Problem 1
We are interested in producing hard drives for computers. The average seek time for the
hard drive has been determined to be 12.1ms +/- .25ms. During each hour of a 10-hour
production run, a sample of 5 hard drives was collected at a process along the line. The
following data were collected. Produce the appropriate chart(s):
SAMPLE
1 2 3 4 5 6 7 8 9 10
12.2 12.3 12.4 12.5 12.1 12.6 11.8 12.5 12.1 11.5
12.3 12.1 12.7 12.3 12.4 11.8 12.1 12.8 12.3 11
12.4 11.8 12.3 12.3 11.9 12.2 12.5 12 12 11.8
11.8 12.2 12.5 12.1 12 11.9 12.8 12.5 11.9 11.7
12.7 12.3 12.3 12.1 12.3 11.9 12.5 11.9 12.1 11.9
Answer Problem 1
Sample
Observation 1 2 3 4 5 6 7 8 9 10
1 12.2 12.3 12.4 12.5 12.1 12.6 11.8 12.5 12.1 11.5
2 12.3 12.1 12.7 12.3 12.4 11.8 12.1 12.8 12.3 11
3 12.4 11.8 12.3 12.3 11.9 12.2 12.5 12 12 11.8
4 11.8 12.2 12.5 12.1 12 11.9 12.8 12.5 11.9 11.7
5 12.7 12.3 12.3 12.1 12.3 11.9 12.5 11.9 12.1 11.9
Max 12.7 12.3 12.7 12.5 12.4 12.6 12.8 12.8 12.3 11.9
Min 11.8 11.8 12.3 12.1 11.9 11.8 11.8 11.9 11.9 11
Range 0.9 0.5 0.4 0.4 0.5 0.8 1 0.9 0.4 0.9
R-bar 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67
UCL-R 1.4137 1.4137 1.4137 1.4137 1.4137 1.4137 1.4137 1.4137 1.4137 1.4137
LCL-R 0 0 0 0 0 0 0 0 0 0
Mean 12.28 12.14 12.44 12.26 12.14 12.08 12.34 12.34 12.08 11.58
X-bar-bar 12.168 12.168 12.168 12.168 12.168 12.168 12.168 12.168 12.168 12.168
UCL-X 12.5566 12.5566 12.5566 12.5566 12.5566 12.5566 12.5566 12.5566 12.5566 12.5566
LCL-X 11.7794 11.7794 11.7794 11.7794 11.7794 11.7794 11.7794 11.7794 11.7794 11.7794
R Chart
1.6
1.4
1.2
0.8
0.6
0.4
0.2
0
1 2 3 4 5 6 7 8 9 10
12.8
12.6
12.4
12.2
12
11.8
11.6
11.4
11.2
11
1 2 3 4 5 6 7 8 9 10
Problem 2
We are conducting quality assurance inspections for a local manufacturer. Suppose that
15 samples of 100 items are inspected with a go/no-go gauge. The results of our
inspections follow. Construct the appropriate graph(s), state whether the process is in or
out of control.
Sample Defective
1 3
2 1
3 0
4 0
5 2
6 5
7 3
8 6
9 1
10 4
11 0
12 2
13 1
14 3
15 4
16 1
17 1
18 2
19 5
20 2
Answer Problem 2
Sample 1 2 3 4 5 6 7 8 9 10
Defective 3 1 0 0 2 5 3 6 1 4
%
Defective 3.00% 1.00% 0.00% 0.00% 2.00% 5.00% 3.00% 6.00% 1.00% 4.00%
P-bar 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30%
UCL-P 12.36% 12.36% 12.36% 12.36% 12.36% 12.36% 12.36% 12.36% 12.36% 12.36%
LCL-P 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Sample 11 12 13 14 15 16 17 18 19 20
Defective 0 2 1 3 4 1 1 2 5 2
%
Defective 0.00% 2.00% 1.00% 3.00% 4.00% 1.00% 1.00% 2.00% 5.00% 2.00%
P-bar 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30%
UCL-P 12.36% 12.36% 12.36% 12.36% 12.36% 12.36% 12.36% 12.36% 12.36% 12.36%
LCL-P 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
P-Bar Chart
14.00%
12.00%
10.00%
8.00%
6.00%
4.00%
2.00%
0.00%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Problem 3
In problem 1 we were interested in producing hard drives for computers. The average
seek time for the hard drive has a specification of 12.1ms +/- .25ms. Based on our
previous observations, the process producing the hard drive has a process mean of 12.168
and standard deviation of .267. What is Cp and Cpk for this product on this process?
Answer Problem 3
UTL LTL
Cp
6
12.35 11 .85
Cp
6(.267)
Cp = .312
LTL UTL
Cpk min ,
3 3
12.168 11 .85 12.35 12.168
Cpk min ,
3(.267) 3(.267)
Cpk = .227