Organization structure suitable for project companies with diverse projects is: (a) Product
3 organization (b) Functional organization (c) Matrix organization (d) Projectised Organization 4
If sum of the variance along critical path is 25, then what should be the standard deviation: a)
6 3
1 b) 5 c) 15 d) 50
Which of the following is not a rule of network construction? (a) Each defined activity is
represented by one and only one arrow (b) A network should have only initial and one
7 terminal node (c) Identical initial and final nodes can identify two activities (d) D. Only as few 2
dummy activities should be included as is warranted.
Q4) The three phases involved in the management of large projects are (a) scheduling,
operating, evaluating (b) planning, scheduling, controlling (c) scheduling, designing,
8 1
operating (d) planning, scheduling, evaluating.
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
Densification, Inc.
OPEN
41. If the total float and duration of an activity are 5 and 10 days respectively, the particular
activity can be
A.started 5 days later
B.completed 5 days later
C.performed at slower rate in 15 days
D.all the above.
Answer: Option D
Explanation:
No answer description available for this question. Let us discuss.
Workspace
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option C
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option A
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option A
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
« Prev 1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
schuchart.com
Ad
1. Const ruct ion Management Programs
2. Best Civil Engineering MCQ Book
3. Building Est imat ion & Cost ing
Read more:
Construction Management - Section 2
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
Answer: Option A
Explanation:
No answer description available for this question. Let us discuss.
Workspace
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option C
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
40. The time which results in the leasi, possible construction cost of an activity, is known
A.normal time
B.slow time
C.crash time
D.standard time.
Answer: Option B
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
« Prev 1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
schuchart.com
Trust ed Engineer
Consult ing
Ad MT Mechanical Group, LLC
Ad
1. Exam Answers Sit e
2. Civil Engineering MCQ App
3. Const ruct ion Management Curriculum
Read more:
Construction Management - Section 2
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
WEBSITE CALL
31. Critical path lies along the activities having total float
A.positive
B.negative
C. zero
D.same.
Answer: Option C
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
33. Pick up the correct network for the activities of pouring concrete, erection of form work,
removal of form work and curing of concrete from the following:
A.1. Pouring of Concrete
2. Erection of form work
3. Curing of concrete
4. Removal of form work
1. Erection of form work
2. Pouring of concrete
B.
3. Curing of concrete
4. Removal of form work
1. Removal of form work
2. Erection of form work
C.
3. Pouring of concrete
4. Curing of concrete
1. Pouring of concrete
2. Curing of concrete
D.
3. Erection of form work
4. Removal of form work
Answer: Option B
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
No answer description available for this question. Let us discuss.
Workspace
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option A
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
« Prev 1 2 3 4 5 6 7 8 9 10 Next »
Call Us for Details
We Provide Our Services
to Both Residential and
Commercial Properties.
Ad
Industrial Engineering
and Production
Management -…
indiabix.com
Structural Analysis -
Engineering Mechanics
Questions and Answers
indiabix.com
Strength of Materials -
Civil Engineering
Questions and Answers…
indiabix.com
Ad
1. Construction Management Textbook
2. Civil Engineering MCQ for Practice
3. Exam Answers Site
Read more:
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
26. The difference between the time avail-to do a job and the time required to do the job, is
known as
A.event
B.float
C. duration
D.constraint.
Answer: Option B
Explanation:
No answer description available for this question. Let us discuss.
Workspace
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
30. CPM is
A.synthesising in concepts
B.is built of activities oriented programme
C. is based on time estimate
D.is used for repetitive works
E. all the above.
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
« Prev 1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
nyserda.ny.gov
Ad
Structural Analysis -
Engineering Mechanics
Questions and Answers
indiabix.com
Industrial Engineering
and Production
Management -…
indiabix.com
Strength of Materials -
Civil Engineering
Questions and Answers…
indiabix.com
Engineering Questions
and Answers
indiabix.com
Ad
1. Civil Engineering MCQ for Practice
2. Exam Answers Site
3. Construction Management Textbook
Read more:
Construction Management - Section 2
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
1. The normal time required for the completion of project in the above problem is
A. 9 days
B. 13 days
Ad Historic Mortar Analysis
C. 14 days highbridgematerials.com Visit Site
D. 19 days
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-normal-time-required-for-the-completion-of-project-in-
the-above-problem-is-53239)
2. If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the
expected time t of the activity will be
A. to + 3tm+ tp/3
B. to + 4tm+ tp/4
C. to + 4tm+ tp/5
D. to + 4tm+ tp/6
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-to-tp-and-tm-are-the-optimistic-pessimistic-and-most-
likely-time-estimates-of-an-activity-respectively-the-expected-time-t-of-the-activity-will-be-53240)
A. Number of operations
B. Output of labour
C. Output of machinery
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-construction-schedule-is-prepared-after-collecting-53241)
4. If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time
and variance are respectively
B. 5 and 25/36
D. 4 and 5/6
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-an-activity-has-its-optimistic-most-likely-and-pessimistic-
times-as-2-3-and-7-respectively-then-its-expected-time-and-variance-are-respectively-53242)
5. Bar charts are suitable for
A. Minor works
B. Major works
C. Large projects
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/bar-charts-are-suitable-for-53243)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE DIRECTIONS
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Preparation of estimate
C. Initiation of proposal
Ad Federal Proposal Writers
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-first-stage-of-a-construction-is-53244)
7. A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and
som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these
phone calls were an activity in PERT project, then phone calls expected duration will be
A. 15 minutes
B. 20.143 minutes
C. 21 minutes
D. 27 minutes
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-father-notes-that-when-his-teenage-daughter-uses-the-
telephone-she-takes-not-less-than-6-minutes-for-a-call-and-som-times-as-much-as-an-hour-fifteen-53245)
A. 50 %
B. 84.1 %
C. 99.9 %
D. 100 %
9. For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5, 17 and 8 days
respectively, The expected time is
A. 8 days
B. 9 days
C. 10 days
D. 15 days
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-a-given-activity-the-optimistic-time-pessimistic-time-
and-the-most-probable-estimates-are-5-17-and-8-days-respectively-the-expected-time-is-53247)
10. For the network shown in the given figure, the expected time for the activity
A. 1-2 is 4
B. 2-3 is 7
C. 3-4 is 8
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-the-network-shown-in-the-given-figure-the-expected-
time-for-the-activity-53248)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Ad
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Bar chart
B. Gantt chart
Ad Historic Mortar Analysis
C. Modified Mile stone chart highbridgematerials.com Visit Site
D. All the above
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/time-and-progress-chart-of-a-construction-is-also-known-as-
53249)
12. The difference between the time avail-to do a job and the time required to do the job, is known as
A. Event
B. Float
C. Duration
D. Constraint
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-difference-between-the-time-avail-to-do-a-job-and-the-
time-required-to-do-the-job-is-known-as-53250)
13. The Overall in-charge of an organization at the site responsible for the execution of the works, is
A. Executive Engineer
B. Engineer
C. Junior Engineer
D. Assistant Engineer
Ad
14. For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and
curing of concrete, number of bar(s) required on bar chart, is
A. 1
B. 2
C. 3
D. 4
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-the-supply-of-materials-for-concrete-form-work-
reinforcing-and-placing-of-concrete-removal-of-form-work-and-curing-of-concrete-number-of-bars-required-on-bar-chart-is-53252)
A. Vertical lines
B. Horizontal lines
C. Dots
D. Crosses
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/various-activities-of-a-project-are-shown-on-bar-charts-by-
53253)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Ad
Custom homes
We Work to Deliver Exactly What You Want out of Your
Bathroom Remodel. Call Now.
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Rigid structure
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-main-disadvantage-of-line-organization-is-53254)
A. Unity of command
C. Delegation of authority
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-main-principle-of-an-organization-is-53255)
C. Is a dynamic system
D. None of these
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-critical-ratio-scheduling-53256)
19. A golden rule for the procurement of construction stones, suggests
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-golden-rule-for-the-procurement-of-construction-stones-
suggests-53257)
20. If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the
activity, is
A. (a + m + b)/6
B. (a + 2m + b)/6
C. (a + 4m + b)/6
D. (a + 5m + b)/6
Answer & Solution
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-a-is-the-optimistic-time-b-is-the-pessimistic-time-and-m-
is-most-likely-time-of-an-activity-the-expected-time-of-the-activity-is-53258)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=5)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
21. A four wheel truck or whose operating weight is 12000 kg is pulled along a road having a rising slope of 2% at a
uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the tow cable is 720 kg. The rolling
resistance of the road will be
Ad Get Your Dream Home Interiors
Bonito Designs Open
A. 20 kg/tonne
B. 30 kg/tonne
C. 40 kg/tonne
D. 50 kg/tonne
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-four-wheel-truck-or-whose-operating-weight-is-12000-kg-
is-pulled-along-a-road-having-a-rising-slope-of-2-percent-at-a-uniform-speed-assume-grade-resistance-factor-53259)
22. A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road having a rolling
resistance of 30 kg per tonne. If this tractor is operated on a level road having a rolling resistance of 40 kg per
tonne, then the drawbar pull of the tractor will
A. Reduce by 200 kg
B. Increase by 200 kg
C. Increase by 250 kg
D. Reduce by 250 kg
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-tractor-whose-weight-is-20-tonnes-has-a-drawbar-pull-of-
2500-kg-when-operated-on-a-level-road-having-a-rolling-resistance-of-30-kg-per-tonne-if-53260)
23. The time with which direct cost does not reduce with the increase in time is known as
A. Crash time
B. Normal time
C. Optimistic time
D. Standard time
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-with-which-direct-cost-does-not-reduce-with-the-
increase-in-time-is-known-as-53261)
24. If the gross vehicle weight of a truck is 30 tonne and rolling resistance is 30 kg/tonne, then the tractive effort
required to keep the truck moving at a uniform speed is
A. 30 kg
B. 300 kg
C. 900 kg
D. 1000 kg
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-gross-vehicle-weight-of-a-truck-is-30-tonne-and-
rolling-resistance-is-30-kgtonne-then-the-tractive-effort-required-to-keep-the-truck-moving-at-a-uniform-53262)
25. For a given size of bucket, the ideal output of a dragline will be least in
A. Moist loam
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-a-given-size-of-bucket-the-ideal-output-of-a-dragline-
will-be-least-in-53263)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=4)
5
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?page=6)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE CALL
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Line organization
C. Functional organization
Ad A&D Construction
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/frederick-w-taylor-introduced-a-system-of-working-known-
as-53264)
A. A person
B. A firm
C. An agency
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-the-execution-of-a-project-a-contractor-is-53265)
28. An earth moving equipment costs Rs. 5,00,000 and has an estimated life of 10 years and a salvage value of Rs.
50,000. What uniform annual amount must be set aside at the end of each of the 10 years for replacement if the
interest rate is 8% per annum and if the sinking fund factor at 8% per annum interest rate for 10 years is 0.069?
A. Rs. 31050
B. Rs. 34500
C. Rs. 37950
D. Rs. 50000
Ad
A. Any project
B. Major projects
C. Minor projects
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/works-costing-less-than-rs-20000-are-treated-as-53267)
30. If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the expected time
of completion of the project with 99.9% probability is
A. 4 days
B. 6 days
C. 10 days
D. 16 days
Answer & Solution
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-expected-time-for-completion-of-a-project-is-10-days-
with-a-standard-deviation-of-2-days-the-expected-time-of-completion-of-the-project-with-999-percent-probability-53268)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Ad
Custom homes
We Work to Deliver Exactly What You Want out of Your
Bathroom Remodel. Call Now.
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Is artificially introduced
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-dummy-activity-53269)
D. None of these
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-milestone-chart-53270)
A. 1, 2 and 4
B. 3, 4 and 5
C. 1, 3 and 4
D. 1, 2 and 5
Answer & Solution
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-featuresfactors-1-projects-are-of-the-
non-repetitive-type-2-time-required-need-not-be-known-3-time-required-is-known-precisely-4-events-have-been-established-for-53271)
B. Weighing accurately, the quantity of each material for a job before mixing
D. Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/batching-refers-to-53273)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)
7
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Ad
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Line organization
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/military-organization-is-known-as-53274)
37. Critical path lies along the activities having total float
A. Positive
B. Negative
C. Zero
D. Same
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/critical-path-lies-along-the-activities-having-total-float-
53275)
38. An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It has no salvage value at the end of 8
years. The book value of the excavator at the end of 3 years using general double declining balance method is
A. Rs. 8,43,750
B. Rs. 8,75,000
C. Rs. 10,50,000
D. Rs. 11,56,250
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/an-excavator-costs-rs-2000000-and-has-an-estimated-life-
of-8-years-it-has-no-salvage-value-at-the-end-of-8-years-the-book-value-of-the-excavator-53276)
A. An activity
B. An event
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/slack-time-refers-to-53277)
40. The most suitable type of equipment for compaction of cohesive soils is
A. Smooth-wheeled rollers
B. Vibratory rollers
D. Tampers
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-most-suitable-type-of-equipment-for-compaction-of-
cohesive-soils-is-53278)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
41. The most popular type of organization used for Civil Engineering Constructions, is
A. Line organization
Ad 2AL Handyman Services
2alproconstruction.com Visit Site
B. Line and staff organization
C. Functional organization
D. Effective organization
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-most-popular-type-of-organization-used-for-civil-
engineering-constructions-is-53279)
42. CPM is
A. Synthesising in concepts
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/cpm-is-53280)
C. Only on activities lying on the original critical path and having flatter cost slopes
D. On original critical activities and those that become critical at any stage of crashing in the order of ascending cost slope
Ad
A. Is always longest
B. Is always shortest
C. May be longest
D. May be shortest
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/critical-path-53282)
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/earliest-finish-of-an-activity-is-always-53283)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE CALL
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
D. less than latest event time of preceding node hbhconstructioninc.com Visit Site
Answer & Solution Discuss in Board (https://www.examveda.com/latest-start-of-an-activity-is-always-53284) Save for Later
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/latest-start-of-an-activity-is-always-53284)
47. The rated loads of lifting cranes, as percentage of tipping load at specified radius, for crawler-mounted and
pneumatic tyre-mounted machines would be respectively
A. 80 and 90
B. 90 and 80
C. 85 and 75
D. 75 and 83
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-rated-loads-of-lifting-cranes-as-percentage-of-tipping-
load-at-specified-radius-for-crawler-mounted-and-pneumatic-tyre-mounted-machines-would-be-respectively-53285)
48. In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the
critical path is done starting with the activity having
A. Longest duration
D. Shortest duration
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-the-time-cost-optimisation-using-cpm-method-for-
network-analysis-the-crashing-of-the-activities-along-the-critical-path-is-done-starting-with-the-activity-having-53286)
WEBSITE CALL
49. A machine costs Rs. 20000 and its useful life is 8 years. The money is borrowed at 8% interest per annum. The
capital recovery factor at 8% interest per annum for 8 years is 0.174. The annual equipment cost of the machine
will be
A. Rs. 1740
B. Rs. 3480
C. Rs. 5220
D. Rs. 6960
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-machine-costs-rs-20000-and-its-useful-life-is-8-years-the-
money-is-borrowed-at-8-percent-interest-per-annum-the-capital-recovery-factor-at-8-percent-interest-per-annum-53287)
50. Consider the following statements for a power shovel:
(i) Output can be increased by reducing the angle of swing for a given depth of cut.
(ii) For a given angle of swing, output will be maximum at optimum depth of cut.
(iii) Output can be increased by keeping the depth of cut less than optimum depth.
(iv) Output can be increased by increasing the size of shovel.
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-statements-for-a-power-shovel-i-
output-can-be-increased-by-reducing-the-angle-of-swing-for-a-given-depth-of-cut-ii-for-a-given-angle-53288)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
10
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
51. For which of the following materials, the output of power shovels for a fixed shovel size will be maximum
A. Moist loam
Ad Historic Mortar Analysis
highbridgematerials.com Visit Site
B. Good common earth
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-which-of-the-following-materials-the-output-of-power-
shovels-for-a-fixed-shovel-size-will-be-maximum-53289)
52. The original cost of an equipment is Rs.10,000. Its salvage value at the end of its total useful life of five years is
Rs. 1,000. Its book value at the end of two years of its useful life (as per straight line method of evaluation of
depreciation) will be
A. Rs. 8,800
B. Rs. 7,600
C. Rs. 6,400
D. Rs. 5,000
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-original-cost-of-an-equipment-is-rs10000-its-salvage-
value-at-the-end-of-its-total-useful-life-of-five-years-is-rs-1000-its-book-value-at-the-53290)
D. Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the
activities
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/crash-project-duration-is-obtained-by-summing-the-53291)
Ad
A. 1910
B. 1920
C. 1930
D. 1940
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/mile-stone-charts-were-invented-in-the-year-of-53292)
B. Curing of concrete
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-one-of-the-following-represents-an-activity-53293)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Ad
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-part-of-a-derrick-crane-include-i-mast-ii-boom-iii-bull-
wheel-iv-jack-which-of-these-statements-are-correct-53294)
57. For excavating utility trenches with precise control of depth, the excavation equipment used is
A. Hoe
B. Shovel
C. Dragline
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-excavating-utility-trenches-with-precise-control-of-depth-
the-excavation-equipment-used-is-53295)
58. Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?
A. Concrete
B. Loose sand
C. Asphalt
D. Firm earth
Answer & Solution Discuss in Board (https://www.examveda.com/which-of-the-following-surfaces-will-give-highest-rolling-resistance-for-a-rubber-tyred-vehicle-53296) Save for Later
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-surfaces-will-give-highest-rolling-
resistance-for-a-rubber-tyred-vehicle-53296)
A. Light construction
B. Heavy construction
C. Industrial construction
D. Electrical construction
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/power-stations-are-generally-treated-as-53297)
60. If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for
activity B are 5, 5.5 and 9 respectively, then
A. expected time of activity A is greater than the expected time of activity B
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-optimistic-time-most-likely-time-and-pessimistic-time-
for-activity-a-are-4-6-and-8-respectively-and-for-activity-b-are-5-55-and-9-respectively-then-53298)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
12
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Interdependencies of activities
Ad Highbridge - Historic Mortar Analysis
highbridgematerials.com Visit Site
B. Project progress
C. Uncertainties
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-is-a-weakness-of-bar-chart-53299)
62. For completion of a project, the critical path of the network represents
A. Minimum time
B. Maximum time
C. Maximum cost
D. Minimum cost
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/for-completion-of-a-project-the-critical-path-of-the-network-
represents-53300)
63. A machine is purchased for Rs. 10,000,00 and has an estimated life of 10 years. The salvage value at the end of
10 years is Rs. 1,50,000. The book value of the machine at the end of 5 years using general straight line method of
evaluation of depreciation is
A. Rs. 4,75,000
B. Rs. 5,75,000
C. Rs. 6,50,000
D. Rs. 8,50,000
Answer & Solution
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-machine-is-purchased-for-rs-1000000-and-has-an-
estimated-life-of-10-years-the-salvage-value-at-the-end-of-10-years-is-rs-150000-the-book-value-53301)
Ad
64. Which of the following excavators is most suitable for digging under water?
A. Drag line
B. Hoe
C. Clam shell
D. Dipper shovel
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-excavators-is-most-suitable-for-
digging-under-water-53302)
65. Rolling resistance of a wheel depends upon
(i) Vehicle load
(ii) Grade
(iii) Ground conditions
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/rolling-resistance-of-a-wheel-depends-upon-i-vehicle-load-ii-
grade-iii-ground-conditions-53303)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
13
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=14)
Each Section contains maximum 70 questions. To get more questions visit other sections.
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE CALL
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Light construction
B. Heavy construction
C. Industrial construction
8AM–4PM Boonton
D. Private construction
Answer & Solution Discuss in Board (https://www.examveda.com/residential-buildings-are-treated-as-53304) Save for Later
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/residential-buildings-are-treated-as-53304)
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/output-of-a-bulldozer-is-i-increased-if-drawbar-hp-of-the-
tractor-is-increased-for-a-given-hauling-distance-ii-decreased-if-drawbar-hp-of-the-tractor-is-increased-53305)
A. Maximum float
B. Minimum float
C. Zero float
D. None of these
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-critical-activity-has-53306)
WEBSITE CALL
A. Preparation of specifications
B. Preparation of estimates
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-object-of-technical-planning-is-53307)
70. Total float for any activity is defined as the difference between
A. Its latest finish time and earliest start time for its successor activity
D. Its earliest finish time and earliest start time for its successor activity
Answer & Solution Discuss in Board (https://www.examveda.com/total-float-for-any-activity-is-defined-as-the-difference-between-53308) Save for Later
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/total-float-for-any-activity-is-defined-as-the-difference-
between-53308)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=1&page=13)
14
Each Section contains maximum 70 questions. To get more questions visit other sections.
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE DIRECTIONS
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/interfering-float-is-the-difference-between-53309)
A. its earliest finish time and earliest start time for its successor activity
C. its latest finish time and earliest start time for its successor activity
D. its earliest finish time and latest start time for its successor activity
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/free-float-for-any-activity-is-defined-as-the-difference-
between-53310)
3. Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of
swing.
Reason R: If the angle of swing is decreased, the cycle time will be decreased.
Ad
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-statements-in-the-critical-path-
method-of-construction-planning-free-float-can-be-1-greater-than-total-float-2-greater-than-independent-float-3-equal-to-total-53312)
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/updating-may-result-in-53313)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Ad
Twilio Open
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Bar chart method
B. Milestone chart
Ad Highbridge - Historic Mortar Analysis
C. Critical path method (CPM) highbridgematerials.com Visit Site
D. Programme Evaluation and Review Technique (PERT)
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-first-method-invented-for-planning-projects-was-53314)
7. A contractor has two options;(l) : Invest his money in project A or (II) : Invest his money in project B. If he decides
to invest in A, for every rupee invested, he is assured of doubling his money in ten years. If he decides to invest in
B, he is assured of making his money 1.5 times in 5 years. If the contractor values his money at 10% interest rate,
he
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-contractor-has-two-optionsl-invest-his-money-in-project-a-
or-ii-invest-his-money-in-project-b-if-he-decides-to-invest-in-a-for-every-53315)
A. Identify the activities which can be delayed without affecting the total float of preceding activity
B. Identify the activities, which can be delayed without affecting the total float of succeeding activity
C. Establish priorities
D. Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/free-float-is-mainly-used-to-53316)
Ad
Twilio Open
9. The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is
known as
A. Total float
B. Free float
C. Interfering float
D. Independent float
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-by-which-a-particular-activity-can-be-delayed-
without-affecting-the-preceding-and-succeeding-activities-is-known-as-53317)
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/preliminary-project-report-for-a-road-project-must-contain-
53318)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Ad
Highbridge
Our Team Of Materials Scientists Bring Many Years Of
Specialized Expertise.
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
Ad Custom homes
pueblodevelopmentllc.com Visit Site
4. Placing steel
5. Placing concrete
The correct sequence of these operations in tunnel construction is
A. 1, 2, 4, 3, 5
B. 1, 3, 2, 4, 5
C. 1, 2, 3, 4, 5
D. 1, 3, 4, 2, 5
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-operations-1-drilling-2-blasting-3-
mucking-4-placing-steel-5-placing-concrete-the-correct-sequence-of-these-operations-in-tunnel-construction-is-53319)
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-salient-feature-of-functional-organization-is-53320)
A. Crash time
B. Normal time
C. Optimistic time
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-corresponding-to-minimum-total-project-cost-is-
53321)
Ad
A. Resource levelling
B. Resource smoothening
C. Updating
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-process-of-incorporating-changes-and-rescheduling-or-
replanning-is-called-53322)
15. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then
the following relation holds good
A. EF = ES + D
B. LS = LF - D
C. LF = LS + D
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-d-is-the-duration-es-and-ef-are-the-earliest-start-and-
finish-ls-and-lf-are-latest-start-and-latest-finish-time-then-the-following-relation-holds-good-53323)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
16. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is
complete, is known as
C. Dummy
D. Constraint
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-artificial-activity-which-indicates-that-an-activity-
following-it-cannot-be-started-unless-the-preceding-activity-is-complete-is-known-as-53324)
A. Preceding activities
B. Succeeding activities
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-independent-float-affects-only-53325)
A. Optimistic time
B. Pessimistic time
C. Most likely time
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pert-analysis-is-based-on-53326)
WEBSITE DIRECTIONS
19. Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
A. The latest occurrence time of the node of which the activity arrow terminates minus the duration of the activity, is called
latest start time
B. The latest occurrence time for the node at which the activity arrow terminates, is called latest finish time
C. Earliest occurrence time of the event from which the activity arrow' originates, is called earliest start time of the activity
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-with-
regards-to-cpm-network-analysis-of-projects-53327)
20. A CPM family includes
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-cpm-family-includes-53328)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE DIRECTIONS
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Small projects
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pert-technique-of-network-analysis-is-mainly-useful-for-
53329)
22. In India, are prefabricated components costlier than those of traditional cast-in-situ items that the prefabricated
components replace?
B. Yes, because of the very high order of quality control for the factory made components
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-india-are-prefabricated-components-costlier-than-those-
of-traditional-cast-in-situ-items-that-the-prefabricated-components-replace-53330)
23. What estimate would you give for the variance in above problem ?
A. 81
B. 54
C. 36
D. 9
Ad
D. For all activities required to start the work at site on finalization of the contract document
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/mobilization-advance-up-to-10-percent-of-the-cost-of-work-
is-given-to-a-contractor-53332)
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-is-not-a-pert-event-53333)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE DIRECTIONS
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
26. During the construction period, price variation clause in contracts caters to
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/during-the-construction-period-price-variation-clause-in-
contracts-caters-to-53334)
27. In PERT analysis, the time estimates of activities and probability of their occurrence follow
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-pert-analysis-the-time-estimates-of-activities-and-
probability-of-their-occurrence-follow-53335)
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/at-a-work-site-statistical-quality-control-of-concrete-means-
53336)
Ad
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53337)
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-pert-event-from-the-following-53338)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
Each Section contains maximum 70 questions. To get more questions visit other sections.
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
31. Pick up the correct statement from the following:
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53339)
C. Maximum value of earliest expected time is used if there is more than one value of any event
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53340)
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53342)
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53343)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE DIRECTIONS
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. The difference between the earliest start time and latest finish time of any activity, is the maximum time available for the
activity
B. The difference between the maximum time available for the job and actual time it consumes, is called total float
C. The difference between the latest start time and earliest start time of an activity, is called total float
D. None of these
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53344)
A. The difference of latest occurrence time and earliest expected time, is called slack
B. The activities connecting the events having zero slack, lie on the critical path
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53345)
A. The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called
'float'
B. The duration of time by which an activity can be delayed without affecting the succeeding activity, is called free float
C. The difference between total float and free float, is called interfering float
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53346)
39. Pick up the correct statement from the following:
B. If the float is positive and the activity is delayed by a period equal to its total float, the completion of project is not delayed
C. If the float of an activity is negative, delay in its performance is bound to delay the completion of project
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-correct-statement-from-the-following-53347)
A. The various functions under each activity, are shown by one bar on Bar Charts
D. None of these
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pick-up-the-incorrect-statement-from-the-following-53348)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
Each Section contains maximum 70 questions. To get more questions visit other sections.
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE DIRECTIONS
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/select-the-correct-statement-53349)
A. Earliest start of an activity is the early event time of the node it leaves
B. Latest finish of an activity is the late event time of the node it enters
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/select-the-incorrect-statement-53350)
D. Start float and finish float are the differences between activity times and not event times
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/select-the-incorrect-statement-53351)
44. Select the incorrect statement.
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/select-the-incorrect-statement-53352)
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/wheeled-tractors-are-replacing-crawler-tractors-because-1-
wheeled-tractors-travel-faster-2-crawler-tractors-are-more-expensive-3-track-parts-of-a-crawler-wear-out-quickly-4-crawler-tractors-53353)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE DIRECTIONS
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
46. The maximum rimpull in the first gear of a tractor while towing a load is 6300 kg. The tractor weighs 12.5 tonnes
and is operating along a 2 percent upgrade and the rolling resistance is 45 kg/tonne. Pull available for towing the
load is
A. 3425 kg
B. 5515 kg
8AM–4PM Boonton
C. 4350 kg
D. 2975 kg
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-maximum-rimpull-in-the-first-gear-of-a-tractor-while-
towing-a-load-is-6300-kg-the-tractor-weighs-125-tonnes-and-is-operating-along-a-2-percent-upgrade-53354)
A. Kneading
B. Pressing
C. Tamping
D. Vibration
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-basic-action-involved-in-sheep-foot-rolling-is-53355)
48. If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of
completing the project in 50 weeks and 65 weeks respectively will be
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-expected-time-of-completion-of-a-project-is-60-
weeks-with-a-standard-deviation-of-5-weeks-the-probability-of-completing-the-project-in-50-weeks-and-65-53356)
A. Resources
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-constraints-in-case-of-resource-smoothening-operation-
would-be-53357)
50. PERT is
A. An analytic in concept
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/pert-is-53358)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE DIRECTIONS
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/while-scheduling-a-project-by-cpm-53359)
A. Assistant Engineer
B. Executive Engineer
C. Superintending Engineer
D. Chief Engineer
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/final-technical-authority-of-a-project-lies-with-53360)
53. The technique for establishing and maintaining priorities among the various jobs of a project, is known
54. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-total-float-and-duration-of-an-activity-are-5-and-10-
days-respectively-the-particular-activity-can-be-53362)
55. Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written
above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event
2, is
A. 20
B. 25
C. 35
D. 15
Answer & Solution
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/optimistic-time-most-likely-time-and-pessimistic-times-for-
the-activities-of-a-network-in-the-given-figure-are-written-above-their-arrows-if-the-contractual-obligation-time-for-the-53363)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
56. The three time estimates for the activities of the network shown in the given figure are shown above their arrows.
The earliest expected time for the event 4, is
B. 14
C. 24
D. None of these
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-three-time-estimates-for-the-activities-of-the-network-
shown-in-the-given-figure-are-shown-above-their-arrows-the-earliest-expected-time-for-the-event-4-is-53364)
57. Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?
A. Ice
B. Concrete
C. Loose sand
D. Earth
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-one-of-the-following-surfaces-will-give-highest-
coefficient-of-traction-while-using-crawler-track-tractors-53365)
A. Concrete cured
B. Fixing of door
C. Plastering of walls
D. Selecting sites
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-one-of-the-following-represents-an-event-53366)
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-reduction-in-project-time-normally-results-in-53367)
60. In the given figure, the network of a project represents
B. Activity of an excavation which starts at event No. 1 and ends at even No. 2
D. None of these
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-the-given-figure-the-network-of-a-project-represents-
53368)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
HOT
Broken Tractor
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
61. Which of the following earth moving machines has the shortest cycle time?
A. Drag line
Ad Flat Roofs Done Right - Residential
lifetimeflatroofs.com Visit Site
B. Hoe
C. Clam shell
D. Dipper shovel
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-earth-moving-machines-has-the-
shortest-cycle-time-53369)
62. A tractor shovel has a purchase price of Rs. 4.7 lacs and could save the organization an amount of rupees one lac
per year on operating costs. The salvage value after the amortization period is 10% of the purchase price. The
capital recovery period will be
A. 3.7 years
B. 4.23 years
C. 5 years
D. 7.87 years
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-tractor-shovel-has-a-purchase-price-of-rs-47-lacs-and-
could-save-the-organization-an-amount-of-rupees-one-lac-per-year-on-operating-costs-the-salvage-value-53370)
A. Event
B. Node
C. Connector
D. All the above
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/completion-of-an-activity-on-cpm-network-diagram-is-
generally-known-53371)
HOT
Broken Tractor
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/grader-is-used-mainly-for-53372)
65. Consider the following activities in a building construction:
1. Concreting of roof slabs
2. Brick-jelly lime concrete terracing
3. Erection of form work for slab
4. Construction of parapet wall in terrace
The correct sequence of these activities is
A. 1, 3, 2, 4
B. 3, 1, 4, 2
C. 3, 1, 2, 4
D. 1, 3, 4, 2
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/consider-the-following-activities-in-a-building-construction-
1-concreting-of-roof-slabs-2-brick-jelly-lime-concrete-terracing-3-erection-of-form-work-for-slab-4-construction-of-parapet-wall-53373)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13
14 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=14)
Each Section contains maximum 70 questions. To get more questions visit other sections.
Construction Planning and Management - Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-
and-management/?section=1)
(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE DIRECTIONS
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/frequency-distribution-curves-53379)
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/economic-saving-of-time-results-by-crashing-53380)
3. If the output of a drag-line for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of
swing at 120 % of optimum depth of cut will be
A. Equal to X
B. More than X
C. Less than X
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-output-of-a-drag-line-for-90-angle-of-swing-at-
optimum-depth-of-cut-is-x-then-the-output-for-120-angle-of-swing-at-120-percent-of-53381)
Ad
4. A wheeled tractor hauling unit is working on firm earth. The total loaded weight distribution of this unit is:
Drive wheels: 25000 kg
Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the rimpull which this tractor can exert without
slipping is
A. 10000 kg
B. 12500 kg
C. 22500 kg
D. 5000 kg
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/a-wheeled-tractor-hauling-unit-is-working-on-firm-earth-the-
total-loaded-weight-distribution-of-this-unit-is-drive-wheels-25000-kg-scraper-wheels-10000-kgif-the-coefficient-of-53382)
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/critical-path-method-53383)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=4)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)
Each Section contains maximum 70 questions. To get more questions visit other sections.
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
HOT
Broken Tractor
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/site-order-book-is-used-for-recording-53374)
A. Site located
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/which-of-the-following-does-not-represent-an-activity-53375)
A. The fund for rebuilding a structure when its economic life is over
D. A part of the money kept in reserve for providing additional structures and structural modifications
HOT
Broken Tractor
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/sensitivity-analysis-is-a-study-of-53377)
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/in-resources-levelling-53378)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=4)
5 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=5)
6 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=6)
7 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=7)
8 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=8)
9 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=9)
10 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=10)
11 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=11)
12 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=12)
13 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=2&page=13)
14
Each Section contains maximum 70 questions. To get more questions visit other sections.
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Ad
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
6. The time by which activity completion time can be delayed without affecting the start of succeeding activities, is
known as
A. Duration
B. Total float
8AM–4PM Boonton
C. Free float
D. Interfering float
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-by-which-activity-completion-time-can-be-delayed-
without-affecting-the-start-of-succeeding-activities-is-known-as-53384)
7. If the scheduled completion time of a project is more than the earliest expected time for completion of the project,
then the probability of completion of the project within the scheduled completion time will be
A. 50 %
B. Less than 50 %
C. More than 50 %
D. 100 %
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-scheduled-completion-time-of-a-project-is-more-than-
the-earliest-expected-time-for-completion-of-the-project-then-the-probability-of-completion-of-the-project-within-the-53385)
A. Minimum
B. Maximum
C. Zero
D. Infinite
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-direct-cost-of-a-project-with-respect-to-normal-time-is-
53386)
Ad
A. Free float of the activity must be zero but independent float need not be zero
B. Independent float must be zero but free float need not be zero
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/whenever-an-activity-has-zero-total-float-then-53387)
10. While filling the tender for any work, the contractor considers
A. Site survey
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/while-filling-the-tender-for-any-work-the-contractor-
considers-53388)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=4)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)
Each Section contains maximum 70 questions. To get more questions visit other sections.
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
A. Light construction
B. Heavy construction
C. Industrial construction
D. None of these
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/railway-projects-are-treated-as-53389)
12. If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of
Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine
will be equal to the cost of manual excavation is
A. 500 cum
B. 1000 cum
C. 1500 cum
D. 2000 cum
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/if-the-excavation-of-earth-is-done-manually-then-it-costs-rs-
10-per-cum-a-machine-can-excavate-at-a-fixed-cost-of-rs-4000-plus-a-variable-cost-53390)
A. An engineer
B. An architect
C. An owner
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/construction-team-means-53391)
14. Assertion (A): Activity 57 is critical.
Reason (R): Earliest finish time and latest finish time for events 57 are same
Answer: Option A
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/assertion-a-activity-57-is-criticalreason-r-earliest-finish-
time-and-latest-finish-time-for-events-57-are-same-53392)
15. The time which results in the least possible construction cost of an activity, is known as
A. Normal time
B. Slow time
C. Crash time
D. Standard time
Answer: Option B
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-time-which-results-in-the-least-possible-construction-
cost-of-an-activity-is-known-as-53393)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)
4 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=4)
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=4)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
(https://www.examveda.com/) Login
(https://www.examv
url=https%3A%2F%
engineering%2Fpra
mcq-question-
on-
construction-
planning-and-
management%2F%3
English (https://www.examveda.com/mcq-question-on-competitive-english/)
Reasoning (https://www.examveda.com/mcq-question-on-competitive-reasoning/)
DI (https://www.examveda.com/mcq-question-on-data-interpretation/) GK (https://www.examveda.com/mcq-question-on-general-knowledge/)
Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Home (https://www.examveda.com/) / Civil Engineering (https://www.examveda.com/mcq-question-on-civil-engineering/) / Construction Planning And Management
WEBSITE CALL
Section 1 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=1)
Section 2 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=2)
Section 3 (https://www.examveda.com/civil-engineering/practice-mcq-question-on-construction-planning-and-management/?section=3)
16. The area under the Beta distribution curve is divided into two equal parts by
B. Optimistic time
C. Pessimistic time
We Specialize in All Aspects of Road
D. Expected time Construction.
Answer & Solution Discuss in Board (https://www.examveda.com/the-area-under-the-beta-distribution-curve-is-divided-into-two-equal-parts-by-53394) Save for Later
Answer: Option D
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-area-under-the-beta-distribution-curve-is-divided-into-
two-equal-parts-by-53394)
17. The grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a
factor approximately equal to
A. 2 kg/tonne
B. 6 kg/tonne
C. 9 kg/tonne
D. 20 kg/tonne
Answer: Option C
No explanation is given for this question Let's Discuss on Board (https://www.examveda.com/the-grade-resistance-factor-for-an-earth-moving-machine-
can-be-obtained-by-multiplying-grade-percentage-by-a-factor-approximately-equal-to-53395)
18. Which one of the following is not an excavating and moving type of equipment?
A. Bulldozer
B. Clam shell
C. Scraper
D. Dump truck
(https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)
1 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3)
2 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=2)
3 (https://www.examveda.com:443/civil-engineering/practice-mcq-question-on-construction-planning-and-
management/?section=3&page=3)
Each Section contains maximum 70 questions. To get more questions visit other sections.
(https://www.twitter.com/examveda)
(https://www.facebook.com/examveda)
(https://plus.google.com/+Examveda/)
About Us | (https://www.examveda.com/about/) Terms & Condition | (https://www.examveda.com/terms-and-condition/) Privacy Policy | (https://www.examveda.com/privacy-policy/)
Contact Us (https://www.examveda.com/contact-us/)
Ads by
Grayhill CANbus Displays Text to Search...
Built for harsh
Stopenvironments
seeing thiscommon
ad Why in this ad? OPEN
agriculture, construction, and mining vehicles.
Grayhill Inc.
6. Engineering Notes
7. Mechanical Interview
Automobile Engineering
6. Automobile Interview (C) Only on activities lying on the original critical path and having flat
(D) On original critical activities and those that become critical at any
order of ascending cost slope
Civil Engineering Correct Answer
Answer: Option D
1. MCQ Practice Tests
Correct Answer
6. Civil Interview
3. In resources levelling
Electrical Engineering
(A) Total duration of project is reduced
4. Online Quizzes
4. Sensitivity analysis is a study of
5. Electrical GK MCQ
(A) Comparison of profit and loss
4. Online Quizzes (C) The soil survey, traffic survey, concept design and approximate cos
(D) The contract documents for inviting tenders
Computer Science Text to Search...
Correct Answer
1. MCQ Practice Tests
2. Mock Tests (Level I) 6. For which of the following materials, the output of power shovels for a
maximum
3. Mock Tests (Level II) (A) Moist loam
1. Basic National GK
7. If the output of a drag-line for 90° angle of swing at optimum depth of c
2. Ancient India 120° angle of swing at 120 % of optimum depth of cut will be
Correct Answer
6. Famous Places in India
7. Indian Culture
8. In PERT analysis, the time estimates of activities and probability of thei
Correct Answer
11. Constitution of India & Indian
Politics
GK International MCQ
1. Basic International GK
(D) Identify the activities which can be delayed without affecting the t
preceding or succeeding activities
Correct Answer
Correct Answer
11. Which of the following surfaces will give highest rolling resistance for
(A) Concrete
(C) Asphalt
Correct Answer
12. Which of the following earth moving machines has the shortest cycle t
(A) Drag line
Text to Search...
(B) Hoe
Correct Answer
Correct Answer
14. The time by which a particular activity can be delayed without affectin
succeeding activities is known as
Correct Answer
15. During the construction period, price variation clause in contracts cat
Correct Answer
Text to Search...
PL/SQL Programs
OPEN
Engineering Solutions - Consulting Engineering Text to Search...
Firm
Ad engsolu.com
Popular Posts Category
Strength of Materials Objective Text to Search...
Questions with Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric
stress and volumetric strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amazon.in KDP Books
1 4 0 0 Type your Ema
Amazon.com KDP & Paperback
1 0 2 2
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | Terms of use | Privacy Policy
Advertise with Google Ads Text to Search...
With Google Ads, keep quality SIGN UP
customers coming and your business
going
Home About Cont act Submit Project Affiliat e Program Free Books
3. Online Quiz z es 02
4. T echnical T erms
MCQ Construction
5. Mechanical Projects
Onorati Construction - Asphalt
6. Engineering Notes Resurf acing Services
Onorati Construction Co., Inc.
7. Mechanical Interview
Automobile Engineering
6. Automobile Interview (C) Avoids delays which are very common in bar charts
Correct Answer
Civil Engineering
1. MCQ Practice T ests 2. At a work site, statistical quality control of concrete means
Correct Answer
5. T echnical T erms
6. Civil Interview 3. For the network shown in the g iven fig ure, the expected time for the ac
Electrical Engineering
(A) 1-2 is 4
1. MCQ Practice T ests
(B) 2-3 is 7
2. Mock T ests (Level I)
(C) 3-4 is 8
Correct Answer
4. Online Quiz z es
5. Electrical GK MCQ
4. A critical ratio scheduling
7. Indian Culture 8. A g olden rule for the procurement of construction stones, sug g ests
9. National Days and Years (C) 50% at the site and 50% under procurement
Correct Answer
10. Pick up the correct statement from the following with reg ards to C.P.M
projects
(A) The latest occurrence time of the node of which the activity arrow te
duration of the activity, is called latest start time
(B) The latest occurrence time for the node at which the activity arrow t
finish time
(C) Earliest occurrence time of the event from which the activity arrow
earliest start time of the activity
Correct Answer
Correct Answer
12. While filling the tender for any work, the contractor considers
(A) Site survey
Text to Search...
(B) Availability of construction materials
Correct Answer
13. An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It
end of 8 years. T he book value of the excavator at the end of 3 years usin
balance method is
Correct Answer
(A) The various functions under each activity, are shown by one bar on
Correct Answer
15. A wheeled tractor hauling unit is working on firm earth. T he total load
unit is:
Drive wheels: 25000 kg
Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the ri
exert without slipping is
(A) 10000 kg
(B) 12500 kg
(C) 22500 kg
(D) 5000 kg
Correct Answer
Answer: Option B
Set 11
Text to Search...
Sponsored by
Open
ledwell.com
Quality Craftsmanship
We Help You with All Your Kitchen
Remodeling Services.
GENPRO Remodeling
Pro Engineering Consulting - Over 25 Years of Text to Search...
Experience
Ad proengc.com
Popular Post s Cat egor y
Strength of Materials Text to Search...
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 1 3
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
Text to Search...
Round Table Pizza
INSTALL
Rewards
Home About Cont act Submit Project Affiliat e Program Free Books
Automobile Engineering
Correct Answer
3. Mock T ests (Level II)
Answer: Option C
4. Online Quiz z es
2. T he difference between the time avail-to do a job and the time required
5. T echnical T erms
(A) Event
6. Civil Interview
(B) Float
(C) Duration
Correct Answer
1. MCQ Practice T ests
2. Mock T ests (Level I) 3. T he g rade resistance factor for an earth moving machine can be obtain
percentag e by a factor approximately equal to
3. Mock T ests (Level II)
(A) 2 kg/tonne
(C) 9 kg/tonne
5. Electrical GK MCQ
(D) 20 kg/tonne
6. Electrical Lab Viva Correct Answer
1. MCQ Practice T ests (C) Increasing the direct cost and indirect cost both
(A) Line organization
Correct Answer
2. Ancient India
3. History of India
7. T he area under the Beta distribution curve is divided into two equal pa
(B) Optimistic time
5. Economics and Indian
(C) Pessimistic time
Economy
(D) Expected time
6. Famous Places in India
Correct Answer
7. Indian Culture
8. CPM is
8. Famous Personalities
(A) Synthesising in concepts
9. National Days and Years
(B) Is built of activities oriented programme
(A) 20 kg/tonne
6. Worlds Honours and Awards
(B) 30 kg/tonne
7. World Geography (C) 40 kg/tonne
(D) 50 kg/tonne
Correct Answer
(B) Engineer
(C) Junior Engineer
(D) Assistant Engineer
Correct Answer
(A) 1, 2 and 4
(B) 3, 4 and 5
(C) 1, 3 and 4
(D) 1, 2 and 5
Correct Answer
Text to Search...
12. T he first stag e of a construction, is
(A) Preparation of estimate
(C) Initiation of proposal
Correct Answer
(C) Crash durations for all the activities along the critical path obtained
normal duration for all the activities
(D) Crash durations for all the activities along the critical path obtained
crash duration for all the activities
Correct Answer
(B) Backward pass is used for calculating the latest occurrence time
(C) Maximum value of earliest expected time is used if there is more tha
Correct Answer
(A) The fund for rebuilding a structure when its economic life is over
(C) The total sum to be paid to the municipal authorities by the tenants
(D) A part of the money kept in reserve for providing additional struct
modifications
Correct Answer
Set 11
INSTALL
Text to Search...
GENPRO
We Build Great Products and
Deliver Good Experiences.
GENPRO Remodeling
Popular Post s Cat egor y
Strength of Materials Text to Search...
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 3 7 3
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
RegisterAdsforby Engage Text to Search...
Everywhere
St op seeing t his ad Why t his ad? OPEN
Join Jeff Lawson and Yuval Noah
Harari for an Online Event
Home About Cont act Submit Project Affiliat e Program Free Books
4. T echnical T erms
5. Mechanical Projects
6. Engineering Notes
7. Mechanical Interview
Correct Answer
Civil Engineering
2. Power stations are g enerally treated as
1. MCQ Practice T ests (A) Light construction
(B) Heavy construction
2. Mock T ests (Level I)
(C) Industrial construction
3. Mock T ests (Level II)
(D) Electrical construction
5. T echnical T erms
3. For a g iven size of bucket, the ideal output of a drag line will be least in
6. Civil Interview
(A) Moist loam
(C) An owner
2. Mock T ests (Level I)
(D) All the above
3. Mock T ests (Level II) Correct Answer
4. Online Quiz z es
7. Select the incorrect statement.
1. Basic National GK (C) Start float and finish float need not be equal
(D) Start float and finish float are the differences between activity times
2. Ancient India
Correct Answer
3. History of India
4. Books and Authors 8. T he artificial activity which indicates that an activity following it, canno
preceding activity is complete, is known as
5. Economics and Indian (A) Event
Economy
(B) Free float
(D) Constraint
7. Indian Culture
Correct Answer
8. Famous Personalities
9. National Days and Years 9. PERT technique of network analysis is mainly useful for
GK International MCQ
1. Basic International GK
Correct Answer
Correct Answer
12. T he time by which activity completion time can be delayed without affe
activities, is known as
(A) Duration
Correct Answer
Correct Answer
(B) Construction measurements
Correct Answer
15. If the g ross vehicle weig ht of a truck is 30 tonne and rolling resistance
tractive effort required to keep the truck moving at a uniform speed is
(A) 30 kg
(B) 300 kg
(C) 900 kg
(D) 1000 kg
Correct Answer
Answer: Option C
Set 11
Text to Search...
Onorati Construction - Asphalt
Resurfacing Services
Onorati Construction Co., Inc.
WEBSITE DIRECTIONS
Onorati Construction - Established in Text to Search...
1918
Onorati Construction Co., Inc.
WEBSITE DIRECTIONS
Looking f or a Paving Company? - Onorati Text to Search...
Construction Co., Inc.
Ad onoraticonstruction.com
Text to Search...
Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 1 9
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...
Home About Cont act Submit Project Affiliat e Program Free BooksText to Search...
3. Online Quiz z es 02
4. T echnical T erms
MCQ Construction
5. Mechanical Projects
Onorati Construction - Asphalt
6. Engineering Notes Resurf acing Services
Onorati Construction Co., Inc.
7. Mechanical Interview
Automobile Engineering
1. MCQ Practice T ests 2. At a work site, statistical quality control of concrete means
Correct Answer
5. T echnical T erms
6. Civil Interview
3. For the network shown in the g iven fig ure, the expected time for the ac
Electrical Engineering
(B) 2-3 is 7
2. Mock T ests (Level I)
(C) 3-4 is 8
Correct Answer
4. Online Quiz z es
5. Electrical GK MCQ
4. A critical ratio scheduling
(A) 8 days
4. Online Quiz z es
(B) 9 days
(C) 10 days
Computer Science (D) 15 days
Correct Answer
1. MCQ Practice T ests
1. Basic National GK
7. In the time-cost optimisation, using CPM method for network analysis,
2. Ancient India along the critical path is done starting with the activity having
(D) Shortest duration
5. Economics and Indian
Economy Correct Answer
2. Departmental Interview
Questions Practice T ests
WEBSITE DIRECTIONS
GK International MCQ
(A) Crash time
1. Basic International GK (B) Normal time
Text to Search...
(C) Optimistic time
2. Books and Authors
(D) Standard time
(A) The latest occurrence time of the node of which the activity arrow te
6. Worlds Honours and Awards
duration of the activity, is called latest start time
7. World Geography (B) The latest occurrence time for the node at which the activity arrow t
finish time
(C) Earliest occurrence time of the event from which the activity arrow
earliest start time of the activity
Correct Answer
Correct Answer
12. While filling the tender for any work, the contractor considers
Correct Answer
13. An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It
end of 8 years. T he book value of the excavator at the end of 3 years usin
balance method is
(A) The various functions under each activity, are shown by one bar on
Correct Answer
15. A wheeled tractor hauling unit is working on firm earth. T he total load
unit is:
Drive wheels: 25000 kg
Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the ri
exert without slipping is
(A) 10000 kg
(B) 12500 kg
(C) 22500 kg
(D) 5000 kg
Correct Answer
Set 11
Commercial Contractor
Schedule your estimate today
GENPRO Remodeling
Text to Search...
Quality Craftsmanship
We Help You with All Your Kitchen
Remodeling Services.
GENPRO Remodeling
Text to Search...
Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 3 8 4
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...
Home About Cont act Submit Project Affiliat e Program Free Books
Text to Search...
6. Engineering Notes
7. Mechanical Interview
Automobile Engineering
Grayhill CANbus Keypads
1. MCQ Practice T ests A wide array of form factors and customization
options with J1939 or CANopen available.
3. Mock T est (Level I) Grayhill Inc. Open
4. T echnical T erms 1. Works costing less than Rs. 20,000 are treated as
1. MCQ Practice T ests 2. A machine costs Rs. 20000 and its useful life is 8 years. T he money is bor
annum. T he capital recovery factor at 8% interest per annum for 8 years
2. Mock T ests (Level I) cost of the machine will be
Correct Answer
6. Civil Interview
(C) Industrial construction
2. Mock T ests (Level I)
(D) None of these
4. Online Quiz z es
4. Consider the following statements:
5. Electrical GK MCQ In the critical path method of construction planning , Free Float can be.
1. Greater than Total Float.
6. Electrical Lab Viva 2. Greater than Independent Float
3. Equal to Total Float.
4. Less than Independent Float
(A) The duration between the earliest start time of the preceding event
Computer Science
succeeding event, is called 'float'
1. MCQ Practice T ests (B) The duration of time by which an activity can be delayed without aff
activity, is called free float
2. Mock T ests (Level I) (C) The difference between total float and free float, is called interferin
3. Mock T ests (Level II) (D) All the above
Correct Answer
4. Online Quiz z es
10. Research and Developments 8. T he maximum rimpull in the first g ear of a tractor while towing a load i
12.5 tonnes and is operating along a 2 percent upg rade and the rolling re
11. Constitution of India & available for towing the load is
Indian Politics (A) 3425 kg
(C) 4350 kg
13. Indian Geography
(D) 2975 kg
Correct Answer
GK MCQ : Indian Railways
9. Which one of the following represents an event?
1. Basic GK about Indian
Railways
2. Departmental Interview
Questions Practice T ests
GK International MCQ
1. Basic International GK
Correct Answer
(A) 80 and 90
(B) 90 and 80
(C) 85 and 75
(D) 75 and 83
Correct Answer
11. Optimistic time, most likely time and pessimistic times for the activitie
fig ure are written above their arrows. If the contractual oblig ation time f
occurrence time for the event 2, is
(A) 20
(B) 25
(C) 35
(D) 15
Correct Answer
12. An earth moving equipment costs Rs. 5,00,000 and has an estimated life
value of Rs. 50,000. What uniform annual amount must be set aside at the e
replacement if the interest rate is 8% per annum and if the sinking fund fa
rate for 10 years is 0.069?
Correct Answer
13. PERT is
Correct Answer
WEBSITE CALL
Correct Answer
(A) A person
(B) A firm
(C) An agency
Correct Answer
Answer: Option D
Set 11
Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 2 3
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
AR Construction AdsManagement
by Text to Search...
- IFC, Revit® Models
St op seeing t his adonWhy
Sitet his ad? OPEN
BIM powered Construction and Operation for
Buildings and Plants. gamma-ar.com
Home About Cont act Submit Project Affiliat e Program Free Books
6. Engineering Notes
7. Mechanical Interview
Automobile Engineering
AR Construction Management - IFC, Revi
1. MCQ Practice T ests
Models on Site
3. Mock T est (Level I) gamma-ar.com Learn more
4. Mock T est (Level II)
Practice Test: Question Set - 05
3. Online Quiz z es
1. T he constraints in case of resource smoothening operation would be
4. T echnical T erms Text to Search...
(A) Resources
5. Automobile Projects
(B) Project duration time
Correct Answer
Civil Engineering
1. MCQ Practice T ests 2. T he time which results in the least possible construction cost of an activ
Correct Answer
5. T echnical T erms
(A) Minimum
(C) Zero
1. MCQ Practice T ests (D) Infinite
Correct Answer
Chemical Engineering
5. If an activity has its optimistic, most likely and pessimistic times as 2, 3 a
1. MCQ Practice T ests expected time and variance are respectively
Correct Answer
Computer Science Text to Search...
6. Various activities of a project, are shown on bar charts by
Correct Answer
4. Online Quiz z es
(B) LS = LF - D
6. Famous Places in India
(C) LF = LS + D
7. Indian Culture
(D) All the above
11. Constitution of India & (B) Its latest start time and earliest start time
Indian Politics (C) Its latest start time and earliest finish time
(D) Its earliest finish time and earliest start time for its successor activity
12. Honours and Awards
Correct Answer
13. Indian Geography
Correct Answer
Correct Answer
(A) Unity of command
(C) Delegation of authority
Correct Answer
13. If the expected time for completion of a project is 10 days with a stand
expected time of completion of the project with 99.9% probability is
(A) 4 days
Text to Search...
(B) 6 days
(C) 10 days
(D) 16 days
Correct Answer
Correct Answer
Answer: Option D
(A) 1, 2, 4, 3, 5
(B) 1, 3, 2, 4, 5
(C) 1, 2, 3, 4, 5
(D) 1, 3, 4, 2, 5
Correct Answer
Set 11
Text to Search...
Civil Engineering Consulting - Development and Text to Search...
Utilities
Ad valorcivilengineeringpllc.com
Text to Search...
Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 2 7
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...
Adswith
Advertise by Google
StAds
op seeing t his ad Why t his ad? SIGN UP
Get in front of customers when they
search for businesses like yours
Home About Cont act Submit Project Affiliat e Program Free Books
Text to Search...
Automobile Engineering
5. Automobile Projects (B) The difference between the maximum time available for the job an
called total float
6. Automobile Interview
(C) The difference between the latest start time and earliest start time of
float
(D) Vibration
5. T echnical T erms
Correct Answer
6. Civil Interview
2. Mock T ests (Level I) (D) Critical Path Method is not event oriented
Correct Answer
3. Mock T ests (Level II)
4. Online Quiz z es 4. If the excavation of earth is done manually then it costs Rs. 10 per cum.
fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. T he quantity of
5. Electrical GK MCQ excavation by machine will be equal to the cost of manual excavation is
Correct Answer
GK National MCQ : India
2. Ancient India
3. History of India
(B) Activity of an excavation which starts at event No. 1 and ends at even
5. Economics and Indian
(C) Activity of excavation which takes 8 units of time
Economy
(D) None of these
6. Famous Places in India
Correct Answer
7. Indian Culture
10. Research and Developments (C) Latest start of an activity is its latest finish minus its duration
Correct Answer
(C) Uncertainties
Correct Answer
Correct Answer
12. Which of the following excavators is most suitable for dig g ing under w
(B) Hoe
(C) Clam shell
Correct Answer
Correct Answer
Correct Answer
15. For the supply of materials for concrete, form work reinforcing and p
of form work and curing of concrete, number of bar(s) required on bar c
(A) 1
(B) 2
(C) 3
(D) 4
Correct Answer
Set 11
Relat ed Test Series ...
Register Or Download Free App
Ad Soil Connect
Residential Remodeling
Ad SeaTac Build & Rem odel
Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 3 2
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
Home About Cont act Submit Project Affiliat e Program Free Books
Text to Search...
3. Online Quiz z es 07
4. T echnical T erms
MCQ Construction
5. Mechanical Projects
Onorati Construction - Established in
6. Engineering Notes 1918
Onorati Construction Co., Inc.
7. Mechanical Interview
We Are a Premier Civil Construction
4. Piping Engg. Interview Company.Contact Us f or Details.
Automobile Engineering
4. T echnical T erms 1. Which one of the following surfaces will g ive hig hest coefficient of trac
tractors?
5. Automobile Projects (A) Ice
Adswith
Advertise by Google
(B) Concrete
6. Automobile Interview
StAds
op seeing t his ad Why t his ad? SIGN UP
Get in front(C) Loose sandwhen they
of customers
search for businesses like yours
(D) Earth
Correct Answer
Civil Engineering
(B) Heavy construction
3. Mock T ests (Level II)
(C) Industrial construction
Correct Answer
5. T echnical T erms
6. Civil Interview
3. Consider the following statements:
In the bar chart planning
1. Interdependence of the operations cannot be portrayed.
Electrical Engineering 2. Prog ress of work can be measured.
3. Spare time of the activities can be determined.
1. MCQ Practice T ests 4. Schedule cannot be updated.
Of these statements
2. Mock T ests (Level I)
(A) 1, 2 and 3 are correct
Chemical Engineering
(A) 19
3. Mock T ests (Level II)
(B) 14
4. Online Quiz z es (C) 24
(A) 1, 3, 2, 4
(B) 3, 1, 4, 2
GK National MCQ : India
(C) 3, 1, 2, 4
Correct Answer
2. Ancient India
Answer: Option C
3. History of India
Correct Answer
7. Indian Culture
8. Famous Personalities
7. Mobilization advance up to 10% of the cost of work is g iven to a contra
9. National Days and Years (A) On commencement of work at site for payment of loan taken by him
13. Indian Geography 8. Pick up the PERT event from the following :
2. Departmental Interview
Questions Practice T ests 9. A machine is purchased for Rs. 10,000,00 and has an estimated life of 10
the end of 10 years is Rs. 1,50,000. T he book value of the machine at the en
straig ht line method of evaluation of depreciation is
GK International MCQ
1. Basic International GK Onorati Construction - Established in
1918
2. Books and Authors Onorati Construction Co., Inc.
7. World Geography
WEBSITE DIRECTIONS
Correct Answer
(C) The head of the arrow indicates the end of the activity
Correct Answer
(A) Resource levelling
(B) Resource smoothening
(C) Updating
Correct Answer
(A) Event
(B) Node
(C) Connector
Correct Answer
13. Assertion A: For a given depth of cut, the output of a power shovel can be
angle of swing.
Reason R: If the angle of swing is decreased, the cycle time will be decreased.
Select the correct answer.
Correct Answer
Correct Answer
15. A tractor shovel has a purchase price of Rs. 4.7 lacs and could save the
rupees one lac per year on operating costs. T he salvag e value after the a
the purchase price. T he capital recovery period will be
(C) 5 years
Correct Answer
Sponsored by
Open
moosejaw.com
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 4 0
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
Home About Cont act Submit Project Affiliat e Program Free BooksText to Search...
Automobile Engineering
1. MCQ Practice T ests 2. Which one of the following is not an excavating and moving type of equ
Correct Answer
5. T echnical T erms
6. Civil Interview
3. T he main disadvantag e of line org anization, is
5. Electrical GK MCQ (B) Weighing accurately, the quantity of each material for a job before
Correct Answer
Chemical Engineering
Correct Answer
Computer Science
6. Slack time refers to
1. MCQ Practice T ests
(A) An activity
(B) Executive Engineer
1. Basic National GK
(C) Superintending Engineer
2. Ancient India (D) Chief Engineer
3. History of India
Correct Answer
6. Famous Places in India (C) Free float and independent float both must be zero
(D) Free float and independent float both need not be zero
7. Indian Culture
Correct Answer
8. Famous Personalities
9. National Days and Years 9. Mile Stone charts were invented in the year of
(C) 1930
GK International MCQ (D) 1940
Correct Answer
1. Basic International GK Text to Search...
10. Which of the following is not a PERT event?
2. Books and Authors (A) Site investigation started
Correct Answer
12. A tractor whose weig ht is 20 tonnes has a drawbar pull of 2500 kg , whe
having a rolling resistance of 30 kg per tonne. If this tractor is operated o
rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor
(B) Increase by 200 kg
Correct Answer
(A) The difference of latest occurrence time and earliest expected time,
(B) The activities connecting the events having zero slack, lie on the crit
Correct Answer
(B) Yes, because of the very high order of quality control for the factory
Correct Answer
Set 11
Text to Search...
Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 4 6
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms of use | Privacy Policy
Text to Search...
Ads by
Track Your Workforce Text to Search...
Home About Cont act Submit Project Affiliat e Program Free Books
6. Engineering Notes
7. Mechanical Interview
Automobile Engineering
Correct Answer
3. Mock T ests (Level II)
4. Online Quiz z es 2. T he difference between the time avail-to do a job and the time required
(B) Float
6. Civil Interview
(C) Duration
(D) Constraint
(A) 2 kg/tonne
3. Mock T ests (Level II)
(B) 6 kg/tonne
4. Online Quiz z es (C) 9 kg/tonne
(D) 20 kg/tonne
5. Electrical GK MCQ
Correct Answer
6. Electrical Lab Viva
4. A dummy activity
Correct Answer
3. Mock T ests (Level II)
4. Online Quiz z es
5. T he reduction in project time normally results in
(A) Decreasing the direct cost and increasing indirect cost
Computer Science Text to Search...
(B) Increasing the direct cost and decreasing the indirect cost
1. MCQ Practice T ests (C) Increasing the direct cost and indirect cost both
(A) Line organization
Correct Answer
2. Ancient India
3. History of India
7. T he area under the Beta distribution curve is divided into two equal pa
(B) Optimistic time
5. Economics and Indian
(C) Pessimistic time
Economy
(D) Expected time
6. Famous Places in India
Correct Answer
7. Indian Culture
8. CPM is
8. Famous Personalities
(A) Synthesising in concepts
9. National Days and Years
(B) Is built of activities oriented programme
GK International MCQ
1. Basic International GK
(D) 50 kg/tonne
Correct Answer
(B) Engineer
(C) Junior Engineer
(D) Assistant Engineer
Correct Answer
(A) 1, 2 and 4
(B) 3, 4 and 5
(C) 1, 3 and 4
(D) 1, 2 and 5
Correct Answer
Text to Search...
12. T he first stag e of a construction, is
(A) Preparation of estimate
(C) Initiation of proposal
Correct Answer
(C) Crash durations for all the activities along the critical path obtained
normal duration for all the activities
(D) Crash durations for all the activities along the critical path obtained
crash duration for all the activities
Correct Answer
(B) Backward pass is used for calculating the latest occurrence time
(C) Maximum value of earliest expected time is used if there is more tha
Correct Answer
(A) The fund for rebuilding a structure when its economic life is over
(C) The total sum to be paid to the municipal authorities by the tenants
(D) A part of the money kept in reserve for providing additional struct
modifications
Correct Answer
Set 11
Text to Search...
Sponsored by
Open
chifranciscan.org
Text to Search...
Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 4 9
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...
GoogleAdsAds by for Quality Text to Search...
Leads
St op seeing t his ad Why t his ad? SIGN UP
Get customer calls, website visits or
store walk ins with Google Ads
Home About Cont act Submit Project Affiliat e Program Free Books
Automobile Engineering
(B) (a + 2m + b)/6
6. Automobile Interview
(C) (a + 4m + b)/6
(D) (a + 5m + b)/6
Civil Engineering Correct Answer
(B) Vibratory rollers
1. MCQ Practice T ests
(C) Sheep foot rollers
Correct Answer
3. Mock T ests (Level II)
4. Online Quiz z es
5. If the total float and duration of an activity are 5 and 10 days respective
be
(A) Started 5 days later
Computer Science Text to Search...
(B) Completed 5 days later
Correct Answer
4. Books and Authors
Correct Answer
(A) Positive
(B) Negative
(C) Zero
(D) Same
Correct Answer
10. If the scheduled completion time of a project is more than the earliest
of the project, then the probability of completion of the project within the
will be
(A) 50 %
(D) 100 %
Correct Answer
Correct Answer
12. For excavating utility trenches with precise control of depth, the exca
(A) Hoe
(B) Shovel
(C) Dragline
Correct Answer
Correct Answer
14. T he most popular type of org anization used for Civil Eng ineering Con
(A) Line organization
(C) Functional organization
(D) Effective organization
Correct Answer
(A) 50 %
(B) 84.1 %
(C) 99.9 %
(D) 100 %
Correct Answer
Set 11
Text to Search...
Sponsored by
Open
chifranciscan.org
Track Your Workf orce Text to Search...
Ad Eyrus
Text to Search...
Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 5 7
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...
Onorati Construction - Asphalt
Resurfacing Services
Onorati Construction Co., Inc.
OPEN
1 2 3 »
SPONSORED SEARCHES
Question No : 1
For the execution of a project, a contractor is
A A person
B A firm
C An agency
Correct Answer : D
By using this website, you agree that we and our partners may set cookies for purposes such as
customising content and advertising. I Understand
Question No : 2
Question No : 2
The first stage of a construction, is
A Preparation of estimate
C Initiation of proposal
D Preparation of tender
Correct Answer : C
SPONSORED SEARCHES
Question No : 3
Whenever an activity has zero total float, then
A Free float of the activity must be zero but independent float need not be zero
Independent
BBy using float must
this website, be zero
you agree but
that wefree
andfloat
our need not may
partners be zero
set cookies for purposes such as
customising content and advertising. I Understand
C Free float and independent float both must be zero
C ee oat a d depe de t oat bot ust be e o
Correct Answer : C
Question No : 4
Pre-tender stage requires
≡A Acquisition
Home of land
PDF Store Exams G.K. Aptitude Reasoning English Computer
B Selection of site
Correct Answer : D
Question No : 5
Bar charts are suitable for
A Minor works
By using this website, you agree that we and our partners may set cookies for purposes such as
B Major works
customising content and advertising. I Understand
C Large projects
Correct Answer : A
Question No : 6
Railway projects are treated as
A Light construction
B Heavy construction
C Industrial construction
D None of these
Correct Answer : B
Question No : 7
The time which results in the leasi, possible construction cost of an activity, is known as
A Normal time
By using this website, you agree that we and our partners may set cookies for purposes such as
B Slow time
customising content and advertising. I Understand
C Crash time
D Standard time
Correct Answer : B
1 2 3 »
Node AEC -
Architecture &
Engineering
Ad nodeaec.com
M.Eng. Engineering
Management - Cornell
University
By using this website, you agree that we and our partners may set cookies for purposes such as
Ad oncampus.engmanagement.cor…
customising content and advertising. I Understand
Data Structure MCQ
Data Structure MCQ
Question with Answer
| PDF Download |…
competitive-exam.in
PageMaker MCQ
Question with Answer
| PDF Download |…
competitive-exam.in
Networking MCQ
Question with Answer
| PDF Download |…
competitive-exam.in
Multimedia and
Graphics MCQ
Question with…
competitive-exam.in
Ad
1. MCQ Question Answer App
2. Multiple Choice Questions App
3. Free Book Downloads Online
Related Categories
ByDBMS
using MCQ World
you
this website, History
agree thatMCQ Visual Basic
we and ourpartners MCQ
may set cookies for purposes such as
customising content and advertising. I Understand
General Science MCQ Banking MCQ PageMaker MCQ Payroll MCQ
General Science MCQ Banking MCQ PageMaker MCQ Payroll MCQ
SPONSORED SEARCHES
Onorati Construction -
Asphalt Resurfacing
Services
Ad onoraticonstruction.com
PageMaker MCQ
Question with Answer |
PDF Download | 2020|…
competitive-exam.in
Networking MCQ
Question with Answer |
PDF Download | 2020|…
competitive-exam.in
Multimedia and
Graphics MCQ Question
with Answer | PDF…
competitive-exam.in
Ad
1. MCQ Question Answer App
2. Multiple Choice Questions App
3. Free Book Downloads Online
By using this website, you agree that we and our partners may set cookies for purposes such as
customising content and advertising. I Understand
Competitive Exam India | Copyright @2017-2018 | About Us | Contact Us
Hosting partner DigitalOcean - Click here to get $10 joining bonus
By using this website, you agree that we and our partners may set cookies for purposes such as
customising content and advertising. I Understand
Home About Cont act Submit Project Affiliat e Program Free BooksText to Search...
Automobile Engineering
(A) Dummy
5. Automobile Projects
ICRAVE Design Studio - Large-scale
(B) Event
development OPEN
6. Automobile Interview NYC's lead design firm for
(C) Activity
built environments, properties,
amenities and beyond development.icrave.com
(D) Contract
Correct Answer
Civil Engineering Text to Search...
Correct Answer
5. T echnical T erms
6. Civil Interview
3. An event is indicated on the network by a number enclosed in
(A) A circle
(C) A triangle
1. MCQ Practice T ests
(D) All the above
5. Electrical GK MCQ (B) A critical path always terminates at the last event
Correct Answer
Chemical Engineering
5. If t is the duration of an activity, t1 is the latest finish possible moment o
1. MCQ Practice T ests
and t2 is the earliest start possible moment, the independent float of the a
(B) t - (t1 - t2)
3. Mock T ests (Level II)
(C) (t1 + t2) - t
4. Online Quiz z es (D) t + (t1 - t2)
Correct Answer
Computer Science
6. Free float for any activity is defined as the difference between
1. MCQ Practice T ests
(A) Its earliest finish time and earliest start time for its successor activity
2. Mock T ests (Level I) (B) Its latest start time and earliest start time
3. Mock T ests (Level II) (C) Its latest finish time and earliest start time for its successor activity
Text to Search...
(D) Its earliest finish time and latest start time for its successor activity
4. Online Quiz z es
Correct Answer
(C) Duration
7. Indian Culture
(D) Float
8. Famous Personalities Correct Answer
3. World Organiz ations 10. A contractor has two options; (I): Invest his money in project A or (II)
B. If he decides to invest in A, for every rupee invested, he is assured of d
4. International Days & Years years. If he decides to invest in B, he is assured of making his money 1.5 t
contractor values his money at 10% interest rate, he
5. World Famous Personality
(A) Should invest in neither of the two projects
6. Worlds Honours and Awards (B) Could invest in either of the two projects
Correct Answer
11. Henry Gantt developed Bar charts for planning and scheduling of pro
(A) 1880
(B) 1900
(C) 1920
(D) 1940
Correct Answer
12. If TL is the latest allowable event occurrence time, total activity slack(
(A) LST - EST
(B) LFT - EFT
(C) TL - EFT
Correct Answer
(A) Planning
(B) Designing
(C) Execution
Correct Answer
Correct Answer
Correct Answer
Set 11
OPEN
ICRAVE Design Studio - Large-scale development Text to Search...
Ad developm ent.icrave.com
Text to Search...
Strength of Materials
Objective Questions with
Answers - Set 10
Practice Test: Question
Set - 10 1. Young's
modulus is defined as the
ratio of (A) Volumetric stress and volumetric
strain (B)...
Free Android & Total Number of KDP & Paperback Books Follow by Email
Windows Mobile App Visitors
Free e-Books
Submit
Amaz on.in KDP Books
1 4 0 0 Amaz on.com KDP & Paperback
Type your Ema
5 4 6 6
© 2014 - 2020 | ObjectiveBooks - All Rights Reserved Contact | Sitemap | T erms
Textoftouse | Privacy Policy
Search...
Search...
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
21. If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity,
the expected time of the activity, is
A.
B.
C.
D.
Answer: Option C
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
22. The time by which activity completion time can be delayed without affecting the start of
succeeding activities, is known as
A.duration
B.total flat
C. free float
D.interfering float.
Answer: Option C
Explanation:
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
23. The artificial activity which indicates that an activity following it, cannot be started unless
the preceding activity is complete, is known as
A.event
B.free float
C. dummy
D.constant
Answer: Option C
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
24. Henry Gantt developed Bar charts for planning and scheduling of projects in
A.1880
B.1900
C. 1920
D.1940
E. 1950
Answer: Option B
Explanation:
No answer description available for this question. Let us discuss.
Workspace
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
25. The most popular type of organisation used for Civil Engineering Constructions, is
A.line organisation
B.line and staff organisation
C. functional organisation
D.effective organisation.
Answer: Option A
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
« Prev 1 2 3 4 5 6 7 8 9 10 Next »
Walston Timber Frame
Expect excellent, honest
communication from our
knowledgeable and responsive
sales team
Ad
Industrial Engineering
and Production
and Production
Management Section 4…
indiabix.com
Industrial Engineering
and Production
Management -…
indiabix.com
Strength of Materials -
Civil Engineering
Questions and Answers…
indiabix.com
Problems on Trains -
Aptitude Questions and
Answers
indiabix.com
Ad
1. Civil Engineering MCQ for Practice
2. Construction Management Programs
3. Exam Answers Site
Read more:
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy
Question No. 01
In time-cost optimization of a project, crashing is done.
(A) On all the activities
(B) On all the activities lying on the critical path
(C) Only on activities lying on the original critical path and having flatter cost slopes
(D) On original critical activities and those that become critical at any stage of crashing in the
order of ascending cost slope
Answer: Option D
Question No. 02
Which of the following does not represent an activity?
(A) Site located
(B) Foundation is being dug
(C) The office area is being cleaned
(D) The invitations are being sent
Answer: Option A
Question No. 03
In resources levelling
(A) Total duration of project is reduced
(B) Total duration of project is increased
(C) Uniform demand of resources is achieved
(D) Cost of project is controlled
Answer: Option C
Question No. 04
Sensitivity analysis is a study of
(A) Comparison of profit and loss
(B) Comparison of assets and liabilities
(C) Change in output due to change in input
(D) Economics of cost and benefits of the project
Answer: Option C
Question No. 05
Preliminary project report for a road project must contain
(A) The detailed estimated cost based on detailed design
(B) The several alternatives of the project that have been considered
(C) The soil survey, traffic survey, concept design and approximate cost
(D) The contract documents for inviting tenders
Answer: Option C
Question No. 06
For which of the following materials, the output of power shovels for a fixed shovel size will be
maximum
(A) Moist loam
(B) Good common earth
(C) Well blasted rock
(D) Wet sticky clay
Answer: Option A
Question No. 07
If the output of a dragline for 90° angle of swing at optimum depth of cut is X, then the output for
120° angle of swing at 120 % of optimum depth of cut will be
(A) Equal to X
(B) More than X
(C) Less than X
(D) Any of the above
Answer: Option C
Question No. 08
In PERT analysis, the time estimates of activities and probability of their occurrence follow
(A) Normal distribution curve
(B) Poisson's distribution curve
(C) Beta distribution curve
(D) None of the above
Answer: Option C
Question No. 09
Free float is mainly used to
(A) Identify the activities which can be delayed without affecting the total float of preceding
activity
(B) Identify the activities, which can be delayed without affecting the total float of succeeding
activity
(C) Establish priorities
(D) Identify the activities which can be delayed without affecting the total float of either the
preceding or succeeding activities
Answer: Option B
Question No. 10
Grader is used mainly for
(A) Trimming and finishing
(B) Shaping and trimming
(C) Finishing and shaping
(D) Finishing, shaping and trimming
Answer: Option D
Question No. 11
Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?
(A) Concrete
(B) Loose sand
(C) Asphalt
(D) Firm earth
Answer: Option B
Question No. 12
Which of the following earth moving machines has the shortest cycle time?
(A) Drag line
(B) Hoe
(C) Clam shell
(D) Dipper shovel
Answer: Option D
Question No. 13
Updating may result in
(A) Change of critical path
(B) Decrease of project completion time
(C) Increase of project completion time
(D) All of the above
Answer: Option D
Question No. 14
The time by which a particular activity can be delayed without affecting the preceding and
succeeding activities is known as
(A) Total float
(B) Free float
(C) Interfering float
(D) Independent float
Answer: Option D
Question No. 15
During the construction period, price variation clause in contracts caters to
(A) Increase in rates of only important materials
(B) Variation in cost in materials element, labour element and petrol-oil-lubricant element
(C) Variation in total cost of the project on an ad hoc basis
(D) Rate of inflation
Answer: Option B
Question No. 16
Critical path method
(A) Is an improvement upon bar chart method
(B) Provides a realistic approach to daily problems
(C) Avoids delays which are very common in bar charts
(D) All the above
Answer: Option D
Question No. 17
At a work site, statistical quality control of concrete means
(A) Measurement of risks to eliminate failures
(B) Applying the theory' of probability to sample testing or inspection
(C) Reduction in wastage of inspection costs
(D) Reduction in costs for the removal of defects
Answer: Option B
Question No. 18
For the network shown in the given figure, the expected time for the activity
(A) 1-2 is 4
(B) 2-3 is 7
(C) 3-4 is 8
(D) All the above
Answer: Option D
Question No. 19
A critical ratio scheduling
(A) Determines the status of each activity
(B) Adjusts automatically changes in activity progress
(C) Is a dynamic system
(D) None of these
Answer: Option D
Question No. 20
For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5,
17 and 8 days respectively, The expected time is
(A) 8 days
(B) 9 days
(C) 10 days
(D) 15 days
Answer: Option B
Question No. 21
Pick up the correct statement from the following:
(A) Optimistic time estimate refers to activities
(B) Pessimistic time estimate refers to activities
(C) Most likely time estimate refers to activities
(D) All the above
Answer: Option D
Question No. 22
In the time-cost optimisation, using CPM method for network analysis, the crashing of the
activities along the critical path is done starting with the activity having
(A) Longest duration
(B) Highest cost slope
(C) Least cost slope
(D) Shortest duration
Answer: Option C
Question No. 23
A golden rule for the procurement of construction stones, suggests
(A) 100% at the site
(B) 67% at the site and 33% under procurement
(C) 50% at the site and 50% under procurement
(D) 33% at the site and 67% under procurement
Answer: Option B
Question No. 24
The time with which direct cost does not reduce with the increase in time is known as
(A) Crash time
(B) Normal time
(C) Optimistic time
(D) Standard time
Answer: Option B
Question No. 25
Pick up the correct statement from the following with regards to C.P.M. network analysis of
projects
(A) The latest occurrence time of the node of which the activity arrow terminates minus the
duration of the activity, is called latest start time
(B) The latest occurrence time for the node at which the activity arrow terminates, is called
latest finish time
(C) Earliest occurrence time of the event from which the activity arrow' originates, is called
earliest start time of the activity
(D) All the above
Answer: Option D
Question No. 26
Interfering float is the difference between
(A) Total float and free float
(B) Total float and independent float
(C) Free float and independent float
(D) None of the above
Answer: Option A
Question No. 27
While filling the tender for any work, the contractor considers
(A) Site survey
(B) Availability of construction materials
(C) Availability of labour
(D) All the above
Answer: Option D
Question No. 28
An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It has no salvage value at the
end of 8 years. The book value of the excavator at the end of 3 years using general double
declining balance method is
(A) Rs. 8,43,750
(B) Rs. 8,75,000
(C) Rs. 10,50,000
(D) Rs. 11,56,250
Answer: Option A
Question No. 29
Pick up the incorrect statement from the following:
(A) The various functions under each activity, are shown by one bar on Bar Charts
(B) Bar chart establishes the interdependency of one event on another
(C) Only approximate percentage of the completed work is reported
(D) None of these
Answer: Option B
Question No. 30
A wheeled tractor hauling unit is working on firm earth. The total loaded weight distribution of
this unit is:
Drive wheels: 25000 kg
Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the rimpull which this tractor
can exert without slipping is
(A) 10000 kg
(B) 12500 kg
(C) 22500 kg
(D) 5000 kg
Answer: Option B
Question No. 31
If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks,
the probability of completing the project in 50 weeks and 65 weeks respectively will be
(A) 2.3% and 84.1%
(B) 97.7% and 84.1%
(C) 97.7 % and 15.9%
(D) 15.9% and 97.7%
Answer: Option A
Question No. 32
Power stations are generally treated as
(A) Light construction
(B) Heavy construction
(C) Industrial construction
(D) Electrical construction
Answer: Option C
Question No. 33
For a given size of bucket, the ideal output of a dragline will be least in
(A) Moist loam
(B) Sand and gravel
(C) Good common earth
(D) Wet sticky clay
Answer: Option D
Question No. 34
Bar charts are suitable for
(A) Minor works
(B) Major works
(C) Large projects
(D) All the Above
Answer: Option A
Question No. 35
The time corresponding to minimum total project cost is
(A) Crash time
(B) Normal time
(C) Optimistic time
(D) Between normal time and crash time
Answer: Option D
Question No. 36
Construction team means
(A) An engineer
(B) An architect
(C) An owner
(D) All the above
Answer: Option D
Question No. 37
Select the incorrect statement.
(A) Start float and finish float are always equal.
(B) Total float can be either start float or finish float.
(C) Start float and finish float need not be equal.
(D) Start float and finish float are the differences between activity times and not event times.
Answer: Option C
Question No. 38
The artificial activity which indicates that an activity following it, cannot be started unless the
preceding activity is complete, is known as
(A) Event
(B) Free float
(C) Dummy
(D) Constraint
Answer: Option C
Question No. 39
PERT technique of network analysis is mainly useful for
(A) Small projects
(B) Large and complex projects
(C) Research and development projects
(D) Deterministic activities
Answer: Option C
Question No. 40
Pick up the correct statement from the following:
(A) The float may be positive, zero or negative
(B) If the float is positive and the activity is delayed by a period equal to its total float, the
completion of project is not delayed
(C) If the float of an activity is negative, delay in its performance is bound to delay the
completion of project
(D) All the above
Answer: Option D
Question No. 41
The independent float affects only
(A) Preceding activities
(B) Succeeding activities
(C) The particular activity involved
(D) None of the above
Answer: Option C
Question No. 42
Site order book is used for recording
(A) Instructions by the executive engineers
(B) Construction measurements
(C) Issue of store equipments
(D) Names of the casual labour
Answer: Option A
Question No. 43
The time by which activity completion time can be delayed without affecting the start of
succeeding activities, is known as
(A) Duration
(B) Total float
(C) Free float
(D) Interfering float
Answer: Option C
Question No. 44
The part of a derrick crane include
(i) Mast
(ii) Boom
(iii) Bull wheel
(iv) Jack
Of these statements
(A) (i), (ii) and (iv) are correct
(B) (ii), (iii) and (iv) are correct
(C) (i), (iii) and (iv) are correct
(D) (i), (ii) and (iii) are correct
Answer: Option D
Question No. 45
If the gross vehicle weight of a truck is 30 tonne and rolling resistance is 30 kg/tonne, then the
tractive effort required to keep the truck moving at a uniform speed is
(A) 30 kg
(B) 300 kg
(C) 900 kg
(D) 1000 kg
Answer: Option C
Question No. 46
Works costing less than Rs. 20,000 are treated as
(A) Any project
(B) Major projects
(C) Minor projects
(D) All the above
Answer: Option C
Question No. 47
A machine costs Rs. 20000 and its useful life is 8 years. The money is borrowed at 8% interest per
annum. The capital recovery factor at 8% interest per annum for 8 years is 0.174. The annual
equipment cost of the machine will be
(A) Rs. 1740
(B) Rs. 3480
(C) Rs. 5220
(D) Rs. 6960
Answer: Option B
Question No. 48
Railway projects are treated as
(A) Light construction
(B) Heavy construction
(C) Industrial construction
(D) None of these
Answer: Option B
Question No. 49
Consider the following statements:
In the critical path method of construction planning, Free Float can be.
1. Greater than Total Float.
2. Greater than Independent Float
3. Equal to Total Float.
4. Less than Independent Float. Of these statements
(A) 1 and 4 are correct
(B) 2 and 3 are correct
(C) 1 and 4 are correct
(D) 1 and 2 are correct
Answer: Option B
Question No. 50
Pick up the correct statement from the following:
(A) The duration between the earliest start time of the preceding event and latest finish time of
the succeeding event, is called 'float'
(B) The duration of time by which an activity can be delayed without affecting the succeeding
activity, is called free float
(C) The difference between total float and free float, is called interfering float
(D) All the above
Answer: Option D
Question No. 51
The original cost of an equipment is Rs.10,000. Its salvage value at the end of its total useful life of
five years is Rs. 1,000. Its book value at the end of two years of its useful life (as per straight line
method of evaluation of depreciation) will be
(A) Rs. 8,800
(B) Rs. 7,600
(C) Rs. 6,400
(D) Rs. 5,000
Answer: Option C
Question No. 52
For completion of a project, the critical path of the network represents
(A) Minimum time
(B) Maximum time
(C) Maximum cost
(D) Minimum cost
Answer: Option A
Question No. 53
The maximum rimpull in the first gear of a tractor while towing a load is 6300 kg. The tractor
weighs 12.5 tonnes and is operating along a 2 percent upgrade and the rolling resistance is 45
kg/tonne. Pull available for towing the load is
(A) 3425 kg
(B) 5515 kg
(C) 4350 kg
(D) 2975 kg
Answer: Option B
Question No. 54
Which one of the following represents an event?
(A) Concrete cured
(B) Fixing of door
(C) Plastering of walls
(D) Selecting sites
Answer: Option A
Question No. 55
The rated loads of lifting cranes, as percentage of tipping load at specified radius, for crawler-
mounted and pneumatic tyre-mounted machines would be respectively
(A) 80 and 90
(B) 90 and 80
(C) 85 and 75
(D) 75 and 83
Answer: Option D
Question No. 56
PERT is
(A) An analytic in concept
(B) Limited of event oriented diagrams
(C) Used for research and development projects
(D) All the above
Answer: Option D
Question No. 57
Optimistic time, most likely time and pessimistic times for the activities of a network in the given
figure are written above their arrows. If the contractual obligation time for the project is 75, the
latest occurrence time for the event 2, is
(A) 20
(B) 25
(C) 35
(D) 15
Answer: Option B
Question No. 58
An earth moving equipment costs Rs. 5,00,000 and has an estimated life of 10 years and a salvage
value of Rs. 50,000. What uniform annual amount must be set aside at the end of each of the 10
years for replacement if the interest rate is 8% per annum and if the sinking fund factor at 8% per
annum interest rate for 10 years is 0.069?
(A) Rs. 31050
(B) Rs. 34500
(C) Rs. 37950
(D) Rs. 50000
Answer: Option A
Question No. 59
Output of a bulldozer is
(i) Increased if drawbar HP of the tractor is increased for a given hauling distance
(ii) Decreased if drawbar HP of the tractor is increased for a given hauling distance
(iii) Increased if the hauling distance is increased for a given drawbar HP of the tractor
(iv) Decreased if the hauling distance is increased for a given drawbar HP of the tractor
Of these statement
(A) (i) and (iii) are correct
(B) (i) and (iv) are correct
(C) (ii) and (iii) are correct
(D) (ii) and (iv) are correct
Answer: Option B
Question No. 60
For the execution of a project, a contractor is
(A) A person
(B) A firm
(C) An agency
(D) All the above
Answer: Option D
Question No. 61
The constraints in case of resource smoothening operation would be
(A) Resources
(B) Project duration time
(C) Both resources and project duration time
(D) None of the above
Answer: Option B
Question No. 62
The time which results in the leasi, possible construction cost of an activity, is known as
(A) Normal time
(B) Slow time
(C) Crash time
(D) Standard time
Answer: Option B
Question No. 63
The direct cost of a project with respect to normal time is
(A) minimum
(B) Maximum
(C) Zero
(D) Infinite
Answer: Option A
Question No. 64
The object of technical planning, is
(A) Preparation of specifications
(B) Preparation of estimates
(C) Initiating the procurement action of resources
(D) All the above
Answer: Option D
Question No. 65
If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its
expected time and variance are respectively
(A) 3.5 and 5/6
(B) 5 and 25/36
(C) 3.5 and 25/36
(D) 4 and 5/6
Answer: Option C
Question No. 66
Various activities of a project, are shown on bar charts by
(A) Vertical lines
(B) Horizontal lines
(C) Dots
(D) Crosses
Answer: Option B
Question No. 67
Select the correct statement.
(A) Activity arrows in a CPM network are drawn to scale
(B) The tail of an arrow represents the finish of an activity
(C) Arrow bead represents the start of an activity
(D) None of the above
Answer: Option D
Question No. 68
If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest
finish time, then the following relation holds good
(A) EF = ES + D
(B) LS = LF - D
(C) LF = LS + D
(D) All the above
Answer: Option D
Question No. 69
Total float for any activity is defined as the difference between
(A) Its latest finish time and earliest start time for its successor activity
(B) Its latest start time and earliest start time
(C) Its latest start time and earliest finish time
(D) Its earliest finish time and earliest start time for its successor activity
Answer: Option B
Question No. 70
Pick up the incorrect statement from the following:
(A) The activity is the time consuming part of a project
(B) The beginning and end of a job, are called events
(C) The activity which consumes maximum time, is called a node
(D) Logically and sequentially connected activities and events form a network
Answer: Option C
Question No. 71
Assertion (A): Activity 57 is critical.
Reason (R): Earliest finish time and latest finish time for events 57 are same
Select the correct answer.
(A) A is correct but R is not correct
(B) R is correct but A is not correct
(C) Both A and R is correct
(D) Both A and R is incorrect
Answer: Option A
Question No. 72
The main principle of an organisation, is
(A) Unity of command
(B) Effective control at all levels
(C) Delegation of authority
(D) All the above
Answer: Option D
Question No. 73
If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the
expected time of completion of the project with 99.9% probability is
(A) 4 days
(B) 6 days
(C) 10 days
(D) 16 days
Answer: Option D
Question No. 74
Pick up the correct statement from the following:
(A) Earliest expected time is denoted by TE
(B) Latest occurrence time is denoted by TL
(C) Contractual obligation time is denoted by Ts
(D) All the above
Answer: Option D
Question No. 75
Consider the following operations:
1. Drilling
2. Blasting
3. Mucking
4. Placing steel
5. Placing concrete
The correct sequence of these operations in tunnel construction is
(A) 1, 2, 4, 3, 5
(B) 1, 3, 2, 4, 5
(C) 1, 2, 3, 4, 5
(D) 1, 3, 4, 2, 5
Answer: Option C
Question No. 76
Pick up the incorrect statement from the following:
(A) The difference between the earliest start time and latest finish time of any activity, is the
maximum time available for the activity
(B) The difference between the maximum time available for the job and actual time it
consumes, is called total float
(C) The difference between the latest start time and earliest start time of an activity, is called
total float
(D) None of these
Answer: Option D
Question No. 77
The basic action involved in sheep foot rolling is
(A) Kneading
(B) Pressing
(C) Tamping
(D) Vibration
Answer: Option A
Question No. 78
Pick up the correct statement from the following:
(A) Programme Evaluation and Review Technique, is event oriented
(B) Programme Evaluation and Review Technique is not event oriented
(C) Critical Path Method is event oriented
(D) Critical Path method is event oriented
Answer: Option A
Question No. 79
If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at
a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the
cost of excavation by machine will be equal to the cost of manual excavation is
(A) 500 cum
(B) 1000 cum
(C) 1500 cum
(D) 2000 cum
Answer: Option A
Question No. 80
Time and progress chart of a construction, is also known as
(A) Bar chart
(B) Gantt chart
(C) Modified Mile stone chart
(D) All the above
Answer: Option D
Question No. 81
Economic saving of time results by crashing
(A) Cheapest critical activity
(B) Cheapest noncritical activity
(C) Costliest critical activity
(D) Costliest noncritical activity
Answer: Option A
Question No. 82
In the given figure, the network of a project represents
Question No. 83
Select the incorrect statement.
(A) Earliest start of an activity is the early event time of the node it leaves.
(B) Latest finish of an activity is the late event time of the node it enters.
(C) Latest start of an activity is its latest finish minus its duration.
(D) None of the above
Answer: Option D
Question No. 84
The technique for establishing and maintaining priorities among the various jobs of a project, is
known
(A) Event flow scheduling technique
(B) Critical ratio scheduling
(C) Slotting technique for scheduling
(D) Short interval scheduling
Answer: Option B
Question No. 85
Which of the following is a weakness of bar chart?
(A) Interdependencies of activities
(B) Project progress
(C) Uncertainties
(D) All of the above
Answer: Option D
Question No. 86
Which one of the following represents an activity?
(A) Excavation for foundation
(B) Curing of concrete
(C) Setting of question paper
(D) All the above
Answer: Option D
Question No. 87
Which of the following excavators is most suitable for digging under water?
(A) Drag line
(B) Hoe
(C) Clam shell
(D) Dipper shovel
Answer: Option A
Question No. 88
A CPM family includes
(A) CPA (Critical Path Analysis)
(B) CPP (Critical Path Plotted)
(C) MCE (Minimum Cost Expenditure)
(D) All the above
Answer: Option D
Question No. 89
Critical path
(A) Is always longest
(B) Is always shortest
(C) May be longest
(D) May be shortest
Answer: Option A
Question No. 90
For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of
form work and curing of concrete, number of bar(s) required on bar chart, is
(A) 1
(B) 2
(C) 3
(D) 4
Answer: Option A
Question No. 91
Which one of the following surfaces will give highest coefficient of traction while using crawler
track tractors?
(A) Ice
(B) Concrete
(C) Loose sand
(D) Earth
Answer: Option D
Question No. 92
Residential buildings are treated as
(A) Light construction
(B) Heavy construction
(C) Industrial construction
(D) Private construction
Answer: Option A
Question No. 93
Consider the following statements:
In the bar chart planning
1. Interdependence of the operations cannot be portrayed.
2. Progress of work can be measured.
3. Spare time of the activities can be determined.
4. Schedule cannot be updated.
Of these statements
(A) 1, 2 and 3 are correct
(B) 1 and 4 are correct
(C) 2, 3 and 4 are correct
(D) 1, 2 and 4 are correct
Answer: Option B
Question No. 94
The three time estimates for the activities of the network shown in the given figure are shown
above their arrows. The earliest expected time for the event 4, is
(A) 19
(B) 14
(C) 24
(D) None of these
Answer: Option A
Question No. 95
Consider the following activities in a building construction:
1. Concreting of roof slabs
2. Brick-jelly lime concrete terracing
3. Erection of form work for slab
4. Construction of parapet wall in terrace
The correct sequence of these activities is
(A) 1, 3, 2, 4
(B) 3, 1, 4, 2
(C) 3, 1, 2, 4
(D) 1, 3, 4, 2
Answer: Option C
Question No. 96
Military organisation is known as
(A) Line organisation
(B) Line and staff organisation
(C) Functional organisation
(D) None of these
Answer: Option A
Question No. 97
Mobilization advance up to 10% of the cost of work is given to a contractor
(A) On commencement of work at site for payment of loan taken by him
(B) For the purchase of construction materials
(C) For the payment of advances to labour and other staff
(D) For all activities required to start the work at site on finalization of the contract document
Answer: Option D
Question No. 98
Pick up the PERT event from the following:
(A) Digging of foundation started
(B) Digging of foundation completed
(C) Laying of concrete started
(D) All the above
Answer: Option D
Question No. 99
A machine is purchased for Rs. 10,000,00 and has an estimated life of 10 years. The salvage value
at the end of 10 years is Rs. 1,50,000. The book value of the machine at the end of 5 years using
general straight line method of evaluation of depreciation is
(A) Rs. 4,75,000
(B) Rs. 5,75,000
(C) Rs. 6,50,000
(D) Rs. 8,50,000
Answer: Option B
B. If he decides to invest in A, for every rupee invested, he is assured of doubling his money in ten
years. If he decides to invest in B, he is assured of making his money 1.5 times in 5 years. If the
contractor values his money at 10% interest rate, he
(A) Should invest in neither of the two projects
(B) Could invest in either of the two projects
(C) Should invest in project A
(D) Should invest in project B
Answer: Option A
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
OPEN
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option D
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
3. The technique for establishing and maintaining priorities among the various jobs of a
project, is known
A.Event flow scheduling technique
B.Critical ratio scheduling
C. Slotting technique for scheduling
D.Short interval scheduling.
Answer: Option B
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option D
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option C
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
schuchart.com
Ad
Theory of Structures
Section 3 - Civil
Engineering Questions…
indiabix.com
Theory of Structures
Section 2 - Civil
Engineering Questions…
indiabix.com
Ad
1. MCQ Question Answer App
2. Civil Engineering MCQ Book
3. Investment Management MCQ with Answers
Read more:
Construction Management - Section 2
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
46. If TL is the latest allowable event occurrence time, total activity slack(s), is equal to
A.LST-EST
B.LFT-EFT
C.TL-EFT
D.all the above.
Answer: Option D
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
47. The Overall in-charge of an organisation at the site responsible for the execution of the
works, is
A.Executive Engineer
B.Engineer
C.Junior Engineer
D.Sub overseer
E.Assistant Engineer.
Answer: Option B
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option D
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
« Prev 1 2 3 4 5 6 7 8 9 10
Sponsored by
Open
schuchart.com
Trust ed Engineer
Consult ing
g
Ad MT Mechanical Group, LLC
Problems on Trains -
Apt it ude Quest ions and
Answers
indiabix.com
Ad
1. Civil Engineering MCQ for Pract ice
2. Exam Answers Sit e
3. Const ruct ion Management Programs
Read more:
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
6. If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity
respectively, the expected time t of the activity will be
A.
B.
C.
D.
E.
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option C
Explanation:
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
9. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and
latest finish time, then the following relation holds good
A.EF = ES + D
B.LS = LF - D
C. LF = LS + D
D.D = EF - ES
E. all the above.
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option D
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
« Prev 1 2 3 4 5 6 7 8 9 10 Next »
Densification, Inc.
OPEN
#1 Blueprint App -
Trusted by 750,000+
Projects
Ad lp.fieldwire.com
i i d i
Estimating and Costing
Section 2 - Civil
Engineering Questions…
indiabix.com
Industrial Engineering
and Production
Management -…
indiabix.com
Strength of Materials -
Civil Engineering
Questions and…
indiabix.com
Problems on Trains -
Aptitude Questions and
Answers
indiabix.com
Ad
1. 2 Year Construction Management Degree
g g
2. Foundation Engineering Exam Questions
3. Civil Engineering MCQ for Practice
Read more:
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
Answer: Option C
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
13. A Milestone chart
A.shows the interdependencies of various jobs
B.depicts the delay of jobs, if any
C. points outgoing ahead of schedule of jobs, if any
D.none of these.
Answer: Option D
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option D
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option D
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
« Prev 1 2 3 4 5 6 7 8 9 10 Next »
Sponsored by
Open
schuchart.com
Multifamily Renovations
Apartment Unit
- Apartment Unit
Interiors
Ad onecallconstructionservice.com
Industrial Engineering
and Production
Management -…
indiabix.com
Strength of Materials -
Civil Engineering
Questions and…
indiabix.com
Problems on Trains -
Aptitude Questions and
Answers
indiabix.com
Theory of Structures
Section 4 - Civil
Engineering Questions…
indiabix.com
Ad
1. Civil Engineering MCQ for Practice
2. Construction Management Programs
3. Civil Engg MCQ App
Read more:
Construction Management - Section 2
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy
Home Aptitude Logical Verbal CA Current Affairs GK Engineering Interview Online Tests
Puzzles
Answer: Option A
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option C
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option B
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option E
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
Answer: Option D
Explanation:
Report errors
...
Name :
Email:
Send Report
View Answer Discuss in Forum Workspace Report
« Prev 1 2 3 4 5 6 7 8 9 10 Next »
Log, Post & Beam, Timber Kits
We will design, manufacture,
and install your new custom
Timber Home
Ad
Industrial Engineering
and Production
Management -…
indiabix.com
Strength of Materials -
Civil Engineering
Questions and Answers…
indiabix.com
Problems on Trains -
Aptitude Questions and
Answers
indiabix.com
Theory of Structures
Section 4 - Civil
Engineering Questions…
indiabix.com
Ad
1. Construction Management Programs
2. Exam Answers Site
3. Construction Management Fees in Canada
Read more:
© 2009 - 2020 by IndiaBIX™ Technologies. All Rights Reserved. | Copyright | Terms of Use &
Privacy Policy