You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

NOTES:
1. ALL DIMENSIONS ARE IN METERS AND PIPE
DIAMETERS ARE IN MILLIMETERS UNLESS OTHERWISE
STATED.
2. ALL LEVELS ARE IN METRES RELATED TO QATAR
A NATIONAL DATUM (QND). A
3. PROFILE DRAWINGS SHOULD BE READ IN
CONJUNCTION WITH PLAN DRAWINGS.
4. THE BEDDING MATERIAL FOR ALL THE RIDER PIPES
SHALL BE "GRANULAR BEDDING (CLASS 'S').

LEGEND:

PROPOSED FOUL SEWER PIPE (VC)

PROPOSED FOUL SEWER PIPE (NDM)

B PROPOSED RIDER SEWER B

EXISTING GROUND LEVEL

PROPOSED GROUND LEVEL

PROPOSED MANHOLE

EXISTING MANHOLE UNDER


CP654

EXISTING MANHOLE

C C

ACRONYMS/ABBREVIATIONS:
DI - DUCTILE IRON
DN - NOMINAL DIAMETER
EGL - EXISTING GROUND LEVEL
EX - EXISTING
GRP - GLASS REINFORCED PLASTIC
PGL - PROPOSED GROUND LEVEL
PR/PROP. - PROPOSED
RB - RAMP BACKDROP
D TP - TOP LEVEL
VC - VITRIFIED CLAY
VB - VERTICAL BACKDROP

CA 12 NOV'20 ISSUED FOR CONSTRUCTION ZE


E REV. E
DATE DESCRIPTION APPR.
NO.

Public Works Authority


P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

PROJECT AFFAIRS
F
F
DESIGNS DEPARTMENT

DESIGN CONSULTANT

PROJECT
CONSTRUCTION OF
FOUL SEWER NETWORK
FOR INNER DOHA
G PACKAGE 3B (C816/3B) G
PROJECT CODE
C816-3B
TITLE

FOUL SEWER
LONGITUDINAL SECTION
SHEET 004

DESIGNED STATUS
M. ARSHAD CONTRACT
H CHECKED APPROVAL H
HK. RAMADAN Z. EL- BALBISI
DATE SCALE 1:1000 HOR
NOVEMBER 2020
1:100 VER
DWG. NO. REV. NO.

CDCBP-CP6-PIL-FS-2004 CA
1 2 3 4 5 6 7 8 9 10 11 12

You might also like