You are on page 1of 2

18" typ

#8 dowel typ

2

bottom of
Typical Pilecap Notes #5 Z-bars

pilecap
S1.03 230SN001-1 #5 Z-bars @ 8"cc

from t.o. cap max


3' - 0" min or 2" clr
1. All pilecaps to have top curtain of #5 @ 12"cc min @ 12"cc
each way, 3" clear from top of pilecap, uno. Ê col
Pile Notes: 2. Contractor and job inspector shall notify Structural
Engineer of any pile not driven in its proper location
1. Use 1/2"ø ASTM 416-68 gr.270 as shown on drawings so that corrective measures

.
t.o. pile

.
"lowlax" strands; f' = 268,000 may be taken if required. Piles driven more than 3"
p.s.i. A# 0.153" out of proper location shall be replaced with new

5'-0"
piles, as reqd, at no cost to owner.

1"
2. Initial tension: 28,900 #/strand 3. Where wall pours across the top or into the side
Effect: Prestress: 960 p.s.l. of pilecaps, provide dowels from pilecap with 48
M+ bar diameters embedment at same size and

4"
3. Concrete strength: spacing as wall reinforcing. Project
+550 in-kips

5 @ 1"cc
f'c = 4,000 p.s.i. @ transfer dowels 48 bar diameters above pilecap.

bottom of
pilecap

20'-0"
f'c = 6,000 p.s.i @ 28 days 4. Bottom mat reinforcing at pilecaps to be 6" clear pile cap

35'- 0"
4. Design load capacities: from bottom of cap w/ 90° standard hooks ea. pile cap Ê col
end. Place longitudinal bars on bottom uno.

4' - 3" min


5. Concrete pilecap 28 day strength to be conc wall
Typical 14"Ì Piles F'c= 4000psi. tie/grade bm reinforcing
DL+LL = 200k Ties to engage top Plan Plan @ Edge
DL+LL+S = 300k 6. If pile must be cut off, use the following procedures:
mat of pile cap reinf.
. per sections to terminate @
a) if pile is cut off below point where minimum dowel blockout w/ std hook, typ
Lateral = 15k See tie/grade beam
Tension = 150k embedment into sleeves at top of pile can not be sections for tie size conc column 2'-6"
Max moment = +550 in-kips achieved, a minimum of 4'-0" of strand shall extend and spacing per plan
Flexural length = 45'-0" into pilecap.

.
point of fixity #5 @ 12"cc around
120% Flexural Length

(includes 10 feet for maximum cutoff) b) if pilecap is cut at point where minimum dowel perimeter of pilecap
embed into sleeves at top of pilecap can be conc slab

P.I
on grade (8"cc where slab

plan
see
5. Pile Design Criteria: made, exposed strands to remain and provide edge occurs)
per plan
ductile spiral

Combine axial load & bending: dowels in grouted sleeves as shown in .


1) 1.4D 7. If pile cut off exceeds maximum cut-off length, pile
2) 1.2D+1.6L+0.5Lr toc
reinf

ductile tie reinforcing must be evaluated and


3) 1.2D+0.5L+1.6Lr accepted by Structural Engineer or a new pile must see plan
4) 1.2D+0.5L+1.0E Fixed Pile Moment Diagram be driven.
5) 0.9D-E tof
8. See 1 for typical pilecap section. see plan Buehler & Buehler

1'-6"
Pile manufacturer is to provide pile design calculations signed by
Structural Engineers, Inc.

min
S1.03
2" clr
"length of payment"

see pilecap
a registered Professional Engineer. Provide additional mild
typ

600 Q Street, Suite 200, Sacramento, CA 95811

thickness
detail for
typ uno
reinforcing as required to provide required capacity. Spirals shown 9. For pile extensions see detail #6 @ 12"cc EW

3" clr
tel 916.443.0303 fax 916.443.0313
are a minimum and subject to manufacturer's design. top, typ uno
10. All pile caps shall be poured against undisturbed (see note)
6. Placement of piles shall conform to the soils report native soil or engineered fill.
1' - 2"

t.o.
pile
and under the continuous observation by a representative of that firm. 11. No dobies allowed on top of precast concrete piles.
Final pile depths to be determined in the field by the Geotechnical
Engineer.
7. Pile extension detail, if required, to be submitted to and approved
1' - 2" by Structural Engineer. pile cap per

6"
plan, see

8"
clr
8. Provide driving follower to protect steel and strand extended specific pile
from pile typical. cap details for
1 size & reinf
piles per
S1.03 bottom reinf per pilecap
details w/ 180° std hook
Note: Where top reinf, T, is indicated on ea end, ea way typ
plan per Foundation Note #5 on Sheet
S100, top reinf size & spacing shall match
W4 @ 3" pitch

bottom reinf w/ 180° std hook ea end, ea


way typ.
remainder

dense gravel
3
-40.0' to -45.0' datum
for estimating Detail S1.03
3/8" = 1'-0"
5 @ 1"cc

5'-0" min
1"

tip elevation varies


typical for estimating only
Actual depth to be field determined
by geotechnical engineer

1
14"Ì Prestressed Concrete Pile S1.03
No Scale
È col

8' - 6"
È col

È col
È col 7' - 0" 1' - 9" 2' - 6" 2' - 6" 1' - 9"

3' - 6" pile cap & pile,


see 2' - 8"
1 1' - 9" 1' - 9" 1' - 9" 1' - 9"
#5 bott ea edge
1' - 9" 1' - 9"
S1.03

1' - 9"
pile cap & pile
see
3" clr

1
typ

1' - 9"

1' - 9"
S1.03 4-#10 3 ways @ 6"cc
È col
center over piles

2' - 6"
3"
5' - 0"
1' - 9"

clr

14-#7 bars
2' - 2"

8' - 6"
2' - 6" 2' - 6"

1' - 9"
column
6' - 9"

14-#7 bars
per plan

7' - 0"

È col
1' - 9"

3"

2' - 6"
clr
1' - 1"
#4 ties @ 6"cc

1' - 9"
È col
7' - 0"

pile per
È col

1
2' - 6"
È col

S1.03
2' - 4"
1' - 9"
È col

1' - 9"

3" clr
5' - 0"

6-#9 ea way

1' - 9"
1' - 9"
typ
bottom
2' - 6"

1' - 9"

3" 3'- 6" deep


clr pile cap & pile pile cap & pile
see see
1 1
1' - 9" 1' - 9" 1' - 9" 1' - 9" 3'-3" 14-#7 bars 3'-3"
S1.03 14-#7 bars deep S1.03 deep
3'- 6" deep
3'-6" thick
7' - 0"
4-#7 top
4-#10 bottom

4 5 6 7 8
1
Detail S1.03
3/8" = 1'-0" 2
Detail S1.03
3/8" = 1'-0" 3
Detail S1.03
3/8" = 1'-0" 4
Four Pile Cap S1.03
3/8" = 1'-0" 5 Five Pile Cap S1.03
3/8" = 1'-0" ED
P RO
F E SS I O
NA
L

EN
R
TE

GIN
LAWRENCE E.

R E GI S
JONES

EER
No. 3138 THIS DRAWING IS NOT FINAL OR TO BE
USED FOR CONSTRUCTION UNTIL IT IS
Exp. 12/31/13
SIGNED BY THE ARCHITECT/ENGINEER
STRUCTURAL
TA IA

S
TE RN
OF CA LI F O

1 2 100% DESIGN DEVELOPMENT


C:\Users\TomKs\Desktop\_REVIT\_REVIT 2012\S09-16700_Campus-Typicals_TKK_R12.rvt

added rebar x
REVISION BY DATE
9 Class A top bar at interior typ
Grade Beam Reinforcing Schedule end pilecap
lap @ midspan
S1.03 added rebar x
at midspan typ
Width Depth Top Reinf Bottom Reinf Ties

GB1 1'-6" 1'-6" 2 - #9 2 - #9 #4 @ 12"cc

GB2 2'-0" 2'-0" 3 - #11 5 - #11 #5 @ 12"cc 90° std


hooks, typ
added end pilecap Basic Rebar
GB3 2-#5 @ 12"cc Class A
3'-0" 2'-0" 4 - #11 6 - #11 rebar or grade bm see schedule
lap splice
GB1 GB2 @ pilecap A DISCOVERY MUSEUM PROJECT
Notes:
Note:
1. Schedule indicates basic reinforcing top and bottom. See beam elevation Grade Beam Elevation
for added bars as required.
Transition EW bars
over intersecting
POWERHOUSE SCIENCE
2. See beam elevation for lap splice locations. See lap schedule sheet NS bars CENTER
10
3. Ties begin 2" from face of intersecting beam or pilecap. Alternate cap ties typical.
Detail S1.03
No Scale

PILE CAP DETAILS

A9007.03
4/19/2012 10:23:15 AM

As indicated
19 APRIL 2012

S1.03
0 4'
Lenton thrd coupler as column base 1'- 4"Ø
1'- 4"Ø req'd, coupler to anchor bolts ASTM A615, grade 75, #18 center
reinf. bar continuous full height #5 Z-bars
1 develop 125% of rebar

S1.03A
Typical Augered Pressure Grouted Pile #3 spirals
yield stress #8 verts w/
T-head at
top @ pile,
ofpile w/ Lenton thrd coupler as
required (by ERICO, ICC-ER
#5 Z-bars
@ 12"cc
@ 8"cc

Ê col
ASTM A706 #9 grade 60 center reinf. bar 3967). Coordinate length w/
typ
(APG) Notes continuous full height of pile w/ Geotechnical Engineer and pile

12" min
Lenton thrd coupler as required contractor. Coupler to develop
(by ERICO, ICC-ER 3967). 125% of rebar yield stress
Coordinate length w/ Geotechnical
Engineer and pile contractor. Coupler #3 spirals
1. Designs herein are based on the use of 18" diameter augered pressure grouted to develop 125% of rebar yield stress t.o. pilecap ASTM A706
piles. The pile length is expected to be as noted in details & .

3"
bottom of
3 4 6-#8 verts

3"
Actual depth of piles is subject to field recommendations anchor É 8-#8 verts Note:

cl
by the Geotechnical Engineer. ASTM A706

cl
pilecap
S6.01 S6.01 where occurs Center bar to be cut off to match

r
ASTM A706

r
T-head location at Contractor's
2. Pile grout requirements: Section A-A option. Bar permitted to be cut off at
f'c = 4500 psi minimum compressive strength @ 28 days Section A-A top of pile. pile cap
Fly ash content: 25-30% maximum cement replacement pile cap Ê col
See also spec section 31 63 16 Condition @ top of conc wall
top of Anchor É
b.o. pile cap Plan Plan @ Edge
3. Design load capacities for 16"Ø piles: b.o. pile cap T-head .

Flexural Length
DL + LL = 200 kips allowable (1.0D + 1.0L) T-head

one pile cap


one pile cap
DL + LL + seismic = 550 kips ultimate (1.29D + 0.5L + ΩE) M extend vertical column

3'-6" typ
2'-6"

1'-8" typ at
3'-6" typ
uplift = 300 kips ultimate (0.9D - ΩE) extend vertical round HRC 555 T-head

1'-8" typ at
reinforcing cont. per plan
flexural length = 10 ft reinforcing cont. round HRC 555 T-head out of auger terminator at top of bars, typ
location of M = 4 ft out of auger terminator at top of bars, typ cast pile (by Headed Reinforcement #5 @ 12"cc around
Note: Piles not relied upon for lateral load reistance. conc slab 7 blockout perimeter of pilecap
cast pile (by Headed Reinforcement Corporation, ICC-ESR 2935)
Pile reinforcing shown on sheet is adequate to Corporation, ICC-ESR-2935) minimum of 2 tight see abv for condition @ on grade S1.02 (8"cc where slab

plan
see
minimum of 2 tight edge occurs)
resist 1/4" deflection at pile head. turns at top turns at top anchor É where occurs per plan
4. Pile Design Criteria: Governing Load Combinations bottom of bottom of
pile cap toc
a) D+L (allowable) pile cap
b) 1.29D + 0.5L + ΩE (ultimate) see plan

6"
6"
provide a minimum 3" clr
c) 0.81D - ΩE @ tension piles (ultimate)

P.I.
provide a minimum 3" clr tof
of 3 spacers, typ
of 3 spacers, typ distributed radially see plan
Combine axial load & bending in design of pile. point of

1'-6"
distributed radially

min
Design shall be performed in accordance w/ 2010 fixity @ 10'cc max along Buehler & Buehler

S6.01

see pilecap
@ 10'cc max along

3"cc pitch
CBC, Section 1810. length of cage Structural Engineers, Inc.

thickness
S6.01
3"cc pitch

detail for
typ uno
Pinned Pile Moment Diagram length of cage #6 @ 12"cc EW

3" clr
1
see see 600 Q Street, Suite 200, Sacramento, CA 95811

1
12 top, typ uno

length per Geotechnical Engineer


12 tel 916.443.0303 fax 916.443.0313
5. Pile design and installation shall conform to the project soils report:
-

length per Geotechnical Engineer

drilled hole filled w/ grout per


#59633-06-1 by Geocon Consultants Inc. dated September 9, 2011 with continuous -

drilled hole filled w/ grout per

t.o.
pile
observation by a representative of that firm. Pile design calculations, signed by a
licensed structural engineer in the State of California, shall be submitted for review
prior to contruction of piles.
A A
A A
6. Provide testing on piles per the requirements of the specifications and 2010 CBC pile cap per
Section 1808.3.3. Additionally, pile load testing shall conform to the

6"
35ft. min, plan, see

8"
clr
recommendations of the solis report. Submit a test pile plan showing the location of

±10'-0"
35ft. min, bottom of spiral specific pile

±10'-0"
the test piles for approval prior to the commencement of testing. The test program bottom of spiral spiral

max
reinf. cage cap details for

max
shall represent all loading conditions on the site. Per 2010 CBC Section 1810.3.3.1.2, reinf. cage spiral (coordinate w/ size & reinf
at least one pile shall be tested in each area of uniform subsoil conditions as (coordinate w/ piles per 1
determined by the geotechnical engineer. The construction of production Geotechnical dense gravel layer
Geotechnical dense gravel layer Engineer & pile S6.01 bottom reinf per pilecap
pile/foundations will not be allowed until the tests for pile capacities have been Engineer & pile contractor) -40.0' to 45.0' datum details w/ 180° std hook
completed and the test results have been accepted by Geotechnical & Structural contractor) -40.0' to 45.0' datum ea end, ea way typ
Engineers.

± 20'-0"cc
5

± 20'-0"cc
longitudinal
longitudinal
bar typ
ASTM A706
Typical Pile Cap Detail S1.03A
3/8" = 1'-0"
bar typ
ASTM A706 È col
2 3
Typical Pile Cap Notes

embedment
#18 grade 75 S6.01
S1.03A 9' - 6"

5'- 0" min


piles per

2' - 5"
center bar È col
#9 grade 60 or , typ
center bar 2' - 6" 2'-3" 2'-3" 2' - 6" 4
1. All pile caps to have top curtain of #6 @ 12"cc min EW, 5' - 0"
3" clear from top of pilecap, typ. uno. S6.01

3" clr
2' - 6" 2' - 6"

3" clr
2. Contractor and job inspector shall notify
Structural Engineer of any pile not installed in its column
proper location as shown on drawings, so that per plan
augered pressure

2' - 6"
corrective measures may be taken if required. augered pressure center bar centralizer below grouted pile center bar centralizer below

È col
Piles not installed within tolerances per specifications, grouted pile bottom of cage & at bottom bottom of cage & at bottom

6-#11 bottom
shall be corrected, as required, at no cost to owner. of pile, see , of pile, see , pile per 3 or 4 , typ
Pile Elevation 3" clr

2' - 6"
10 11 10 11
Pile Elevation

5' - 0"
È col
3. Where wall pours across the top or into the side S6.01 S6.01 typ
- - Notes: - -
of pile caps, provide dowels from pile cap same size Notes:
and spacing as wall reinforcing. Embed wall dowels to 1. Tension piles are indicated on foundation plan sheet S2.11

5' - 0"
bottom layer of pile cap reinforcing per 1. Contractor shall submit pile design/build drawings 6-#11 ea way

2' - 6"
3 & S2.12 and designated with a "T" next to the pile cap mark.
Dowel projection into wall above per for review and approval bottom
specific sections at each condition. S6.02 2. All piles are compression piles unless designated 2. All piles to be installed to specified length (minimum) or

2' - 6"
as tension piles on plan per to practical refusal as determined by the Geotechnical
4. Bottom mat reinforcing at pile caps to be 8" clear 4 Engineer in the field. 3" clr
from bottom of cap w/ 180° standard hooks ea. end. S6.01 typ
Place longitudinal bars on bottom uno. 4
5. Minimum compressive strength of pile cap concrete is
to be f'c = 5000 psi @ 28 days. See specs for type G concrete.
3. All piles to be installed to specified length (minimum) or
to practical refusal as determined by the Geotechnical Tension S1.03A 2'-6" thick
8-#5
column
col per plan
Engineer in the field.
6. See 5
S6.01
for typical pile cap detail.
Pile Detail 1 One Pile Cap 6
3/8" = 1'-0" 4'-6" thick

7. All pile caps shall be poured against undisturbed


Compression S1.03A
3 S1.03A
7
native soil or engineered fill per soils report.
8. No dobies allowed on top of piles.
Pile Detail 2 Two Pile Cap S1.03A
3/8" = 1'-0"

È col È col
È col
3 9' - 6" 3
9' - 6"
9' - 6" S6.01 S6.01
piles per 2'-3" 2'-3" piles per
2' - 6" 2'-3" 2'-3" 2' - 6" 2' - 6" 2' - 6" or , typ
2' - 6" 2'-3" 2'-3" 2' - 6" or , typ 4
4
S6.01 S6.01
1' - 6" 1' - 6" shaped cap @
contractor's
option

2' - 6"
2' - 6"
2' - 6"

3 4
piles per or , typ

2'-3"
S6.01 S6.01

È col
2'-3"
È col

11-#11 bottom
3" clr
11-#11 bottom

3" clr
typ

9' - 6"
typ
2'-8"

5-#11 bottom
9' - 6"
È col

3 ways, centered
9' - 0"

over piles

2'-3"
2'-3"
1'-4"

3" clr

2' - 6"
3' - 3"

2' - 6"
2' - 6"

typ

#5 bottom ea column 11-#11 bottom column


È column 11-#11 bottom per plan
4'-6" thick side of cap per plan
per plan
4'-6" thick 4'-6" thick
8 9 10
3 Three Pile Cap S1.03A
3/8" = 1'-0" 4
Four Pile Cap S1.03A
3/8" = 1'-0" 5
Five Pile Cap S1.03A
3/8" = 1'-0" ED
P RO
F E SS I O
NA
L

EN
R
TE

GIN
LAWRENCE E.

R E GI S
JONES

EER
No. 3138 THIS DRAWING IS NOT FINAL OR TO BE
USED FOR CONSTRUCTION UNTIL IT IS
Exp. 12/31/13
SIGNED BY THE ARCHITECT/ENGINEER
STRUCTURAL
TA IA

S
TE RN
OF CA LI F O

100% DESIGN DEVELOPMENT


C:\Users\TomKs\Desktop\_REVIT\_REVIT 2012\S09-16700_Campus-Typicals_TKK_R12.rvt

pile Ø less 2" ±


pile Ø less 2"±
center bar REVISION BY DATE
center bar
1 Revision 1 Date 1
HDPE or PVC
HDPE or PVC pipe, sch. 80
pipe, sch. 80
3"
clr

7"
2 3/4"

A DISCOVERY MUSEUM PROJECT


4-6 straps
4-6 straps
galvanized bolt
POWERHOUSE SCIENCE
end cap
CENTER
3"

2"

Upper Centralizer Lower Centralizer 3" Cover Clip Spacers- HDPE Plastic

ALTERNATE APG PILE & PILE


11 12 13 CAP DETAILS
Detail S1.03A
1 1/2" = 1'-0" Detail S1.03A
1 1/2" = 1'-0" Detail S1.03A
1 1/2" = 1'-0"

A9007.03
4/19/2012 10:23:16 AM

As indicated
19 APRIL 2012

S1.03A