You are on page 1of 3

Stamping

Grinding

Forging
Lathe
TRIP
Location X Y Machine Location X Y
MATRIX

1 1 1 Grinding 1 1 1 Grinding 0
2 1 2 Stamping 2 1 2 Stamping 37 0
3 2 1 Lathe 3 2 1 Lathe 0 53 0
4 2 2 Forging 4 2 2 Forging 86 121 8 0
5 2 3 Drilling 5 2 3 Drilling 9 214 55 28
6 2 4 Painting 6 2 4 Painting 15 652 215 84
7 3 1 Milling 7 3 1 Milling 621 64 46 0
8 3 2 Cutting 8 3 2 Cutting 221 0 100 284
9 3 3 Shaping 9 3 3 Shaping 0 328 0 30
10 3 4 Extruding 10 3 4 Extruding 271 286 50 8
11 1 3 Entrance 11 1 3 Entrance 10 102 514 0

Total TRIP-
DISTANCE

16508
Extruding

Stamping
Grinding
Painting

Painting
Shaping

Forging
Drilling

Drilling
Cutting
Milling

Lathe
DISTANCE
MATRIX

Grinding 0 1 1 2 3 4
Stamping 1 0 2 1 2 3
Lathe 1 2 0 1 2 3
Forging 2 1 1 0 1 2
0 Drilling 3 2 2 1 0 1
74 0 Painting 4 3 3 2 1 0
170 138 0 Milling 2 3 1 2 3 4
13 16 192 0 Cutting 3 2 2 1 2 3
14 252 183 12 0 Shaping 4 3 3 2 1 2
0 0 18 0 0 0 Extruding 5 4 4 3 2 1
0 1029 0 58 0 0 Entrance 2 1 3 2 1 2
Extruding
Shaping
Cutting
Milling

2 3 4 5
3 2 3 4
1 2 3 4
2 1 2 3
3 2 1 2
4 3 2 1
0 1 2 3
1 0 1 2
2 1 0 1
3 2 1 0
4 3 2 3