SCHEDULE 7.

1
SCHEDULES

TABLE OF CONTENTS

SCHEDULE DESCRIPTION

7.1 SCHEDULES TO BE ISSUED WITH SPECIFICATION

7.1.1 TRANSFORMER REQUIREMENTS

7.1.2 RATING & REQUIREMENTS FOR TRANSFORMERS

7.1.3 REFERENCE STANDARDS AND DOCUMENTS

7.1.4 SPECIFICATIONS DRAWINGS

7.1.5 PRE-APPROVED MANUFACTURER LIST

7.2 SCHEDULES TO BE COMPLETED BY CONTRACTOR

7.2.1 DEPARTURES FROM SPECIFIED TECHNICAL REQUIREMENTS

7.2.2 PLACE OF MANUFACTURE

7.2.3 GUARANTEED PERFORMANCE FOR TRANSFORMERS OFFERED

7.2.4

TRANSFORMER SCHEDULE
TENAGA NASIONAL BERHAD Table of Content Project Details
Doc No. Schedule: 7.0 Revision No. 0.0 Date: 1 Sept Page 1 of 1
2017
SCHEDULE 7.1.1.1: SUMMARY OF REQUIREMENTS
No Service Rating (HV-LV) Type Vector No Load Rated Connection Details Voltage Tap Impedance Cooling Tap
Location Group Voltage (kV) HV LV TV Reg Step Method Changer
Conn Conn Conn (Tap
Pos)
1. PMU 300kVA Outdoor ZNyn11 33/0.415kV Dry Air - - - Zero seq KNAN -
BAYUEMAS ETX type Cable 35.7 ohms
Ester plug Box per phase
design in

TRANSFORMER SCHEDULE
TENAGA NASIONAL BERHAD Summary of Requirements Project Details PMU BAYUEMAS
Doc No. Schedule 7.1.1.1 Revision No. 8.0 Date: 28 October 2022 Page 1 of 1