POEGECOS.
5,000,000.00
Oe elG9on, BUILDING
Source of Fund: 206 DF (2021/2022)
CHECKED& SUBMITED BY
PREPARED BY.
RODERICH P EREZ
sCO
ERWEASCON
Myfhcipal Engineer
Labpr Foréman
2022 11-21-2022
APPROVED BY:
1-A| CEILING WORKS (Roof Eaves &Parapet Eaves) 4.45%SQ.M 147.00 179,34.96 1,219.97 1,511.54
551.50
11-8 CEILING WORKS (interior Areas Only) 11.92%Sa.M 480,263.40 870 83 1,078 96
PARAPET IMPROVEMENT (Wall Cladáing) 11.21%
13.26%
sa.M
CU.M
152.13.75
6 451.911.56 2,961.41 3,669.19
cONCRETE WORKS (New Stairs &Fir. Extension @ 2nd fr Lobby) 38,858.62
4.52% Sa.M
4,306.00 48,145.83
VMASONRY WORKS (Parapet, Neow Slairs, Mayor's Offce) 3. 182,296.00 3,269.88 4,051.39
ViA METAL WORKS (Stairease Handrail & Ralings) 6.22% LM 38.90 250,512.60 6,439.91 7,979.05
VI-9 METAL WORKS (Dry Wall Parttion@ Mayor's Office) 0.34% sQM 15.75 13.726.80
3.43% SQ.M
87154 1,07984
ITILE WORKS (New Stairs, Floor Extension@2nd Fir Lobty) 111.75 138,228.64
1,236.95 1,532.58
VIllDOORS &WINDOWS 847% SETS 10.00 341,186.00 34,118.60 42,272.95
XAELECTRICAL WORKS 2.81% LOr
113,156.40 113,156.40 140,200.78
Ix-B ELECTRICAL WORKS 3.23% 1.00 130,187.04 130,187.04
LO 161 ,301.74
PAINTING WORKS
1536%SQM 1,556.32 618,895.00 397.67 492.71
INSTALLATION OF PROJECT BILLBOARD
0.06%EACH 2,339.60 2,339.60 2.808.76
0.00%
0.00%
#DIVO #DIVO
#DIVO #DIV/O
0.00%
0.00%
#DIVIO #DIV/D
#DIVIO #DIV/O
0.00% #DIV/D #DIV/O
TOTAL DIRECTCOST 100.00% 4,0530,060.80
RENOVATION AND IMPROVEMENT OF MULTLPURPOSE HALL
POBLACION, LAKEWOOD, ZAMBOANGA DEL SUR
-ESTIMATED COST
A_ DIRECT
COST
Matenials 60.05% 3,002.461.00
1.1 Supply and Delivery 0.00%
0.00%
12 Testing of Materials 8 3.88% 944,095.2
2 Labor (ncludes Fringe Benefits)
K
RODARICHPTEREZ RWIN A. BASCON
LatoForeman htiCipal Engineer
2122022 11.21.2022
APPROVED
DOMINGO V. MIRRAR
Munlcipal Mayor