Root Cause Analysis (RCA) Report

Site Name Digicon Technologies Ltd. (Rajuk Trade Center 4th Floor)
Problem Reported Date 17-Dec-2019
Outage Period 05 minutes ( 17-12-19 10:55 am – 17-12-19 11:00 am)
Process Affected Airtel Process at Jessore.

Services Affected Internet connectivity.

Problem Severity  Critical Major Minor

RCA Report Submission Date 18-Dec-2019


PROBLEM STATEMENT When the problem occurred, process did not get internet connectivity.

STEPS TAKEN BY DTL NOC After getting complain from process, we dig down our all the network as well
as we informed to our ISP (FHL). We didn’t found any issue at our side. The
problem occurred at ISP end. ISP informed us and solved the problem
immediately.
ROOT CAUSE Jessore- Benapole fiber down issue.

RESOLUTION ISP (FHL) solve their fiber down issue.

Recommendation We informed our ISP to monitor the service carefully.