Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB
Concept
SD M P M P M P M P M P M P M P M P M P
ARCHITECTURE DD D R D R D R D R D R D R D R D R D R
CD P A P A P A P A P A P A P A P A P A
Site Planning, 1/500 M P M P M P M P M P M P M P M P
Floor plan, 1/500 M P M P M P M P M P M P M P M P
Roof plan, 1/500 M P M P M P M P M P M P M P M P
SCHEMATIC
Longgitudinal and cross Section, 1/500 M P M P M P M P M P M P M P M P M P
DESIGN
Elevation, 1/500 M P M P M P M P M P M P M P M P M P
02-04 Renderings of Facade Design M P M P M P M P M P M P M P
02-04 Renerings of underground area M P M P M P M P M P M P M P M P M P
Site Plan, 1/500 D R D R D R D R D R D R D R D R
Floor Plan, 1/100 D R D R D R D R D R D R D R D R
Roof Plan, 1/100 D R D R D R D R D R D R D R D R
Elevation, 1/500 D R D R D R D R D R D R D R D R D R
Longitudinal and cross Section, 1/500, 1/200 D R D R D R D R D R D R D R D R D R
Façade enlarge plan, 1/50 D R D R D R D R D R D R D R D R D R
Wall Section, 1/100 D R D R D R D R D R D R D R D R
Stair details, 1/100 D R D R D R D R D R D R D R D R
Technical core details, 1/50 D R D R D R D R D R D R D R D R
Miscellaneous metal Details 1/100 D R D R D R D R D R D R D R D R
Doors and windows details and Schedule, 1/50 D R D R D R D R D R D R D R D R
Room finish schedule, 1/100 D R D R D R D R D R D R D R D R
Section
Ceiling Plan
Floor finish plan
Wall finish plan
Kitchen plan
Bathroom plan
Area calculation report D R D R D R D R D R D R D R D R
Room Schedule D R D R D R D R D R D R D R D R
Typical section details of, 1/50, 1/20 D R D R D R D R D R D R D R D R
Roof Details
Wall Details
Floor Details
DEVELOPMENT Door and Window Details Schedule D R D R D R D R D R D R D R D R
DESIGN
Stairs Details 1/50, 1/20 D R D R D R D R D R D R D R D R
Technical core Details 1/50 D R D R D R D R D R D R D R D R
Room Details 1/100, 1/50 D R D R D R D R D R D R D R D R
Floor finish plan
Ceiling plan
Wall finish plan
Sanitary ware schedule D R D R D R D R D R D R D R D R
Material Schedule D R D R D R D R D R D R D R D R
DEVELOPMENT
DESIGN
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB
Section
Ceiling Plan
Floor finish plan
Wall finish plan
Kitchen plan
Bathroom plan
Waterproofing plan 1/50 P A P A P A P A P A P A P A P A
Waterproofing section Details, 1/20 P A P A P A P A P A P A P A P A
Sanitary ware schedule P A P A P A P A P A P A P A P A
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB
Material specifications D R D R D R D R D R D R D R D R
Detailed plan with built-in furniture and settings 1/50 P A P A P A P A P A P A P A P A
Interior elevation with built-in furniture and settings 1/50 P A P A P A P A P A P A P A P A
Dimensioned drawings setting out of electrical sockets,
switches, video-door phone, emergency call button, as well
P A P A P A P A P A P A P A P A
as smoke detection and MVAC grilles where necessary.
1/50
CONSTRUCTION
DOCUMENTATIO Detailed Ceiling plan with settings 1/50 P A P A P A P A P A P A P A P A
N Detailed section 1/50 P A P A P A P A P A P A P A P A
Internal typical & miscellaneous details 1/20, 1/10, 1/5, 1/1 P A P A P A P A P A P A P A P A
Door and window schedule 1/50 P A P A P A P A P A P A P A P A
Sanitary Fittings Schedule P A P A P A P A P A P A P A P A
External typical & miscellaneous details 1/20, 1/10, 1/5, 1/1 P A P A P A P A P A P A P A P A
Material specifications P A P A P A P A P A P A P A P A
Concept M P M P M P M P M P M P M P M P M P M P
SD M P M P M P M P M P M P M P M P M P M P
LIGHTING
DD D R D R D R D R D R D R D R D R D R D R
CD P A P A P A P A P A P A P A P A P A P A
CONCEPT
DESIGN Catalogue of specific requirements to the illumination, the
M P M P M P M P M P M P M P M P M P M P
lighting fixtures, choice of material and technical provisions
CONSTRUCTION
DOCUMENTATIO
N
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB
Mechanical services:
General notes and legend of symbols D R D R D R D R D R D R D R D R D R D R
System schematic D R D R D R D R D R D R D R D R D R D R
Chiller plant schematic D R D R D R D R D R D R D R D R D R D R
Building management system schematic D R D R D R D R D R D R D R D R D R D R
Chilled and condenser water route layout 1/500 D R D R D R D R D R D R D R D R D R D R
Chiller plan layout 1/200 1/100 1/50 D R D R D R D R D R D R D R D R D R D R
Cooling tower plan layout 1/200 1/100 1/50 D R D R D R D R D R D R D R D R D R D R
Mechanical floor plans 1/100 D R D R D R D R D R D R D R D R D R D R
Typical rooms plan 1/50 P R P R P R P R P R P R P R P R P R P R
Hydraulic services:
General notes and legend D R D R D R D R D R D R D R D R D R D R
Central cold water supply system schematic D R D R D R D R D R D R D R D R D R D R
Waste water treatment schematic D R D R D R D R D R D R D R D R D R D R
Water supply routing layout 1/500 1/100 D R D R D R D R D R D R D R D R D R D R
Sanitary drainage routing layout 1/500 1/100 D R D R D R D R D R D R D R D R D R D R
Typical rooms water supply layout 1/50 D R D R D R D R D R D R D R D R D R D R
Typical rooms drainage layout 1/50 D R D R D R D R D R D R D R D R D R D R
DESIGN LPG Services: D D D D D D D D D D
DEVELOPMENT
General notes and legend D R D R D R D R D R D R D R D R D R D R
LPG system schematic D R D R D R D R D R D R D R D R D R D R
LPG route layout plan 1/500 1/100 D R D R D R D R D R D R D R D R D R D R
Fire protection services:
General note and legend D R D R D R D R D R D R D R D R D R D R
Fire pumps system schematic D R D R D R D R D R D R D R D R D R D R
Fire protection system schematic D R D R D R D R D R D R D R D R D R D R
Fire protection route layout plan 1/500 1/100 D R D R D R D R D R D R D R D R D R D R
Electrical Plans:
General note and legend D R D R D R D R D R D R D R D R D R D R
Main single line diagram D R D R D R D R D R D R D R D R D R D R
Earthling system schematic D R D R D R D R D R D R D R D R D R D R
Electrical route plan 1/500 D R D R D R D R D R D R D R D R D R D R
Main power schematic plan D R D R D R D R D R D R D R D R D R D R
Fire alarm and EWIS systems schematic D R D R D R D R D R D R D R D R D R D R
Telephone and data system schematic D R D R D R D R D R D R D R D R D R D R
MATV system schematic D R D R D R D R D R D R D R D R D R D R
CCTV and access control system schematic D R D R D R D R D R D R D R D R D R D R
Lightning protection system schematic D R D R D R D R D R D R D R D R D R D R
Power and ELV layout plan 1/100 D R D R D R D R D R D R D R D R D R D R
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB
Mechanical services:
General notes and legend of symbols P A P A P A P A P A P A P A P A P A P A
System schematic P A P A P A P A P A P A P A P A P A P A
Chiller plant schematic P A P A P A P A P A P A P A P A P A P A
Building management system schematic P A P A P A P A P A P A P A P A P A P A
Chilled and condenser water route layout 1/500 P A P A P A P A P A P A P A P A P A P A
Chiller plan layout 1/200 1/100 1/50 P A P A P A P A P A P A P A P A P A P A
Cooling tower plan layout 1/200 1/100 1/50 P A P A P A P A P A P A P A P A P A P A
Mechanical floor plans 1/100 P A P A P A P A P A P A P A P A P A P A
Typical rooms plan 1/50 P A P A P A P A P A P A P A P A P A P A
Hydraulic services:
General notes and legend P A P A P A P A P A P A P A P A P A P A
Central cold water supply system schematic P A P A P A P A P A P A P A P A P A P A
Waste water treatment schematic P A P A P A P A P A P A P A P A P A P A
Water supply routing layout 1/500 1/100 P A P A P A P A P A P A P A P A P A P A
Sanitary drainage routing layout 1/500 1/100 P A P A P A P A P A P A P A P A P A P A
Typical rooms water supply layout 1/50 P A P A P A P A P A P A P A P A P A P A
Typical rooms drainage layout 1/50 P A P A P A P A P A P A P A P A P A P A
CONSTRUCTION
DOCUMENTATION LPG Services:
General notes and legend P A P A P A P A P A P A P A P A P A P A
LPG system schematic P A P A P A P A P A P A P A P A P A P A
LPG route layout plan 1/500 1/100 P A P A P A P A P A P A P A P A P A P A
Fire protection services:
General note and legend P A P A P A P A P A P A P A P A P A P A
Fire pumps system schematic P A P A P A P A P A P A P A P A P A P A
Fire protection system schematic P A P A P A P A P A P A P A P A P A P A
Fire protection route layout plan 1/500 1/100 P A P A P A P A P A P A P A P A P A P A
Electrical Plans:
General note and legend P A P A P A P A P A P A P A P A P A P A
Main single line diagram P A P A P A P A P A P A P A P A P A P A
Hotel Base
Apart.A Apart.B Apart. C Apart. D Villa A Villa B Cinema Landscape
(Spine Building) ment
ACTIVITY
SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB SYN SUB
DESCON
subcontractor
Subcontractor
SYNECTICS
Go to Site
DESCON/SYNECTICS
AUTHOR
No. ITEMS
SYN TBD
1 Master Plan
2 Concept Subs
3 SD Subs
4 DD Draft Review
Modify
Review/Approve Go to Site
5 CD Draft Review DES/SYN
Approve
PROJECT TEAM RESPONSIBILITY & CONTRACT VALUE - SOUTHLIGHT
LEGEN
P = Performance Direct Responsibility for Execution of the Task
D = Draft Drafting documentation on BIM
M = Modeling Modeling on BIM
S/R = Sketch and Review Sketch and Review documentation
R/A = Review and Approve Review and Approve the Documentation
N/A = Not Available
STRUCTURE
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope
MODEL
1 CONCEPT DESIGN 10% P 100% 200,000,000
N/A
MODEL
2 SCHEMATIC DESIGN 20% P 100% 400,000,000
N/A
3 DD & CD 55% R/A 30% 330,000,000 D
5 CONTRACT ADMINISTRATION 5% NA 0% - P
6 CONSTRUCTION STAGE 5% NA 0% - P
7 POST CONSTRUCTION 5% NA 0% - P
MEP
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope
1 CONCEPT DESIGN 10% P 100% 90,000,000 N/A
2 SCHEMATIC DESIGN 20% P 100% 180,000,000 N/A
3 DD & CD 55% S/R 60% 297,000,000 D
5 CONTRACT ADMINISTRATION 5% NA 0% - P
6 CONSTRUCTION STAGE 5% NA 0% - P
7 POST CONSTRUCTION 5% NA 0% - P
TOTAL 100% 567,000,000
1,497,000,000
TOTAL 2,000,000,000 VND
SYNECTIC
Sub-Rate Sub-Total
0%
0%
70% 770,000,000
100% 100,000,000
100% 100,000,000
100% 100,000,000
1,070,000,000 2,000,000,000
1,403,000,000
PROJECT TEAM RESPONSIBILITY & CONTRACT VALUE - SOUTHLIGHT
LEGEN
P = Performance Direct Responsibility for Execution of the Task
D = Draft Drafting documentation on BIM
M = Modeling Modeling on BIM
S/R = Sketch and Review Sketch and Review documentation
R/A = Review and Approve Review and Approve the Documentation
N/A = Not Available
STRUCTURE
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope Sub-Rate Sub-Total
MODEL
1 CONCEPT DESIGN 10% P 100% 200,000,000 0%
N/A
MODEL
2 SCHEMATIC DESIGN 20% P 100% 400,000,000 0%
N/A
3 DD & CD 55% R/A 30% 330,000,000 D 70% 770,000,000
5 CONTRACT ADMINISTRATION 5% NA 0% - P 100% 100,000,000
6 CONSTRUCTION STAGE 5% NA 0% - P 100% 100,000,000
7 POST CONSTRUCTION 5% NA 0% - P 100% 100,000,000
TOTAL 100% 930,000,000 1,070,000,000
MEP
SOUTHLIGHT SYNECTIC
No. PROCESS RATE %
Scope Sub-Rate Sub-Total Scope Sub-Rate Sub-Total
1 CONCEPT DESIGN 10% P 100% 90,000,000 N/A 0%
2 SCHEMATIC DESIGN 20% P 100% 180,000,000 N/A 0%
3 DD & CD 55% S/R 60% 297,000,000 D 40% 198,000,000
5 CONTRACT ADMINISTRATION 5% NA 0% - P 100% 45,000,000
6 CONSTRUCTION STAGE 5% NA 0% - P 100% 45,000,000
7 POST CONSTRUCTION 5% NA 0% - P 100% 45,000,000
TOTAL 100% 567,000,000 333,000,000
2,000,000,000
TOTAL 900,000,000 VND
900,000,000
TOTAL 2,000,000,000 VND
2,000,000,000
TOTAL 900,000,000 VND
900,000,000
PROJECT TEAM RESPONSIBILITY & CONTRACT VALUE - VO TRONG NGHIA- ACCEPTA
VTN
No. PROCESS RATE %
Scope Rate
TOTAL 100%
- VO TRONG NGHIA- ACCEPTABLE OPTION
Currency = VND TOTAL
VTN SYN
Sub-Total Scope Rate Sub-Total
MODEL
100,000,000 N/A 0% -
MODEL
200,000,000 0% -
N/A
75,000,000 D 70% 175,000,000
45,000,000 P 85% 255,000,000
50,000,000 P 0% 50,000,000
- P 0% 50,000,000
- P 0% 50,000,000
470,000,000 580,000,000
TOTAL 1,000,000,000 USA
1,000,000