BILLS OF QUANTITIES

PROJECT NAME HVAC


LOCATION PT.RAPP Pangkalan Kerinci
BUILDING NAME GEDUNG RAK

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR
1. Chilled Water AHU
Supply, Installation and setting to work including all required
field wiring in rigid metal conduit from AHU panel to local
isolators, condenser anti corrosion coatings, spring vibration
isolators, electrical isolators temperature controllers, testing and
commissioning etc. Complete (modulating 3 way valve
temperature controls) as per equipment schedule

1.1 AHU-1 capacity 50 TR 1 Unit -


1.2 AHU-2 capacity 50 TR 1 Unit -

11/06/2023 702847275.xlsHVAC Page 1of5


BILLS OF QUANTITIES
PROJECT NAME HVAC
LOCATION PT.RAPP Pangkalan Kerinci
BUILDING NAME GEDUNG RAK

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR
2. Air Distributing Equipment

2.1 Supply and install Supply air Ceiling Diffuser SCD with
internally insulated plenum boxes as per drawings.

2.2 600 x 600 mm (24 x 24) Inch M' -


2.3 450 x 450 mm (18 x 18) Inch M' -
2.4 300 x 300 mm (12 x 12) Inch M' -
2.5 225 x 225 mm (9 x 9) Inch M' -
2.6 150 x 150 mm (6 x 6) Inch M' -

2.7 Supply and install Return air Ceiling Diffuser RCD, with
internally insulated plenum boxes unless it is not connected to
return duct, as per drawings
2.8 600 x 600 mm (24 x 24) Inch M' -
2.9 450 x 450 mm (18 x 18) Inch M' -
3 300 x 300 mm (12 x 12) Inch M' -
3.1 225 x 225 mm (9 x 9) Inch M' -
3.2 150 x 150 mm (6 x 6) Inch M' -

11/06/2023 702847275.xlsHVAC Page 2of5


BILLS OF QUANTITIES
PROJECT NAME HVAC
LOCATION PT.RAPP Pangkalan Kerinci
BUILDING NAME GEDUNG RAK

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

3. Grill Difuser
SAD 300 x 300 mm Bh
RAD 400 x 200 mm Bh

4. Chilled Water Pipe works


4.1 Supply, installation and setting to work chilled water pipes and
fittings including galvanized hangers and supports, vibration
isolators, expansion joints, thrust block, pressure testing, system
testing and commissioning all necessary accessories to finalize 1 Lot
work (Brand RUCIKA)

4.2 Pipa PPR 75 mm (3 Inch) dia 50 m -

11/06/2023 702847275.xlsHVAC Page 3of5


BILLS OF QUANTITIES
PROJECT NAME HVAC
LOCATION PT.RAPP Pangkalan Kerinci
BUILDING NAME GEDUNG RAK

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR
5. Chilled Water Valves and Accessories
5.1 Supply, install, set to work and commission all necessary Lot -
sundries, supports, etc., complete

11/06/2023 702847275.xlsHVAC Page 4of5


BILLS OF QUANTITIES
PROJECT NAME HVAC
LOCATION PT.RAPP Pangkalan Kerinci
BUILDING NAME GEDUNG RAK

Unit Price Amount


Ref. DESCRIPTION Quantity Unit SR SR

6. Supply, installation, test and setting to work condensate drain Lot -


piping of AC machines connected to nearest drain point with
fittings and accessories completely

TOTAL HARGA