Installation Requirements and Announcement of

Readiness for Installation

PlasmaQuant MS Product Family


Installation Requirements and
Announcement of Readiness for Installation

Analytik Jena AG Phone +49 3641 77 70 Version: 04.18 1/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com
Installation Requirements and Announcement of
Readiness for Installation

Contents
1 Announcement ............................................................................................................................................................... 3
2 Installation requirements ............................................................................................................................................... 4
2.1 Installation site ...................................................................................................................................................... 4
2.2 Power requirements .............................................................................................................................................. 5
2.3 Gas supply .............................................................................................................................................................. 6
2.4 Exhaust unit ........................................................................................................................................................... 7
2.5 Water cooler .......................................................................................................................................................... 7
2.6 Fore-line vacuum pump ........................................................................................................................................ 8
2.7 Control computer ................................................................................................................................................... 8
3 Device layout and space requirements .......................................................................................................................... 9

Analytik Jena AG Phone +49 3641 77 70 Version: 05.19 2/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com
Installation Requirements and Announcement of
Readiness for Installation

1 Announcement

The device will be installed by service technician(s) employed with or authorized by Analytik Jena.
It is strictly necessary that all persons supposed to operate the device attend the introduction of the device
given by the service technician.
Please confirm that the requirements for the installation of the device have been met, and return the
corresponding announcement to us. If necessary, we will readily send more detailed information to you.

Analytik Jena AG Phone: +49 3641/ 77 7407


Konrad-Zuse-Strasse 1 Fax: +49 3641/ 77 7449
07745 Jena Email: service@analytik-jena.de

By signing the announcement, you confirm that all requirements for the complete installation of the device
will have been met by the time our service technician arrives. If this should not be the case and thus
additional costs arise (e.g. by a repeated visit), Analytik Jena is entitled to invoice these costs to your account
according to the price list.
Please fill in in block letters:

Company

Department

Address
(Street, Number,
Zip code, City)

Telephone

E-mail

Customer no.

Order no.

Date:

Signature of customer:

Analytik Jena AG Phone +49 3641 77 70 Version: 05.19 3/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com
Installation Requirements and Announcement of
Readiness for Installation

2 Installation requirements

2.1 Installation site

Compliant Not compliant

Work bench:
 1800 x 800 mm (basic unit + autosampler)
 Resistant against wiping, scratching and corrosion, moisture resistant
 Load capacity min. 200 kg
 The table is placed so that all sides are easily accessible. A distance of at least 200 mm
to the next wall should be kept. Alternatively, a heavy lift roll-top-table is used.
The installation site is free of:
 Exposition of direct sunlight
 High dust exposure
 Strong mechanical vibrations
 Magnetic fields
 Draft
 Corrosive gases
The installation site has the following ambient conditions:
 +15 to 25 °C, optimum +20 to 24 °C (as constant as possible during measuring,
air condition recommended)
 max. 80 % relative humidity at 20 °C (prevent condensation)
 2000 m max. altitude
 Storage temperature: +5 to 45 °C
The installation site is at ground level or accessible by means of an appropriate lift.

If "not compliant", describe the respective conditions:

A transporter can drive to the installation building.

If "not compliant ", describe the respective conditions:

The device will be delivered by a carrier directly to the final site of installation. When the
device is delivered by this company, ensure that a competent person is present.

Analytik Jena AG Phone +49 3641 77 70 Version: 05.19 4/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com
Installation Requirements and Announcement of
Readiness for Installation

2.2 Power requirements

The four models of the PlasmaQuant MS product family are operated from a single phase alternating
current mains. Optimum device function strongly depends on a correct mains connection with adequate
cable cross-section. The mains connection shall be protected on the input (building) side with a circuit
breaker 25 A, curve C and must be installed prior to the delivery of the basic device at the installation
location. The instrument cable is 3 m long. The CEE surface socket (2 pole + E Blue 5UR 3 206-2 220/32,
Siemens) is supplied according to the terms of delivery.
To avoid sudden voltage fluctuations, do not connect the ICP-MS to the same electrical circuit as other
power-intensive devices.
If a single-phase electricity supply is not available, most three-phase supply systems can be adapted to
supply the correct line-to-neutral voltage in the specified range. To enable the IPC-MS to be used in areas
with power supply voltages of 100 V/115 V/120 V/127 V, connection to 2 phases is possible via optional
accessories. Contact Analytik Jena if required.

Compliant Not compliant

Voltage 200 to 240 V ~

Frequency 50 / 60 Hz

Typical average power consumption 2700 VA

Maximum power consumption 3700 VA

Maximum current consumption 18 A

Fuse provided (mains side) 25 A, curve C

Power cable 3 m length, min. 4 mm2 Cu cross-section

CEE-surface-mounted socket is delivered (with order confirmation).

If the electrical connection conditions are "not compliant", describe the respective conditions:

Analytik Jena AG Phone +49 3641 77 70 Version: 05.19 5/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com
Installation Requirements and Announcement of
Readiness for Installation

2.3 Gas supply

Compliant Not compliant Not


applicable*
Argon Quality ≥ 4.6

Inlet pressure 700 kPa (range: 500 to 700 kPa)

Rate of supply 0 to 28 L/min (typical


consumption: 9 to 12 L/min)
Connection for FEP gas tubing outer diameter
6 mm or Swagelok ¼ in

Helium Quality ≥ 4.6


(iCRC gas)
Inlet pressure 150 kPa (range: 140 to 250 kPa)

Rate of supply 0 to 0.2 L/min

Connection For copper tubing outer diameter


1/8 in, Swagelok 6 mm or ¼ in

Hydrogen Quality ≥ 4.6


(iCRC gas) Inlet pressure 100 kPa (range: 90 to 130 kPa)

Rate of supply 0 to 0.2 L/min

Connection For copper tubing outer diameter


1/8 in, Swagelok 6 mm or ¼ in
Nitrogen/ Quality ≥ 4.6
Oxygen
Inlet pressure 125 kPa (range: 100 to 150 kPa)
(Nitrox gas)
Rate of supply 0 to 0.2 L/min

Connection for FEP gas tubing outer diameter


6 mm or Swagelok ¼ in

* Not applicable if the scope of delivery does not include the appropriate technique or if the use of these
gases is not planned.

Analytik Jena AG Phone +49 3641 77 70 Version: 05.19 6/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com
Installation Requirements and Announcement of
Readiness for Installation

2.4 Exhaust unit

The exhaust unit is meant to remove hazardous gases generated during plasma operation, such as ozone or
nitrous gases. The instrument exhaust unit must be made of heat and corrosion-resistant material. Correct
exhaustion requires the connection of flexible ducting from your exhaust system to the exhaust port on top
of the ICP-MS. As the exhaust port moves when the interface door is opened during regular maintenance, it
is not possible to use a rigid duct connection.

Compliant Not compliant

Material Heat and corrosion resistant (60 °C),


recommended V2A steel
Exhaust performance 3.0 to 4.5 m3/min

Connection of the exhaust With aluminum or plastic flexible tubing,


unit Inner diameter 100 mm,
length 400 mm to 5000 mm

Exhaust unit for the Option 1: separate exhaust unit for the vacuum
fore-line vacuum pump pump available
(Please choose an option.) Option 2: the exhaust of the vacuum pump is
connected to the exhaust unit of the ICP-MS

For PlasmaQuant MS (Q) + An additional oil mist filter has been ordered
option 2 only: separately and has been delivered.

2.5 Water cooler

A water cooling system is needed to circulate water to the ICP-MS induction coils, plasma interface
assembly, RF generator, and both turbo pumps.
 The water cooler can be ordered from Analytik Jena as a separate position.
 Other models are suitable as long as they fulfill the minimum requirements.
Please select an option from the following list.

Compliant

Option 1: Water cooler Manufacturer/Model:


(ordered from Analytik Jena) Labtech Smart HS150-3000
Option 2: Water cooler Manufacturer/Model:

___________________________
For option 1 only: Included in the delivery of the water cooler:
Power cable of 2.70 m length, standalone dongle

Analytik Jena AG Phone +49 3641 77 70 Version: 05.19 7/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com
Installation Requirements and Announcement of
Readiness for Installation

The water cooler must satisfy the following minimum requirements:

Compliant Not compliant

Cooling capacity min. 1,8 kW

Water temperature (water 20 °C ± 1 °C


supplied to the instrument)
Water pressure 440 ± 40 kPa
Pressure at the instrument water inlet
Water purity Conductivity
Permitted range 75 to 150 μS/cm
Particle size < 0,1 mm
pH 7 to 9
Total chlorine < 20 mg/L (20 ppm)
Total nitrate < 10 mg/L (10 ppm)
Total sulfate < 100 mg/L (100 ppm)

2.6 Fore-line vacuum pump

The fore-line vacuum pump is included within the scope of delivery of the ICP-MS. The pump is supplied
with power via the ICP-MS (see section 2.4). The outlet of the pump has to be connected to an exhaust unit
via the flexible exhaust tubing (length 4 m). The delivered vacuum tubing is 4 m long.

2.7 Control computer

The control computer can be ordered from Analytik Jena as a separate position. The computer must satisfy
the following minimum requirements:

Compliant Not compliant

Processor 2,8 GHz or better


Hard disk drive min. 80 GB hard disk drive storage capacity
RAM 4 GB of RAM
CD/DVD drive 16x DVD RW+/- drive

USB ports min. 2x USB 2.0 ports


Serial ports ≥1

Multimedia Integrated video, audio, and network support

Operating system Windows 7 Professional, 64-bit

Analytik Jena AG Phone +49 3641 77 70 Version: 05.19 8/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com
Installation Requirements and Announcement of
Readiness for Installation

3 Device layout and space requirements

The four models of PlasmaQuant MS product family are compact devices designed for table-top operation.
The required space depends on the number of components needed for measurement. A minimum distance
of 20 cm from the device and system components to walls and adjacent installations must be maintained.
Components:
 The autosampler is installed next to the base instrument. Between these two instruments 30 cm of
distance is required to allow space for opening the interface door.
 PC and printer may be placed on a separate table.
 Due to the dissipated heat and possible noise it is recommended to place the water cooler outside the
laboratory. An extension of the cooling water tubing (standard length 3 m) is permitted if the minimum
pressure and the flow volume are maintained.
 The fore-line vacuum pump is a floor-mounted pump, typically placed under or behind the bench where
the ICP-MS is located. The pump can also be located up to 12 m away from the ICP-MS for noise
reduction. This is recommended for Clean Room operation. For installations more than 5 m away from
the instrument a specific electrical installation performed by a qualified electrical technician is necessary.
 A bottle for receiving residue sample liquids and autosampler wash liquid is placed underneath the work
bench.

Component Width [mm] Height [mm] Depth [mm] Mass [kg]

On the work bench

Models of PlasmaQuant MS product family 660 1131 589 186


Autosampler (ASPQ 3300) 285 510 490 15

Outside the laboratory / or next to the work bench

Water Cooler 460 703 735 92


(LabTech Smart HS150-3000)
Fore-line vacuum pump 330 380 500 43
Model SV40BI for PlasmaQuant MS (Q)
Model XDS46i for PlasmaQuant MS Elite (S) 340 400 480 48

Under the work bench

Waste bottle ∅ 200 400

Analytik Jena AG Phone +49 3641 77 70 Version: 05.19 9/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com
Installation Requirements and Announcement of
Readiness for Installation

Fig. 1 Dimensions of PlasmaQuant MS models

Analytik Jena AG Phone +49 3641 77 70 Version: 05.19 10/10


Konrad-Zuse-Strasse 1 Fax +49 3641 77 9279
07745 Jena  Germany info@analytik-jena.com TechDoc
www.analytik-jena.com