Professional Documents
Culture Documents
Note: Please insert the attached NEW / REVISED Data Sheet(s) in your File Copy, and
DESTROY ALL SUPERSEDED PAGES
Prepared Checked Approved
Date Date Date
Include in This
Sheet No Revision Description Revision Status
Issue
0 DOC NO REV
0 0 0
0
EQUIPMENT TAGS:
SERVICE DESCRIPTION: POWER TRANSFORMERS
CLIENT: 0 PURCHASER:
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: XXXXX-XXXX-33017
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
1.0 GENERAL
1.1 Manufacturer - VTS
1.2 Manufacturer location - VTS
1.3 Model No. - VTS
1.4 Serial No. - VTS
1.5 Design standard AS2374/IEC60076
1.6 No. of years Power transformer type in service (local/overseas) Years VTS
1.7 Year of manufacture - VTS
2.0 SITE CONDITIONS
2.1 Site conditions specification - XXXXX-XXXX-GXXXX
2.2 Pollution level -
2.3 Atmospheric conditions
2.4 Altitude above sea level m
2.5 Adverse ambient temperature conditions o
C
2.6 Design ambient temperature o
C
2.7 Seismic activity hazard factor (Z) -
2.8 Geographical location -
2.9 Project area
2.10 Solar irradiance (maximum) W/m2
2.11 Design wind load m/s
2.12 Design life Years
3.0 SYSTEM PARAMETERS
3.1 Phases
3.2 Frequency Hz
3.3 Primary Winding system highest Voltage, Um kV
3.4 Secondary Winding system highest Voltage, Um kV
3.5 Tertiary Winding system highest Voltage, Um V
3.6 Insulation Level Primary winding line terminals - Impulse Voltage kVp
3.7 Insulation Level Secondary winding line terminals - Impulse Voltage kVp
3.8 Insulation Level Tertiary winding line terminals - Impulse Voltage kVp
3.9 Insulation Level Primary winding line terminals - Power Frequency kV rms
3.10 Insulation Level Secondary winding line terminals - Power Frequency kV rms
3.11 Insulation Level Tertiary winding line terminals - Power Frequency kV rms
3.12 Primary Winding system earthing
3.13 Secondary Winding system earthing
3.14 Tertiary Winding system earthing
3.15 Power Supply Voltage for Fan & Pump Motors, OLTC motor & OLTC controls V, phase, Hz
3.16 AVR secondary voltage V
3.17 Line drop Current transformer (Ratio/Class/Accuracy/Output)
3.18 Primary Connection Type (Bushing/Cable Box)
3.19 Secondary Connection Type (Bushing/Cable Box)
3.20 Tertiary Connection Type (Bushing/Cable Box)
4.0 TRANSFORMER SPECIFICATIONS
4.1 Location (Indoor/Outdoor)
4.2 Construction Core/Shell
4.3 Dry Type or Oil Immersed
4.4 Cooling Type (ONAN/ONAF)
4.5 Rated continuous max Power, Primary (ONAN/ONAF) MVA
4.6 Rated continuous max Power, Secondary (ONAN/ONAF) MVA
4.7 Rated continuous max Power, Tertiary (ONAN/ONAF) MVA
4.8 Sustained Emergency Loading (% of continuous ONAF rating) pu
4.9 Duration of sustained emergency rating Hour
4.10 Tap changer (On Load/Off load)
4.11 Tap voltage range -% +%
4.12 Number of Tap positions
4.13 Tapping step %
4.14 Type of Voltage Variation
4.15 Max. continuous over-voltage on any tapping at continuous max. current
4.16 Rated no-load voltages on principal tapping (Primary/Secondary/Tertiary) kV
4.17 Connection Symbol (vector group)
4.18 Impedance Voltage (HV-LV) (base MVA) %
4.19 Impedance Voltage (HV-TV) (base MVA) %
4.20 Impedance Voltage (TV-LV) (base MVA) %
Disc Project
REV DATE Prepared Checked DESCRIPTION
Approved Approved
0 12/30/1899 0 0 0 0 0
0 DOC NO REV
0 0 0
0
EQUIPMENT TAGS:
SERVICE DESCRIPTION: POWER TRANSFORMERS
CLIENT: 0 PURCHASER:
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: XXXXX-XXXX-33017
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
7.7 Expected number of tap-changes at full load before renewal of diverter switch
contacts
7.8 Make and Model of Automatic Voltage Regulator
7.9 Service Interval between OLTC Inspections
7.10 Service Interval between OLTC Contact Replacement
8.0 REGULATION AND EFFICIENCY
8.1 Regulation @ Rated Load and Unity P.F
8.2 Regulation @ Rated Load and 0.9 P.F
8.3 Regulation @ Rated Load and 0.8 P.F
8.4 Efficiency @ Rated Load and Unity P.F
8.5 Efficiency @ Rated Load and 0.9 P.F
8.6 Efficiency @ Rated Load and 0.8 P.F
Disc Project
REV DATE Prepared Checked DESCRIPTION
Approved Approved
0 12/30/1899 0 0 0 0 0
0 DOC NO REV
0 0 0
0
EQUIPMENT TAGS:
SERVICE DESCRIPTION: POWER TRANSFORMERS
CLIENT: 0 PURCHASER:
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: XXXXX-XXXX-33017
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
0 DOC NO REV
0 0 0
0
EQUIPMENT TAGS:
SERVICE DESCRIPTION: POWER TRANSFORMERS
CLIENT: 0 PURCHASER:
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: XXXXX-XXXX-33017
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
0 DOC NO REV
1.0 GENERAL
1.1 Manufacturer - STS
1.2 Manufacturer Location - STS
1.3 Model - STS
1.4 Design Standard - STS
1.5 Switchboard Technical Specification - 11442-0000-E0710
1.6 Wiring Identification Specification - 11442-0000-E0710
1.7 Single Line Diagram - Refer to Requisition
1.8
2.0 SITE CONDITIONS
2.1 Site Conditions Specification - 11442-0000-G0713
2.2 Altitude Above Sea Level m <1000
2.3 Design Ambient Temperature o
C 0-40
2.4 Seismic Condition - NA -
2.5 Location - Indoor
2.6 Environment - Indoor
2.7
3.0 SYSTEM PARAMETERS
3.1 System Voltage kV 11, +10% to -11%
3.2 Supply Frequency Hz 50, +/- 1Hz
3.3 No. of Phases - 3
3.4 System Prospective Short Circuit Current (Symmetrical RMS) kA/s 31.5kA / 3s
3.5 System Short Circuit Peak Current kA 60 70 - TBC P2
3.6 System Earthing - Resistance - TBA
3.7
4.0 SWITCHBOARD GENERAL
4.1 Rated Voltage kV 12
4.2 Rated Frequency Hz 50
4.3 Insulation Medium AIS / GIS AIS
4.4 Rated Short Circuit Withstand Current and Duration kA/s 31.5kA / 3s
4.5 Rated Peak Withstand Current kA 70
4.6 Rated Short Time Power Frequency Withstand kV 28
4.7 Rated Impulse Withstand Voltage kV 75
4.8 Type Test Certificate Number - STS
4.9 Type Testing Authority - STS
4.10 Arc Fault Containment Required Y/N Y
4.11 Duration of Arc Fault Test s STS
4.12 Name of Arc Testing Authority - STS
4.13 Total Switchboard Heat Loss at Full Load W STS
5.0 SWITCHBOARD BUSBARS
5.1 Busbar arrangement / Busbars per phase - STS
5.2 Busbar Material - Fully Insulated Cu
5.3 Main Busbar Size mm2 STS
5.4 Main Busbar Current Rating A 630A
5.5 Main Earth Busbar Size mm2 STS
5.6 Main Earth Busbar Current Rating A STS
5.7 Main Earth Bar Location - STS
5.8 Busbar Earth Switch (with Mechanical Interlock) Yes/No Yes
REV DATE BY CHK APPR AUTH DESCRIPTION
P1 7/28/2011 BR CJC CJC JR Issue for Client Review
P2 8/23/2011 BR CJC CJC JR Issue for Client Approval
0 DOC NO REV
0 DOC NO REV
0 DOC NO REV
0 DOC NO REV
0 DOC NO REV
EQUIPMENT TAGS:
SERVICE DESCRIPTION:
CLIENT: 0 PURCHASER: 0
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: 11442-0000-33010
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
1.0 GENERAL
1.1 Manufacturer - STS
1.2 Manufacturer Location - STS
1.3 Model - STS
1.4 Design Standard - STS
1.5 Switchboard Technical Specification - 11442-0000-E0710
1.6 Wiring Identification Specification - 11442-0000-E0710
1.7 Single Line Diagram - Refer to Requisition
1.8
2.0 SITE CONDITIONS
2.1 Site Conditions Specification - 11442-0000-G0713
2.2 Altitude Above Sea Level m <1000
2.3 Design Ambient Temperature o
C 0-40
2.4 Seismic Condition - NA -
2.5 Location - Indoor
2.6 Environment - Indoor
2.7
3.0 SYSTEM PARAMETERS
3.1 System Voltage kV 11, +10% to -11%
3.2 Supply Frequency Hz 50, +/- 1Hz
3.3 No. of Phases - 3
3.4 System Prospective Short Circuit Current (Symmetrical RMS) kA/s 31.5kA / 3s
3.5 System Short Circuit Peak Current kA 70 - TBC
3.6 System Earthing - Resistance - TBA
3.7
4.0 SWITCHBOARD GENERAL
4.1 Rated Voltage kV 12
4.2 Rated Frequency Hz 50
4.3 Insulation Medium AIS / GIS AIS
4.4 Rated Short Circuit Withstand Current and Duration kA/s 31.5kA / 3s
4.5 Rated Peak Withstand Current kA 70
4.6 Rated Short Time Power Frequency Withstand kV 28
4.7 Rated Impulse Withstand Voltage kV 75
4.8 Type Test Certificate Number - STS
4.9 Type Testing Authority - STS
4.10 Arc Fault Containment Required Y/N Y
4.11 Duration of Arc Fault Test s STS
4.12 Name of Arc Testing Authority - STS
4.13 Total Switchboard Heat Loss at Full Load W STS
5.0 SWITCHBOARD BUSBARS
5.1 Busbar arrangement / Busbars per phase - STS
5.2 Busbar Material - Fully Insulated Cu
5.3 Main Busbar Size mm2 STS
5.4 Main Busbar Current Rating A Refer Single Line Diagram
5.5 Main Earth Busbar Size mm2 STS
5.6 Main Earth Busbar Current Rating A STS
5.7 Main Earth Bar Location - STS
5.8 Busbar Earth Switch (with Mechanical Interlock) Yes/No Yes
REV DATE BY CHK APPR AUTH DESCRIPTION
P1 6/10/2011 BR CJC CJC JR Preliminary review
EQUIPMENT TAGS:
SERVICE DESCRIPTION:
CLIENT: 0 PURCHASER: 0
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: 11442-0000-33010
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
EQUIPMENT TAGS:
SERVICE DESCRIPTION:
CLIENT: 0 PURCHASER: 0
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: 11442-0000-33010
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
EQUIPMENT TAGS:
SERVICE DESCRIPTION:
CLIENT: 0 PURCHASER: 0
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: 11442-0000-33010
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
EQUIPMENT TAGS:
SERVICE DESCRIPTION:
CLIENT: 0 PURCHASER: 0
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: 11442-0000-33010
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
EQUIPMENT TAGS:
SERVICE DESCRIPTION:
CLIENT: 0 PURCHASER: 0
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: 11442-0000-33010
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER
EQUIPMENT TAGS:
SERVICE DESCRIPTION:
CLIENT: 0 PURCHASER: 0
PROJECT TITLE: 0 PROJECT NUMBER: 0
REQUISITION NUMBER: 11442-0000-33010
ITEM DESCRIPTION UNIT PURCHASER SUPPLIER