SURFACE UNEVENNESS

Contract: Construction of two Lanning with paved shoulders HAM-AM-2 in the State of Maharashtra under MRIP

Client: Public Works Department, Government of Maharashtra

Engineer: G- Eng. Advisory Service Pvt. Ltd. J.V. Global Infra Solution

Concessionaire: Welspun Road Infra Pvt. Ltd.

Contractor: Welspun Enterprises Ltd.

Location: Date:
Layer : Lane:

at (m) Diff. (mm) at (m) Diff. (mm) at (m) Diff. (mm) at (m) Diff. (mm) at (m) Diff. (mm)

0 63 126 189 252


3 66 129 192 255
6 69 132 195 258
9 72 135 198 261
12 75 138 201 264
15 78 141 204 267
18 81 144 207 270
21 84 147 210 273
24 87 150 213 276
27 90 153 216 279
30 93 156 219 282
33 96 159 222 285
36 99 162 225 288
39 102 165 228 291
42 105 168 231 294
45 108 171 234 297
48 111 174 237 300
51 114 177 240
54 117 180 243
57 120 183 246
60 123 186 249

Specification requirements:

Surface of carriageways and paved shoulders Surface of laybys, service roads and all bituminous base
courses

Irregularity 4mm 7mm 4mm 7mm

Length (m) 300 75 300 75 300 75 300 75

Allowable no.of 15 9 2 1 40 18 4 2
irregularitie

Results obtained

Remarks:

Contractor's Representative IE's Representative Client's Representative