INTRODUCION:-
T&P REQUIRED:-
Pilot Rope
Hand Line
Rope Ladder
Chain Hoist 1.5 Ton
Nylon Sling 2’-3 No & 4’-1 No
Grip All clamp stick + Earth Leads
Nylon Rope 1.5” for lashing
Basket with required T&P
Snatch Blocks 2 No
MATERIAL:-
PROCEDURE:-
1. First of all obtain PTW on concerned circuit.
2. Pray to GOD for successful work and did tail board conference.
3. Took up the hand line with the help of pilot rope and install it on most convenient position on X
arm brace.
4. Take up the earth set and install it on conductor after teasing the line with the help of grip all.
5. No take up the rope ladder and install it on the bottom of the tower arm for easy approach to
Insulators and conductor.
6. Take up the 1.5 Ton chain hoist and install it on tower arm and conductor near the string with the
help of nylon sling.
7. Lash the disc Insulator with 1.5” lashing rope by lefting 2 No disc Insulators on both side of
defective disc Insulator for easy removal of pin.
8. Take the load on chain hoist for proper loop in disc Insulators.
9. Replace the defective disc Insulator with new one.
10. Open the lashing and reverse all the above procedure to bring the insulator string to it normal
position.
11. Cancel the PTW and normalize the system.