MATERIAL UNCERTAINTY AND COST EFFECTIVENESS

OF THE COMMERICAL BUILDING

PRESENTATION OF PROJECT WORK


PHASE 1
First Review

UNDER THE GUIDANCE OF BY

DR.P.T.RAVICHANDRAN,PH.D A.PAULMAKESH
PROFESSOR M.TECH - CEM
DEPT. OF CIVIL ENGINEERING REG NO. 1520910010
SRM UNIVERSITY DEPT. OF CIVIL ENGINEERING
KATTHANKULATHUR SRM UNIVERSITY
INTRODUCTION
• One of the most common sets of activities in the
management is planning.

• Creating the project plan is the first thing you should do


when undertaking any kind of project.

• However , many people fail to realize the value of a plan in


saving time, money, and many problems

* The project management techniques of planning and


scheduling are tools and devices, which are used to compute
the project.
SCHEDULE FOR PROJECT WORK
PHASE 1 PHASE 2

* Literature Review , Floor •Planning and scheduling


Plan… using primavera .

•Estimate of the work. •To find duration by using


PERT method.
•To visit the site and to find
deviation or uncertainty in •Resource planning, resource
the project. allocation and resource

•Planning and scheduling leveling.


using primavera . •Report preparation.
LITERATURE REVIEW:
 Knowledge- Based System for Construction Planning
of High- Rise Buildings, Ory Shaked and Abraham
Warszawsi (2001),J.Constr. Engg. Mgmt., the knowledge-
based expert system for construction planning is part of
an automated building realization a process. This paper
presents the principles of the system, explains the
structure of its knowledge and discusses various
implementations.
 LITERATURE REVIEW:

Estimating Resource Requirements at conceptual Design Stage


Using Neutral Networks ,Asharaf.M Elazouni, Ibrahim A. Nosair,
and Yousif A. Mohieldin (2001), construction conceptual estimating
models provide frame works for evaluating different alternatives at
the conceptual design stage.. The results indicated can be used
satisfactorily to estimate the construction resources requirements
at the conceptual design stage
LITERATURE REVIEW:
Optimal Allocation of construction Planning Resources,
J.Constr. Engfg and Mgmt., Tarek Hegazy (2002), Resource
allocation and leveling are among the top challenges in
project management. In this paper, improvements are
proposed to resource allocation
LITERATURE REVIEW:
• Schedule Analysis under the effect of Resources
Allocation , William IBBS and Long D. Nguyan (2007), the
construction industry has employed various schedule
analysis techniques to supply delay claims. The research
presented here shows that delay analysis without
resources allocation practice substantially affects results of
schedule analysis.
 

LITERATURE REVIEW:
• Managing Port folios of Projects Under Uncertainty, Annals of
Operations Research, Linda K.Nozick Mark A. Turnquist and
Ningxiong Xu (2004), Managers of projects and multi- project
programs often face considerable uncertainty in the duration and
outcomes of specific tasks as well as in the overall of resources
required by tasks. This paper presents optimizing the resources
allocations to individual tasks to minimize the completion times of a
collection of projects.
LITERATURE REVIEW:
 Simulation – based optimization for dynamic resource allocation,
automation in construction, Olusegun O. Faniran, Peter E.D.Love,
and Heng Li (2001), Efficient allocation of resources foe
construction planning activities requires construction planning
resource requirements to be determined on a cost- effective and
value- adding basis. This study explored the concept of optimal
planning of construction projects.

 
OBJECTIVES OF THE PROJECT

* To understand the uncertainty.

* To select an ongoing projects, and find out the deviation in


scheduled.

* Allocate the limited available resources using primavera software.

* To complete the project on scheduled date or to minimize the


delay.
NEED OF THE STUDY
• Task durations are subject to considerable uncertainty, and that
uncertainty can be influenced by resources assigned.
• Due to the complexity of projects, resource allocation and
leveling are among the top challenges in project management.

* The purpose of this study is to optimally allocate the resources


among individual tasks
SCOPE OF THE WORK
* This thesis work covers the entire main civil works of the

commercial complex building.

* To plan and evaluate the resources for the commercial

complex building project


FOCUS AREA

• Planning and scheduling for micro level activities.

• Resource calculation, which includes the different categories of

labors, material and machinery

• Resource leveling of labour resources.


WORK SCHEME

• Macro level are defined and also defined uncertainty.


• Based on macro level, the project completion dates are to be
calculated.
• Macro level activities are divided into micro level.
• Quantum of work in micro level activities.
• Micro level activities using primavera software.
• Resource planning is done with the duration and quantum of work
found.
• The resources are loaded for activities and leveled that assigned
resources
FLOW CHART OF THE METHODOLOGY
Detail of the project

• Name of the project : Commercial Complex


• Location : Avadi, Chennai.
• Floor : Basement + G+ 9
• Client : FSO foundations. Pvt.ltd
• Contractor : R.K Enterprises
• Plot area : 55,200 sqft
• Type of structure : RCC Framed structure
BASEMENT FLOOR PLAN
FLOOR PLAN
Planned Schedule
Planned Schedule
References
• Knowledge – based system for construction planning of high rise
building. J.Constr. Engg. Management.
• Chitkara. K.K. Construction Project Management: Planning Scheduling
and Control Tata McGraw Hill Publishing Company, New Delhi, 1998.
• Construction Management – S.Chand & Company Pvt Ltd.
• Project scheduling under uncertainty, Survey and Research potentials
• Websites
• www.cm.pg.edu
• www.seiencedirect.com
• www.primavera.com
THANKING YOU