Cable stayed

Bridges

 Name- Prajakta Pawar


 Subject- ABCM
 Sem- 9th
 Year- Final Year
 College- Ideal Institute
of Architecture
Temporary saddle
Tatara Bridge,
Hiroshima and Ehime Prefectures

 Carries - 4 lanes of roadway


bicycle/pedestrian lanes Stay cables, harped
 Crosses - Seto Inland Sea
 Maintained by - Honshū-Shikoku
Bridge Authority

 Characteristics
 Design - Cable-stayed bridge
 Total length- 1,480 metres (4,856 ft)
 Width - 30.6 metres (100 ft)
 Longest span - 890 metres (2,920 ft)
 Clearance below- 26 metres (85 ft)

 History
 Construction cost- $605.8 million USD
 Opened - May 1, 1999
Spreader beam Deck
Rio–Antirrio
Bridge,
Rio, Greece Antirrio, Greece

 Carries - Ionia Odos


 Crosses - Gulf of Corinth
 Official name-Charilaos Trikoupis
Bridge
 Owner - Government of Greece
 Maintained by- Gefyra SA

 Design Characteristics
 Cable-stayed bridge by Berdj Mikaelian
 Total length -2,880 meters
(9,450 ft)
 Width -27.2 meters (89 ft)
 Longest span- 560 meters (1,840 ft)

 History
 Opened - 12 August 2004

 Statistics
 Daily traffic Expected 11,000
vehicles/day
Sunshine
Skyway Bridge,
South of St. Petersburg and north of
Terra Ceia, Florida
 Carries - 4 lanes of I-275 / US 19
 Crosses - Tampa Bay
 Maintained by- Florida Department
of Transportation

 Characteristics
 Design - Cable-stayed
 Total length- 4.14 miles (6.7 km)
 Width - 94 feet (29 m)
 Height - 430 feet (131 m)
 Longest span- 1,200 feet (366 m)
 Clearance below- 180.5 feet (55 m)

 History
 Engineering design by- Figg & Muller
Engineering Group
 Constructed by- American Bridge Company
 Construction start - June 1982
 Construction cost - $244 million

 Statistics
 Daily traffic - 59,178 (2018)
Millau
Viaduct Bridge,
Millau-Creissels, Aveyron, France

 Carries - 4 lanes of the A75 autoroute


 Crosses - Gorge valley of the river Tarn
 Official name - le Viaduc de
Millau
 Maintained - Compagnie Eiffage du
Viaduc de Millau

Characteristics
 Design - Multiple-span cable-stayed
viaduct motorway bridge
 Material- Concrete, steel
 Total length- 2,460 m (8,070 ft)
 Width - 32.05 m (105.2 ft)
 Height - 336.4 m (1,104 ft) (max pylon
above ground)
 Longest span - 342 m (1,122 ft)
 No. of spans - 204 m (669 ft), 6×342 m
(1,122 ft), 204 m (669 ft)
 Clearance below - 270 m (890 ft)
 Design life - 120 years
Ting Kau
Bridge,
Tsing Yi Island and Ting Kau

 Carries -6 lanes of roadway


 Crosses - Rambler Channel
 Location- Tsing Yi Island and Ting Kau
 Official name- Ting Kau Bridge

 Characteristics
 Design - Cable-stayed bridge
 Total length -1,177 metres
(3,862 ft)
 Longest span -448 metres (1,470 ft)
and 475 metres (1,558 ft)

 History
 Opened 5 May 1998; 22 years ago