PROJECT TEAM RESPONSIBILITY MATRIX

LEGEND P = Perform Direct Responsibility for Execution of the Task


A = Approve Approve document
R = Review and modify Review and modify the document
M = Model Modeling
D = Draft Draft document

Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB

Concept
SD M P M P M P M P M P M P M P M P M P
ARCHITECTURE DD D R D R D R D R D R D R D R D R D R
CD P A P A P A P A P A P A P A P A P A
Site Planning, 1/500 M P M P M P M P M P M P M P M P
Floor plan, 1/500 M P M P M P M P M P M P M P M P
Roof plan, 1/500 M P M P M P M P M P M P M P M P
SCHEMATIC
Longgitudinal and cross Section, 1/500 M P M P M P M P M P M P M P M P M P
DESIGN
Elevation, 1/500 M P M P M P M P M P M P M P M P M P
02-04 Renderings of Facade Design M P M P M P M P M P M P M P
02-04 Renerings of underground area M P M P M P M P M P M P M P M P M P
Site Plan, 1/500 D R D R D R D R D R D R D R D R
Floor Plan, 1/100 D R D R D R D R D R D R D R D R
Roof Plan, 1/100 D R D R D R D R D R D R D R D R
Elevation, 1/500 D R D R D R D R D R D R D R D R D R
Longitudinal and cross Section, 1/500, 1/200 D R D R D R D R D R D R D R D R D R
Façade enlarge plan, 1/50 D R D R D R D R D R D R D R D R D R
Wall Section, 1/100 D R D R D R D R D R D R D R D R
Stair details, 1/100 D R D R D R D R D R D R D R D R
Technical core details, 1/50 D R D R D R D R D R D R D R D R
Miscellaneous metal Details 1/100 D R D R D R D R D R D R D R D R
Doors and windows details and Schedule, 1/50 D R D R D R D R D R D R D R D R
Room finish schedule, 1/100 D R D R D R D R D R D R D R D R
Section
Ceiling Plan
Floor finish plan
Wall finish plan
Kitchen plan
Bathroom plan
Area calculation report D R D R D R D R D R D R D R D R
Room Schedule D R D R D R D R D R D R D R D R
Typical section details of, 1/50, 1/20 D R D R D R D R D R D R D R D R
Roof Details
Wall Details
Floor Details
DEVELOPMENT Door and Window Details Schedule D R D R D R D R D R D R D R D R
DESIGN
Stairs Details 1/50, 1/20 D R D R D R D R D R D R D R D R
Technical core Details 1/50 D R D R D R D R D R D R D R D R
Room Details 1/100, 1/50 D R D R D R D R D R D R D R D R
Floor finish plan
Ceiling plan
Wall finish plan
Sanitary ware schedule D R D R D R D R D R D R D R D R
Material Schedule D R D R D R D R D R D R D R D R
DEVELOPMENT
DESIGN

Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB

Detail plan with built-in furniture and settings 1/50 D R D R D R D R D R D R D R D R


Interior elevation with built-in furniture and settings D R D R D R D R D R D R D R D R

Dimentioned drawings setting out of electricalsockets,


switches, video-door phone, emergency call button, as well D R D R D R D R D R D R D R D R
as smoke detection and MVAC grilles where necessary.

Detailed Ceiling plan with settings 1/100 D R D R D R D R D R D R D R D R


Finishes and furnishing schedule D R D R D R D R D R D R D R D R
Door and Window schedule 1/50 D R D R D R D R D R D R D R D R
Sanitary Fittings Schedule D R D R D R D R D R D R D R D R
Miscellaneous metal detail 1/100, 1/20 D R D R D R D R D R D R D R D R
Floor plans / ceiling plans with Lighting layout 1/100 D R D R D R D R D R D R D R D R
Lighting Details D R D R D R D R D R D R D R D R
Specification D R D R D R D R D R D R D R D R
Calculation of costs D R D R D R D R D R D R D R D R
Rendering D R D R D R D R D R D R D R D R D R
Site Plan, 1/500 P A P A P A P A P A P A P A P A
Floor Plan, 1/50 P A P A P A P A P A P A P A P A
Roof Plan, 1/50 P A P A P A P A P A P A P A P A
Elevation, 1/200 P A P A P A P A P A P A P A P A P A
Longgitudinal and cross Section, 1/50 P A P A P A P A P A P A P A P A P A
Façade enlarge plan, 1/20 P A P A P A P A P A P A P A P A P A
Wall Section, 1/100 P A P A P A P A P A P A P A P A
Stairs Details , 1/20 P A P A P A P A P A P A P A P A
Technical core details, 1/20 P A P A P A P A P A P A P A P A
Miscellaneous metal Details 1/20, 1/1 P A P A P A P A P A P A P A P A
Doors and windows details, 1/20, 1/5 P A P A P A P A P A P A P A P A

Room finish schedule 1/50, 1/20, 1/10, 1/5, 1/1 P A P A P A P A P A P A P A P A

Section
Ceiling Plan
Floor finish plan
Wall finish plan
Kitchen plan
Bathroom plan
Waterproofing plan 1/50 P A P A P A P A P A P A P A P A
Waterproofing section Details, 1/20 P A P A P A P A P A P A P A P A
Sanitary ware schedule P A P A P A P A P A P A P A P A

Necessary drawings and details for coordination with


contractor and consultant such as Structure engineer, MEO
P A P A P A P A P A P A P A P A
consultant, façade consultant, kitchen consultant and so
on.

Area caculation report P A P A P A P A P A P A P A P A P A


Room Schedule P A P A P A P A P A P A P A P A
CONSTRUCTION Material specification P A P A P A P A P A P A P A P A P A
DOCUMENTATIO
N Typical section details, 1/50, 1/20 P A P A P A P A P A P A P A P A
Roof Details
Wall Details
Floor Details
Door and Window Details P A P A P A P A P A P A P A P A
Material Schedule P A P A P A P A P A P A P A P A P A
Stairs Details 1/50, 1/20, 1/10, 1/5 P A P A P A P A P A P A P A P A
Technical core Details 1/50, 1/20, 1/10 P A P A P A P A P A P A P A P A
Miscellaneous metal Details 1/100, 1/20 P A P A P A P A P A P A P A P A
DOCUMENTATIO
N

Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB

Room Details 1/100,1/50, 1/20, 1/10, 1/5 P A P A P A P A P A P A P A P A


Floor finish plan
Ceiling plan
Wall finish plan
Sanitary ware schedule P A P A P A P A P A P A P A P A
Detail plan with built-in furniture and settings 1/50 P A P A P A P A P A P A P A P A
Interior elevation with built-in furniture and settings P A P A P A P A P A P A P A P A
Dimentioned drawings setting out of electricalsockets,
switches, video-door phone, emergency call button,
P A P A P A P A P A P A P A P A
as well as smoke detection and MVAC grilles
where necessary.
Derailed Ceiling plan with settings 1/100, 1/50 P A P A P A P A P A P A P A P A
Finishes and furnishing schedule P A P A P A P A P A P A P A P A
Door and Window schedule 1/50, 1/20, 1/10, 1/5, 1/1 P A P A P A P A P A P A P A P A P A
Sanitary Fittings Schedule P A P A P A P A P A P A P A P A
Miscellaneous metal detail 1/100, 1/20, 1/10, 1/5, 1/1 P A P A P A P A P A P A P A P A
Floor plans / ceiling plans with Lighting layout 1/100, 1/50 P A P A P A P A P A P A P A P A
Lighting Details 1/50, 1/20, 1/10, 1/5, 1/1 P A P A P A P A P A P A P A P A
Specification P A P A P A P A P A P A P A P A P A
Calculation of costs P A P A P A P A P A P A P A P A P A
Concept M P M P M P M P M P M P M P M P
SD M P M P M P M P M P M P M P M P
INTERIOR
DD D R D R D R D R D R D R D R D R
CD P A P A P A P A P A P A P A P A
Concept plan with built-in furniture 1/100 M P M P M P M P M P M P M P M P
Interior elevation with built-in furniture 1/100 M P M P M P M P M P M P M P M P
CONCEPT
Ceiling plan 1/100 M P M P M P M P M P M P M P M P
DESIGN
Basic finishes and furnishing schedule M P M P M P M P M P M P M P M P
01-02 renderings for each room M P M P M P M P M P M P M P M P
Detailed plan with built-in furniture and settings 1/50 M P M P M P M P M P M P M P M P
Interior elevation with built-in furniture and settings 1/50 M P M P M P M P M P M P M P M P
Dimensioned drawings setting out of electrical sockets,
switches, video-door phone, emergency call button, as well
M P M P M P M P M P M P M P M P
as smoke detection and MVAC grilles where necessary.
1/50
SCHEMATIC
DESIGN Derailed Ceiling plan with settings 1/50 M P M P M P M P M P M P M P M P
Detailed section 1/50 M P M P M P M P M P M P M P M P
Internal typical & miscellaneous details 1/20, 1/10, M P M P M P M P M P M P M P M P
Door and window schedule 1/50 M P M P M P M P M P M P M P M P
Sanitary Fittings Schedule M P M P M P M P M P M P M P M P
External typical & miscellaneous details 1/20, 1/10, M P M P M P M P M P M P M P M P
Material specifications M P M P M P M P M P M P M P M P
Detailed plan with built-in furniture and settings 1/50 D R D R D R D R D R D R D R D R
Interior elevation with built-in furniture and settings 1/50 D R D R D R D R D R D R D R D R

Dimensioned drawings setting out of electrical sockets,


switches, video-door phone, emergency call button, as well
D R D R D R D R D R D R D R D R
as smoke detection and MVAC grilles where necessary.
1/50
DEVELOPMENT
DESIGN Derailed Ceiling plan with settings 1/50 D R D R D R D R D R D R D R D R
Detailed section 1/50 D R D R D R D R D R D R D R D R
Internal typical & miscellaneous details 1/20, 1/10, 1/5, 1/1 D R D R D R D R D R D R D R D R
Door and window schedule 1/50 D R D R D R D R D R D R D R D R
Sanitary Fittings Schedule D R D R D R D R D R D R D R D R
External typical & miscellaneous details 1/20, 1/10, 1/5, 1/1 D R D R D R D R D R D R D R D R
DEVELOPMENT
DESIGN
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB

Material specifications D R D R D R D R D R D R D R D R
Detailed plan with built-in furniture and settings 1/50 P A P A P A P A P A P A P A P A
Interior elevation with built-in furniture and settings 1/50 P A P A P A P A P A P A P A P A
Dimensioned drawings setting out of electrical sockets,
switches, video-door phone, emergency call button, as well
P A P A P A P A P A P A P A P A
as smoke detection and MVAC grilles where necessary.
1/50
CONSTRUCTION
DOCUMENTATIO Detailed Ceiling plan with settings 1/50 P A P A P A P A P A P A P A P A
N Detailed section 1/50 P A P A P A P A P A P A P A P A
Internal typical & miscellaneous details 1/20, 1/10, 1/5, 1/1 P A P A P A P A P A P A P A P A
Door and window schedule 1/50 P A P A P A P A P A P A P A P A
Sanitary Fittings Schedule P A P A P A P A P A P A P A P A
External typical & miscellaneous details 1/20, 1/10, 1/5, 1/1 P A P A P A P A P A P A P A P A
Material specifications P A P A P A P A P A P A P A P A
Concept M P M P M P M P M P M P M P M P M P M P
SD M P M P M P M P M P M P M P M P M P M P
LIGHTING
DD D R D R D R D R D R D R D R D R D R D R
CD P A P A P A P A P A P A P A P A P A P A

Design and definition of specific requirements for all


M P M P M P M P M P M P M P M P M P M P
technical lighting components

CONCEPT
DESIGN Catalogue of specific requirements to the illumination, the
M P M P M P M P M P M P M P M P M P M P
lighting fixtures, choice of material and technical provisions

Floor plans / ceiling plans with lighting layout 1/100 M P M P M P M P M P M P M P M P M P M P

Design and definition of specific requirements for all


M P M P M P M P M P M P M P M P M P M P
technical lighting components

Catalogue of specific requirements to the illumination, the


M P M P M P M P M P M P M P M P M P M P
lighting fixtures, choice of material and technical provisions
SCHEMATIC Floor plans / ceiling plans with lighting layout 1/100 M P M P M P M P M P M P M P M P M P M P
DESIGN
Lighting details and schedule 1/50, 1/20, 1/10, 1/5, 1/1 M P M P M P M P M P M P M P M P M P M P
Lighting control details (switches etc) M P M P M P M P M P M P M P M P M P M P
Information necessary for the electrical engineer (wattage,
lighting control, technical specifications of control gears and M P M P M P M P M P M P M P M P M P M P
modules)
Calculation of costs / cost schedule M P M P M P M P M P M P M P M P M P M P
Design and definition of specific requirements for all
D R D R D R D R D R D R D R D R D R D R
technical lighting components

Catalogue of specific requirements to the illumination, the


D R D R D R D R D R D R D R D R D R D R
lighting fixtures, choice of material and technical provisions

Floor plans / ceiling plans with lighting layout 1/100 D R D R D R D R D R D R D R D R D R D R


DEVELOPMENT Lighting details and schedule 1/50, 1/20, 1/10, 1/5, 1/1 D R D R D R D R D R D R D R D R D R D R
DESIGN
Lighting control details (switches etc) D R D R D R D R D R D R D R D R D R D R

Information necessary for the electrical engineer (wattage,


lighting control, technical specifications of control gears and D R D R D R D R D R D R D R D R D R D R
modules)
Calculation of costs / cost schedule D R D R D R D R D R D R D R D R D R D R
Design and definition of specific requirements for all
P A P A P A P A P A P A P A P A P A P A
technical lighting components

CONSTRUCTION
DOCUMENTATIO
N
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB

Catalogue of specific requirements to the illumination, the


P A P A P A P A P A P A P A P A P A P A
lighting fixtures, choice of material and technical provisions
CONSTRUCTION
DOCUMENTATIO Floor plans / ceiling plans with lighting layout 1/100 P A P A P A P A P A P A P A P A P A P A
N Lighting details and schedule 1/50, 1/20, 1/10, 1/5, 1/1 P A P A P A P A P A P A P A P A P A P A
Lighting control details (switches etc) P A P A P A P A P A P A P A P A P A P A
Information necessary for the electrical engineer (wattage,
lighting control, technical specifications of control gears and P A P A P A P A P A P A P A P A P A P A
modules)
Calculation of costs / cost schedule P A P A P A P A P A P A P A P A P A P A
Concept M P
SD M P
STRUCTURE DD D R D R D R D R D R D R D R
CD P A P A P A P A P A P A P A
M P
CONCEPT FACADE OF CINEMA DESIGN DRAWINGS
M P
DESIGN DELIVERABLE
M P
M P
SCHEMATIC FACADE OF CINEMA DESIGN DRAWINGS
M P
DESIGN DELIVERABLE
M P
Final structural design criteria D R D R D R D R D R D R D R
Foundation design criteria D R D R D R D R D R D R D R
Critical coordination clearances D R D R D R D R D R D R D R
Outline specifications or materials lists D R D R D R D R D R D R D R
Structural engineering calculations, D R D R D R D R D R D R D R
General notes and legend D R D R D R D R D R D R D R
DESIGN Floors framing plan: 1/200 1/100 D R D R D R D R D R D R D R
DEVELOPMENT Basement – sections and details 1/200 1/100 D R D R D R D R D R D R D R
Sections and details 1/200 1/100 D R D R D R D R D R D R D R
Reinforcement details and sections 1/200 1/100 D R D R D R D R D R D R D R
Column schedules D R D R D R D R D R D R D R
Core wall elevations 1/50 D R D R D R D R D R D R D R
Bearing wall details 1/50 D R D R D R D R D R D R D R
Beam reinforcement schedule D R D R D R D R D R D R D R
Final structural engineering calculations P A P A P A P A P A P A P A
Specifications based on approved Design Development
P A P A P A P A P A P A P A
documents
General notes and legend P A P A P A P A P A P A P A
Floors framing plan: 1/200 1/100 1/50 P A P A P A P A P A P A P A
Bottom reinforcement plan 1/200 1/100 1/50 P A P A P A P A P A P A P A
Top reinforcement plan 1/200 1/100 1/50 P A P A P A P A P A P A P A
Basement – sections and details 1/200 1/100 1/20 1/10 P A P A P A P A P A P A P A
CONSTRUCTION
DOCUMENTATION Sections and details 1/200 1/100 1/20 1/10
Reinforcement details and sections 1/200 1/100 1/20 1/10
P A P A P A P A P A P A P A
P A P A P A P A P A P A P A
1/1
Detail of waste water treatment tank 1/50 1/10 1/1 P A P A P A P A P A P A P A
Detail of septic tank 1/50 1/10 1/1 P A P A P A P A P A P A P A
Steelwork details 1/50 1/10 1/1 P A P A P A P A P A P A P A
Column schedules P A P A P A P A P A P A P A
Column details 1/50 1/20 1/5 1/1 P A P A P A P A P A P A P A
Core wall elevations 1/50 1/20 1/5 1/1 P A P A P A P A P A P A P A
Bearing wall details 1/50 1/20 1/5 1/1 P A P A P A P A P A P A P A
Concept M P
SD M P
MEP DD D R D R D R D R D R D R D R D R D R D R
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB
MEP
CD P A P A P A P A P A P A P A P A P A P A
Lighting layout 1/100 M P
CONCEPT
Lightning protection system schematic M P
DESIGN
Power and ELV layout plan 1/100 M P
Lighting layout 1/100 M P
SCHEMATIC
Lightning protection system schematic M P
DESIGN
Power and ELV layout plan 1/100 M P
Approximate equipment sizes and capacities of major
D R D R D R D R D R D R D R D R D R D R
components
Required space for equipment D R D R D R D R D R D R D R D R D R D R
Required chases and clearances D R D R D R D R D R D R D R D R D R D R
Acoustical and vibration control D R D R D R D R D R D R D R D R D R D R
Energy conservation measures D R D R D R D R D R D R D R D R D R D R

Outline specifications, equipments schedules, calculations D R D R D R D R D R D R D R D R D R D R

Mechanical services:
General notes and legend of symbols D R D R D R D R D R D R D R D R D R D R
System schematic D R D R D R D R D R D R D R D R D R D R
Chiller plant schematic D R D R D R D R D R D R D R D R D R D R
Building management system schematic D R D R D R D R D R D R D R D R D R D R
Chilled and condenser water route layout 1/500 D R D R D R D R D R D R D R D R D R D R
Chiller plan layout 1/200 1/100 1/50 D R D R D R D R D R D R D R D R D R D R
Cooling tower plan layout 1/200 1/100 1/50 D R D R D R D R D R D R D R D R D R D R
Mechanical floor plans 1/100 D R D R D R D R D R D R D R D R D R D R
Typical rooms plan 1/50 P R P R P R P R P R P R P R P R P R P R
Hydraulic services:
General notes and legend D R D R D R D R D R D R D R D R D R D R
Central cold water supply system schematic D R D R D R D R D R D R D R D R D R D R
Waste water treatment schematic D R D R D R D R D R D R D R D R D R D R
Water supply routing layout 1/500 1/100 D R D R D R D R D R D R D R D R D R D R
Sanitary drainage routing layout 1/500 1/100 D R D R D R D R D R D R D R D R D R D R
Typical rooms water supply layout 1/50 D R D R D R D R D R D R D R D R D R D R
Typical rooms drainage layout 1/50 D R D R D R D R D R D R D R D R D R D R
DESIGN LPG Services: D D D D D D D D D D
DEVELOPMENT
General notes and legend D R D R D R D R D R D R D R D R D R D R
LPG system schematic D R D R D R D R D R D R D R D R D R D R
LPG route layout plan 1/500 1/100 D R D R D R D R D R D R D R D R D R D R
Fire protection services:
General note and legend D R D R D R D R D R D R D R D R D R D R
Fire pumps system schematic D R D R D R D R D R D R D R D R D R D R
Fire protection system schematic D R D R D R D R D R D R D R D R D R D R
Fire protection route layout plan 1/500 1/100 D R D R D R D R D R D R D R D R D R D R
Electrical Plans:
General note and legend D R D R D R D R D R D R D R D R D R D R
Main single line diagram D R D R D R D R D R D R D R D R D R D R
Earthling system schematic D R D R D R D R D R D R D R D R D R D R
Electrical route plan 1/500 D R D R D R D R D R D R D R D R D R D R
Main power schematic plan D R D R D R D R D R D R D R D R D R D R
Fire alarm and EWIS systems schematic D R D R D R D R D R D R D R D R D R D R
Telephone and data system schematic D R D R D R D R D R D R D R D R D R D R
MATV system schematic D R D R D R D R D R D R D R D R D R D R
CCTV and access control system schematic D R D R D R D R D R D R D R D R D R D R
Lightning protection system schematic D R D R D R D R D R D R D R D R D R D R
Power and ELV layout plan 1/100 D R D R D R D R D R D R D R D R D R D R
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB

Fire alarm layout 1/100 D R D R D R D R D R D R D R D R D R D R


Lighting layout 1/100 D R D R D R D R D R D R D R D R D R D R
Combined services
Services route layout 1/500 D R D R D R D R D R D R D R D R D R D R
Central plant layout 1/100 D R D R D R D R D R D R D R D R D R D R
Sections and details 1/100 1/50 D R D R D R D R D R D R D R D R D R D R

Approximate equipment sizes and capacities of major


P A P A P A P A P A P A P A P A P A P A
components
Required space for equipment P A P A P A P A P A P A P A P A P A P A
Required chases and clearances P A P A P A P A P A P A P A P A P A P A
Acoustical and vibration control P A P A P A P A P A P A P A P A P A P A
Energy conservation measures P A P A P A P A P A P A P A P A P A P A

Outline specifications, equipments schedules, calculations P A P A P A P A P A P A P A P A P A P A

Mechanical services:
General notes and legend of symbols P A P A P A P A P A P A P A P A P A P A
System schematic P A P A P A P A P A P A P A P A P A P A
Chiller plant schematic P A P A P A P A P A P A P A P A P A P A
Building management system schematic P A P A P A P A P A P A P A P A P A P A
Chilled and condenser water route layout 1/500 P A P A P A P A P A P A P A P A P A P A
Chiller plan layout 1/200 1/100 1/50 P A P A P A P A P A P A P A P A P A P A
Cooling tower plan layout 1/200 1/100 1/50 P A P A P A P A P A P A P A P A P A P A
Mechanical floor plans 1/100 P A P A P A P A P A P A P A P A P A P A
Typical rooms plan 1/50 P A P A P A P A P A P A P A P A P A P A
Hydraulic services:
General notes and legend P A P A P A P A P A P A P A P A P A P A
Central cold water supply system schematic P A P A P A P A P A P A P A P A P A P A
Waste water treatment schematic P A P A P A P A P A P A P A P A P A P A
Water supply routing layout 1/500 1/100 P A P A P A P A P A P A P A P A P A P A
Sanitary drainage routing layout 1/500 1/100 P A P A P A P A P A P A P A P A P A P A
Typical rooms water supply layout 1/50 P A P A P A P A P A P A P A P A P A P A
Typical rooms drainage layout 1/50 P A P A P A P A P A P A P A P A P A P A
CONSTRUCTION
DOCUMENTATION LPG Services:
General notes and legend P A P A P A P A P A P A P A P A P A P A
LPG system schematic P A P A P A P A P A P A P A P A P A P A
LPG route layout plan 1/500 1/100 P A P A P A P A P A P A P A P A P A P A
Fire protection services:
General note and legend P A P A P A P A P A P A P A P A P A P A
Fire pumps system schematic P A P A P A P A P A P A P A P A P A P A
Fire protection system schematic P A P A P A P A P A P A P A P A P A P A
Fire protection route layout plan 1/500 1/100 P A P A P A P A P A P A P A P A P A P A
Electrical Plans:
General note and legend P A P A P A P A P A P A P A P A P A P A
Main single line diagram P A P A P A P A P A P A P A P A P A P A
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB

Earthling system schematic P A P A P A P A P A P A P A P A P A P A


Electrical route plan 1/500 P A P A P A P A P A P A P A P A P A P A
Main power schematic plan P A P A P A P A P A P A P A P A P A P A
Fire alarm and EWIS systems schematic P A P A P A P A P A P A P A P A P A P A
Telephone and data system schematic P A P A P A P A P A P A P A P A P A P A
MATV system schematic P A P A P A P A P A P A P A P A P A P A
CCTV and access control system schematic P A P A P A P A P A P A P A P A P A P A
Lightning protection system schematic P A P A P A P A P A P A P A P A P A P A
Power and ELV layout plan 1/100 P A P A P A P A P A P A P A P A P A P A
Fire alarm layout 1/100 P A P A P A P A P A P A P A P A P A P A
Lighting layout 1/100 P A P A P A P A P A P A P A P A P A P A
Combined services
Services route layout 1/500 P A P A P A P A P A P A P A P A P A P A
Central plant layout 1/100 P A P A P A P A P A P A P A P A P A P A
Sections and details 1/100 1/50 P A P A P A P A P A P A P A P A P A P A
Concept M P
SD M P
LANDSCAPE DD D R
CD P A
Concept design review M P
Presentation of proposed design M P
CONCEPT
Landscape scheme and main materials specification M P
DESIGN
Preliminary plan 1/200 1/100 M P
Estimation of cost plan M P
The hardscape plan deliverables
Coordination plan M P
General notes and legend M P
Materials schedule and specification M P
Dimension plan 1/200 1/100 1/50 M P
Grading and drainage plan 1/200 1/100 1/50 M P
SCHEMATIC
Materials plan 1/200 1/100 1/50 M P
DESIGN
Soil depth plan 1/200 1/100 M P
Subsoil drainage plan 1/200 1/100 M P
Water features coordination plan 1/100 M P
The hardscape detail deliverables
Typical Feature walls 1/100 1/50 M P
Typical Planter details 1/100 1/50 M P
The hardscape plan deliverables
Coordination plan D R
General notes and legend D R
Materials schedule and specification D R
Dimension plan 1/200 1/100 1/50 D R
Grading and drainage plan 1/200 1/100 1/50 D R
DEVELOPMENT
Materials plan 1/200 1/100 1/50 D R
DESIGN
Soil depth plan 1/200 1/100 D R
Subsoil drainage plan 1/200 1/100 D R
Water features coordination plan 1/100 D R
The hardscape detail deliverables
Typical Feature walls 1/100 1/50 D R
Typical Planter details 1/100 1/50 D R
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB

The hardscape plan deliverables


Coordination plan P A
General notes and legend P A
Materials schedule and specification P A
Dimension plan 1/200 1/100 1/50 P A
Grading and drainage plan 1/200 1/100 1/50 P A
Materials plan 1/200 1/100 1/50 P A
Soil depth plan 1/200 1/100 P A
Subsoil drainage plan 1/200 1/100 P A
CONSTRUCTIO Water features coordination plan 1/100 P A
N
DOCUMENTATI
The hardscape detail deliverables
ON Feature walls 1/100 1/20 1/10 P A
Planter details 1/100 1/20 1/10 P A
The softscape drawings deliverables
Trees & Palms Planting Plan 1/200 1/50 1/10 P A
Shrubs & Groundcovers Planting Plans 1/200 P A
1/50 1/10
Planting Details to include the following: P A
§  Tree Staking Details 1/50 1/20 1/5 P A
§  Tree, Palm, Shrub & Groundcover Planting P A
Details 1/50 1/20 1/5
Softscape Bill of Quantities P A
Softscape Specifications P A
CÁC HỢP ĐỒNG GIỮA DESCON & SYN và DESCON + SYN & Subcontractor

DESCON

Design Management Triangle Contract


SYNECTICS

subcontractor

SƠ ĐỒ CÔNG VIỆC GIỮA DESCON --> SYNECTICS --> NHÀ THIẾT KẾ

Subcontractor

Document Check and approve

SYNECTICS

Check and Approve

Go to Site
DESCON/SYNECTICS

AUTHOR
No. ITEMS
SYN TBD
1 Master Plan
2 Concept Subs
3 SD Subs

4 DD Draft Review
Modify
Review/Approve Go to Site
5 CD Draft Review DES/SYN
Approve
PROJECT TEAM RESPONSIBILITY & CONTRACT VALUE - SOUTHLIGHT
LEGEN
P = Performance Direct Responsibility for Execution of the Task
D = Draft Drafting documentation on BIM
M = Modeling Modeling on BIM
S/R = Sketch and Review Sketch and Review documentation
R/A = Review and Approve Review and Approve the Documentation
N/A = Not Available

STRUCTURE
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope
MODEL
1 CONCEPT DESIGN 10% P 100% 200,000,000
N/A
MODEL
2 SCHEMATIC DESIGN 20% P 100% 400,000,000
N/A
3 DD & CD 55% R/A 30% 330,000,000 D
5 CONTRACT ADMINISTRATION 5% NA 0% - P
6 CONSTRUCTION STAGE 5% NA 0% - P
7 POST CONSTRUCTION 5% NA 0% - P

TOTAL 100% 930,000,000

MEP
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope
1 CONCEPT DESIGN 10% P 100% 90,000,000 N/A
2 SCHEMATIC DESIGN 20% P 100% 180,000,000 N/A
3 DD & CD 55% S/R 60% 297,000,000 D
5 CONTRACT ADMINISTRATION 5% NA 0% - P
6 CONSTRUCTION STAGE 5% NA 0% - P
7 POST CONSTRUCTION 5% NA 0% - P
TOTAL 100% 567,000,000

1,497,000,000
TOTAL 2,000,000,000 VND
SYNECTIC
Sub-Rate Sub-Total

0%

0%

70% 770,000,000
100% 100,000,000
100% 100,000,000
100% 100,000,000

1,070,000,000 2,000,000,000

TOTAL 900,000,000 VND


SYNECTIC
Sub-Rate Sub-Total
0%
0%
40% 198,000,000
100% 45,000,000
100% 45,000,000
100% 45,000,000
333,000,000 900,000,000

1,403,000,000
PROJECT TEAM RESPONSIBILITY & CONTRACT VALUE - SOUTHLIGHT
LEGEN
P = Performance Direct Responsibility for Execution of the Task
D = Draft Drafting documentation on BIM
M = Modeling Modeling on BIM
S/R = Sketch and Review Sketch and Review documentation
R/A = Review and Approve Review and Approve the Documentation
N/A = Not Available
STRUCTURE
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope Sub-Rate Sub-Total
MODEL
1 CONCEPT DESIGN 10% P 100% 200,000,000 0%
N/A
MODEL
2 SCHEMATIC DESIGN 20% P 100% 400,000,000 0%
N/A
3 DD & CD 55% R/A 30% 330,000,000 D 70% 770,000,000
5 CONTRACT ADMINISTRATION 5% NA 0% - P 100% 100,000,000
6 CONSTRUCTION STAGE 5% NA 0% - P 100% 100,000,000
7 POST CONSTRUCTION 5% NA 0% - P 100% 100,000,000
TOTAL 100% 930,000,000 1,070,000,000
MEP
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope Sub-Rate Sub-Total
1 CONCEPT DESIGN 10% P 100% 90,000,000 N/A 0%
2 SCHEMATIC DESIGN 20% P 100% 180,000,000 N/A 0%
3 DD & CD 55% S/R 60% 297,000,000 D 40% 198,000,000
5 CONTRACT ADMINISTRATION 5% NA 0% - P 100% 45,000,000
6 CONSTRUCTION STAGE 5% NA 0% - P 100% 45,000,000
7 POST CONSTRUCTION 5% NA 0% - P 100% 45,000,000
TOTAL 100% 567,000,000 333,000,000

CONTRACT TOTAL SOUTHLIGHT 1,497,000,000 SYNECTICS 1,403,000,000


OPTION 2

PROJECT TEAM RESPONSIBILITY & CONTRACT VALUE - SOUTHLIGHT


LEGEN
P = Performance Direct Responsibility for Execution of the Task
D = Draft Drafting documentation on BIM
M = Modeling Modeling on BIM
S/R = Sketch and Review Sketch and Review documentation
R/A = Review and Approve Review and Approve the Documentation
N/A = Not Available
STRUCTURE
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope Sub-Rate Sub-Total
MODEL
1 CONCEPT DESIGN 10% P 100% 200,000,000 0%
N/A
MODEL
2 SCHEMATIC DESIGN 20% P 100% 400,000,000 0%
N/A
3 DD & CD 55% R/A 0% - D 100% 1,100,000,000
5 CONTRACT ADMINISTRATION 5% NA 0% - P 100% 100,000,000
6 CONSTRUCTION STAGE 5% NA 0% - P 100% 100,000,000
7 POST CONSTRUCTION 5% NA 0% - P 100% 100,000,000
TOTAL 100% 600,000,000 1,400,000,000
MEP
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope Sub-Rate Sub-Total
1 CONCEPT DESIGN 10% P 100% 90,000,000 N/A 0%
2 SCHEMATIC DESIGN 20% P 100% 180,000,000 N/A 0%
3 DD & CD 55% S/R 60% 297,000,000 D 40% 198,000,000
5 CONTRACT ADMINISTRATION 5% NA 0% - P 100% 45,000,000
6 CONSTRUCTION STAGE 5% NA 0% - P 100% 45,000,000
7 POST CONSTRUCTION 5% NA 0% - P 100% 45,000,000
TOTAL 100% 567,000,000 333,000,000
CONTRACT TOTAL SOUTHLIGHT 1,167,000,000 SYNECTICS 1,733,000,000
TOTAL 2,000,000,000 VND

2,000,000,000
TOTAL 900,000,000 VND

900,000,000
TOTAL 2,000,000,000 VND

2,000,000,000
TOTAL 900,000,000 VND

900,000,000
PROJECT TEAM RESPONSIBILITY & CONTRACT VALUE - VO TRONG NGHIA- ACCEPTA

VTN
No. PROCESS RATE %
Scope Rate

CONCEPT DESIGN 10% 100%


P
1
INTERIOR
LIGHTING
2 SCHEMATIC DESIGN 20% P 100%

3 DEVELOPMENT DESIGN 25% S/R 30%


4 CONSTRUCTION DOCUMENT 30% R/A 15%
5 CONTRACT ADMINISTRATION 5% NA 100%
6 CONSTRUCTION STAGE 5% NA 100%
7 POST CONSTRUCTION 5% NA 100%

TOTAL 100%
- VO TRONG NGHIA- ACCEPTABLE OPTION
Currency = VND TOTAL
VTN SYN
Sub-Total Scope Rate Sub-Total
MODEL
100,000,000 N/A 0% -

MODEL
200,000,000 0% -
N/A
75,000,000 D 70% 175,000,000
45,000,000 P 85% 255,000,000
50,000,000 P 0% 50,000,000
- P 0% 50,000,000
- P 0% 50,000,000

470,000,000 580,000,000
TOTAL 1,000,000,000 USA

1,000,000