MATERIAL TAKE-OFF LIST

REV.
DESCRIPTION QTY I/U DWG. CODE REMARKS
CODE

WALLS

CMU WALL 15 SM R

EXTERIOR FINISH 15 SM R

ROOF

SINGLE PLY. 2MM REINFORCED PVC SINGLE MEMBRANE 9 SM R

EXPOSED ROOFING WITH WHITE HIGH (SOLAR REFLECTANT

INDEX) SRI OF 111% FULLY ADHERED TO TAPERED

POLYSCYANURATE (ISO)- BOARD (RIGID CELL INSULATION -

BOOARD WITH MIN.THICKNESS OF 100MM MAINTAINED AT

LOW POINT) OVER SLOPPED-TO-DRAIN LIGHT WEIGH

SCREED,OVER STRUCTURAL CONCRETE DECK

SCUPPER DRAIN 1 EA R

SPLASH BLOCK 1 EA R

FINISHES

TRANSLUCENT GLASS 9 SM R

PORCELAIN/CERAMIC TILES 6.4 SM R

NOTES:
Contractor shall verify quantities before construction with reference to design drawings and documents.

APPROVAL REFERENCE DRAWING


COMPILED BY REV.
CHECKED DATE PROJECT ENGR DATE
NZM 02G AHC 07/09/2020 DHH 07/09/2020 RR-ARC004 001 RR-ARC006 001
RR-ARC008 001
B.I. EWO PHASE ENG. ITEM AREA START-UP DATE PRELIMINARY REVISION
200 FINAL x REVISION 02G
INDEX Materials for SHEET 1 OF 2
R GUARD HOUSE
PLANT RNMTO003
- SAUDI ARABIA
MATERIAL TAKE-OFF LIST

REV.
DESCRIPTION QTY I/U DWG. CODE REMARKS
CODE

ACCOUSTIC TILES 6.4 SM R

PORCELAIN/CERAMIC BASE 12 LM R

DOORS

HD1:900X2200 WOODEN VINYL DOOR WITH CARD ACCESS 1 EA R

AND KICK PLATE

FURNITURE

CH12:WORKSTATION ADJUSTABLE DESK CHAIR 1 EA R

GT:GUARD HOUSE TASK TABLE 1 EA R

NOTES:
Contractor shall verify quantities before construction with reference to design drawings and documents.

APPROVAL REFERENCE DRAWING


COMPILED BY REV.
CHECKED DATE PROJECT ENGR DATE
NZM 02G AHC 07/09/2020 DHH 07/09/2020 RR-ARC004 001 RR-ARC006 001
RR-ARC008 001
B.I. EWO PHASE ENG. ITEM AREA START-UP DATE PRELIMINARY REVISION
200 05/13/2020 FINAL x REVISION 02G
INDEX Materials for SHEET 2 OF 2
R GUARD HOUSE
PLANT RNMTO003
- SAUDI ARABIA