GRP Sectional Panel tank (Non-Insulated)

Reference Water Storage Tank


Product Hot Press Moulded GRP Sectional
Panel Tank/s
Make Sangwon (Republic of Korea)
Sr Capacity (m3) Length (m) Width (m) Height (m) Quantity

1 196 7 7 4 2

Division 0
Compartments 1
Roof Panels Non-Insulated
Side Panels Non-Insulated
Base Panels Non-Insulated
Internal Bolts & reinforcement Stainless Steel 316
External bolts HDG
Base Skid and external accessories HDG
Erection Supervision of Installation shall be provided
Fittings, Accessories & Sundries
Vent 1 No. Plastic / EVA sealant tape

Manhole 1 No. 750mm dia

Ladders 1 No. in GRP (internal)/HDG(external)

Level Indicator 1 No. Aluminium Type


Insulation NA
General Scope Of Supply GRP Panel Type water Tank + Skid base +
1 No Internal & External Ladder + 1 No
Level Gauge + 1 No. Air Vent + 1 No.
Manhole + 2” brass threaded connectors -
4 Nos + Installation (boarding & lodging to
be arranged by you for our supervisor, if
outside the Capital Area).
Please Note the following:

1. Water to be provided by you for testing & commissioning of tank upon completion of installation.
2. All Piping, valves, fitting etc., for the tank to be carried out by you within 1 week.
3. This type of tank installation strictly needs the foundation as per manufacturer recommendation (which is
minimum 525mm height including basic frame, minimum 400 mm width and center to center distance of the beams
to be 1000mm as per our drawing). Scaffolding required to carry out the work will be under your scope.
4. Extra Connectors are chargeable.
5. Movement of all the materials to the work site will be under your scope
6. Any passes / permissions required to carry out the work shall be taken care by you
7. Design / structure and civil works of RCC beam for the tank installation is under your scope.
8. Positions of the connectors for inlet, outlet, drain & overflow to confirmed by you before installation
9. Work space of minimum 600mm on all sides of the tank and 1000mm at the top to be available.
10. Base Steel skid will be provided for tanks over 1m height.
11. Tie-rod system (SS 316) will be provided for tanks over 2m height.
12. Ladders will be provided for tanks over 1m height.
13. Level Indicator will be provided for tanks over 1m height.
14. Responsibility to provide accurate tank requirement solely rests with the Buyer/Purchaser.
15. Dimensions of panel tanks cannot be altered as they come as a package from the OEM.
16. Tank delivery to be taken by Buyer/Purchaser within 15 days from date of arrival.

Please feel free to contact the undersigned for any queries or clarifications.

We look forward to your order confirmation which will receive our best service and attention.

Thanking you,

Amiantit Oman co l.l.c


MOHMED AVESH
Sales Manager
Po Box 417 ,Central Post Office
Postal Code 111,Sultanate of Oman
Tel - 24446600, 24449442 ,Ext - 178
Fax - 24446611 , Gsm - 95474543
Email - avesh_amiantit@omzest.com

You might also like