- BASEMENT FLOOR
16/10 ~ 21/10
INSTALLATION 0%
16/10 ~ 15/11
INSPECTION 16/11 0%
DEFECT WORK 16/11 ~ 17/11 0%
- GROUND FLOOR
WB FACTORY 006 DURATION PROGRESS STATUS REMARKS 05/10 ~ 17/10
INSTALLATION 75%
05/10 ~ 15/11
- 1ST FLOOR
INSPECTION 16/11 0%
20/10 ~ 03/11
INSTALLATION 0% DEFECT WORK 16/11 ~ 19/11 0%
20/10 ~ 10/11
INSPECTION 11/10 0% - 1ST FLOOR
14/10 ~ 24/10
DEFECT WORK 12/11 ~ 13/11 0% INSTALLATION 70%
14/10 ~ 10/11
INSPECTION 11/10 0%
DEFECT WORK 12/11 ~ 13/11 0%
- GROUND FLOOR
03/10 ~ 25/10 Installation
INSTALLATION 20% AHU behind
03/10 ~ 10/11 progress
INSPECTION 11/11 0%
DEFECT WORK 12/11 ~ 13/11 0%