Professional Documents
Culture Documents
150
NWSDB
50
(MIN. HEIGHT)
15
150
BV
500
- FOR BUTTERFLY VALVE
225 mm
10
(DIAMETER OF PIPE)
150
PRE CAST CONCRETE GRADE 20
150
R/F WITH 2 No R 10 AND
FH
R6 STIRRUPS @ 150c/c
50
(SEE LETTERING DETAILS)
200 - FOR FIRE HYDRANT
INSITU CONCRETE
BASE (GRADE 15)
150
3.5 m
10
150 150 150
MSL
10
532 1.8 m (DISTANCE IN METERS)
100
(SEE DETAIL)
15 GATE VALVE ALL WHITE BLUE
AV
NON-RETURN ALL WHITE BLUE
200 100 200 VALVE
- FOR AIR VALVE
AIR VALVE ALL WHITE BLUE
SECTION A-A
NOTES:
ONLY DOWNWARD ARROW WITH DISTANCE DOWNWARD AND HORIZONTAL ARROWS WITH DISTANCE DOWNWARD AND HORIZONTAL ARROWS WITH DISTANCE
X 'X' IN METERS. X
Y 'X' AND 'Y' RESPECTIVELY IN METERS. Y X 'X' AND 'Y' RESPECTIVELY IN METERS.
1. MARKER POST FOR FIRE HYDRANTS SHALL BE PAINTED WITH
LUMINOUS YELLOW PAINT TO THE APPROVAL OF ENGINEER.
EDGE OF WALKWAY OR
PROPERTY LINE
2. INDICATOR PLATE SHALL BE FIXED TO THE RECESS IN THE
POST WITH NEAT CEMENT PASTE.
GL
RELEVANT INDICATOR PLATES SHALL BE INSTALLED ON THE SAME POST
GL GL
ONE BELOW THE OTHER, WITH NECESSARY MODIFICATIONS.
VALVE
VALVE 6. INDICATOR PLATE SHALL BE 5mm THICK EMBOSSED CERAMIC ENGRAVED PLATE
VALVE WITH FIRMLY PRINTED LETTERING
TYPE A TYPE B TYPE C ( STICKERS NOT ALLOWED )
PIPELINE PIPELINE
PIPELINE
TYPES OF INSTALLATION
CLIENT: PROJECT NAME: REV. DESCRIPTION SIGN DATE TITLE: APPROVED : DATE: SHEET NO:
DISTRIBUTION SYSTEM - STANDARD DRAWINGS APPROVED IN PRINCIPLE SUBJECT TO
NATIONAL WATER SUPPLY KANDY NORTH PATHADUMBARA 01 KNPIWSP-STD-DIS 20.06.08 THE CONDITION THAT THE DESIGN &
2020.07.10 001
DRAWING INDEX BUILD CONTRACTOR IS RESPONSIBLE
& DRAINAGE BOARD INTEGRATED WATER SUPPLY PROJECT FOR THE CONFORMITY OF THE DESIGN SCALE:
00 KNPIWSP-STD-DIS 20.07.22
WITH FUNCTIONAL & STRUCTURAL A3 = 1 : 2
NATIONAL WATER SUPPLY & DRAINAGE BOARD
CONTRACTOR REQUIREMENTS. A1 = 1 : 1
CONTRACTOR: CONTRACT NO: P&P/DB/PATHADUMBARA/2013
DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
SUB-PROJECT NAME: DRAWING NO:
POWERCHINA SINOHYDRO
DISTRIBUTION SYSTEM .................................... .................................... .................................... .................................... DATE PROJECT DIRECTOR
KNPIWSP-STD-DIS-001
D'.MAN ENG. CE/TM PM/APM