BUILDING 003 DURATION PROGRESS STATUS REMARKS BUILDING 001,002 DURATION PROGRESS STATUS REMARKS BUILDING 016 DURATION

SS STATUS REMARKS BUILDING 016 DURATION PROGRESS STATUS REMARKS


- GROUND FLOOR - GROUND FLOOR INSTALLATION 25/09 ~ 01/10 100%
30/09 ~ 29/10 INSTALLATION 97% Waiting
TESTING 01/10 100%
INSTALLATION 70% CSA not yet CSA
30/09 ~06/11 TESTING 100% INSPECTION 01/10 100%
handover for handover
TESTING 100% INSPECTION 100% ME INSTALLATION EQUIPMENT 2 DAYS 0% ceiling
INSPECTION 04/11 ~05/11 30% DEFECT WORK 30/10 ~ 02/11 80% INSTALLATION ROOF FAN 23/10-01/11 0%
DEFECT WORK 06/11 ~ 08/11 0% - 1ST FLOOR
- 1ST FLOOR 25/09 ~ 30/10
INSTALLATION 95%
25/09 ~ 30/10 25/09 ~ 01/11
INSTALLATION 95%
25/09 ~ 04/11 TESTING 100%
TESTING 100% INSPECTION 100%
INSPECTION 04/11 ~ 05/11 0% DEFECT WORK 01/10 ~ 05/11 0%
DEFECT WORK 06/11 ~ 08/11 0% - AHU ROOM
- AHU ROOM 21/10 ~ 31/10
INSTALLATION 20%
25/10 ~ 05/11 21/10 ~ 10/11
INSTALLATION 0%
09/11 ~ 16/11 01/11 ~ 03/11
TESTING 0%
01/11 ~ 03/11 10/10 ~ 12/11
TESTING 0% INSPECTION 12/11 0%
16/11 ~ 17/11
INSPECTION 17/11 ~ 18/11 0% DEFECT WORK 12/10 ~ 15/11 0%
DEFECT WORK 19/11 ~ 20/11 0%

BUILDING 011&012 DURATION PROGRESS STATUS REMARKS


BUILDING 007 DURATION PROGRESS STATUS REMARKS INSTALLATION 90%
Waiting
30/09 ~ 06/10 TESTING 02/11-03/11 0%
INSTALLATION 50% CSA
05/11 ~ 12/11 Installation INSPECTION 04/11 0% handover
07/10 ~ 07/10 AHU behind DEFECT WORK 04/11 ~ 05/11 0% wall
TESTING 0% progress
13/11 ~ 14/11
INSPECTION 15/11 0%
DEFECT WORK 15/11 ~ 16/11 0% BUILDING 013 DURATION PROGRESS STATUS REMARKS
INSTALLATION FABRIC DUCT 16/11 ~ 27/11 0%
- NONE CEILING
CSA not yet INSTALLATION 01/10 ~ 14/10 100%
INSTALLATION ROOF FAN 25/10 ~ 03/11 0% handover for
TESTING 02/11 0%
ME
INSPECTION 02/10 0%
DEFECT WORK 03/11 ~ 04/11 0%
WB FACTORY 006 DURATION PROGRESS STATUS REMARKS
- OFFICE-013
- GROUND FLOOR INSTALLATION 100%
INSTALLATION 100% TESTING 100%
TESTING 100% INSPECTION 02/10 0%
INSPECTION 05/11 0% DEFECT WORK 03/11 ~ 05/11 0%
DEFECT WORK 05/11 ~12 /11 0% INSTALLATION FABRIC DUCT 16/11 ~ 27/11 0%
- 1ST FLOOR
CSA not yet
+ OFFICE-006 INSTALLATION ROOF FAN 25/10 ~ 03/11 0% handover for
INSTALLATION 100% ME
TESTING 100%
28/10 POWDER FACTORY 010 DURATION PROGRESS STATUS REMARKS
INSPECTION 50%
02/11
- BASEMENT FLOOR
DEFECT WORK 02/11 ~ 05/11 0%
INSTALLATION 15/10 ~ 25/10 0%
+ NONE CEILING
07/11 ~ 15/11
15/10 ~ 31/10
INSTALLATION 10% TESTING 15/11 ~ 16/11 0%
30/10~ 15/11
INSPECTION 17/10 0%
27/10 ~ 28/10
TESTING 0% DEFECT WORK 17/11 ~ 20/11 0%
15/11 ~ 16/11
- GROUND FLOOR
INSPECTION 17/17 0% CSA
INSTALLATION 25/10 ~ 05/11 95%
DEFECT WORK 17/11 ~ 20/11 0% handover
TESTING 100%
wall behind
INSPECTION 06/11 0% progress
DEFECT WORK 07/11 ~ 10/11 0%
UTILITY AREA 004 DURATION PROGRESS STATUS REMARKS - 1ST FLOOR
- GROUND FLOOR INSTALLATION 100%
11/10 ~ 26/10 TESTING 05/10 ~ 06/11 50%
INSTALLATION 85% 07/11 0%
11/10 ~15/11 INSPECTION
TESTING 0% DEFECT WORK 07/11 ~ 10/11 0%
16/11 ~17/11
INSPECTION 18/11 0%
DEFECT WORK 18/11 ~ 20/11 0% BUILDING 015 DURATION PROGRESS STATUS REMARKS
- 1ST FLOOR 10/10 ~ 15/10
12/10 ~ 25/10 INSTALLATION VENTILATION FAN 70%
INSTALLATION 85% 10/10 ~ 03/11
12/10 ~15/10
TESTING 16/11 ~17/11 0%
INSPECTION 18/11 0%
DEFECT WORK 18/11 ~ 20/11 0%
- ROOF FLOOR
INSTALLATION 15/11 ~ 22/11 0%
TESTING N/A N/A
INSPECTION 24/11 0%
DEFECT WORK 24/11 ~ 27/11 0%

(Updated until: 10-Oct-2020)


DETAIL SCHEDULE - DUCTING SYSTEM
POWDER FACTORY 010 DURATION PROGRESS STATUS REMARKS

- BASEMENT FLOOR
16/10 ~ 21/10
INSTALLATION 0%
16/10 ~ 15/11
INSPECTION 16/11 0%
DEFECT WORK 16/11 ~ 17/11 0%
- GROUND FLOOR
WB FACTORY 006 DURATION PROGRESS STATUS REMARKS 05/10 ~ 17/10
INSTALLATION 75%
05/10 ~ 15/11
- 1ST FLOOR
INSPECTION 16/11 0%
20/10 ~ 03/11
INSTALLATION 0% DEFECT WORK 16/11 ~ 19/11 0%
20/10 ~ 10/11
INSPECTION 11/10 0% - 1ST FLOOR
14/10 ~ 24/10
DEFECT WORK 12/11 ~ 13/11 0% INSTALLATION 70%
14/10 ~ 10/11
INSPECTION 11/10 0%
DEFECT WORK 12/11 ~ 13/11 0%

UTILITY AREA 004 DURATION PROGRESS STATUS REMARKS

- GROUND FLOOR
03/10 ~ 25/10 Installation
INSTALLATION 20% AHU behind
03/10 ~ 10/11 progress
INSPECTION 11/11 0%
DEFECT WORK 12/11 ~ 13/11 0%

(Updated until: 17-Oct-2020)