You are on page 1of 3

Construction Daily Report

Construction of Foul Sewer for Various Catchment within Client /


Project Title : Ashghal - PWA
Doha South - Package 2 (DS039 & DS040) - C826/2 Owner:

Contract Title / PM / CM:


Prepared By: Consultant: ASCO
Date: Contractor: BIN OMRAN

Day No.: Day S S M T W TH F

Date:

Weather Clear Over Rain Dust Temp To0 0-30 30-40 40 - 50 50 up


C

Contract: Wind Still Moderate High Report #

Humidity Dry Moderate Humid

Machinery Used
Backhoe (s) Dump Truck 6-Wheel
Tractor(s) Crane (s) Backhoe (s) Transmit
with Jack (s) Truck (s)
Size
No. on Site
Down Time

Compressor
Hoist (s) Trailer (s) Vibrator (s) Welding Traffic Pickup (s)
(s)
Size
No. on Site
Down Time

Concrete
Dumper (s) Level (s) Theadolite (s) Compactor (s) Grader (s) Roller (s)
Pump (s)
Size
No. on Site
Down Time

Bending Machine (s) Wood / Marble Brick Cutter (s) Other

Size
No. on Site
Down Time

ASCO-QMS-027/REV 00/ DATE 03 JAN 2018


CONSTRUCTION DAILY REPORT

Machinery Used (Indicate If part Time (P)

Foreman Others Surveyor (s)


Occupatio Engineer Machine
Driver (s)
n (s) Operators
Asst.
Foreman Store Keeper Guards Surveyor Asst. Surveyor
Formeman

No. On
Site

Mason (s) Carpenter (s) Steel Bender (s) Structural Steel Welder (s) Join (s)
Occupatio
n
Unskill
Skilled Unskilled Skilled Skilled Unskilled Skilled Unskilled Skilled Unskilled Skilled Unskilled
ed

No. On
Site

Marble Ceramic Mosaic Stone Pre-cast Safety Officer


Occupatio
n
Unskill
Skilled Unskilled Skilled Skilled Unskilled Skilled Unskilled Skilled Unskilled Skilled Unskilled
ed

No. On
Site

Aluminum Painter (s) False Ceiling Glazing Plasterer (s) Tiler (s)
Occupatio
n
Unskill
Skilled Unskilled Skilled Skilled Unskilled Skilled Unskilled Skilled Unskilled Skilled Unskilled
ed

No. On
Site

Plumber (s) Fire System HVAC Electrician (s) Clerk (s) Labourer (s)
Occupatio
n
Unskill
Skilled Unskilled Skilled Skilled Unskilled Skilled Unskilled Skilled Unskilled Skilled Unskilled
ed

No. On
Site

TOTAL MANPOWER

ASCO-QMS-027/REV 00/ DATED 03 JAN 2018


Construction Daily Report
Construction of Foul Sewer for Various
Project Title : Catchment within Doha South - Package 2 (DS039 Client / Owner : ASHGHAL - (PWA)
& DS040) - C826/2
Contract Title / No. : PM / CM :

Prepared By : Consultant : ASCO

Date : Contractor : MACE

Material Delivered to Site

SN Description Quantity Uints Origin / Manufacturer

Work in Progress

Description & Location or Work in Progress Actual Dates Progress % Complete


Activity
Activity ID Location Planned Start Start Finish Planned Actual
Description

VIP Visitor (s)

Remarks

Date : Contractor's Signature :

ASCO-QMS-027/REV 00/DATE 03 JAN 2018

You might also like