if there is more tha

(D) All the above

Correct Answer

15. Sinking fund is

(A) The fund for rebuilding a structure when its economic life is over

(B) Raised to meet maintenance costs

(C) The total sum to be paid to the municipal authorities by the tenants

(D) A part of the money kept in reserve for providing additional struct
modifications

Correct Answer

View All Answers


01. Answer: Option C 02. Answer: Option B 03. Answer: Option C 04. Answer:
Option D
Option C 07. Answer: Option D 08. Answer: Option D 09. Answer: Option C 10. Answe
12. Answer: Option C 13. Answer: Option D 14. Answer: Option D 15. Answer: Option A
Show/hide
Text to Search...
Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   

Relat ed Test Series ...

 Construction Planning and Management MCQ - Set 07

 Study Materials Construction Planning and Management - Set 06

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Civil Construction Planning Objective Questions - Set 10

 Construction Planning Objective Questions and Answers - Set 08

 Blogger Comment  Facebook Comm

     

The Daily Wire


Meet the Daily Wire App

INSTALL

Text to Search...

GENPRO
We Build Great Products and
Deliver Good Experiences.
GENPRO Remodeling

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview

4. Civil Engineering MCQ with Interview Questions


and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **

Track Your Workf orce Text to Search...
Ad Eyrus

Used Tractors f or Sale


Ad Machinery Pete

Construction Planning MCQ Practice Test - Set 0


objectivebooks.com

Engineering MEP Consultants - Engineering MEP


Consultants
Ad proengc.com

Construction Planning Objective Questions and


Answers - Set 08
objectivebooks.com

Civil Construction Multiple Choice Questions - Se


02
objectivebooks.com

Construction Planning and Management Objective


Questions and Answers - Set 01
objectivebooks.com

Civil Engineering Construction Management


Questions - Set 05
objectivebooks.com

Civil Construction Planning Objective Questions -


Set 10
objectivebooks.com

Construction Planning and Management Practice


Test
objectivebooks.com

Construction Planning and Management MCQ


Quiz - Set 04
objectivebooks.com


Popular Post s Cat egor y
Strength of Materials Text to Search...
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...

Structural Analysis Objective T ype Questions and


Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with Text to Search...
Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 3 7 3

© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy


RegisterAdsforby Engage Text to Search...
Everywhere
St op seeing t his ad Why t his ad?  OPEN
Join Jeff Lawson and Yuval Noah
Harari for an Online Event

Home About Cont act Submit Project Affiliat e Program Free Books

Update your Android App - Live on Google Play Store

Home MCQ Construction Construction Planning MCQ Practice Test - Set 0


Mechanical Engineering

Construction Planning MCQ Practice


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es  MCQ Construction

4. T echnical T erms

5. Mechanical Projects

6. Engineering Notes

7. Mechanical Interview

4. Piping Engg. Interview

Track Your Workforce


Automatically track the workforce in rea
Automobile Engineering time with the Eyrus platform
Eyrus Open
1. MCQ Practice T ests

3. Mock T est (Level I) Practice Test: Question Set - 03



4. Mock T est (Level II)
1. If the expected time of completion of a project is 60 weeks with a standa
3. Online Quiz z es probability of completing the project in 50 weeks and 65 weeks respectiv
4. T echnical T erms (A) 2.3% and 84.1%
Text to Search...
(B) 97.7% and 84.1%
5. Automobile Projects
(C) 97.7 % and 15.9%

6. Automobile Interview (D) 15.9% and 97.7%

Correct Answer

Civil Engineering
2. Power stations are g enerally treated as
1. MCQ Practice T ests (A) Light construction

(B) Heavy construction
2. Mock T ests (Level I)
(C) Industrial construction
3. Mock T ests (Level II)
(D) Electrical construction

4. Online Quiz z es Correct Answer

5. T echnical T erms
3. For a g iven size of bucket, the ideal output of a drag line will be least in
6. Civil Interview
(A) Moist loam

(B) Sand and gravel

Electrical Engineering (C) Good common earth

(D) Wet sticky clay


1. MCQ Practice T ests
Correct Answer

2. Mock T ests (Level I)

4. Bar charts are suitable for


3. Mock T ests (Level II)
(A) Minor works
4. Online Quiz z es (B) Major works

5. Electrical GK MCQ (C) Large projects

(D) All the Above


6. Electrical Lab Viva
Correct Answer

Chemical Engineering 5. T he time corresponding to minimum total project cost is

(A) Crash time


1. MCQ Practice T ests
(B) Normal time
2. Mock T ests (Level I) (C) Optimistic time

(D) Between normal time and crash time


3. Mock T ests (Level II) 
Correct Answer
4. Online Quiz z es
6. Construction team means
Computer Science Text to Search...
(A) An engineer

1. MCQ Practice T ests (B) An architect

(C) An owner
2. Mock T ests (Level I)
(D) All the above
3. Mock T ests (Level II) Correct Answer

4. Online Quiz z es
7. Select the incorrect statement.

(A) Start float and finish float are always equal


GK National MCQ : India
(B) Total float can be either start float or finish float

1. Basic National GK (C) Start float and finish float need not be equal

(D) Start float and finish float are the differences between activity times
2. Ancient India
Correct Answer
3. History of India

4. Books and Authors 8. T he artificial activity which indicates that an activity following it, canno
preceding activity is complete, is known as
5. Economics and Indian (A) Event
Economy
(B) Free float

6. Famous Places in India (C) Dummy

(D) Constraint
7. Indian Culture
Correct Answer
8. Famous Personalities

9. National Days and Years 9. PERT technique of network analysis is mainly useful for

(A) Small projects


10. Research and Developments
(B) Large and complex projects
11. Constitution of India & (C) Research and development projects
Indian Politics
(D) Deterministic activities

12. Honours and Awards Correct Answer

13. Indian Geography


10. Pick up the correct statement from the following :

GK MCQ : Indian Railways



1. Basic GK about Indian
Railways
2. Departmental Interview Text to Search...
Questions Practice T ests

GK International MCQ

1. Basic International GK

2. Books and Authors


Track Your Workforce
3. World Organiz ations
Automatically track the workforce in r
time with the Eyrus platform
4. International Days & Years
Eyrus Open
5. World Famous Personality

(A) The float may be positive, zero or negative


6. Worlds Honours and Awards
(B) If the float is positive and the activity is delayed by a period equal to
7. World Geography completion of project is not delayed

(C) If the float of an activity is negative, delay in its performance is boun


of project

(D) All the above

Correct Answer

11. T he independent float affects only

(A) Preceding activities

(B) Succeeding activities

(C) The particular activity involved

(D) None of the above

Correct Answer

12. T he time by which activity completion time can be delayed without affe
activities, is known as

(A) Duration

(B) Total float

(C) Free float

(D) Interfering float

Correct Answer 

13. T he part of a derrick crane include


      (i) Mast
Text to Search...
      (ii) Boom
      (iii) Bull wheel
      (iv) Jack
      Of these statements

(A) (i), (ii) and (iv) are correct

(B) (ii), (iii) and (iv) are correct

(C) (i), (iii) and (iv) are correct

(D) (i), (ii) and (iii) are correct

Correct Answer

14. Site order book is used for recording

(A) Instructions by the executive engineers

(B) Construction measurements

(C) Issue of store equipments

(D) Names of the casual labour

Correct Answer

15. If the g ross vehicle weig ht of a truck is 30 tonne and rolling resistance
tractive effort required to keep the truck moving at a uniform speed is

(A) 30 kg

(B) 300 kg

(C) 900 kg

(D) 1000 kg

Correct Answer
Answer: Option C

View All Answers


01. Answer: Option A 02. Answer: Option C 03. Answer: Option D 04. Answer: Option A
Option D 07. Answer: Option C 08. Answer: Option C 09. Answer: Option C 10. Answer
12. Answer: Option C 13. Answer: Option D 14. Answer: Option A 15. Answer: Option C
Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   
Text to Search...

Relat ed Test Series ...

 Study Materials Construction Planning and Management - Set 06

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Civil Construction Planning Objective Questions - Set 10

 Construction Management Objective Questions and Answers - Set 0

 Construction Planning Objective Questions and Answers - Set 08

 Construction Planning and Management MCQ - Set 07

 Blogger Comment  Facebook Comm

     
Onorati Construction - Asphalt
Resurfacing Services
Onorati Construction Co., Inc.

We Specialize in All Aspects of Road


Construction.

WEBSITE DIRECTIONS


Onorati Construction - Established in Text to Search...
1918
Onorati Construction Co., Inc.

We Are a Premier Civil Construction


Company.Contact Us for Details.

WEBSITE DIRECTIONS

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview

4. Civil Engineering MCQ with Interview Questions


and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **


Looking f or a Paving Company? - Onorati Text to Search...
Construction Co., Inc.
Ad onoraticonstruction.com

Building Engineering Course - Learn Cutting Edge


Skills
Ad skill-lync.com

Civil Construction Multiple Choice Questions - Se


02
objectivebooks.com

Node AEC - Architecture & Engineering


Ad nodeaec.com

Construction Planning Objective Questions and


Answers - Set 08
objectivebooks.com

Construction Management Objective Questions


and Answers - Set 09
objectivebooks.com

Construction Planning and Management Objective


Questions and Answers - Set 01
objectivebooks.com

Civil Engineering Construction Management


Questions - Set 05
objectivebooks.com

Civil Construction Planning Objective Questions -


Set 10
objectivebooks.com

Industrial Engineering and Production


Management MCQ Practice Test
objectivebooks.com

Construction Planning and Management MCQ


Quiz - Set 04
objectivebooks.com


Text to Search...

Popular Post s Cat egor y

Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01 
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...
Structural Analysis Objective T ype Questions and
Text to Search...
Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 1 9 
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...


Home About Cont act Submit Project Affiliat e Program Free BooksText to Search...

Update your Android App - Live on Google Play Store

Home MCQ Construction Civil Construction Multiple Choice Questions - S


Mechanical Engineering

Civil Construction Multiple Choice Qu


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es 02
4. T echnical T erms
 MCQ Construction
5. Mechanical Projects
Onorati Construction - Asphalt
6. Engineering Notes Resurf acing Services
Onorati Construction Co., Inc.
7. Mechanical Interview

We Specialize in All Aspects of Road


4. Piping Engg. Interview Construction.

Automobile Engineering

1. MCQ Practice T ests

3. Mock T est (Level I) WEBSITE DIRECTIONS

4. Mock T est (Level II)


Practice Test: Question Set - 02
3. Online Quiz z es

4. T echnical T erms 1. Critical path method

(A) Is an improvement upon bar chart method


5. Automobile Projects 
Advertise with Google
(B) Provides Adsapproach to daily problems
a realistic
With Google Ads, keep quality SIGN UP
6. Automobile Interview (C) Avoids
customers coming anddelays which are very common in bar charts
your business
going
(D) All the above
Correct Answer
Civil Engineering Text to Search...

1. MCQ Practice T ests 2. At a work site, statistical quality control of concrete means

2. Mock T ests (Level I) (A) Measurement of risks to eliminate failures

(B) Applying the theory' of probability to sample testing or inspection


3. Mock T ests (Level II)
(C) Reduction in wastage of inspection costs

4. Online Quiz z es (D) Reduction in costs for the removal of defects

Correct Answer
5. T echnical T erms

6. Civil Interview
3. For the network shown in the g iven fig ure, the expected time for the ac

Electrical Engineering

1. MCQ Practice T ests (A) 1-2 is 4

(B) 2-3 is 7
2. Mock T ests (Level I)
(C) 3-4 is 8

3. Mock T ests (Level II) (D) All the above

Correct Answer
4. Online Quiz z es

5. Electrical GK MCQ
4. A critical ratio scheduling

6. Electrical Lab Viva (A) Determines the status of each activity

(B) Adjusts automatically changes in activity progress

(C) Is a dynamic system


Chemical Engineering
(D) None of these

1. MCQ Practice T ests Correct Answer

2. Mock T ests (Level I)


5. For a g iven activity, the optimistic time, pessimistic time and the most p
3. Mock T ests (Level II) and 8 days respectively, T he expected time is

(A) 8 days
4. Online Quiz z es
(B) 9 days

(C) 10 days
Computer Science (D) 15 days

Correct Answer 
1. MCQ Practice T ests

2. Mock T ests (Level I)


6. Pick up the correct statement from the following :
3. Mock T ests (Level II) (A) Optimistic time estimate refers to activities
Text to Search...
(B) Pessimistic time estimate refers to activities
4. Online Quiz z es
(C) Most likely time estimate refers to activities

(D) All the above

GK National MCQ : India Correct Answer

1. Basic National GK
7. In the time-cost optimisation, using CPM method for network analysis,
2. Ancient India along the critical path is done starting with the activity having

(A) Longest duration


3. History of India
(B) Highest cost slope
4. Books and Authors (C) Least cost slope

(D) Shortest duration
5. Economics and Indian
Economy Correct Answer

6. Famous Places in India


8. A g olden rule for the procurement of construction stones, sug g ests
7. Indian Culture
(A) 100% at the site

8. Famous Personalities (B) 67% at the site and 33% under procurement

(C) 50% at the site and 50% under procurement


9. National Days and Years
(D) 33% at the site and 67% under procurement

10. Research and Developments Correct Answer

11. Constitution of India &


Indian Politics 9. T he time with which direct cost does not reduce with the increase in tim

12. Honours and Awards


Onorati Construction - Asphalt
Resurf acing Services
13. Indian Geography
Onorati Construction Co., Inc.

We Specialize in All Aspects of Road


GK MCQ : Indian Railways Construction.

1. Basic GK about Indian


Railways

2. Departmental Interview
Questions Practice T ests
WEBSITE DIRECTIONS

GK International MCQ
(A) Crash time
1. Basic International GK (B) Normal time
Text to Search...
(C) Optimistic time
2. Books and Authors
(D) Standard time

3. World Organiz ations Correct Answer

4. International Days & Years


10. Pick up the correct statement from the following with reg ards to C.P.M
5. World Famous Personality projects

(A) The latest occurrence time of the node of which the activity arrow te
6. Worlds Honours and Awards
duration of the activity, is called latest start time

7. World Geography (B) The latest occurrence time for the node at which the activity arrow t
finish time

(C) Earliest occurrence time of the event from which the activity arrow
earliest start time of the activity

(D) All the above

Correct Answer

11. Interfering float is the difference between

(A) Total float and free float

(B) Total float and independent float

(C) Free float and independent float

(D) None of the above

Correct Answer

12. While filling the tender for any work, the contractor considers

(A) Site survey

(B) Availability of construction materials

(C) Availability of labour

(D) All the above

Correct Answer

13. An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It
end of 8 years. T he book value of the excavator at the end of 3 years usin
balance method is

(A) Rs. 8,43,750



(B) Rs. 8,75,000

(C) Rs. 10,50,000


(D) Rs. 11,56,250
Text to Search...
Correct Answer

14. Pick up the incorrect statement from the following :

(A) The various functions under each activity, are shown by one bar on

(B) Bar chart establishes the interdependency of one event on another

(C) Only approximate percentage of the completed work is reported

(D) None of these

Correct Answer

15. A wheeled tractor hauling unit is working on firm earth. T he total load
unit is:
    Drive wheels: 25000 kg
    Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the ri
exert without slipping is

(A) 10000 kg

(B) 12500 kg

(C) 22500 kg

(D) 5000 kg

Correct Answer

View All Answers


Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   

Relat ed Test Series ...

 Construction Management Objective Questions and Answers


- Set 0

 Construction Planning Objective Questions and Answers - Set 08


 Construction Planning and ManagementText
MCQ to -Search...
Set 07

 Study Materials Construction Planning and Management - Set 06

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Civil Construction Planning Objective Questions - Set 10

 Blogger Comment  Facebook Comm

     

Commercial Contractor
Schedule your estimate today
GENPRO Remodeling


Text to Search...

Quality Craftsmanship
We Help You with All Your Kitchen
Remodeling Services.
GENPRO Remodeling

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview

4. Civil Engineering MCQ with Interview Questions


and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **

Pro Engineering Consulting - Over 25 Years of Text to Search...
Experience
Ad proengc.com

Give The Gif t Of Balance


Ad ISLE®

Civil Engineering MCQ Practice Tests


objectivebooks.com

Civil Engineering Consulting - Development and


Utilities
Ad valorcivilengineeringpllc.com

Construction Management Objective Questions


and Answers - Set 09
objectivebooks.com

Civil Construction Planning Objective Questions -


Set 10
objectivebooks.com

Construction Planning and Management Objective


Questions and Answers - Set 01
objectivebooks.com

Construction Planning Objective Questions and


Answers - Set 08
objectivebooks.com

Civil Engineering Construction Management


Questions - Set 05
objectivebooks.com

Construction Planning MCQ Practice Test - Set 0


objectivebooks.com

Construction Planning and Management Practice


Test
objectivebooks.com


Text to Search...

Popular Post s Cat egor y

Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01 
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...
Structural Analysis Objective T ype Questions and
Text to Search...
Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 3 8 4 
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...


Home About Cont act Submit Project Affiliat e Program Free Books

Update your Android App - Live on Google Play Store

Text to Search...

Home MCQ Construction Construction Planning and Management MCQ Q


Mechanical Engineering

Construction Planning and Managem


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es Set 04


4. T echnical T erms
 MCQ Construction
5. Mechanical Projects

6. Engineering Notes

7. Mechanical Interview

4. Piping Engg. Interview

Automobile Engineering
Grayhill CANbus Keypads
1. MCQ Practice T ests A wide array of form factors and customization
options with J1939 or CANopen available.
3. Mock T est (Level I) Grayhill Inc. Open

4. Mock T est (Level II)


Practice Test: Question Set - 04
3. Online Quiz z es

4. T echnical T erms 1. Works costing less than Rs. 20,000 are treated as

(A) Any project


5. Automobile Projects
(B) Major projects
Grayhill CANbus Keypads
6. Automobile Interview (C) Minor projects
A wide array of form factors and customization OPEN
options with J1939 or(D)
CANopen available.
All the above
Grayhill Inc.
Correct Answer
Civil Engineering

1. MCQ Practice T ests 2. A machine costs Rs. 20000 and its useful life is 8 years. T he money is bor
annum. T he capital recovery factor at 8% interest per annum for 8 years
2. Mock T ests (Level I) cost of the machine will be

3. Mock T ests (Level II) (A) Rs. 1740

(B) Rs. 3480


4. Online Quiz z es
(C) Rs. 5220

5. T echnical T erms (D) Rs. 6960

Correct Answer
6. Civil Interview

3. Railway projects are treated as


Electrical Engineering
(A) Light construction

1. MCQ Practice T ests (B) Heavy construction

(C) Industrial construction
2. Mock T ests (Level I)
(D) None of these

3. Mock T ests (Level II) Correct Answer

4. Online Quiz z es
4. Consider the following statements:
5. Electrical GK MCQ     In the critical path method of construction planning , Free Float can be.
    1. Greater than Total Float.
6. Electrical Lab Viva     2. Greater than Independent Float
    3. Equal to Total Float.
    4. Less than Independent Float

Chemical Engineering     Of these statements

(A) 1 and 4 are correct


1. MCQ Practice T ests (B) 2 and 3 are correct

2. Mock T ests (Level I) (C) 1 and 4 are correct

(D) 1 and 2 are correct


3. Mock T ests (Level II)
Correct Answer
4. Online Quiz z es

5. Pick up the correct statement from the following :

(A) The duration between the earliest start time of the preceding event
Computer Science
succeeding event, is called 'float'

1. MCQ Practice T ests (B) The duration of time by which an activity can be delayed without aff
activity, is called free float
2. Mock T ests (Level I) (C) The difference between total float and free float, is called interferin
3. Mock T ests (Level II) (D) All the above

Correct Answer
4. Online Quiz z es

6. T he orig inal cost of an equipment is Rs.10,000. Its salvag e value at the e


GK National MCQ : India five years is Rs. 1,000. Its book value at the end of two years of its useful l
method of evaluation of depreciation) will be

1. Basic National GK (A) Rs. 8,800

(B) Rs. 7,600


2. Ancient India
(C) Rs. 6,400
3. History of India (D) Rs. 5,000

4. Books and Authors Correct Answer

5. Economics and Indian


Economy 7. For completion of a project, the critical path of the network represents

(A) Minimum time


6. Famous Places in India
(B) Maximum time

7. Indian Culture (C) Maximum cost

(D) Minimum cost


8. Famous Personalities
Correct Answer
9. National Days and Years

10. Research and Developments 8. T he maximum rimpull in the first g ear of a tractor while towing a load i
12.5 tonnes and is operating along a 2 percent upg rade and the rolling re
11. Constitution of India & available for towing the load is
Indian Politics (A) 3425 kg

12. Honours and Awards (B) 5515 kg

(C) 4350 kg
13. Indian Geography
(D) 2975 kg

Correct Answer
GK MCQ : Indian Railways
9. Which one of the following represents an event?
1. Basic GK about Indian
Railways

2. Departmental Interview
Questions Practice T ests

GK International MCQ
1. Basic International GK

2. Books and Authors

3. World Organiz ations

4. International Days & Years

5. World Famous Personality

6. Worlds Honours and Awards Grayhill CANbus Keypads


A wide array of form factors and customization
7. World Geography options with J1939 or CANopen available.

Grayhill Inc. Open

(A) Concrete cured

(B) Fixing of door

(C) Plastering of walls

(D) Selecting sites

Correct Answer

10. T he rated loads of lifting cranes, as percentag e of tipping load at spe


mounted and pneumatic tyre-mounted machines would be respectively

(A) 80 and 90

(B) 90 and 80

(C) 85 and 75

(D) 75 and 83

Correct Answer

11. Optimistic time, most likely time and pessimistic times for the activitie
fig ure are written above their arrows. If the contractual oblig ation time f
occurrence time for the event 2, is

(A) 20

(B) 25

(C) 35

(D) 15

Correct Answer
12. An earth moving equipment costs Rs. 5,00,000 and has an estimated life
value of Rs. 50,000. What uniform annual amount must be set aside at the e
replacement if the interest rate is 8% per annum and if the sinking fund fa
rate for 10 years is 0.069?

(A) Rs. 31050

(B) Rs. 34500

(C) Rs. 37950

(D) Rs. 50000

Correct Answer

13. PERT is

(A) An analytic in concept

(B) Limited of event oriented diagrams

(C) Used for research and development projects

(D) All the above

Correct Answer

14. Output of a bulldozer is


     (i) Increased if drawbar HP of the tractor is increased for a g iven hauli
     (ii) Decreased if drawbar HP of the tractor is increased for a g iven hau

Plast ic Jersey Barriers - For Sale or


Rent
Tiger Jersey Barriers Inc.

We have plast ic jersey barriers in st ock and


ready t o ship. Low price guarant ee.

WEBSITE CALL

     (iii) Increased if the hauling distance is increased for a g iven drawbar


     (iv) Decreased if the hauling distance is increased for a g iven drawbar
     Of these statement

(A) (i) and (iii) are correct

(B) (i) and (iv) are correct

(C) (ii) and (iii) are correct


(D) (ii) and (iv) are correct

Correct Answer

15. For the execution of a project, a contractor is

(A) A person

(B) A firm

(C) An agency

(D) All the above

Correct Answer
Answer: Option D

View All Answers


01. Answer: Option C 02. Answer: Option B 03. Answer: Option B 04. Answer: Option B
Option C 07. Answer: Option A 08. Answer: Option B 09. Answer: Option A 10. Answer
12. Answer: Option A 13. Answer: Option D 14. Answer: Option B 15. Answer: Option D
Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   

Relat ed Test Series ...

 Construction Management Objective Questions and Answers - Set 0

 Construction Planning Objective Questions and Answers - Set 08

 Construction Planning and Management MCQ - Set 07

 Study Materials Construction Planning and Management - Set 06

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning MCQ Practice Test - Set 03

 Civil Construction Planning Objective Questions - Set 10

 Blogger Comment  Facebook Comm


     

Track Your Workf orce


Ad Eyrus

Pro Engineering Consulting - Over 25 Years of


Experience
Ad proengc.com

Construction Planning Objective Questions and


Answers - Set 08
objectivebooks.com

Plastic Jersey Barriers - For Sale or Rent


Ad tigerbarriers.com

Civil Construction Multiple Choice Questions - Se


02
objectivebooks.com

Construction Management Objective Questions


and Answers - Set 09
objectivebooks.com

Civil Construction Planning Objective Questions -


Set 10
objectivebooks.com

Civil Engineering Construction Management


Questions - Set 05
objectivebooks.com

Construction Planning MCQ Practice Test - Set 0


objectivebooks.com

Industrial Engineering and Production


Management MCQ Practice Test
objectivebooks.com

Construction Planning and Management Objective


Questions and Answers - Set 01
objectivebooks.com
Track Your Workforce
Automatically track the
workforce in real-time
with the Eyrus platform

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview

4. Civil Engineering MCQ with Interview Questions


and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **
Popular Post s Cat egor y

Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...
Structural Analysis Objective T ype Questions and
Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 2 3
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
AR Construction AdsManagement
by Text to Search...
- IFC, Revit® Models
St op seeing t his adonWhy
Sitet his ad?  OPEN
BIM powered Construction and Operation for
Buildings and Plants. gamma-ar.com

Home About Cont act Submit Project Affiliat e Program Free Books

Update your Android App - Live on Google Play Store

Home MCQ Construction Civil Engineering Construction Management Qu


Mechanical Engineering

Civil Engineering Construction Manag


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es Questions - Set 05


4. T echnical T erms
 MCQ Construction
5. Mechanical Projects

6. Engineering Notes

7. Mechanical Interview

4. Piping Engg. Interview

Automobile Engineering
AR Construction Management - IFC, Revi
1. MCQ Practice T ests
Models on Site
3. Mock T est (Level I) gamma-ar.com Learn more

4. Mock T est (Level II)
Practice Test: Question Set - 05
3. Online Quiz z es
1. T he constraints in case of resource smoothening operation would be
4. T echnical T erms Text to Search...
(A) Resources
5. Automobile Projects
(B) Project duration time

6. Automobile Interview (C) Both resources and project duration time

(D) None of the above

Correct Answer
Civil Engineering

1. MCQ Practice T ests 2. T he time which results in the least possible construction cost of an activ

(A) Normal time


2. Mock T ests (Level I)
(B) Slow time
3. Mock T ests (Level II)
(C) Crash time

4. Online Quiz z es (D) Standard time

Correct Answer
5. T echnical T erms

6. Civil Interview 3. T he direct cost of a project with respect to normal time is

(A) Minimum

Electrical Engineering (B) Maximum

(C) Zero
1. MCQ Practice T ests (D) Infinite

2. Mock T ests (Level I) Correct Answer

3. Mock T ests (Level II)


4. T he object of technical planning , is
4. Online Quiz z es (A) Preparation of specifications

5. Electrical GK MCQ (B) Preparation of estimates

(C) Initiating the procurement action of resources


6. Electrical Lab Viva
(D) All the above

Correct Answer

Chemical Engineering
5. If an activity has its optimistic, most likely and pessimistic times as 2, 3 a
1. MCQ Practice T ests expected time and variance are respectively

2. Mock T ests (Level I) (A) 3.5 and 5/6

(B) 5 and 25/36


3. Mock T ests (Level II) 
(C) 3.5 and 25/36

4. Online Quiz z es (D) 4 and 5/6

Correct Answer
Computer Science Text to Search...
6. Various activities of a project, are shown on bar charts by

(A) Vertical lines


1. MCQ Practice T ests
(B) Horizontal lines
2. Mock T ests (Level I)
(C) Dots

3. Mock T ests (Level II) (D) Crosses

Correct Answer
4. Online Quiz z es

7. Select the correct statement.


GK National MCQ : India (A) Activity arrows in a CPM network are drawn to scale

(B) The tail of an arrow represents the finish of an activity


1. Basic National GK
(C) Arrow bead represents the start of an activity
2. Ancient India (D) None of the above

3. History of India Correct Answer

4. Books and Authors


8. If D is the duration, ES and EF are the earliest start and finish, LS and LF
5. Economics and Indian finish time, then the following relation holds g ood
Economy (A) EF = ES + D

(B) LS = LF - D
6. Famous Places in India
(C) LF = LS + D
7. Indian Culture
(D) All the above

8. Famous Personalities Correct Answer

9. National Days and Years


9. Total float for any activity is defined as the difference between
10. Research and Developments
(A) Its latest finish time and earliest start time for its successor activity

11. Constitution of India & (B) Its latest start time and earliest start time
Indian Politics (C) Its latest start time and earliest finish time

(D) Its earliest finish time and earliest start time for its successor activity
12. Honours and Awards
Correct Answer
13. Indian Geography

10. Pick up the incorrect statement from the following :

GK MCQ : Indian Railways



1. Basic GK about Indian
Railways
2. Departmental Interview
Bluelam - SiteText
Preparation
to Search... Servic
Questions Practice T ests
Bluelam LLC

GK International MCQ We Help Builders Bring Quality and


Consistency to New Construction Projec
1. Basic International GK

2. Books and Authors

3. World Organiz ations

4. International Days & Years WEBSITE CALL

5. World Famous Personality

(A) The activity is the time consuming part of a project


6. Worlds Honours and Awards
(B) The beginning and end of a job, are called events
7. World Geography (C) The activity which consumes maximum time, is called a node

(D) Logically and sequentially connected activities and events form a ne

Correct Answer

11. Assertion (A): Activity 57 is critical.


Reason (R): Earliest finish time and latest finish time for events 57 are same
Select the correct answer.

(A) A is correct but R is not correct

(B) R is correct but A is not correct

(C) Both A and R is correct

(D) Both A and R is incorrect

Correct Answer

12. T he main principle of an org anization, is

(A) Unity of command

(B) Effective control at all levels

(C) Delegation of authority

(D) All the above

Correct Answer

13. If the expected time for completion of a project is 10 days with a stand
expected time of completion of the project with 99.9% probability is
(A) 4 days
Text to Search...
(B) 6 days

(C) 10 days

(D) 16 days

Correct Answer

14. Pick up the correct statement from the following :

(A) Earliest expected time is denoted by TE

(B) Latest occurrence time is denoted by TL

(C) Contractual obligation time is denoted by Ts

(D) All the above

Correct Answer
Answer: Option D

15. Consider the following operations:


     1. Drilling
     2. Blasting
     3. Mucking
     4. Placing steel
     5. Placing concrete
     T he correct sequence of these operations in tunnel construction is

(A) 1, 2, 4, 3, 5

(B) 1, 3, 2, 4, 5

(C) 1, 2, 3, 4, 5

(D) 1, 3, 4, 2, 5

Correct Answer

View All Answers


01. Answer: Option B 02. Answer: Option B 03. Answer: Option A 04. Answer: Option D
Option B 07. Answer: Option D 08. Answer: Option D 09. Answer: Option B 10. Answe
12. Answer: Option D 13. Answer: Option D 14. Answer: Option D 15. Answer: Option
Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11 

   
Text to Search...

Relat ed Test Series ...

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Civil Construction Planning Objective Questions - Set 10

 Construction Management Objective Questions and Answers - Set 0

 Construction Planning Objective Questions and Answers - Set 08

 Construction Planning and Management MCQ - Set 07

 Study Materials Construction Planning and Management - Set 06

 Blogger Comment  Facebook Comm

     

Myntra Men Clohting


Myntra

1. Objective Mechanical Engineering & T echnical



Interview E-book

2. Mechanical Engineering Objective


3. Mechanical T echnical Interview
Text to Search...

4. Civil Engineering MCQ with Interview Questions


and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **


Civil Engineering Consulting - Development and Text to Search...

Utilities
Ad valorcivilengineeringpllc.com

Pro Engineering Consulting - Engineering MEP


Consultants
Ad proengc.com

Civil Construction Planning Objective Questions -


Set 10
objectivebooks.com

M.Eng. Engineering Management - Cornell


University
Ad oncam pus.engm anagem ent.cornell.edu

Construction Management Objective Questions


and Answers - Set 09
objectivebooks.com

Construction Planning Objective Questions and


Answers - Set 08
objectivebooks.com

Civil Construction Multiple Choice Questions - Se


02
objectivebooks.com

Construction Planning and Management MCQ


Quiz - Set 04
objectivebooks.com

Construction Planning MCQ Practice Test - Set 0


objectivebooks.com

Construction Planning and Management Objective


Questions and Answers - Set 01
objectivebooks.com

Construction Planning and Management MCQ -


Set 07
objectivebooks.com


Text to Search...

Popular Post s Cat egor y

Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01 
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...
Structural Analysis Objective T ype Questions and
Text to Search...
Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 2 7 
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...


Adswith
Advertise by Google
StAds
op seeing t his ad Why t his ad?  SIGN UP
Get in front of customers when they
search for businesses like yours

Home About Cont act Submit Project Affiliat e Program Free Books

Update your Android App - Live on Google Play Store

Text to Search...

Home MCQ Construction Study Materials Construction Planning and Man


Mechanical Engineering

Study Materials Construction Plannin


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es Management - Set 06


4. T echnical T erms
 MCQ Construction
5. Mechanical Projects
Ads by - Asphalt
Onorati Construction
6. Engineering Notes Resurf acing Services
St op seeing
Onorati Construction t his ad
Co., Inc.
7. Mechanical Interview
Why t his ad? 
We Specialize in All Aspects of Road
4. Piping Engg. Interview Construction.

Automobile Engineering

1. MCQ Practice T ests

3. Mock T est (Level I) WEBSITE DIRECTIONS

4. Mock T est (Level II)


Practice Test: Question Set - 06
3. Online Quiz z es

1. Pick up the incorrect statement from the following :


4. T echnical T erms (A) The difference between the earliest start time and latest finish time o
maximum time available for the activity

5. Automobile Projects (B) The difference between the maximum time available for the job an
called total float
6. Automobile Interview
(C) The difference between the latest start time and earliest start time of
float

(D) None of these


Civil Engineering
Correct Answer

1. MCQ Practice T ests

2. T he basic action involved in sheep foot rolling is


2. Mock T ests (Level I)
(A) Kneading
3. Mock T ests (Level II)
(B) Pressing

4. Online Quiz z es (C) Tamping

(D) Vibration
5. T echnical T erms
Correct Answer
6. Civil Interview

3. Pick up the correct statement from the following :

Electrical Engineering (A) Programme Evaluation and Review Technique, is event oriented

(B) Programme Evaluation and Review Technique is not event oriented


1. MCQ Practice T ests (C) Critical Path Method is event oriented

2. Mock T ests (Level I) (D) Critical Path Method is not event oriented

Correct Answer
3. Mock T ests (Level II)

4. Online Quiz z es 4. If the excavation of earth is done manually then it costs Rs. 10 per cum.
fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. T he quantity of
5. Electrical GK MCQ excavation by machine will be equal to the cost of manual excavation is

6. Electrical Lab Viva (A) 500 cum

(B) 1000 cum

(C) 1500 cum


Chemical Engineering
(D) 2000 cum

1. MCQ Practice T ests Correct Answer

2. Mock T ests (Level I)


5. T ime and prog ress chart of a construction, is also known as
3. Mock T ests (Level II) (A) Bar chart

(B) Gantt chart


4. Online Quiz z es
(C) Modified Mile stone chart
(D) All the above
Computer Science
Correct Answer
1. MCQ Practice T ests

2. Mock T ests (Level I) 6. Economic saving of time results by crashing

(A) Cheapest critical activity


3. Mock T ests (Level II)
(B) Cheapest noncritical activity

4. Online Quiz z es (C) Costliest critical activity

(D) Costliest noncritical activity

Correct Answer
GK National MCQ : India

1. Basic National GK 7. In the g iven fig ure, the network of a project represents

2. Ancient India

3. History of India

4. Books and Authors (A) Activity of an excavation of a footing

(B) Activity of an excavation which starts at event No. 1 and ends at even
5. Economics and Indian
(C) Activity of excavation which takes 8 units of time
Economy
(D) None of these
6. Famous Places in India
Correct Answer

7. Indian Culture

8. Select the incorrect statement.


8. Famous Personalities
(A) Earliest start of an activity is the early event time of the node it leave
9. National Days and Years
(B) Latest finish of an activity is the late event time of the node it enters

10. Research and Developments (C) Latest start of an activity is its latest finish minus its duration

(D) None of the above


11. Constitution of India &
Correct Answer
Indian Politics

12. Honours and Awards


9. T he technique for establishing and maintaining priorities among the va
known
13. Indian Geography

GK MCQ : Indian Railways

1. Basic GK about Indian


Railways
2. Departmental Interview Onorati Construction - Asphalt
Questions Practice T ests Resurf acing Services
Onorati Construction Co., Inc.

GK International MCQ We Specialize in All Aspects of Road


Construction.
1. Basic International GK

2. Books and Authors

3. World Organiz ations

4. International Days & Years WEBSITE DIRECTIONS

5. World Famous Personality


(A) Event flow scheduling technique
6. Worlds Honours and Awards
(B) Critical ratio scheduling

7. World Geography (C) Slotting technique for scheduling

(D) Short interval scheduling

Correct Answer

10. Which of the following is a weakness of bar chart?

(A) Interdependencies of activities

(B) Project progress

(C) Uncertainties

(D) All of the above

Correct Answer

11. Which one of the following represents an activity?

(A) Excavation for foundation

(B) Curing of concrete

(C) Setting of question paper

(D) All the above

Correct Answer

12. Which of the following excavators is most suitable for dig g ing under w

(A) Drag line

(B) Hoe
(C) Clam shell

(D) Dipper shovel

Correct Answer

13. A CPM family includes

(A) CPA (Critical Path Analysis)

(B) CPP (Critical Path Plotted)

(C) MCE (Minimum Cost Expenditure)

(D) All the above

Correct Answer

14. Critical path

(A) Is always longest

(B) Is always shortest

(C) May be longest

(D) May be shortest

Correct Answer

15. For the supply of materials for concrete, form work reinforcing and p
of form work and curing of concrete, number of bar(s) required on bar c

(A) 1

(B) 2

(C) 3

(D) 4

Correct Answer

View All Answers


01. Answer: Option D 02. Answer: Option A 03. Answer: Option A 04. Answer: Option A
Option A 07. Answer: Option C 08. Answer: Option D 09. Answer: Option B 10. Answer
12. Answer: Option A 13. Answer: Option D 14. Answer: Option A 15. Answer: Option A
Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   
Relat ed Test Series ...

 Construction Planning and Management MCQ - Set 07

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Civil Construction Planning Objective Questions - Set 10

 Construction Management Objective Questions and Answers - Set 0

 Construction Planning Objective Questions and Answers - Set 08

 Blogger Comment  Facebook Comm

     
Register Or Download Free App
Ad Soil Connect

Historic Mortar Analysis - Materials Testing


Ad highbridgem aterials.com

Civil Construction Planning Objective…


objectivebooks.com

Residential Remodeling
Ad SeaTac Build & Rem odel

Construction Planning Objective Questions…


objectivebooks.com

Industrial Engineering MCQ - Set 02


objectivebooks.com

Civil Construction Multiple Choice…


objectivebooks.com

Construction Planning MCQ Practice Test -…


objectivebooks.com

Construction Management Objective…


objectivebooks.com

Construction Planning and Management…


objectivebooks.com

Civil Engineering MCQ Book


objectivebooks.com
Get a Quote Today
We Specialize in Helical
Pier Systems for
Foundation Repairs.

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview

4. Civil Engineering MCQ with Interview Questions


and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **
Popular Post s Cat egor y

Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...
Structural Analysis Objective T ype Questions and
Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 3 2
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
Home About Cont act Submit Project Affiliat e Program Free Books

Update your Android App - Live on Google Play Store

Text to Search...

Home MCQ Construction Construction Planning and Management MCQ -


Mechanical Engineering

Construction Planning and Managem


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es 07
4. T echnical T erms
 MCQ Construction
5. Mechanical Projects
Onorati Construction - Established in
6. Engineering Notes 1918
Onorati Construction Co., Inc.
7. Mechanical Interview
We Are a Premier Civil Construction
4. Piping Engg. Interview Company.Contact Us f or Details.

Automobile Engineering

1. MCQ Practice T ests

3. Mock T est (Level I) WEBSITE DIRECTIONS

4. Mock T est (Level II)


Practice Test: Question Set - 07
3. Online Quiz z es

4. T echnical T erms 1. Which one of the following surfaces will g ive hig hest coefficient of trac
tractors?
5. Automobile Projects (A) Ice
Adswith
Advertise by Google
(B) Concrete
6. Automobile Interview
StAds
op seeing t his ad Why t his ad?  SIGN UP
Get in front(C) Loose sandwhen they
of customers
search for businesses like yours
(D) Earth
Correct Answer
Civil Engineering

1. MCQ Practice T ests 2. Residential building s are treated as

2. Mock T ests (Level I) (A) Light construction

(B) Heavy construction
3. Mock T ests (Level II)
(C) Industrial construction

4. Online Quiz z es (D) Private construction

Correct Answer
5. T echnical T erms

6. Civil Interview
3. Consider the following statements:
     In the bar chart planning
     1. Interdependence of the operations cannot be portrayed.
Electrical Engineering      2. Prog ress of work can be measured.
     3. Spare time of the activities can be determined.
1. MCQ Practice T ests      4. Schedule cannot be updated.
     Of these statements
2. Mock T ests (Level I)
(A) 1, 2 and 3 are correct

3. Mock T ests (Level II) (B) 1 and 4 are correct

(C) 2, 3 and 4 are correct


4. Online Quiz z es
(D) 1, 2 and 4 are correct

5. Electrical GK MCQ Correct Answer

6. Electrical Lab Viva


4. T he three time estimates for the activities of the network shown in the g
their arrows. T he earliest expected time for the event 4, is

Chemical Engineering

1. MCQ Practice T ests

2. Mock T ests (Level I)

(A) 19
3. Mock T ests (Level II)
(B) 14
4. Online Quiz z es (C) 24

(D) None of these

Computer Science Correct Answer

1. MCQ Practice T ests


5. Consider the following activities in a building construction:
     1. Concreting of roof slabs
2. Mock T ests (Level I)
     2. Brick-jelly lime concrete terracing
     3. Erection of form work for slab
3. Mock T ests (Level II)
     4. Construction of parapet wall in terrace

4. Online Quiz z es      T he correct sequence of these activities is

(A) 1, 3, 2, 4

(B) 3, 1, 4, 2
GK National MCQ : India
(C) 3, 1, 2, 4

1. Basic National GK (D) 1, 3, 4, 2

Correct Answer
2. Ancient India
Answer: Option C

3. History of India

6. Military org anization is known as


4. Books and Authors
(A) Line organization
5. Economics and Indian
(B) Line and staff organization
Economy
(C) Functional organization
6. Famous Places in India (D) None of these

Correct Answer
7. Indian Culture

8. Famous Personalities
7. Mobilization advance up to 10% of the cost of work is g iven to a contra

9. National Days and Years (A) On commencement of work at site for payment of loan taken by him

(B) For the purchase of construction materials


10. Research and Developments
(C) For the payment of advances to labour and other staff
11. Constitution of India & (D) For all activities required to start the work at site on finalization of t
Indian Politics
Correct Answer
12. Honours and Awards

13. Indian Geography 8. Pick up the PERT event from the following :

(A) Digging of foundation started

(B) Digging of foundation completed


GK MCQ : Indian Railways
(C) Laying of concrete started

1. Basic GK about Indian (D) All the above

Railways Correct Answer

2. Departmental Interview
Questions Practice T ests 9. A machine is purchased for Rs. 10,000,00 and has an estimated life of 10
the end of 10 years is Rs. 1,50,000. T he book value of the machine at the en
straig ht line method of evaluation of depreciation is

GK International MCQ
1. Basic International GK Onorati Construction - Established in
1918
2. Books and Authors Onorati Construction Co., Inc.

3. World Organiz ations


We Are a Premier Civil Construction
Company.Contact Us f or Details.
4. International Days & Years

5. World Famous Personality

6. Worlds Honours and Awards

7. World Geography
WEBSITE DIRECTIONS

(A) Rs. 4,75,000

(B) Rs. 5,75,000

(C) Rs. 6,50,000

(D) Rs. 8,50,000

Correct Answer

10. Pick up the incorrect statement from the following :

(A) An activity of a project is denoted by an arrow on the net work

(B) The tail of the arrow indicates the start of the activity

(C) The head of the arrow indicates the end of the activity

(D) The arrows are drawn to scale from left to right

Correct Answer

11. T he process of incorporating chang es and rescheduling or replanning

(A) Resource levelling

(B) Resource smoothening

(C) Updating

(D) Critical path scheduling

Correct Answer

12. Completion of an activity on CPM network diag ram, is g enerally know

(A) Event

(B) Node
(C) Connector

(D) All the above

Correct Answer

13. Assertion A: For a given depth of cut, the output of a power shovel can be
angle of swing.
Reason R: If the angle of swing is decreased, the cycle time will be decreased.
Select the correct answer.

(A) Both A and R is true and R is the correct explanation of A

(B) Both A and R is true but R is not the correct explanation of A

(C) A is true but R is false

(D) A is false but R is true

Correct Answer

14. T he salient feature of functional org anization is

(A) Strict adherence to specifications

(B) Separation of planning and design part

(C) Each individual maintains functional efficiency

(D) All the above

Correct Answer

15. A tractor shovel has a purchase price of Rs. 4.7 lacs and could save the
rupees one lac per year on operating costs. T he salvag e value after the a
the purchase price. T he capital recovery period will be

(A) 3.7 years

(B) 4.23 years

(C) 5 years

(D) 7.87 years

Correct Answer

View All Answers


01. Answer: Option D 02. Answer: Option A 03. Answer: Option B 04. Answer: Option A
Option A 07. Answer: Option D 08. Answer: Option D 09. Answer: Option B 10. Answe
12. Answer: Option D 13. Answer: Option A 14. Answer: Option D 15. Answer: Option
Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08


Set 11

   

Relat ed Test Series ...

 Construction Planning Objective Questions and Answers - Set 08

 Study Materials Construction Planning and Management - Set 06

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Civil Construction Planning Objective Questions - Set 10

 Construction Management Objective Questions and Answers - Set 0

 Blogger Comment  Facebook Comm

     
Sponsored by
Open
moosejaw.com

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview

4. Civil Engineering MCQ with Interview Questions


and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **
Construction Planning Objective Questions and
Answers - Set 08

Construction Management Objective Questions and


Answers - Set 09

Civil Engineering Construction Management


Questions - Set 05

Civil Construction Planning Objective Questions - Se


10

Industrial Engineering MCQ - Set 02

Construction Planning MCQ Practice Test - Set 03

Civil Construction Multiple Choice Questions - Set 0

Construction Planning and Management Practice


Test

Construction Planning and Management MCQ Quiz -


Set 04

Construction Planning and Management Objective


Questions and Answers - Set 01

Construction Planning and Management MCQ - Set


07

Popular Post s Cat egor y


Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...

Structural Analysis Objective T ype Questions and


Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...
Automobile Engineering Objective Questions with
Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 4 0

© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
Home About Cont act Submit Project Affiliat e Program Free BooksText to Search...

Update your Android App - Live on Google Play Store

Home MCQ Construction Construction Planning Objective Questions and


Mechanical Engineering

Construction Planning Objective Que


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es Answers - Set 08


4. T echnical T erms
 MCQ Construction
5. Mechanical Projects
Onorati Construction - Established in
6. Engineering Notes 1918
Onorati Construction Co., Inc.
7. Mechanical Interview
We Are a Premier Civil Construction
4. Piping Engg. Interview Company.Contact Us f or Details.

Automobile Engineering

1. MCQ Practice T ests

3. Mock T est (Level I) WEBSITE DIRECTIONS

4. Mock T est (Level II)


Practice Test: Question Set - 08
3. Online Quiz z es

4. T echnical T erms 1. T he first method invented for planning projects, was

(A) Bar chart method


5. Automobile Projects 
(B) Milestone chart

6. Automobile Interview (C) Critical path method (CPM)

(D) Programme Evaluation and Review Technique (PERT)


Correct Answer
Civil Engineering Text to Search...

1. MCQ Practice T ests 2. Which one of the following is not an excavating and moving type of equ

2. Mock T ests (Level I) (A) Bulldozer

(B) Clam shell


3. Mock T ests (Level II)
(C) Scraper

4. Online Quiz z es (D) Dump truck

Correct Answer
5. T echnical T erms

6. Civil Interview
3. T he main disadvantag e of line org anization, is

(A) Rigid structure

Electrical Engineering (B) Extraordinary delay in communications

(C) Top level executions over work


1. MCQ Practice T ests
(D) All the above

2. Mock T ests (Level I) Correct Answer

3. Mock T ests (Level II)


4. Batching refers to
4. Online Quiz z es
(A) Controlling the total quantity at each batch

5. Electrical GK MCQ (B) Weighing accurately, the quantity of each material for a job before

(C) Controlling the quantity of each material into each batch


6. Electrical Lab Viva
(D) Adjusting the water to be added in each batch according to the mois
materials being mixed in the batch

Correct Answer
Chemical Engineering

1. MCQ Practice T ests


5. While scheduling a project by C.P.M.

2. Mock T ests (Level I) (A) A project is divided into various activities

(B) Required time for each activity is established


3. Mock T ests (Level II)
(C) Net work is drawn by connecting the activities and the events

4. Online Quiz z es (D) All the above

Correct Answer

Computer Science
6. Slack time refers to
1. MCQ Practice T ests 
(A) An activity

2. Mock T ests (Level I) (B) An event

(C) Both event and activity


3. Mock T ests (Level II) (D) None of the above
Text to Search...
Correct Answer
4. Online Quiz z es

7. Final technical authority of a project lies with


GK National MCQ : India (A) Assistant Engineer

(B) Executive Engineer
1. Basic National GK
(C) Superintending Engineer
2. Ancient India (D) Chief Engineer

3. History of India
Correct Answer

4. Books and Authors


8. Whenever an activity has zero total float, then
5. Economics and Indian (A) Free float of the activity must be zero but independent float need no
Economy
(B) Independent float must be zero but free float need not be zero

6. Famous Places in India (C) Free float and independent float both must be zero

(D) Free float and independent float both need not be zero
7. Indian Culture
Correct Answer
8. Famous Personalities

9. National Days and Years 9. Mile Stone charts were invented in the year of

10. Research and Developments


Onorati Construction - Established in
1918
11. Constitution of India &
Onorati Construction Co., Inc.
Indian Politics

We Are a Premier Civil Construction


12. Honours and Awards
Company.Contact Us f or Details.
13. Indian Geography

GK MCQ : Indian Railways

1. Basic GK about Indian WEBSITE DIRECTIONS


Railways

2. Departmental Interview (A) 1910


Questions Practice T ests
(B) 1920

(C) 1930 
GK International MCQ (D) 1940

Correct Answer
1. Basic International GK Text to Search...
10. Which of the following is not a PERT event?
2. Books and Authors (A) Site investigation started

(B) Sessional work completed


3. World Organiz ations
(C) Bus starts from Jaipur
4. International Days & Years
(D) Class is being attended

5. World Famous Personality Correct Answer

6. Worlds Honours and Awards


11. A construction schedule is prepared after collecting
7. World Geography
(A) Number of operations

(B) Output of labour

(C) Output of machinery

(D) All the above

Correct Answer

12. A tractor whose weig ht is 20 tonnes has a drawbar pull of 2500 kg , whe
having a rolling resistance of 30 kg per tonne. If this tractor is operated o
rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor

(A) Reduce by 200 kg

(B) Increase by 200 kg

(C) Increase by 250 kg

(D) Reduce by 250 kg

Correct Answer

13. Pick up the correct statement from the following :

(A) The difference of latest occurrence time and earliest expected time,

(B) The activities connecting the events having zero slack, lie on the crit

(C) The critical path consumes the maximum time

(D) All the above

Correct Answer

14. In India, are prefabricated components costlier than those of traditio


prefabricated components replace?

(A) Yes, because of heavier overheads and handling cost

(B) Yes, because of the very high order of quality control for the factory

(C) No, because of repetitive manufacture of a number of elements


(D) No, because of savings in site labour
Text to Search...
Correct Answer

15. Frequency distribution curves

(A) Having a single lump, are called uninodal curves

(B) If symmetrical, are called normal curves

(C) If not symmetrical, are called skew curves

(D) All the above

Correct Answer

View All Answers


01. Answer: Option A 02. Answer: Option D 03. Answer: Option D 04. Answer: Option C
Option B 07. Answer: Option D 08. Answer: Option C 09. Answer: Option D 10. Answe
12. Answer: Option A 13. Answer: Option D 14. Answer: Option C 15. Answer: Option D
Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   

Relat ed Test Series ...

 Study Materials Construction Planning and Management - Set 06

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Civil Construction Planning Objective Questions - Set 10

 Construction Management Objective Questions and Answers - Set 0

 Construction Planning and Management MCQ - Set 07



 Blogger Comment  Facebook Comm
      Text to Search...

Grayhill CANbus Keypads

Grayhill Inc. Open

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview

4. Civil Engineering MCQ with Interview Questions


and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >> 


** Event Management & Designing **
Grayhill CANbus Keypads Text to Search...
Ad Grayhill Inc.

Prof essional Engineer For Hire - Special


inspection
Ad specialinspectionsnyc.com

Civil Engineering Construction Management


Questions - Set 05
objectivebooks.com

Pro Engineering Consulting - In Business since


1995
Ad proengc.com

Industrial Engineering MCQ - Set 02


objectivebooks.com

Civil Construction Planning Objective Questions -


Set 10
objectivebooks.com

Construction Planning MCQ Practice Test - Set 0


objectivebooks.com

Industrial Engineering and Production


Management MCQ Practice Test
objectivebooks.com

Multiple Choice Questions Test Industrial


Engineering - Set 19
objectivebooks.com

Civil Construction Multiple Choice Questions - Se


02
objectivebooks.com

Construction Planning and Management Objective


Questions and Answers - Set 01
objectivebooks.com


Text to Search...

Popular Post s Cat egor y

Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01 
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...
Structural Analysis Objective T ype Questions and
Text to Search...
Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 4 6 
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
Text to Search...


Ads by
Track Your Workforce Text to Search...

St op seeing t his ad Why t his ad?  OPEN


Automatically track the workforce in
real- time with the Eyrus platform Eyrus

Home About Cont act Submit Project Affiliat e Program Free Books

Update your Android App - Live on Google Play Store

Home MCQ Construction Construction Management Objective Questions


Mechanical Engineering

Construction Management Objective


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es Answers - Set 09


4. T echnical T erms
 MCQ Construction
5. Mechanical Projects

6. Engineering Notes

7. Mechanical Interview

4. Piping Engg. Interview

Automobile Engineering

HBH Construction Inc - NYC Bathroom


1. MCQ Practice T ests
Remodeling
3. Mock T est (Level I) hbhconstructioninc.com Learn more

4. Mock T est (Level II)
Practice Test: Question Set - 09
3. Online Quiz z es
1. Consider the following statements:
4. T echnical T erms Text to Search...
    Wheeled tractors are replacing crawler tractors because

5. Automobile Projects     1. Wheeled tractors travel faster.


    2. Crawler tractors are more expensive.
6. Automobile Interview     3. T rack parts of a crawler wear out quickly.
    4. Crawler tractors have stick control.
    Of these statements

Civil Engineering (A) 1, 3 and 4 are correct

(B) 2, 3 and 4 are correct


1. MCQ Practice T ests
(C) 1, 2 and 3 are correct

2. Mock T ests (Level I) (D) 1, 2 and 4 are correct

Correct Answer
3. Mock T ests (Level II)

4. Online Quiz z es 2. T he difference between the time avail-to do a job and the time required

5. T echnical T erms (A) Event

(B) Float
6. Civil Interview
(C) Duration

(D) Constraint

Electrical Engineering Correct Answer

1. MCQ Practice T ests


3. T he g rade resistance factor for an earth moving machine can be obtain
2. Mock T ests (Level I) percentag e by a factor approximately equal to

(A) 2 kg/tonne
3. Mock T ests (Level II)
(B) 6 kg/tonne
4. Online Quiz z es (C) 9 kg/tonne

(D) 20 kg/tonne
5. Electrical GK MCQ
Correct Answer
6. Electrical Lab Viva

4. A dummy activity

Chemical Engineering (A) Is artificially introduced

(B) Is represented by a dotted line


1. MCQ Practice T ests
(C) Does not consume time

2. Mock T ests (Level I) (D) All the above

Correct Answer
3. Mock T ests (Level II) 
4. Online Quiz z es
5. T he reduction in project time normally results in
(A) Decreasing the direct cost and increasing indirect cost
Computer Science Text to Search...
(B) Increasing the direct cost and decreasing the indirect cost

1. MCQ Practice T ests (C) Increasing the direct cost and indirect cost both

(D) Decreasing the direct cost and indirect cost both


2. Mock T ests (Level I)
Correct Answer
3. Mock T ests (Level II)

4. Online Quiz z es 6. Frederick W. Taylor introduced a system of working known as

(A) Line organization

(B) Line and staff organization


GK National MCQ : India
(C) Functional organization

1. Basic National GK (D) Effective organization

Correct Answer
2. Ancient India

3. History of India
7. T he area under the Beta distribution curve is divided into two equal pa

4. Books and Authors (A) Most likely time

(B) Optimistic time
5. Economics and Indian
(C) Pessimistic time
Economy
(D) Expected time
6. Famous Places in India
Correct Answer

7. Indian Culture

8. CPM is
8. Famous Personalities
(A) Synthesising in concepts
9. National Days and Years
(B) Is built of activities oriented programme

10. Research and Developments (C) Is based on time estimate

(D) All the above


11. Constitution of India &
Correct Answer
Indian Politics

12. Honours and Awards


9. A four wheel truck or whose operating weig ht is 12000 kg is pulled alon
of 2% at a uniform speed. Assume g rade resistance factor = 10 kg /tonne. T
13. Indian Geography
720 kg . T he rolling resistance of the road will be

GK MCQ : Indian Railways



1. Basic GK about Indian
Railways
2. Departmental Interview Text to Search...
Questions Practice T ests

GK International MCQ

1. Basic International GK

2. Books and Authors

3. World Organiz ations

4. International Days & Years

5. World Famous Personality


(A) 20 kg/tonne
6. Worlds Honours and Awards
(B) 30 kg/tonne

7. World Geography (C) 40 kg/tonne

(D) 50 kg/tonne

Correct Answer

10. T he Overall in-charg e of an org anization at the site responsible for th

(A) Executive Engineer

(B) Engineer

(C) Junior Engineer

(D) Assistant Engineer

Correct Answer

11. Consider the following features/factors:


     1. Projects are of the non-repetitive type
     2. T ime required need not be known
     3. T ime required is known precisely
     4. Events have been established for planning
     5. Emphasis is g iven to activities of project
     PERT is preferred for planning because of

(A) 1, 2 and 4

(B) 3, 4 and 5

(C) 1, 3 and 4 
(D) 1, 2 and 5

Correct Answer
Text to Search...
12. T he first stag e of a construction, is

(A) Preparation of estimate

(B) Survey of the site

(C) Initiation of proposal

(D) Preparation of tender

Correct Answer

13. Crash project duration is obtained by summing the

(A) Normal durations for all the activities

(B) Crash durations for all activities

(C) Crash durations for all the activities along the critical path obtained
normal duration for all the activities

(D) Crash durations for all the activities along the critical path obtained
crash duration for all the activities

Correct Answer

14. Pick up the correct statement from the following :

(A) Forward pass is used for calculating earliest expected time

(B) Backward pass is used for calculating the latest occurrence time

(C) Maximum value of earliest expected time is used if there is more tha

(D) All the above

Correct Answer

15. Sinking fund is

(A) The fund for rebuilding a structure when its economic life is over

(B) Raised to meet maintenance costs

(C) The total sum to be paid to the municipal authorities by the tenants

(D) A part of the money kept in reserve for providing additional struct
modifications

Correct Answer

View All Answers


01. Answer: Option C 02. Answer: Option B 03. Answer: Option C 04. Answer:
Option D
Option C 07. Answer: Option D 08. Answer: Option D 09. Answer: Option C 10. Answe
12. Answer: Option C 13. Answer: Option D 14. Answer: Option D 15. Answer: Option A
Show/hide
Text to Search...
Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   

Relat ed Test Series ...

 Civil Construction Planning Objective Questions - Set 10

 Construction Planning Objective Questions and Answers - Set 08

 Construction Planning and Management MCQ - Set 07

 Study Materials Construction Planning and Management - Set 06

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Blogger Comment  Facebook Comm

     


Text to Search...

Sponsored by
Open
chifranciscan.org

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview

4. Civil Engineering MCQ with Interview Questions


and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >> 


** Event Management & Designing **
Engineering Solutions - Boutique Engineering Firm Text to Search...
Ad engsolu.com

Used Tractors f or Sale


Ad Machinery Pete

Construction Planning MCQ Practice Test - Set 0


objectivebooks.com

Track Your Workf orce


Ad Eyrus

Civil Construction Multiple Choice Questions - Se


02
objectivebooks.com

Construction Planning Objective Questions and


Answers - Set 08
objectivebooks.com

Civil Engineering Construction Management


Questions - Set 05
objectivebooks.com

Construction Planning and Management Objective


Questions and Answers - Set 01
objectivebooks.com

Civil Construction Planning Objective Questions -


Set 10
objectivebooks.com

Industrial Engineering and Production


Management MCQ Practice Test
objectivebooks.com

Construction Planning and Management Practice


Test
objectivebooks.com


Text to Search...

Popular Post s Cat egor y

Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01 
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...
Structural Analysis Objective T ype Questions and
Text to Search...
Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 4 9 
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...


GoogleAdsAds by for Quality Text to Search...
Leads
St op seeing t his ad Why t his ad?  SIGN UP
Get customer calls, website visits or
store walk ins with Google Ads

Home About Cont act Submit Project Affiliat e Program Free Books

Update your Android App - Live on Google Play Store

Home MCQ Construction Civil Construction Planning Objective Questions


Mechanical Engineering

Civil Construction Planning Objective


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es Set 10


4. T echnical T erms
 MCQ Construction
5. Mechanical Projects
Ads
Onorat i Const byion - Est ablished in
ruct
6. Engineering Notes 1918
St op seeing t his ad
Onorat i Const ruct ion Co., Inc.
7. Mechanical Interview
Why t his ad? 
We Are a Premier Civil Const ruct ion
4. Piping Engg. Interview
Company.Cont act Us for Det ails.

Automobile Engineering

1. MCQ Practice T ests

3. Mock T est (Level I) WEBSITE DIRECTION



4. Mock T est (Level II)
Practice Test: Question Set - 10
3. Online Quiz z es
1. If a is the optimistic time, b is the pessimistic time and m is most likely ti
4. T echnical T erms Text to Search...
expected time of the activity, is

5. Automobile Projects (A) (a + m + b)/6

(B) (a + 2m + b)/6
6. Automobile Interview
(C) (a + 4m + b)/6

(D) (a + 5m + b)/6
Civil Engineering Correct Answer

1. MCQ Practice T ests


2. Consider the following statements for a power shovel:
2. Mock T ests (Level I)     (i) Output can be increased by reducing the ang le of swing for a g iven d
    (ii) For a g iven ang le of swing , output will be maximum at optimum dep
3. Mock T ests (Level II)     (iii) Output can be increased by keeping the depth of cut less than optim
    (iv) Output can be increased by increasing the size of shovel.
4. Online Quiz z es     Of these statements

5. T echnical T erms (A) (ii), (iii) and (iv) are correct

(B) (i), (ii) and (iv) are correct


6. Civil Interview
(C) (i), (iii) and (iv) are correct

(D) (i) and (iv) are correct

Electrical Engineering Correct Answer

1. MCQ Practice T ests


3. If to, tp and tm are the optimistic, pessimistic and most likely time estim
2. Mock T ests (Level I) respectively, the expected time t of the activity will be

(A) to + 3tm+ tp/3


3. Mock T ests (Level II)
(B) to + 4tm+ tp/4
4. Online Quiz z es (C) to + 4tm+ tp/5

(D) to + 4tm+ tp/6


5. Electrical GK MCQ
Correct Answer
6. Electrical Lab Viva

4. T he most suitable type of equipment for compaction of cohesive soils i

Chemical Engineering (A) Smooth-wheeled rollers

(B) Vibratory rollers
1. MCQ Practice T ests
(C) Sheep foot rollers

2. Mock T ests (Level I) (D) Tampers

Correct Answer
3. Mock T ests (Level II) 
4. Online Quiz z es
5. If the total float and duration of an activity are 5 and 10 days respective
be
(A) Started 5 days later
Computer Science Text to Search...
(B) Completed 5 days later

1. MCQ Practice T ests (C) Performed at slower rate in 15 days

(D) All the above


2. Mock T ests (Level I)
Correct Answer
3. Mock T ests (Level II)

4. Online Quiz z es 6. Rolling resistance of a wheel depends upon


    (i) Vehicle load
    (ii) Grade
    (iii) Ground conditions
GK National MCQ : India
    Of these statements

1. Basic National GK (A) Only (i) is correct

(B) (i) and (ii) are correct


2. Ancient India
(C) (i) and (iii) are correct

3. History of India (D) (ii) and (iii) are correct

Correct Answer
4. Books and Authors

5. Economics and Indian


7. A Milestone chart
Economy
(A) Shows the interdependencies of various jobs
6. Famous Places in India (B) Depicts the delay of jobs, if any

7. Indian Culture (C) Points outgoing ahead of schedule of jobs, if any

(D) None of these


8. Famous Personalities
Correct Answer
9. National Days and Years

8. Earliest finish of an activity is always


10. Research and Developments

11. Constitution of India &


Indian Politics

12. Honours and Awards

13. Indian Geography

GK MCQ : Indian Railways



1. Basic GK about Indian
Railways
2. Departmental Interview Onorat i Const ruct
Textion - Est ablished in
to Search...
Questions Practice T ests 1918
Onorat i Const ruct ion Co., Inc.

GK International MCQ We Are a Premier Civil Const ruct ion


Company.Cont act Us for Det ails.
1. Basic International GK

2. Books and Authors

3. World Organiz ations

4. International Days & Years WEBSITE DIRECTION

5. World Famous Personality

(A) Greater than earliest event time of the following node


6. Worlds Honours and Awards
(B) Less than earliest event time of the following node
7. World Geography (C) Less than or equal to earliest event time of the following node

(D) Greater than or equal to earliest event time of the following node

Correct Answer

9. Critical path lies along the activities having total float

(A) Positive

(B) Negative

(C) Zero

(D) Same

Correct Answer

10. If the scheduled completion time of a project is more than the earliest
of the project, then the probability of completion of the project within the
will be

(A) 50 %

(B) Less than 50 %

(C) More than 50 %

(D) 100 %

Correct Answer

11. T he critical activity has

(A) Maximum float


(B) Minimum float
Text to Search...
(C) Zero float

(D) None of these

Correct Answer

12. For excavating utility trenches with precise control of depth, the exca

(A) Hoe

(B) Shovel

(C) Dragline

(D) None of the above

Correct Answer

13. PERT analysis is based on

(A) Optimistic time

(B) Pessimistic time

(C) Most likely time

(D) All the above

Correct Answer

14. T he most popular type of org anization used for Civil Eng ineering Con

(A) Line organization

(B) Line and staff organization

(C) Functional organization

(D) Effective organization

Correct Answer

15. T he probability of completion of any activity within its expected time i

(A) 50 %

(B) 84.1 %

(C) 99.9 %

(D) 100 %

Correct Answer

View All Answers


01. Answer: Option C 02. Answer: Option B 03. Answer: Option D 04. Answer: Option C
Text to Search...
Option C 07. Answer: Option D 08. Answer: Option C 09. Answer: Option C 10. Answer
12. Answer: Option A 13. Answer: Option D 14. Answer: Option A 15. Answer: Option A
Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   

Relat ed Test Series ...

 Civil Engineering Construction Management Questions - Set 05

 Construction Planning and Management MCQ Quiz - Set 04

 Construction Planning MCQ Practice Test - Set 03

 Construction Management Objective Questions and Answers - Set 0

 Construction Planning Objective Questions and Answers - Set 08

 Construction Planning and Management MCQ - Set 07

 Study Materials Construction Planning and Management - Set 06

 Blogger Comment  Facebook Comm

     


Text to Search...

Sponsored by
Open
chifranciscan.org

Visit Our Website Now


We Remodel Kitchens, Bathrooms, And
Build Custom Homes. Call Us Today.
Estate Homes

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective

3. Mechanical T echnical Interview 

4. Civil Engineering MCQ with Interview Questions


and Answers
5. Objective Electrical Engineering with Interview
Text to Search...
Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **


Track Your Workf orce Text to Search...
Ad Eyrus

Civil Engineering Consulting - Development and


Utilities
Ad valorcivilengineeringpllc.com

Civil Construction Multiple Choice Questions - Se


02
objectivebooks.com

AR Construction Management - IFC, Revit®


Models on Site
Ad gam m a-ar.com

Construction Management Objective Questions


and Answers - Set 09
objectivebooks.com

Civil Engineering MCQ Practice Tests


objectivebooks.com

Design of Steel Structures Civil Engineering MCQ


and Answers - Set 01
objectivebooks.com

Industrial Engineering MCQ - Set 02


objectivebooks.com

MCQ on Advanced Surveying - Set 02


objectivebooks.com

Civil Engineering Job Interview Questions and


Answers - Part 01
objectivebooks.com

Civil Structural Analysis Multiple Choice Tests


objectivebooks.com


Text to Search...

Popular Post s Cat egor y

Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01 
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...
Structural Analysis Objective T ype Questions and
Text to Search...
Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 5 7 
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...


Onorati Construction - Asphalt
Resurfacing Services
Onorati Construction Co., Inc.

Home >> Questions>> Engineering>> Civil Engineering

Find Construction Jobs

We'll Help You Win Business

We'll Show You Projects You Can Win with a


Demo. Consider Buying a Lead Service.
leads.construction.com

OPEN

Construction Planning and Management MCQ


Question with Answer
Construction Planning and Management MCQ with
detailed explanation for interview, entrance and
competitive exams. Explanation are given for
understanding.
By using this website, you agree that we and our partners may set cookies for purposes such as
 Download customising
ConstructioncontentPlanning andI Understand
and advertising. Management MCQ
Q ti A PDF
Question Answer PDF

1 2 3 »

SPONSORED SEARCHES

mcq question answer app

multiple choice questions app

mcq book of construction management

construction planning mcq

free book downloads online

 Question No : 1
For the execution of a project, a contractor is

A A person

B A firm

C An agency

D All the above

 View Answer   Discuss

Correct Answer : D

Share this question with your friends

By using this website, you agree that we and our partners may set cookies for purposes such as
customising content and advertising. I Understand
 Question No : 2
 Question No : 2
The first stage of a construction, is

A Preparation of estimate

B Survey of the site

C Initiation of proposal

D Preparation of tender

 View Answer   Discuss

Correct Answer : C

Share this question with your friends

SPONSORED SEARCHES

mcq question answer app

multiple choice questions app

mcq book of construction management

construction planning mcq

free book downloads online

 Question No : 3
Whenever an activity has zero total float, then

A Free float of the activity must be zero but independent float need not be zero

Independent
BBy using float must
this website, be zero
you agree but
that wefree
andfloat
our need not may
partners be zero
set cookies for purposes such as
customising content and advertising. I Understand
C Free float and independent float both must be zero
C ee oat a d depe de t oat bot ust be e o

D Free float and independent float both need not be zero

 View Answer   Discuss

Correct Answer : C

Share this question with your friends

 Question No : 4
Pre-tender stage requires

≡A Acquisition
Home of land
PDF Store Exams G.K. Aptitude Reasoning English Computer

B Selection of site

C Fmalisation of alignment of work

D All the above

 View Answer   Discuss

Correct Answer : D

Share this question with your friends

 Question No : 5
Bar charts are suitable for

A Minor works

By using this website, you agree that we and our partners may set cookies for purposes such as
B Major works
customising content and advertising. I Understand
C Large projects

D All the Above

 View Answer   Discuss

Correct Answer : A

Share this question with your friends

 Question No : 6
Railway projects are treated as

A Light construction

B Heavy construction

C Industrial construction

D None of these

 View Answer   Discuss

Correct Answer : B

Share this question with your friends

 Question No : 7
The time which results in the leasi, possible construction cost of an activity, is known as

A Normal time

By using this website, you agree that we and our partners may set cookies for purposes such as
B Slow time
customising content and advertising. I Understand
C Crash time

D Standard time

 View Answer   Discuss

Correct Answer : B

Share this question with your friends

1 2 3 »

Better Lives Beyond Chemistry


Ad Evonik

Node AEC -
Architecture &
Engineering
Ad nodeaec.com

Microsoft Access MCQ


Question with Answer
| PDF Download |…
competitive-exam.in

M.Eng. Engineering
Management - Cornell
University
By using this website, you agree that we and our partners may set cookies for purposes such as
Ad oncampus.engmanagement.cor…
customising content and advertising. I Understand
Data Structure MCQ
Data Structure MCQ
Question with Answer
| PDF Download |…
competitive-exam.in

Microsoft Excel MCQ


Question with Answer
| PDF Download |…
competitive-exam.in

PageMaker MCQ
Question with Answer
| PDF Download |…
competitive-exam.in

Visual Basic MCQ


Question with Answer
| PDF Download |…
competitive-exam.in

Networking MCQ
Question with Answer
| PDF Download |…
competitive-exam.in

Multimedia and
Graphics MCQ
Question with…
competitive-exam.in

Microsoft Word MCQ


Question with Answer
| PDF Download |…
competitive-exam.in

Ad
1. MCQ Question Answer App
2. Multiple Choice Questions App
3. Free Book Downloads Online

Related Categories

ByDBMS
 using MCQ World
 you
this website, History
agree thatMCQ Visual Basic
we and ourpartners MCQ
may set cookies for purposes such as
customising content and advertising. I Understand
 General Science MCQ  Banking MCQ  PageMaker MCQ  Payroll MCQ
 General Science MCQ  Banking MCQ  PageMaker MCQ  Payroll MCQ

 Multimedia and Graphics MCQ  Investment MCQ  XML Markup MCQ

 WAN MCQ  Fact MCQ

SPONSORED SEARCHES

mcq question answer app

multiple choice questions app

mcq book of construction management

construction planning mcq

free book downloads online

Cornell Engineering Management - Online


Master's Program
Ad onlinelearning.engmanagement.cornell.e...

Onorati Construction -
Asphalt Resurfacing
Services
Ad onoraticonstruction.com

Microsoft Access MCQ


Question with Answer |
PDF Download | 2020|…
competitive-exam.in
By using this website, you agree that we and our partners may set cookies for purposes such as
customising content and advertising. I Understand
A&D Construction
Services Inc - Window
and Door Installation
Ad business.google.com

Data Structure MCQ


Question with Answer |
PDF Download | 2020|…
competitive-exam.in

Visual Basic MCQ


Question with Answer |
PDF Download | 2020|…
competitive-exam.in

PageMaker MCQ
Question with Answer |
PDF Download | 2020|…
competitive-exam.in

Networking MCQ
Question with Answer |
PDF Download | 2020|…
competitive-exam.in

Multimedia and
Graphics MCQ Question
with Answer | PDF…
competitive-exam.in

Banking MCQ Question


with Answer | PDF
Download | 2020| Page 2
competitive-exam.in

Tally MCQ Question with


Answer | PDF Download |
2020| Page 8
competitive-exam.in

Ad
1. MCQ Question Answer App
2. Multiple Choice Questions App
3. Free Book Downloads Online

By using this website, you agree that we and our partners may set cookies for purposes such as
customising content and advertising. I Understand
Competitive Exam India | Copyright @2017-2018 | About Us | Contact Us
Hosting partner DigitalOcean - Click here to get $10 joining bonus

By using this website, you agree that we and our partners may set cookies for purposes such as
customising content and advertising. I Understand
Home About Cont act Submit Project Affiliat e Program Free BooksText to Search...

Update your Android App - Live on Google Play Store

Home Civil MCQ Construction Planning and Management Practice Test


Mechanical Engineering

Construction Planning and Managem


1. MCQ Practice T ests

2. T imed Mock T ests

3. Online Quiz z es Test


4. T echnical T erms
 Civil MCQ
5. Mechanical Projects
Onorat i Const ruct ion - Asphalt
6. Engineering Notes Resurfacing Services
Onorat i Const ruct ion Co., Inc.
7. Mechanical Interview
We Specialize in All Aspect s of Road
4. Piping Engg. Interview Const ruct ion.

Automobile Engineering

1. MCQ Practice T ests

3. Mock T est (Level I) WEBSITE DIRECTION

4. Mock T est (Level II)


Practice Test: Question Set - 11
3. Online Quiz z es

4. T echnical T erms 1. T he performance of a specific task in CPM, is known

(A) Dummy
5. Automobile Projects 
ICRAVE Design Studio - Large-scale
(B) Event
development OPEN
6. Automobile Interview NYC's lead design firm for
(C) Activity
built environments, properties,
amenities and beyond development.icrave.com
(D) Contract
Correct Answer
Civil Engineering Text to Search...

1. MCQ Practice T ests 2. Pre-tender stag e requires

2. Mock T ests (Level I) (A) Acquisition of land

(B) Selection of site


3. Mock T ests (Level II)
(C) Fmalisation of alignment of work

4. Online Quiz z es (D) All the above

Correct Answer
5. T echnical T erms

6. Civil Interview
3. An event is indicated on the network by a number enclosed in

(A) A circle

Electrical Engineering (B) A square

(C) A triangle
1. MCQ Practice T ests
(D) All the above

2. Mock T ests (Level I) Correct Answer

3. Mock T ests (Level II)


4. Select the incorrect statement.
4. Online Quiz z es
(A) A critical path always begins at the very first event

5. Electrical GK MCQ (B) A critical path always terminates at the last event

(C) Critical activities control the project duration


6. Electrical Lab Viva
(D) Critical activity is the one for which free float is zero

Correct Answer
Chemical Engineering
5. If t is the duration of an activity, t1 is the latest finish possible moment o
1. MCQ Practice T ests
and t2 is the earliest start possible moment, the independent float of the a

2. Mock T ests (Level I) (A) (t1 - t2) - t

(B) t - (t1 - t2)
3. Mock T ests (Level II)
(C) (t1 + t2) - t
4. Online Quiz z es (D) t + (t1 - t2)

Correct Answer

Computer Science
6. Free float for any activity is defined as the difference between
1. MCQ Practice T ests 
(A) Its earliest finish time and earliest start time for its successor activity

2. Mock T ests (Level I) (B) Its latest start time and earliest start time
3. Mock T ests (Level II) (C) Its latest finish time and earliest start time for its successor activity
Text to Search...
(D) Its earliest finish time and latest start time for its successor activity
4. Online Quiz z es
Correct Answer

GK National MCQ : India 7. In CPM analysis,

(A) Emphasis is given to activities


1. Basic National GK
(B) Uncertainties are not allowed
2. Ancient India (C) Activities are represented by arrows

(D) All the above


3. History of India
Correct Answer
4. Books and Authors

5. Economics and Indian 8. T he estimated time required to perform an activity, is known as


Economy
(A) Event

6. Famous Places in India (B) Dummy

(C) Duration
7. Indian Culture
(D) Float
8. Famous Personalities Correct Answer

9. National Days and Years


9. Critical Path Net Work helps an eng ineer
10. Research and Developments

11. Constitution of India & Onorat i Const ruct ion - Asphalt


Indian Politics Resurfacing Services
Onorat i Const ruct ion Co., Inc.
12. Honours and Awards
We Specialize in All Aspect s of Road
13. Indian Geography Const ruct ion.

GK MCQ : Indian Railways

1. Basic GK about Indian


Railways
WEBSITE DIRECTION
2. Departmental Interview
Questions Practice T ests
(A) To concentrate his attention on critical activities

(B) To divert the resources from non-critical advanced activities to criti
GK International MCQ (C) To be cautious for avoiding any delay in the critical activities to avoi
project
1. Basic International GK (D) All the above
Text to Search...
Correct Answer
2. Books and Authors

3. World Organiz ations 10. A contractor has two options; (I): Invest his money in project A or (II)
B. If he decides to invest in A, for every rupee invested, he is assured of d
4. International Days & Years years. If he decides to invest in B, he is assured of making his money 1.5 t
contractor values his money at 10% interest rate, he
5. World Famous Personality
(A) Should invest in neither of the two projects
6. Worlds Honours and Awards (B) Could invest in either of the two projects

(C) Should invest in project A


7. World Geography
(D) Should invest in project B

Correct Answer

11. Henry Gantt developed Bar charts for planning and scheduling of pro

(A) 1880

(B) 1900

(C) 1920

(D) 1940

Correct Answer

12. If TL is the latest allowable event occurrence time, total activity slack(

(A) LST - EST

(B) LFT - EFT

(C) TL - EFT

(D) All the above

Correct Answer

13. Modular co-ordination of construction means proper

(A) Planning

(B) Designing

(C) Execution

(D) All the above

Correct Answer

14. Pick up the correct statement from the following :


(A) CPM analysis is activity oriented
Text to Search...
(B) PERT analysis is event oriented

(C) In CPM, the time is related to cost

(D) All the above

Correct Answer

15. T he final selection of a construction site, is done by

(A) Departmental representative or user

(B) Local civil authority representative

(C) Representative of engineer authority

(D) All the above

Correct Answer

View All Answers


01. Answer: Option C 02. Answer: Option D 03. Answer: Option D 04. Answer: Option
Option A 07. Answer: Option D 08. Answer: Option C 09. Answer: Option D 10. Answe
12. Answer: Option D 13. Answer: Option D 14. Answer: Option D 15. Answer: Option
Show/hide

Set 01 Set 02 Set 03 Set 04 Set 05 Set 06 Set 07 Set 08

Set 11

   

Relat ed Test Series ...

 Concrete Technology and Design Objective Type Questions

 Theory of Structures Objective Questions and Answers

 Strength of Materials Civil Engineering Questions and Answers

 Soil Mechanics and Foundation Engineering Civil Engineering MCQ

 Hydrology and Water Resources Engineering MCQ



 Surveying Online Civil Engineering Test

 Railway Engineering Objective Type Questions


 Design of Steel Structures Objective Questions and Answers
Text to Search...

 Blogger Comment  Facebook Comm

     

Find Construction Jobs


We'll Help You Win Business

We'll Show You Project s You Can Win wit h a


Demo. Consider Buying a Lead Service.
leads.construction.com

OPEN

The Only 25 Stocks You Need

Kings Of Capitalism Open

1. Objective Mechanical Engineering & T echnical


Interview E-book

2. Mechanical Engineering Objective 

3. Mechanical T echnical Interview


4. Civil Engineering MCQ with Interview Questions
Text to Search...
and Answers

5. Objective Electrical Engineering with Interview


Questions and Answers

6. Objective (MCQ ) Chemical Engineering

7. Basic Science General Knowledge

8. Electrical Engineering Lab Viva eBook

9. Automobile Engineering MCQ eBook (FREE)

10. IC Engine MCQ eBook (FREE)

11. SSC JE Previous Years Solved Papers (FREE)

Our Partner Site: >>


** Event Management & Designing **


ICRAVE Design Studio - Large-scale development Text to Search...
Ad developm ent.icrave.com

Track Your Workf orce


Ad Eyrus

Construction Planning MCQ Practice Test - Set 0


objectivebooks.com

A&D Construction Services Inc - Window and Doo


Installation
Ad business.google.com

Civil Construction Multiple Choice Questions - Se


02
objectivebooks.com

Construction Planning Objective Questions and


Answers - Set 08
objectivebooks.com

Civil Engineering Construction Management


Questions - Set 05
objectivebooks.com

Construction Planning and Management Objective


Questions and Answers - Set 01
objectivebooks.com

Construction Management Objective Questions


and Answers - Set 09
objectivebooks.com

Industrial Engineering MCQ - Set 02


objectivebooks.com

Construction Planning and Management MCQ


Quiz - Set 04
objectivebooks.com


Text to Search...

Popular Post s Cat egor y

Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A)  Volumetric stress and volumetric
strain (B)...

Multiple Choice Questions with Answers on


Refrigeration and Air-Conditioning - Set 07
Practice Test: Question Set - 07 1.  Freon
group of refrigerants are (A) Inflammable (B)
Toxic (C)  Non-inflammable and toxic (...

I.C Engines Multiple Choice Questions with Answers -


Set 02
Practice Test: Question Set - 02 1.  If the
temperature of intake air in internal
combustion engine increases, then its
efficiency will...

Estimating and Costing Objective Questions and


Answers - Set 01 
Practice Test: Question Set - 01 1. The rate of
payment is made for 100 cu m (per % cu m) in
case of (A)  Earth work in excavation (B...
Structural Analysis Objective T ype Questions and
Text to Search...
Answers - Set 01
Practice Test: Question Set - 01 1. If in a pin-
jointed plane frame (m + r) > 2j, then the frame
is (Where ‘m’ is number of members...

Power Plant Engineering MCQ - Set 01


Practice Test: Question Set - 01 1. Enriched
uranium is required as a fuel in a nuclear
reactor, if light water is used as moderator
an...

Hydraulics and Fluid


Mechanics MCQ - Set 01
Practice Test: Question
Set - 01 1. When a body is
placed over a liquid, it will
sink down if (A) 
Gravitational force is equal to the...

Automobile Engineering Objective Questions with


Answers - Set 16
Practice Test: Question Set - 16 1. The
temperature indicating instrument in vehicles
indicates the temperature of (A)  Engine
piston ...

Friction Clutches Multiple Choice Questions


Friction Clutches Objective Practice Test 1.
The friction moment in a clutch with uniform
wear as compared to friction moment with
unifo...

Industrial Engineering Objective T ype Questions with


Answers - Set 05
Practice Test: Question Set - 05 1.  Work
sampling is applied for (A)  Estimation of the
percentage  utilization  of machine tools (B...

Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema

5 4 6 6 
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...


 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Home » Engineering » Civil Engineering » Construction Management » Section 1

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

21. If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity,
the expected time of the activity, is

A.

B.

C.
D.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

22. The time by which activity completion time can be delayed without affecting the start of
succeeding activities, is known as
A.duration
B.total flat
C. free float
D.interfering float.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace
Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

23. The artificial activity which indicates that an activity following it, cannot be started unless
the preceding activity is complete, is known as
A.event
B.free float
C. dummy
D.constant

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

24.  Henry Gantt developed Bar charts for planning and scheduling of projects in
A.1880
B.1900
C. 1920
D.1940
E. 1950

Answer: Option B

Explanation:
No answer description available for this question. Let us discuss.
Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

25.  The most popular type of organisation used for Civil Engineering Constructions, is
A.line organisation
B.line and staff organisation
C. functional organisation
D.effective organisation.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

« Prev   1 2 3 4 5 6 7 8 9 10 Next »
Walston Timber Frame
Expect excellent, honest
communication from our
knowledgeable and responsive
sales team

Ad

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Industrial Engineering
and Production
and Production
Management Section 4…
indiabix.com

Industrial Engineering
and Production
Management -…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Strength of Materials -
Civil Engineering
Questions and Answers…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Problems on Trains -
Aptitude Questions and
Answers
indiabix.com

Estimating and Costing -


Civil Engineering
Questions and Answers…
indiabix.com

UPSC Civil Service Exam


Questions Section 14 -
Civil Engineering…
indiabix.com

Ad
1. Civil Engineering MCQ for Practice
2. Construction Management Programs
3. Exam Answers Site

Read more:

Construction Management - Section 2


Current Affairs 2019, 2020

Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com


Construction Planning and Management

Question No. 01
In time-cost optimization of a project, crashing is done.
(A) On all the activities
(B) On all the activities lying on the critical path
(C) Only on activities lying on the original critical path and having flatter cost slopes
(D) On original critical activities and those that become critical at any stage of crashing in the
order of ascending cost slope
Answer: Option D

Question No. 02
Which of the following does not represent an activity?
(A) Site located
(B) Foundation is being dug
(C) The office area is being cleaned
(D) The invitations are being sent
Answer: Option A

Question No. 03
In resources levelling
(A) Total duration of project is reduced
(B) Total duration of project is increased
(C) Uniform demand of resources is achieved
(D) Cost of project is controlled
Answer: Option C

Question No. 04
Sensitivity analysis is a study of
(A) Comparison of profit and loss
(B) Comparison of assets and liabilities
(C) Change in output due to change in input
(D) Economics of cost and benefits of the project
Answer: Option C

Question No. 05
Preliminary project report for a road project must contain
(A) The detailed estimated cost based on detailed design
(B) The several alternatives of the project that have been considered
(C) The soil survey, traffic survey, concept design and approximate cost
(D) The contract documents for inviting tenders
Answer: Option C
Question No. 06
For which of the following materials, the output of power shovels for a fixed shovel size will be
maximum
(A) Moist loam
(B) Good common earth
(C) Well blasted rock
(D) Wet sticky clay
Answer: Option A

Question No. 07
If the output of a dragline for 90° angle of swing at optimum depth of cut is X, then the output for
120° angle of swing at 120 % of optimum depth of cut will be
(A) Equal to X
(B) More than X
(C) Less than X
(D) Any of the above
Answer: Option C

Question No. 08
In PERT analysis, the time estimates of activities and probability of their occurrence follow
(A) Normal distribution curve
(B) Poisson's distribution curve
(C) Beta distribution curve
(D) None of the above
Answer: Option C

Question No. 09
Free float is mainly used to
(A) Identify the activities which can be delayed without affecting the total float of preceding
activity
(B) Identify the activities, which can be delayed without affecting the total float of succeeding
activity
(C) Establish priorities
(D) Identify the activities which can be delayed without affecting the total float of either the
preceding or succeeding activities
Answer: Option B

Question No. 10
Grader is used mainly for
(A) Trimming and finishing
(B) Shaping and trimming
(C) Finishing and shaping
(D) Finishing, shaping and trimming
Answer: Option D
Question No. 11
Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?
(A) Concrete
(B) Loose sand
(C) Asphalt
(D) Firm earth
Answer: Option B

Question No. 12
Which of the following earth moving machines has the shortest cycle time?
(A) Drag line
(B) Hoe
(C) Clam shell
(D) Dipper shovel
Answer: Option D

Question No. 13
Updating may result in
(A) Change of critical path
(B) Decrease of project completion time
(C) Increase of project completion time
(D) All of the above
Answer: Option D

Question No. 14
The time by which a particular activity can be delayed without affecting the preceding and
succeeding activities is known as
(A) Total float
(B) Free float
(C) Interfering float
(D) Independent float
Answer: Option D

Question No. 15
During the construction period, price variation clause in contracts caters to
(A) Increase in rates of only important materials
(B) Variation in cost in materials element, labour element and petrol-oil-lubricant element
(C) Variation in total cost of the project on an ad hoc basis
(D) Rate of inflation
Answer: Option B

Question No. 16
Critical path method
(A) Is an improvement upon bar chart method
(B) Provides a realistic approach to daily problems
(C) Avoids delays which are very common in bar charts
(D) All the above
Answer: Option D

Question No. 17
At a work site, statistical quality control of concrete means
(A) Measurement of risks to eliminate failures
(B) Applying the theory' of probability to sample testing or inspection
(C) Reduction in wastage of inspection costs
(D) Reduction in costs for the removal of defects
Answer: Option B

Question No. 18
For the network shown in the given figure, the expected time for the activity

(A) 1-2 is 4
(B) 2-3 is 7
(C) 3-4 is 8
(D) All the above
Answer: Option D

Question No. 19
A critical ratio scheduling
(A) Determines the status of each activity
(B) Adjusts automatically changes in activity progress
(C) Is a dynamic system
(D) None of these
Answer: Option D

Question No. 20
For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5,
17 and 8 days respectively, The expected time is
(A) 8 days
(B) 9 days
(C) 10 days
(D) 15 days
Answer: Option B

Question No. 21
Pick up the correct statement from the following:
(A) Optimistic time estimate refers to activities
(B) Pessimistic time estimate refers to activities
(C) Most likely time estimate refers to activities
(D) All the above
Answer: Option D

Question No. 22
In the time-cost optimisation, using CPM method for network analysis, the crashing of the
activities along the critical path is done starting with the activity having
(A) Longest duration
(B) Highest cost slope
(C) Least cost slope
(D) Shortest duration
Answer: Option C

Question No. 23
A golden rule for the procurement of construction stones, suggests
(A) 100% at the site
(B) 67% at the site and 33% under procurement
(C) 50% at the site and 50% under procurement
(D) 33% at the site and 67% under procurement
Answer: Option B

Question No. 24
The time with which direct cost does not reduce with the increase in time is known as
(A) Crash time
(B) Normal time
(C) Optimistic time
(D) Standard time
Answer: Option B

Question No. 25
Pick up the correct statement from the following with regards to C.P.M. network analysis of
projects
(A) The latest occurrence time of the node of which the activity arrow terminates minus the
duration of the activity, is called latest start time
(B) The latest occurrence time for the node at which the activity arrow terminates, is called
latest finish time
(C) Earliest occurrence time of the event from which the activity arrow' originates, is called
earliest start time of the activity
(D) All the above
Answer: Option D

Question No. 26
Interfering float is the difference between
(A) Total float and free float
(B) Total float and independent float
(C) Free float and independent float
(D) None of the above
Answer: Option A

Question No. 27
While filling the tender for any work, the contractor considers
(A) Site survey
(B) Availability of construction materials
(C) Availability of labour
(D) All the above
Answer: Option D

Question No. 28
An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It has no salvage value at the
end of 8 years. The book value of the excavator at the end of 3 years using general double
declining balance method is
(A) Rs. 8,43,750
(B) Rs. 8,75,000
(C) Rs. 10,50,000
(D) Rs. 11,56,250
Answer: Option A

Question No. 29
Pick up the incorrect statement from the following:
(A) The various functions under each activity, are shown by one bar on Bar Charts
(B) Bar chart establishes the interdependency of one event on another
(C) Only approximate percentage of the completed work is reported
(D) None of these
Answer: Option B

Question No. 30
A wheeled tractor hauling unit is working on firm earth. The total loaded weight distribution of
this unit is:
Drive wheels: 25000 kg
Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the rimpull which this tractor
can exert without slipping is
(A) 10000 kg
(B) 12500 kg
(C) 22500 kg
(D) 5000 kg
Answer: Option B

Question No. 31
If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks,
the probability of completing the project in 50 weeks and 65 weeks respectively will be
(A) 2.3% and 84.1%
(B) 97.7% and 84.1%
(C) 97.7 % and 15.9%
(D) 15.9% and 97.7%
Answer: Option A

Question No. 32
Power stations are generally treated as
(A) Light construction
(B) Heavy construction
(C) Industrial construction
(D) Electrical construction
Answer: Option C

Question No. 33
For a given size of bucket, the ideal output of a dragline will be least in
(A) Moist loam
(B) Sand and gravel
(C) Good common earth
(D) Wet sticky clay
Answer: Option D

Question No. 34
Bar charts are suitable for
(A) Minor works
(B) Major works
(C) Large projects
(D) All the Above
Answer: Option A

Question No. 35
The time corresponding to minimum total project cost is
(A) Crash time
(B) Normal time
(C) Optimistic time
(D) Between normal time and crash time
Answer: Option D

Question No. 36
Construction team means
(A) An engineer
(B) An architect
(C) An owner
(D) All the above
Answer: Option D
Question No. 37
Select the incorrect statement.
(A) Start float and finish float are always equal.
(B) Total float can be either start float or finish float.
(C) Start float and finish float need not be equal.
(D) Start float and finish float are the differences between activity times and not event times.
Answer: Option C

Question No. 38
The artificial activity which indicates that an activity following it, cannot be started unless the
preceding activity is complete, is known as
(A) Event
(B) Free float
(C) Dummy
(D) Constraint
Answer: Option C

Question No. 39
PERT technique of network analysis is mainly useful for
(A) Small projects
(B) Large and complex projects
(C) Research and development projects
(D) Deterministic activities
Answer: Option C

Question No. 40
Pick up the correct statement from the following:
(A) The float may be positive, zero or negative
(B) If the float is positive and the activity is delayed by a period equal to its total float, the
completion of project is not delayed
(C) If the float of an activity is negative, delay in its performance is bound to delay the
completion of project
(D) All the above
Answer: Option D

Question No. 41
The independent float affects only
(A) Preceding activities
(B) Succeeding activities
(C) The particular activity involved
(D) None of the above
Answer: Option C

Question No. 42
Site order book is used for recording
(A) Instructions by the executive engineers
(B) Construction measurements
(C) Issue of store equipments
(D) Names of the casual labour
Answer: Option A

Question No. 43
The time by which activity completion time can be delayed without affecting the start of
succeeding activities, is known as
(A) Duration
(B) Total float
(C) Free float
(D) Interfering float
Answer: Option C

Question No. 44
The part of a derrick crane include
(i) Mast
(ii) Boom
(iii) Bull wheel
(iv) Jack
Of these statements
(A) (i), (ii) and (iv) are correct
(B) (ii), (iii) and (iv) are correct
(C) (i), (iii) and (iv) are correct
(D) (i), (ii) and (iii) are correct
Answer: Option D

Question No. 45
If the gross vehicle weight of a truck is 30 tonne and rolling resistance is 30 kg/tonne, then the
tractive effort required to keep the truck moving at a uniform speed is
(A) 30 kg
(B) 300 kg
(C) 900 kg
(D) 1000 kg
Answer: Option C

Question No. 46
Works costing less than Rs. 20,000 are treated as
(A) Any project
(B) Major projects
(C) Minor projects
(D) All the above
Answer: Option C
Question No. 47
A machine costs Rs. 20000 and its useful life is 8 years. The money is borrowed at 8% interest per
annum. The capital recovery factor at 8% interest per annum for 8 years is 0.174. The annual
equipment cost of the machine will be
(A) Rs. 1740
(B) Rs. 3480
(C) Rs. 5220
(D) Rs. 6960
Answer: Option B

Question No. 48
Railway projects are treated as
(A) Light construction
(B) Heavy construction
(C) Industrial construction
(D) None of these
Answer: Option B

Question No. 49
Consider the following statements:
In the critical path method of construction planning, Free Float can be.
1. Greater than Total Float.
2. Greater than Independent Float
3. Equal to Total Float.
4. Less than Independent Float. Of these statements
(A) 1 and 4 are correct
(B) 2 and 3 are correct
(C) 1 and 4 are correct
(D) 1 and 2 are correct
Answer: Option B

Question No. 50
Pick up the correct statement from the following:
(A) The duration between the earliest start time of the preceding event and latest finish time of
the succeeding event, is called 'float'
(B) The duration of time by which an activity can be delayed without affecting the succeeding
activity, is called free float
(C) The difference between total float and free float, is called interfering float
(D) All the above
Answer: Option D

Question No. 51
The original cost of an equipment is Rs.10,000. Its salvage value at the end of its total useful life of
five years is Rs. 1,000. Its book value at the end of two years of its useful life (as per straight line
method of evaluation of depreciation) will be
(A) Rs. 8,800
(B) Rs. 7,600
(C) Rs. 6,400
(D) Rs. 5,000
Answer: Option C

Question No. 52
For completion of a project, the critical path of the network represents
(A) Minimum time
(B) Maximum time
(C) Maximum cost
(D) Minimum cost
Answer: Option A

Question No. 53
The maximum rimpull in the first gear of a tractor while towing a load is 6300 kg. The tractor
weighs 12.5 tonnes and is operating along a 2 percent upgrade and the rolling resistance is 45
kg/tonne. Pull available for towing the load is
(A) 3425 kg
(B) 5515 kg
(C) 4350 kg
(D) 2975 kg
Answer: Option B

Question No. 54
Which one of the following represents an event?
(A) Concrete cured
(B) Fixing of door
(C) Plastering of walls
(D) Selecting sites
Answer: Option A

Question No. 55
The rated loads of lifting cranes, as percentage of tipping load at specified radius, for crawler-
mounted and pneumatic tyre-mounted machines would be respectively
(A) 80 and 90
(B) 90 and 80
(C) 85 and 75
(D) 75 and 83
Answer: Option D

Question No. 56
PERT is
(A) An analytic in concept
(B) Limited of event oriented diagrams
(C) Used for research and development projects
(D) All the above
Answer: Option D

Question No. 57
Optimistic time, most likely time and pessimistic times for the activities of a network in the given
figure are written above their arrows. If the contractual obligation time for the project is 75, the
latest occurrence time for the event 2, is

(A) 20
(B) 25
(C) 35
(D) 15
Answer: Option B

Question No. 58
An earth moving equipment costs Rs. 5,00,000 and has an estimated life of 10 years and a salvage
value of Rs. 50,000. What uniform annual amount must be set aside at the end of each of the 10
years for replacement if the interest rate is 8% per annum and if the sinking fund factor at 8% per
annum interest rate for 10 years is 0.069?
(A) Rs. 31050
(B) Rs. 34500
(C) Rs. 37950
(D) Rs. 50000
Answer: Option A

Question No. 59
Output of a bulldozer is
(i) Increased if drawbar HP of the tractor is increased for a given hauling distance
(ii) Decreased if drawbar HP of the tractor is increased for a given hauling distance
(iii) Increased if the hauling distance is increased for a given drawbar HP of the tractor
(iv) Decreased if the hauling distance is increased for a given drawbar HP of the tractor
Of these statement
(A) (i) and (iii) are correct
(B) (i) and (iv) are correct
(C) (ii) and (iii) are correct
(D) (ii) and (iv) are correct
Answer: Option B

Question No. 60
For the execution of a project, a contractor is
(A) A person
(B) A firm
(C) An agency
(D) All the above
Answer: Option D

Question No. 61
The constraints in case of resource smoothening operation would be
(A) Resources
(B) Project duration time
(C) Both resources and project duration time
(D) None of the above
Answer: Option B

Question No. 62
The time which results in the leasi, possible construction cost of an activity, is known as
(A) Normal time
(B) Slow time
(C) Crash time
(D) Standard time
Answer: Option B

Question No. 63
The direct cost of a project with respect to normal time is
(A) minimum
(B) Maximum
(C) Zero
(D) Infinite
Answer: Option A

Question No. 64
The object of technical planning, is
(A) Preparation of specifications
(B) Preparation of estimates
(C) Initiating the procurement action of resources
(D) All the above
Answer: Option D

Question No. 65
If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its
expected time and variance are respectively
(A) 3.5 and 5/6
(B) 5 and 25/36
(C) 3.5 and 25/36
(D) 4 and 5/6
Answer: Option C
Question No. 66
Various activities of a project, are shown on bar charts by
(A) Vertical lines
(B) Horizontal lines
(C) Dots
(D) Crosses
Answer: Option B

Question No. 67
Select the correct statement.
(A) Activity arrows in a CPM network are drawn to scale
(B) The tail of an arrow represents the finish of an activity
(C) Arrow bead represents the start of an activity
(D) None of the above
Answer: Option D

Question No. 68
If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest
finish time, then the following relation holds good
(A) EF = ES + D
(B) LS = LF - D
(C) LF = LS + D
(D) All the above
Answer: Option D

Question No. 69
Total float for any activity is defined as the difference between
(A) Its latest finish time and earliest start time for its successor activity
(B) Its latest start time and earliest start time
(C) Its latest start time and earliest finish time
(D) Its earliest finish time and earliest start time for its successor activity
Answer: Option B

Question No. 70
Pick up the incorrect statement from the following:
(A) The activity is the time consuming part of a project
(B) The beginning and end of a job, are called events
(C) The activity which consumes maximum time, is called a node
(D) Logically and sequentially connected activities and events form a network
Answer: Option C

Question No. 71
Assertion (A): Activity 57 is critical.
Reason (R): Earliest finish time and latest finish time for events 57 are same
Select the correct answer.
(A) A is correct but R is not correct
(B) R is correct but A is not correct
(C) Both A and R is correct
(D) Both A and R is incorrect
Answer: Option A

Question No. 72
The main principle of an organisation, is
(A) Unity of command
(B) Effective control at all levels
(C) Delegation of authority
(D) All the above
Answer: Option D

Question No. 73
If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the
expected time of completion of the project with 99.9% probability is
(A) 4 days
(B) 6 days
(C) 10 days
(D) 16 days
Answer: Option D

Question No. 74
Pick up the correct statement from the following:
(A) Earliest expected time is denoted by TE
(B) Latest occurrence time is denoted by TL
(C) Contractual obligation time is denoted by Ts
(D) All the above
Answer: Option D

Question No. 75
Consider the following operations:
1. Drilling
2. Blasting
3. Mucking
4. Placing steel
5. Placing concrete
The correct sequence of these operations in tunnel construction is
(A) 1, 2, 4, 3, 5
(B) 1, 3, 2, 4, 5
(C) 1, 2, 3, 4, 5
(D) 1, 3, 4, 2, 5
Answer: Option C
Question No. 76
Pick up the incorrect statement from the following:
(A) The difference between the earliest start time and latest finish time of any activity, is the
maximum time available for the activity
(B) The difference between the maximum time available for the job and actual time it
consumes, is called total float
(C) The difference between the latest start time and earliest start time of an activity, is called
total float
(D) None of these
Answer: Option D

Question No. 77
The basic action involved in sheep foot rolling is
(A) Kneading
(B) Pressing
(C) Tamping
(D) Vibration
Answer: Option A

Question No. 78
Pick up the correct statement from the following:
(A) Programme Evaluation and Review Technique, is event oriented
(B) Programme Evaluation and Review Technique is not event oriented
(C) Critical Path Method is event oriented
(D) Critical Path method is event oriented
Answer: Option A

Question No. 79
If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at
a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the
cost of excavation by machine will be equal to the cost of manual excavation is
(A) 500 cum
(B) 1000 cum
(C) 1500 cum
(D) 2000 cum
Answer: Option A

Question No. 80
Time and progress chart of a construction, is also known as
(A) Bar chart
(B) Gantt chart
(C) Modified Mile stone chart
(D) All the above
Answer: Option D
Question No. 81
Economic saving of time results by crashing
(A) Cheapest critical activity
(B) Cheapest noncritical activity
(C) Costliest critical activity
(D) Costliest noncritical activity
Answer: Option A

Question No. 82
In the given figure, the network of a project represents

(A) Activity of an excavation of a footing


(B) Activity of an excavation which starts at event No. 1 and ends at even No. 2
(C) Activity of excavation which takes 8 units of time
(D) None of these
Answer: Option C

Question No. 83
Select the incorrect statement.
(A) Earliest start of an activity is the early event time of the node it leaves.
(B) Latest finish of an activity is the late event time of the node it enters.
(C) Latest start of an activity is its latest finish minus its duration.
(D) None of the above
Answer: Option D

Question No. 84
The technique for establishing and maintaining priorities among the various jobs of a project, is
known
(A) Event flow scheduling technique
(B) Critical ratio scheduling
(C) Slotting technique for scheduling
(D) Short interval scheduling
Answer: Option B

Question No. 85
Which of the following is a weakness of bar chart?
(A) Interdependencies of activities
(B) Project progress
(C) Uncertainties
(D) All of the above
Answer: Option D
Question No. 86
Which one of the following represents an activity?
(A) Excavation for foundation
(B) Curing of concrete
(C) Setting of question paper
(D) All the above
Answer: Option D

Question No. 87
Which of the following excavators is most suitable for digging under water?
(A) Drag line
(B) Hoe
(C) Clam shell
(D) Dipper shovel
Answer: Option A

Question No. 88
A CPM family includes
(A) CPA (Critical Path Analysis)
(B) CPP (Critical Path Plotted)
(C) MCE (Minimum Cost Expenditure)
(D) All the above
Answer: Option D

Question No. 89
Critical path
(A) Is always longest
(B) Is always shortest
(C) May be longest
(D) May be shortest
Answer: Option A

Question No. 90
For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of
form work and curing of concrete, number of bar(s) required on bar chart, is
(A) 1
(B) 2
(C) 3
(D) 4
Answer: Option A

Question No. 91
Which one of the following surfaces will give highest coefficient of traction while using crawler
track tractors?
(A) Ice
(B) Concrete
(C) Loose sand
(D) Earth
Answer: Option D

Question No. 92
Residential buildings are treated as
(A) Light construction
(B) Heavy construction
(C) Industrial construction
(D) Private construction
Answer: Option A

Question No. 93
Consider the following statements:
In the bar chart planning
1. Interdependence of the operations cannot be portrayed.
2. Progress of work can be measured.
3. Spare time of the activities can be determined.
4. Schedule cannot be updated.
Of these statements
(A) 1, 2 and 3 are correct
(B) 1 and 4 are correct
(C) 2, 3 and 4 are correct
(D) 1, 2 and 4 are correct
Answer: Option B

Question No. 94
The three time estimates for the activities of the network shown in the given figure are shown
above their arrows. The earliest expected time for the event 4, is

(A) 19
(B) 14
(C) 24
(D) None of these
Answer: Option A

Question No. 95
Consider the following activities in a building construction:
1. Concreting of roof slabs
2. Brick-jelly lime concrete terracing
3. Erection of form work for slab
4. Construction of parapet wall in terrace
The correct sequence of these activities is
(A) 1, 3, 2, 4
(B) 3, 1, 4, 2
(C) 3, 1, 2, 4
(D) 1, 3, 4, 2
Answer: Option C

Question No. 96
Military organisation is known as
(A) Line organisation
(B) Line and staff organisation
(C) Functional organisation
(D) None of these
Answer: Option A

Question No. 97
Mobilization advance up to 10% of the cost of work is given to a contractor
(A) On commencement of work at site for payment of loan taken by him
(B) For the purchase of construction materials
(C) For the payment of advances to labour and other staff
(D) For all activities required to start the work at site on finalization of the contract document
Answer: Option D

Question No. 98
Pick up the PERT event from the following:
(A) Digging of foundation started
(B) Digging of foundation completed
(C) Laying of concrete started
(D) All the above
Answer: Option D

Question No. 99
A machine is purchased for Rs. 10,000,00 and has an estimated life of 10 years. The salvage value
at the end of 10 years is Rs. 1,50,000. The book value of the machine at the end of 5 years using
general straight line method of evaluation of depreciation is
(A) Rs. 4,75,000
(B) Rs. 5,75,000
(C) Rs. 6,50,000
(D) Rs. 8,50,000
Answer: Option B

Question No. 100


Pick up the incorrect statement from the following:
(A) An activity of a project is denoted by an arrow on the net work
(B) The tail of the arrow indicates the start of the activity
(C) The head of the arrow indicates the end of the activity
(D) The arrows are drawn to scale from left to right
Answer: Option D

Question No. 101


The process of incorporating changes and rescheduling or replanning is called
(A) Resource levelling
(B) Resource smoothening
(C) Updating
(D) Critical path scheduling
Answer: Option C

Question No. 102


Completion of an activity on CPM network diagram, is generally known
(A) Event
(B) Node
(C) Connector
(D) All the above
Answer: Option D

Question No. 103


Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing
the angle of swing.
Reason R: If the angle of swing is decreased, the cycle time will be decreased.
Select the correct answer.
(A) Both A and R is true and R is the correct explanation of A
(B) Both A and R is true but R is not the correct explanation of A
(C) A is true but R is false
(D) A is false but R is true
Answer: Option A

Question No. 104


The salient feature of functional organisation is
(A) Strict adherence to specifications
(B) Separation of planning and design part
(C) Each individual maintains functional efficiency
(D) All the above
Answer: Option D

Question No. 105


A tractor shovel has a purchase price of Rs. 4.7 lacs and could save the organization an amount of
rupees one lac per year on operating costs. The salvage value after the amortization period is 10%
of the purchase price. The capital recovery period will be
(A) 3.7 years
(B) 4.23 years
(C) 5 years
(D) 7.87 years
Answer: Option B

Question No. 106


The first method invented for planning projects, was
(A) Bar chart method
(B) Milestone chart
(C) Critical path method (CPM)
(D) Programme Evaluation and Review Technique (PERT)
Answer: Option A

Question No. 107


Which one of the following is not an excavating and moving type of equipment?
(A) Bulldozer
(B) Clam shell
(C) Scraper
(D) Dump truck
Answer: Option D

Question No. 108


The main disadvantage of line organisation, is
(A) Rigid structure
(B) Extraordinary delay in communications
(C) Top level executions over work
(D) All the above
Answer: Option D

Question No. 109


Batching refers to
(A) Controlling the total quantity at each batch
(B) Weighing accurately, the quantity of each material for a job before mixing
(C) Controlling the quantity of each material into each batch
(D) Adjusting the water to be added in each batch according to the moisture content of the
materials being mixed in the batch
Answer: Option C

Question No. 110


While scheduling a project by C.P.M.
(A) A project is divided into various activities
(B) Required time for each activity is established
(C) Net work is drawn by connecting the activities and the events
(D) All the above
Answer: Option D
Question No. 111
Slack time refers to
(A) An activity
(B) An event
(C) Both event and activity
(D) None of the above
Answer: Option B

Question No. 112


Final technical authority of a project lies with
(A) Assistant Engineer
(B) Executive Engineer
(C) Superintending Engineer
(D) Chief Engineer
Answer: Option D

Question No. 113


Whenever an activity has zero total float, then
(A) Free float of the activity must be zero but independent float need not be zero
(B) Independent float must be zero but free float need not be zero
(C) Free float and independent float both must be zero
(D) Free float and independent float both need not be zero
Answer: Option C

Question No. 114


Mile Stone charts were invented in the year of
(A) 1910
(B) 1920
(C) 1930
(D) 1940
Answer: Option D

Question No. 115


Which of the following is not a PERT event?
(A) Site investigation started
(B) Sessional work completed
(C) Bus starts from Jaipur
(D) Class is being attended
Answer: Option D

Question No. 116


A construction schedule is prepared after collecting
(A) Number of operations
(B) Output of labour
(C) Output of machinery
(D) All the above
Answer: Option D

Question No. 117


A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road
having a rolling resistance of 30 kg per tonne. If this tractor is operated on a level road having a
rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor will
(A) Reduce by 200 kg
(B) Increase by 200 kg
(C) Increase by 250 kg
(D) Reduce by 250 kg
Answer: Option A

Question No. 118


Pick up the correct statement from the following:
(A) The difference of latest occurrence time and earliest expected time, is called slack
(B) The activities connecting the events having zero slack, lie on the critical path
(C) The critical path consumes the maximum time
(D) All the above
Answer: Option D

Question No. 119


In India, are prefabricated components costlier than those of traditional cast-in-situ items that the
prefabricated components replace?
(A) Yes, because of heavier overheads and handling cost
(B) Yes, because of the very high order of quality control for the factory made components
(C) No, because of repetitive manufacture of a number of elements
(D) No, because of savings in site labour
Answer: Option C

Question No. 120


Frequency distribution curves
(A) Having a single lump, are called uninodal curves
(B) If symmetrical, are called normal curves
(C) If not symmetrical, are called skew curves
(D) All the above
Answer: Option D

Question No. 121


Consider the following statements:
Wheeled tractors are replacing crawler tractors because
1. Wheeled tractors travel faster.
2. Crawler tractors are more expensive.
3. Track parts of a crawler wear out quickly.
4. Crawler tractors have stick control.
Of these statements
(A) 1, 3 and 4 are correct
(B) 2, 3 and 4 are correct
(C) 1, 2 and 3 are correct
(D) 1, 2 and 4 are correct
Answer: Option C

Question No. 122


The difference between the time avail-to do a job and the time required to do the job, is known as
(A) Event
(B) Float
(C) Duration
(D) Constraint
Answer: Option B

Question No. 123


The grade resistance factor for an earth moving machine can be obtained by multiplying grade
percentage by a factor approximately equal to
(A) 2 kg/tonne
(B) 6 kg/tonne
(C) 9 kg/tonne
(D) 20 kg/tonne
Answer: Option C

Question No. 124


A dummy activity
(A) Is artificially introduced
(B) Is represented by a dotted line
(C) Does not consume time
(D) All the above
Answer: Option D

Question No. 125


The reduction in project time normally results in
(A) Decreasing the direct cost and increasing indirect cost
(B) Increasing the direct cost and decreasing the indirect cost
(C) Increasing the direct cost and indirect cost both
(D) Decreasing the direct cost and indirect cost both
Answer: Option B

Question No. 126


Frederick W. Taylor introduced a system of working known as
(A) Line organisation
(B) Line and staff organisation
(C) Functional organisation
(D) Effective organisation
Answer: Option C

Question No. 127


The area under the Beta distribution curve is divided into two equal parts by
(A) Most likely time
(B) Optimistic time
(C) Pessimistic time
(D) Expected time
Answer: Option D

Question No. 128


CPM is
(A) Synthesising in concepts
(B) Is built of activities oriented programme
(C) Is based on time estimate
(D) All the above
Answer: Option D

Question No. 129


A four wheel truck or whose operating weight is 12000 kg is pulled along a road having a rising
slope of 2% at a uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the
tow cable is 720 kg. The rolling resistance of the road will be
(A) 20 kg/tonne
(B) 30 kg/tonne
(C) 40 kg/tonne
(D) 50 kg/tonne
Answer: Option C

Question No. 130


The Overall in-charge of an organisation at the site responsible for the execution of the works, is
(A) Executive Engineer
(B) Engineer
(C) Junior Engineer
(D) Assistant Engineer
Answer: Option B

Question No. 131


Consider the following features/factors:
1. Projects are of the non-repetitive type
2. Time required need not be known
3. Time required is known precisely
4. Events have been established for planning
5. Emphasis is given to activities of project
PERT is preferred for planning because of
(A) 1, 2 and 4
(B) 3, 4 and 5
(C) 1, 3 and 4
(D) 1, 2 and 5
Answer: Option A

Question No. 132


The first stage of a construction, is
(A) Preparation of estimate
(B) Survey of the site
(C) Initiation of proposal
(D) Preparation of tender
Answer: Option C

Question No. 133


Crash project duration is obtained by summing the
(A) Normal durations for all the activities
(B) Crash durations for all activities
(C) Crash durations for all the activities along the critical path obtained by taking into account
the normal duration for all the activities
(D) Crash durations for all the activities along the critical path obtained by taking into account
the crash duration for all the activities.
Answer: Option D

Question No. 134


Pick up the correct statement from the following:
(A) Forward pass is used for calculating earliest expected time
(B) Backward pass is used for calculating the latest occurrence time
(C) Maximum value of earliest expected time is used if there is more than one value of any
event
(D) All the above
Answer: Option D

Question No. 135


Sinking fund is
(A) The fund for rebuilding a structure when its economic life is over
(B) Raised to meet maintenance costs
(C) The total sum to be paid to the municipal authorities by the tenants
(D) A part of the money kept in reserve for providing additional structures and structural
modifications
Answer: Option A

Question No. 136


If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the
expected time of the activity, is
(A) (a + m + b)/6
(B) (a + 2m + b)/6
(C) (a + 4m + b)/6
(D) (a + 5m + b)/6
Answer: Option C

Question No. 137


Consider the following statements for a power shovel:
(i) Output can be increased by reducing the angle of swing for a given depth of cut.
(ii) For a given angle of swing, output will be maximum at optimum depth of cut.
(iii) Output can be increased by keeping the depth of cut less than optimum depth,
(iv) Output can be increased by increasing the size of shovel. Of these statements
(A) (ii), (iii) and (iv) are correct
(B) (i), (ii) and (iv) are correct
(C) (i), (iii) and (iv) are correct
(D) (i) and (iv) are correct
Answer: Option B

Question No. 138


If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity
respectively, the expected time t of the activity will be
(A) to + 3tm+ tp/3
(B) to + 4tm+ tp/4
(C) to + 4tm+ tp/5
(D) to + 4tm+ tp/6
Answer: Option D

Question No. 139


The most suitable type of equipment for compaction of cohesive soils is
(A) Smooth-wheeled rollers
(B) Vibratory rollers
(C) Sheep foot rollers
(D) Tampers
Answer: Option C

Question No. 140


If the total float and duration of an activity are 5 and 10 days respectively, the particular activity
can be
(A) Started 5 days later
(B) Completed 5 days later
(C) Performed at slower rate in 15 days
(D) All the above
Answer: Option D
Question No. 141
Rolling resistance of a wheel depends upon
(i) Vehicle load
(ii) Grade
(iii) Ground conditions
Of these statements
(A) Only (i) is correct
(B) (i) and (ii) are correct
(C) (i) and (iii) are correct
(D) (ii) and (iii) are correct
Answer: Option C

Question No. 142


A Milestone chart
(A) Shows the interdependencies of various jobs
(B) Depicts the delay of jobs, if any
(C) Points outgoing ahead of schedule of jobs, if any
(D) None of these
Answer: Option D

Question No. 143


Earliest finish of an activity is always
(A) Greater than earliest event time of the following node
(B) Less than earliest event time of the following node
(C) Less than or equal to earliest event time of the following node
(D) Greater than or equal to earliest event time of the following node
Answer: Option C

Question No. 144


Critical path lies along the activities having total float
(A) Positive
(B) Negative
(C) Zero
(D) Same
Answer: Option C

Question No. 145


If the scheduled completion time of a project is more than the earliest expected time for
completion of the project, then the probability of completion of the project within the scheduled
completion time will be
(A) 50 %
(B) Less than 50 %
(C) More than 50 %
(D) 100 %
Answer: Option C
Question No. 146
The critical activity has
(A) Maximum float
(B) Minimum float
(C) Zero float
(D) None of these
Answer: Option C

Question No. 147


For excavating utility trenches with precise control of depth, the excavation equipment used is
(A) Hoe
(B) Shovel
(C) Dragline
(D) None of the above
Answer: Option A

Question No. 148


PERT analysis is based on
(A) Optimistic time
(B) Pessimistic time
(C) Most likely time
(D) All the above
Answer: Option D

Question No. 149


The most popular type of organisation used for Civil Engineering Constructions, is
(A) Line organisation
(B) Line and staff organisation
(C) Functional organisation
(D) Effective organisation
Answer: Option A

Question No. 150


The probability of completion of any activity within its expected time is
(A) 50 %
(B) 84.1 %
(C) 99.9 %
(D) 100 %
Answer: Option A

Question No. 151


The performance of a specific task in CPM, is known
(A) Dummy
(B) Event
(C) Activity
(D) Contract
Answer: Option C

Question No. 152


Pre-tender stage requires
(A) Acquisition of land
(B) Selection of site
(C) Fmalisation of alignment of work
(D) All the above
Answer: Option D

Question No. 153


An event is indicated on the network by a number enclosed in
(A) A circle
(B) A square
(C) A triangle
(D) All the above
Answer: Option D

Question No. 154


Select the incorrect statement.
(A) A critical path always begins at the very first event.
(B) A critical path always terminates at the last event.
(C) Critical activities control the project duration.
(D) Critical activity is the one for which free float is zero.
Answer: Option D

Question No. 155


If t is the duration of an activity, t1 is the latest finish possible moment of its preceding activity
and t2 is the earliest start possible moment, the independent float of the activity is
(A) (t1 - t2) - t
(B) t - (t1 - t2)
(C) (t1 + t2) - t
(D) t + (t1 - t2)
Answer: Option A

Question No. 156


Free float for any activity is defined as the difference between
(A) Its earliest finish time and earliest start time for its successor activity
(B) Its latest start time and earliest start time
(C) Its latest finish time and earliest start time for its successor activity
(D) Its earliest finish time and latest start time for its successor activity
Answer: Option A
Question No. 157
In CPM analysis,
(A) Emphasis is given to activities
(B) Uncertainties are not allowed
(C) Activities are represented by arrows
(D) All the above
Answer: Option D

Question No. 158


The estimated time required to perform an activity, is known as
(A) Event
(B) Dummy
(C) Duration
(D) Float
Answer: Option C

Question No. 159


Critical Path Net Work helps an engineer
(A) To concentrate his attention on critical activities
(B) To divert the resources from non-critical advanced activities to critical activities
(C) To be cautious for avoiding any delay in the critical activities to avoid delay of the whole
project
(D) All the above
Answer: Option D

Question No. 160

B. If he decides to invest in A, for every rupee invested, he is assured of doubling his money in ten
years. If he decides to invest in B, he is assured of making his money 1.5 times in 5 years. If the
contractor values his money at 10% interest rate, he
(A) Should invest in neither of the two projects
(B) Could invest in either of the two projects
(C) Should invest in project A
(D) Should invest in project B
Answer: Option A

Question No. 161


Henry Gantt developed Bar charts for planning and scheduling of projects in
(A) 1880
(B) 1900
(C) 1920
(D) 1940
Answer: Option B
Question No. 162
If TL is the latest allowable event occurrence time, total activity slack(s), is equal to
(A) LST-EST
(B) LFT-EFT
(C) TL-EFT
(D) All the above
Answer: Option D

Question No. 163


Modular co-ordination of construction means proper
(A) Planning
(B) Designing
(C) Execution
(D) All the above
Answer: Option D

Question No. 164


Pick up the correct statement from the following:
(A) CPM analysis is activity oriented
(B) PERT analysis is event oriented
(C) In CPM, the time is related to cost
(D) All the above
Answer: Option D

Question No. 165


The final selection of a construction site, is done by
(A) Departmental representative or user
(B) Local civil authority representative
(C) Representative of engineer authority
(D) All the above
Answer: Option D

Question No. 166


The main advantage of line organisation is:
(A) Effective command and control
(B) Rigid discipline in the organisation
(C) Defined responsibilities at all levels
(D) All the above
Answer: Option D
 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Why Civil Engineering Construction Management?
In this section you can learn and practice Civil Engineering Questions based on "Construction
Management" and improve your skills in order to face the interview, competitive examination
and various entrance test (CAT, GATE, GRE, MAT, Bank Exam, Railway Exam etc.) with full
confidence.

Where can I get Civil Engineering Construction


Management questions and answers with explanation?
IndiaBIX provides you lots of fully solved Civil Engineering (Construction Management)
questions and answers with Explanation. Solved examples with detailed answer description,
explanation are given and it would be easy to understand. All students, freshers can download
Civil Engineering Construction Management quiz questions with answers as PDF files and
eBooks.

Where can I get Civil Engineering Construction


Management Interview Questions and Answers (objective
type, multiple choice)?
Here you can find objective type Civil Engineering Construction Management questions and
answers for interview and entrance examination. Multiple choice and true or false type
questions are also provided.

How to solve Civil Engineering Construction Management


problems?
You can easily solve all kind of Civil Engineering questions based on Construction
Management by practicing the objective type exercises given below, also get shortcut methods
to solve Civil Engineering Construction Management problems.

Home » Engineering » Civil Engineering » Construction Management » Section 1


Projects to Bid

Commercial Construction Leads

We'll Show You Projects You Can Win with a


Demo. Consider Buying a Lead Service.
leads.construction.com

OPEN

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

1.  Which one of the following represents an activity


A.excavation for foundation
B.curing of concrete
C. setting of question paper
D.preparation of breakfast
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

2.  Pick up the incorrect statement from the following:


A.An activity of a project is denoted by an arrow on the net work
B.The tail of the arrow indicates the start of the activity
C. The head of the arrow indicates the end of the activity
D.The arrows are drawn to scale from left to right
E. Each activity consumes a given time.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

3. The technique for establishing and maintaining priorities among the various jobs of a
project, is known
A.Event flow scheduling technique
B.Critical ratio scheduling
C. Slotting technique for scheduling
D.Short interval scheduling.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

4.  Mile Stone charts were invented in the year of


A.1910
B.1920
C. 1930
D.1940
E. 1950

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

5.  Frederick W. Taylor introduced a system of working known as


A.line organisation
B.line and staff organisation
C. functional organisation
D.effective organisation.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
schuchart.com

Ad

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Civil Engineering Test -


Random - Online Civil
Engineering Test
indiabix.com
Industrial Engineering
and Production
Management -…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Estimating and Costing -


Civil Engineering
Questions and Answers…
indiabix.com

Theory of Structures
Section 3 - Civil
Engineering Questions…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

UPSC Civil Service Exam


Questions - Civil
Engineering Questions…
indiabix.com

Theory of Structures
Section 2 - Civil
Engineering Questions…
indiabix.com

Estimating and Costing -


Civil Engineering
Questions and Answers…
indiabix.com

Ad
1. MCQ Question Answer App
2. Civil Engineering MCQ Book
3. Investment Management MCQ with Answers

Read more:
Construction Management - Section 2

Current Affairs 2019, 2020

Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com


 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Home » Engineering » Civil Engineering » Construction Management » Section 1

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

46.  If TL is the latest allowable event occurrence time, total activity slack(s), is equal to
A.LST-EST
B.LFT-EFT
C.TL-EFT
D.all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

47. The Overall in-charge of an organisation at the site responsible for the execution of the
works, is
A.Executive Engineer
B.Engineer
C.Junior Engineer
D.Sub overseer
E.Assistant Engineer.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

48.  Modular co-ordination of construction means proper


A.planning
B.designing
C.execution
D.all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

49.  Pick up the correct statement from the following:


A.CPM analysis is activity oriented
B.PERT analysis is event oriented
C.CPM does not make any allowance for the uncertainties in the duration of time
D.In CPM, the time is related to cost
E.All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

« Prev   1 2 3 4 5 6 7 8 9 10

Sponsored by
Open
schuchart.com

Walston Timber Frame


Ad Walston Tim ber Fram e

Trust ed Engineer
Consult ing
g
Ad MT Mechanical Group, LLC

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

Civil Engg Courses


Online - Become Job
Ready. Join Today
Ad skill-lync.com

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

Indust rial Engineering


and Product ion
Management Sect ion…
indiabix.com

Indust rial Engineering


and Product ion
Management -…
indiabix.com

St rengt h of Mat erials -


Civil Engineering
Quest ions and…
indiabix.com

Est imat ing and Cost ing


Sect ion 2 - Civil
Engineering Quest ions…
indiabix.com

Problems on Trains -
Apt it ude Quest ions and
Answers
indiabix.com

Est imat ing and Cost ing


- Civil Engineering
Quest ions and…
Quest ions and…
indiabix.com

Ad
1. Civil Engineering MCQ for Pract ice
2. Exam Answers Sit e
3. Const ruct ion Management Programs

Read more:

Construction Management - Section 2

Current Affairs 2019, 2020

Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com


 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Home » Engineering » Civil Engineering » Construction Management » Section 1

Get a Quote Today

We Specialize in Helical Pier


Systems for Foundation Repairs.

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

6. If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity
respectively, the expected time t of the activity will be

A.

B.

C.
D.

E.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

7.  In the given figure, the network of a project represents

A.activity of an excavation of a footing


B.activity of an excavation which starts at event No. 1 and ends at even No. 2
C. activity of excavation which takes 8 units of time
D.none of these.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace
Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

8.  Pick up the PERT event from the following:


A.Digging of foundation started
B.Digging of foundation completed
C. Laying of concrete started
D.Laying of concrete completed
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

9. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and
latest finish time, then the following relation holds good
A.EF = ES + D
B.LS = LF - D
C. LF = LS + D
D.D = EF - ES
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

10.  Final technical authority of a project lies with


A.Assistant Engineer
B.Executive Engineer
C. Superintending Engineer
D.Chief Engineer.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

« Prev   1 2 3 4 5 6 7 8 9 10 Next »

Densification, Inc.

Dynamic Compaction Contractors

Improvement Of Fill Soils. Decades Of


Experience On Over 700 Projects.
densification.com

OPEN

Densification, Inc. - Dynamic Compaction


Ad densification.com

#1 Blueprint App -
Trusted by 750,000+
Projects
Ad lp.fieldwire.com

i i d i
Estimating and Costing
Section 2 - Civil
Engineering Questions…
indiabix.com

Contact Us for Details


Ad Walston Timber Frame

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Industrial Engineering
and Production
Management -…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Strength of Materials -
Civil Engineering
Questions and…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Problems on Trains -
Aptitude Questions and
Answers
indiabix.com

Estimating and Costing


- Civil Engineering
Questions and…
indiabix.com

Ad
1. 2 Year Construction Management Degree
g g
2. Foundation Engineering Exam Questions
3. Civil Engineering MCQ for Practice

Read more:

Construction Management - Section 2

Current Affairs 2019, 2020

Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com


 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Home » Engineering » Civil Engineering » Construction Management » Section 1

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

11.  The performance of a specific task in CPM, is known


A.Dummy
B.Event
C. Activity
D.Contract.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

12. Pick up the correct statement from the following:


A.The float may be positive, zero or negative
If the float is positive and the activity is delayed by a period equal to its total float, the
B.
completion of project is not delayed
If the float of an activity is negative, delay in its performance is bound to delay the
C.
completion of project
If the float of an activity is zero, the activity is critical and any delay in its performance
D.
will delay the whole project
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
13.  A Milestone chart
A.shows the interdependencies of various jobs
B.depicts the delay of jobs, if any
C. points outgoing ahead of schedule of jobs, if any
D.none of these.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

14.  Completion of an activity on CPM network diagram, is generally known


A.Event
B.Node
C. Connector
D.All the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

15.  A dummy activity


A.is artificially introduced
B.is represented by a dotted line
C. does not consume time
D.all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

« Prev   1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
schuchart.com

Onorati Construction - Asphalt


Resurfacing Services
Ad onoraticonstruction.com

Walston Timber Frame


Ad Walston Timber Frame

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Multifamily Renovations
Apartment Unit
- Apartment Unit
Interiors
Ad onecallconstructionservice.com

Industrial Engineering
and Production
Management -…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Strength of Materials -
Civil Engineering
Questions and…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Problems on Trains -
Aptitude Questions and
Answers
indiabix.com

UPSC Civil Service


Exam Questions Section
14 - Civil Engineering…
indiabix.com

Theory of Structures
Section 4 - Civil
Engineering Questions…
indiabix.com

Ad
1. Civil Engineering MCQ for Practice
2. Construction Management Programs
3. Civil Engg MCQ App

Read more:
Construction Management - Section 2

Current Affairs 2019, 2020

Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com


 
Search...

Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles

Civil Engineering :: Construction


Management
Home » Engineering » Civil Engineering » Construction Management » Section 1

Exercise :: Construction Management - Section 1

Construction Management - Section 1


Construction Management - Section 2

16.  Military organisation is known as


A.line organisation
B.line and staff organisation
C. functional organisation
D.none of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

17.  Pick up the incorrect statement from the following:


A.The activity is the time consuming part of a project
B.The beginning and end of a job, are called events
C. The activity which consumes maximum time, is called a node
D.Logically and sequentially connected activities and events form a network
E. None of these.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

18.  Various activities of a project, are shown on bar charts by


A.vertical lines
B.horizontal lines
C. dots
D.crosses.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

19.  Time and progress chart of a construction, is also known as


A.Bar chart
B.Gantt chart
C. Modified Mile stone chart
D.Critical path method chart
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

20. Critical Path Net Work helps an engineer


A.to concentrate his attention on critical activities
B.to divert the resources from non-critical advanced activities to critical activities
to be cautious for avoiding any delay in the critical activities to avoid delay of the whole
C.
project
D.all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.


Workspace

Report errors
...

Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report

« Prev   1 2 3 4 5 6 7 8 9 10 Next »
Log, Post & Beam, Timber Kits
We will design, manufacture,
and install your new custom
Timber Home

Ad

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Industrial Engineering
and Production
Management -…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Strength of Materials -
Civil Engineering
Questions and Answers…
indiabix.com

Estimating and Costing


Section 2 - Civil
Engineering Questions…
indiabix.com

Problems on Trains -
Aptitude Questions and
Answers
indiabix.com

Estimating and Costing -


Civil Engineering
Questions and Answers…
indiabix.com

UPSC Civil Service Exam


Questions Section 14 -
Civil Engineering…
indiabix.com

Theory of Structures
Section 4 - Civil
Engineering Questions…
indiabix.com

UPSC Civil Service Exam


Questions - Civil
Engineering Questions…
indiabix.com

Ad
1. Construction Management Programs
2. Exam Answers Site
3. Construction Management Fees in Canada

Read more:

Construction Management - Section 2

Current Affairs 2019, 2020


Interview Questions and Answers

© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy

Contact us: info.india- @ -bix@gma@il.com

You might also like