Professional Documents
Culture Documents
Satisfactory Unsatisfactory
If Unsatisfactory, describe
the problem
·
* old corrugated roofs of
Roofs/Gutter / grade 8 & 10 classrooms
repainting and cleaning boysen roofguard green 2 laborers
s
*some dilapidated walls of Termiticide to be
Termite proofing and to be provided by the termite
· Ceilings / grade 7, 8 & 10 classrooms
treatment and repair
provided by the termite
company
caused by termites company
· Comfort non-functional toilet bowls Replacing of toilet bowls Toilet bowls and pvc
/ of grade 8 rooms and pvc pipes pipes
2 laborers
Rooms
· School
/
Grounds
· School
Canteen/Clin /
ic
· School
/
Fence/ wall
·
/
Electricity
·
Alternative / unused alternative gate
gate
·
Reference /
Materials
·
Laboratory /
equipment
tilted & cracked floor tiles at
· Flooring / Admin Bldg. and Madam Replacing of floor tiles floor tiles, cement 2 laborers
Ludith's classroom in SHS
Prepared by:
_________________________________ _________________ _________________
School Physical Facilities Coordinator Date of Inspection School Head
Noted: