You are on page 1of 7

12/11/2020 MPPP Session 14 class quiz

MPPP Session 14 class quiz Total points 3/12

BBC PFI Scam Video. Please mark the most correct answer, as answers may look similar
and questions may have multiple answers.
VIDEO LINK: https://www.youtube.com/watch?v=32AglebZSZQ&t=1354s

The respondent's email address (p19saim@iimidr.ac.in) was recorded on submission of this


form.

3 of 12 points

Full Name *

SAI SWAROOP MANDAL

Roll Number *

2019PGP356

Section *

MPPP A

MPPP B

https://docs.google.com/forms/d/e/1FAIpQLSfTdKvASb6MJlherHhjGXIRAFcuTdIsYyu6hBAViB1wOWOB6g/viewscore?viewscore=AE0zAgBZAzI… 1/7
12/11/2020 MPPP Session 14 class quiz

Why did the Schools not have light switches? 0/1

The contractor was corrupt

Poor specifications and design

Mismatch in Risk allocation between school design and operation

Poor supervision by the government

Correct answer

Mismatch in Risk allocation between school design and operation

What were the underlying issues with the privatized management 0/1
school's sports facilities?

No issues, just a political issue

High cost

Over use of the fields

Difference between public and private sector working and ethics

Democratic Accountability

Correct answer

Difference between public and private sector working and ethics

Democratic Accountability

https://docs.google.com/forms/d/e/1FAIpQLSfTdKvASb6MJlherHhjGXIRAFcuTdIsYyu6hBAViB1wOWOB6g/viewscore?viewscore=AE0zAgBZAzI… 2/7
12/11/2020 MPPP Session 14 class quiz

What is the concern in upgrading the old Royal Liverpool hospital? 0/1

Water leaking the operation theaters

No money for a run down infrastructure

An ugly hospital

No political mandate

Correct answer

No money for a run down infrastructure

What is the issue with the Toll roads? 0/1

Very expensive

A good infrastructure but built at an exorbitant cost

Unnecessary roads built

No political will

Correct answer

A good infrastructure but built at an exorbitant cost

https://docs.google.com/forms/d/e/1FAIpQLSfTdKvASb6MJlherHhjGXIRAFcuTdIsYyu6hBAViB1wOWOB6g/viewscore?viewscore=AE0zAgBZAzI… 3/7
12/11/2020 MPPP Session 14 class quiz

What was the PPP problem in the fire control centers? 0/1

Fire fighting department does not plan well.

Very high payments for the infrastructure

High credit card interest rates

PPPs are inflexible in design

Correct answer

PPPs are inflexible in design

What were some of the problems with Norflok-Norwich Hospital? 0/1

Little prior experience, as it was an early PFI

Corrupt people in the Treasury

Change in the environment, that the interest rates dropped.

Money for treating patients spent in infrastructure

Debt's assured; Equity uncapped

Correct answer

Little prior experience, as it was an early PFI

Debt's assured; Equity uncapped

https://docs.google.com/forms/d/e/1FAIpQLSfTdKvASb6MJlherHhjGXIRAFcuTdIsYyu6hBAViB1wOWOB6g/viewscore?viewscore=AE0zAgBZAzI… 4/7
12/11/2020 MPPP Session 14 class quiz

What is the institutional investor's view on PPP projects? 0/1

Paid very high salary

Public sector is very happy, as much needed hospitals are built and in budget
and in time

A contract is a contract

Early lockin of a government which can beocme a income stream.

Correct answer

Public sector is very happy, as much needed hospitals are built and in budget and in
time

What problem does the BBC correspondent see in the Princess Royal 0/1
hospital deal?

A windfall gain and returns of 70% in a publics asset

A delayed project

Cheating by institutional investors for profit motives

Private sector has taken over the risks to the project

Correct answer

A windfall gain and returns of 70% in a publics asset

What role of the treasury leads to PPP issues as per the film? 1/1

Financing role

Monitoring role

Advisory role

Planning role

https://docs.google.com/forms/d/e/1FAIpQLSfTdKvASb6MJlherHhjGXIRAFcuTdIsYyu6hBAViB1wOWOB6g/viewscore?viewscore=AE0zAgBZAzI… 5/7
12/11/2020 MPPP Session 14 class quiz

What is Scottish couples primary worry about PFIs? (Mark all that apply) 1/1

Projects cost twice as much

Doggy accounting

Manipulation of numbers

Numbers adjusted to justify PFI is cheap

Very low number by which PFI is better than conventional methods

What is the problem with the PPP policymaking? 0/1

Lack of experts with the government

Political differences between different parties

Politicians do not understand

Senior Treasury people have doubtful backgrounds

Correct answer

Lack of experts with the government

Senior Treasury people have doubtful backgrounds

https://docs.google.com/forms/d/e/1FAIpQLSfTdKvASb6MJlherHhjGXIRAFcuTdIsYyu6hBAViB1wOWOB6g/viewscore?viewscore=AE0zAgBZAzI… 6/7
12/11/2020 MPPP Session 14 class quiz

Why do we continue to see PPP projects and would continue to see them 1/1
in the future?

Very seductive politically

Sometimes the only option to make available public infrastructure

They deliver some good infrastructure within time

Everyone is corrupt

A viable option to cover Governments experience and managerial gaps

THANKS 0 of 0 points

This form was created inside of Indian Institute of Management Indore.

 Forms

https://docs.google.com/forms/d/e/1FAIpQLSfTdKvASb6MJlherHhjGXIRAFcuTdIsYyu6hBAViB1wOWOB6g/viewscore?viewscore=AE0zAgBZAzI… 7/7

You might also like