Professional Documents
Culture Documents
Department of Civil Engineering
Department of Civil Engineering
COURSE OBJECTIVES:
CO1: Resource Planning: Resource Planning, Procurement, identification, Personnel, Planning for
material, Labour, time schedule and cost control. Types of resources, manpower, Equipment, Material,
Money, Time.
CO2: Resource Allocation and Levelling: Time-cost trade of, Computer application in resource
levelling examples, resource list, resource allocation graph, Resource loading, Cumulative cost ETC –
Value Management.
CO4: Materials and Equipment: Time of purchase- Quantity of material- sources- Transportation-
Delivery and Distribution. Planning and selecting by optimistic choice with respect to cost- Time-
Source and handling.
Time: Personnel time- Management and planning - Managing time on the project - forecasting the
future - Critical path measuring the changes and their effects. Cost control: Cash flow and cost control
- objectives of cost - Time and Quality.
REFERENCES:
2. Richard H. Clough, Glenn A. Sears, Construction Project Management 2nd Edition, Wiley, ©
1979.