Professional Documents
Culture Documents
A PROP OS A L F OR
Rio Nuevo D
Stephen Roepke
Sroepke@att.net
(954) 895-2429
CLIENT DESCRIPTION
Remove old entry system, Install a new Smart Entry System programming and setup.
Items Quantity
Misc 1
Unforeseen Miscellaneous
Custom 5
Installation
Items Quantity
Ubiquiti UAP-AC-M-PRO 1
Ubiquiti UniFi AP,AC Mesh Pro
POE Injector 1
Custom Cat6-Blue 1
Custom 1
Installation
Items Quantity
Service 1
Maintenance
Optional Recurring Service Maintenance
Ethical Warning 1
https://www.washingtonpost.com/technology/2021/06/25/china-hikvision-lobbying-fara-moffett-vitter-
boxer/
Distributors still have this type of inventory in stock and trying to get rid of it, giving it away for a very
cheap price, crooked dealers don't tell the truth and keep cheating to the customers, just to close deals
and make more money. On top of that these products don't have a direct support from the factories
any more.
Expiration 1
Deadline
Due of the permanent market prices variation and Inventory shortage, we are only able to keep valid this
bundle deal offer for two weeks.
Code Compliance 1
Any job will be strictly elaborate under the city and fire code compliance.
Guarantee 1
2 Year Labor and & New Parts
Change Order 1
If any additional material, parts or labor is required for an optimal installation, additional costs will apply.
Broken Cables 0
For a proper installation, If any cable needs to be replace, additional materials and labor will be charge per
run.
Permits 1
Permits not included, permit runner and city permits will charge separetaly.
NOTE OF 1
ELECTRICITY
Customer will provide electricity at each require point, by the contractor.
Core Drilling 1
Holes between floors needs to be done by a professional core drilling company
Client Patching 1
Drywall holes, for an optimal installation sometimes is necessary to make holes on some surfaces,
WireAdvise will not be responsible for patching at all.
Passwords 1
We do not storage passwords, to reset a password a service call has to be schedule.