Professional Documents
Culture Documents
Rate
3.2.3 (4) Masonry Work 12478.64 12478.64 13782.08 10.45% 8231.84 7500.00 7500.00
Quantity Rate
New Items (Proposed in VO-2) 1 Metal Beam Crash Barrier - Both Roads 60 RM 9306.37
2 Road Marking- Both Roads 2525.50 Sqm 388.51
3 200mm HDPE Pipe for Irrigation Crossing - Road 1 135.20 Rm 2,842.58