You are on page 1of 7

Level: L3 - Instruction Tier: Global

Document Type: eProcedure


Sub Element: AMO
Doc Number: AMO-EP-BCPM-302372
Rev. B
Date: 3 APR 2019
BAKER HUGHES INCORPORATED
BHOS-OPS/AMO DOCUMENTATION TEAM

AMO-EP-BCPM-302372—INSPECT PULSER CARTRIDGE


Name Initials Name Initials

Technician or Coordinator Date

Comments

Copyright 2019 Baker Hughes, a GE company, LLC (“BHGE”) (unpublished work). All rights reserved. The information contained in this
document is confidential and proprietary property of BHGE and its affiliates. It is to be used only for the benefit of BHGE and may not be
distributed, transmitted, reproduced, altered or used for any purpose without the express written consent of BHGE.

STEP 1. PULSER CARTRIDGE INSPECTION


1.1 Record Tool Size

1.2 Choose Tool Size ?


Tool Size = 0825
Tool Size = 0950

Option: Tool Size = 0825

1.2.1 Pulser Cartridge Inspection


1.2.1.1 Record Part Number

Page 1 of 7
Uncontrolled when printed—confirm the correct revision is used Baker Hughes—Company Confidential
AMO-EP-BCPM-302372 - Inspect pulser cartridge AMO-EP-BCPM-302372 Rev. B
Date: 3 APR 2019

1.2.1.2 Choose Part Number ?


Part Number = 10135324

Part Number = 10159983

Option: Part Number = 10135324

Figure 1: Pulser Cartridge (10135324)


Option: Part Number = 10159983

Figure 2: Pulser Cartridge (10159983)

1.2.2 (1) Dimensional Inspection


1.2.2.1 Record d1
mm (Value must be 119.1 or lower) (Value must be 4.689 in or lower)

1.2.2.2 Record d2
mm (Value must be 116.21 or lower) (Value must be 4.575 in or lower)

Page 2 of 7
Uncontrolled when printed—confirm the correct revision is used Baker Hughes—Company Confidential
AMO-EP-BCPM-302372 - Inspect pulser cartridge AMO-EP-BCPM-302372 Rev. B
Date: 3 APR 2019

1.2.2.3 Record d3
mm (Value must be 106.1 or lower) (Value must be 4.177 in or lower)

1.2.2.4 Record test conclusion

1.2.2.5 Choose test conclusion ?


test conclusion = Pass
test conclusion = Fail - Rework Required

test conclusion = Scrap

Option: test conclusion = Pass


Option: test conclusion = Fail - Rework Required

There are no repair drawings available.

Option: test conclusion = Scrap

1.2.2.5.1 Scrap Part in all required databases.

1.2.2.5.2 Skip all residual steps in this procedure and finish it.

1.2.3 (4) Surface Inspection

1.2.3.1 Do Surface Inspection according to QP200-008.

1.2.3.2 Record test conclusion

1.2.3.3 Choose test conclusion ?


test conclusion = Pass

test conclusion = Fail - Rework Required


test conclusion = Scrap

Option: test conclusion = Pass


Option: test conclusion = Fail - Rework Required

Page 3 of 7
Uncontrolled when printed—confirm the correct revision is used Baker Hughes—Company Confidential
AMO-EP-BCPM-302372 - Inspect pulser cartridge AMO-EP-BCPM-302372 Rev. B
Date: 3 APR 2019

There are no repair drawings available.

Option: test conclusion = Scrap

1.2.3.3.1 Scrap Part in all required databases.

1.2.3.3.2 Skip all residual steps in this procedure and finish it.

1.2.4 Thread Inspection (3) and Repair

1.2.4.1 (5.1) Perform BHI box thread inspection according to QP200-007.

1.2.4.2 Record test conclusion

1.2.4.3 Choose test conclusion ?


test conclusion = Pass
test conclusion = Fail - Rework Required
test conclusion = Scrap

Option: test conclusion = Pass


Option: test conclusion = Fail - Rework Required

There are no repair drawings available.

Option: test conclusion = Scrap

1.2.4.3.1 Scrap Part in all required databases.

1.2.4.3.2 Skip all residual steps in this procedure and finish it.

Option: Tool Size = 0950

1.2.5 Pulser Cartridge Inspection

Page 4 of 7
Uncontrolled when printed—confirm the correct revision is used Baker Hughes—Company Confidential
AMO-EP-BCPM-302372 - Inspect pulser cartridge AMO-EP-BCPM-302372 Rev. B
Date: 3 APR 2019

1.2.5.1 Record Part Number

Figure 3: Pulser Cartridge

1.2.6 (1) Dimensional Inspection


1.2.6.1 Record d1
mm (Value must be 136.6 or lower) (Value must be 5.378 in or lower)

1.2.6.2 Record d2
mm (Value must be 132.2 or lower) (Value must be 5.2047 in or lower)

1.2.6.3 Record d3
mm (Value must be 120.5 or lower) (Value must be 4.7441 in or lower)

1.2.6.4 Record test conclusion

1.2.6.5 Choose test conclusion ?


test conclusion = Pass

test conclusion = Fail - Rework Required


test conclusion = Scrap

Option: test conclusion = Pass


Option: test conclusion = Fail - Rework Required

Page 5 of 7
Uncontrolled when printed—confirm the correct revision is used Baker Hughes—Company Confidential
AMO-EP-BCPM-302372 - Inspect pulser cartridge AMO-EP-BCPM-302372 Rev. B
Date: 3 APR 2019

There are no repair drawings available.

Option: test conclusion = Scrap

1.2.6.5.1 Scrap Part in all required databases.

1.2.6.5.2 Skip all residual steps in this procedure and finish it.

1.2.7 (4) Surface Inspection

1.2.7.1 Do Surface Inspection according to QP200-008.

1.2.7.2 Record test conclusion

1.2.7.3 Choose test conclusion ?


test conclusion = Pass
test conclusion = Fail - Rework Required
test conclusion = Scrap

Option: test conclusion = Pass


Option: test conclusion = Fail - Rework Required

There are no repair drawings available.

Option: test conclusion = Scrap

1.2.7.3.1 Scrap Part in all required databases.

1.2.7.3.2 Skip all residual steps in this procedure and finish it.

1.2.8 (5) Thread Inspection (3) and Repair

1.2.8.1 Do Visual inspection of (5.1) Box thread for wear and tear. Are there damages visible or was
the part reworked? Yes No

Page 6 of 7
Uncontrolled when printed—confirm the correct revision is used Baker Hughes—Company Confidential
AMO-EP-BCPM-302372 - Inspect pulser cartridge AMO-EP-BCPM-302372 Rev. B
Date: 3 APR 2019

If YES then do the following?

1.2.8.1.1 (5.1) Perform box thread inspection according to Table 1.

Thread Profile Gauge Remark


M136×3 N990994661 10140823 (1.1)
Table 1: Box Thread

1.2.8.1.2 Record PD max


mm (Value must be 134.35 or lower)

(Value must be 5.2894 in or lower)

Measure PD max value in mm

1.2.8.2 Record test conclusion

1.2.8.3 Choose test conclusion ?


test conclusion = Pass

test conclusion = Fail - Rework Required


test conclusion = Scrap

Option: test conclusion = Pass


Option: test conclusion = Fail - Rework Required

There are no repair drawings available.

Option: test conclusion = Scrap

1.2.8.3.1 Scrap Part in all required databases.

1.2.8.3.2 Skip all residual steps in this procedure and finish it.

STEP 2. EXIT PROCEDURE

2.1 Go To Exit Procedure

Page 7 of 7
Uncontrolled when printed—confirm the correct revision is used Baker Hughes—Company Confidential

You might also like