Professional Documents
Culture Documents
6. FURNISH ACCESS PANELS TO THE GENERAL CONTRACTOR FOR INSTALLATION UNDER THE CONC CONCRETE GAS COCK ELBOW UP OR RISE V VENT ABOVE GROUND
RELATED TRADES. CONT CONTINUATION
PLUG VALVE ELBOW DOWN OR DROP
V VENT BELOW SLAB
7. PITCH ALL WATER LINES TO DRAIN. CONTR CONTRACTOR
MV MIXING VALVE CAP OR END OF PIPE
CP CHROME PLATED SW SW SPECIAL WASTE ABOVE GROUND
8. INSTALL HORIZONTAL RUNS OF WATER PIPING AS HIGH AS POSSIBLE AND PROVIDE DRAIN-OFFS
CW COLD WATER BALANCING VALVE HB HB HOSE BIBB
AT ALL LOW POINTS. SW SW SPECIAL WASTE BELOW SLAB
DCVA DOUBLE CHECK VALVE ASSEMBLY ANGLE VALVE
WH WH WALL HYDRANT
9. HOT WATER TAKEOFFS SHALL HAVE NOT LESS THAN THREE ELBOW SWINGS. SV SV SPECIAL VENT ABOVE GROUND
CA COMPRESSED AIR STATION
DIA DIAMETER TEMPERATURE AND PRESSURE CA
10. PROVIDE DRAIN VALVE ON HOUSE SIDE OF WATER METER. T&P SEE DETAIL 06 ON PLM-600
RELIEF VALVE SV SV SPECIAL VENT BELOW SLAB
DN DOWN
TEE LOOKING UP
11. PIPING SHALL RUN CONCEALED IN ALL AREAS WITH THE EXCEPTION OF MECHANICAL ROOMS, DWG DRAWING VACUUM RELIEF VALVE
RL RL RAIN LEADER ABOVE GROUND
AREAS WHERE NO CEILING EXISTS OR WHERE NOTED ON THE PLANS. TEE LOOKING DOWN
EC ELECTRICAL CONTRACTOR AQUASTAT
RL RL RAIN LEADER BELOW SLAB
12. INSTALL DIELECTRIC COUPLINGS BETWEEN DISSIMILAR MATERIALS. EL/ELEV ELEVATION UNION
T
THERMOMETER
IW IW INDIRECT WASTE
13. PROVIDE DANDY CLEANOUTS AT THE BASE OF ALL SANITARY AND RAINWATER STACKS. FCO FLOOR CLEANOUT VIV VALVE IN VERTICAL
PRESSURE REDUCING/REGULATING
PRV
FFE FINISH FLOOR ELEVATION VALVE REDUCED PRESSURE ZONE G G NATURAL GAS PIPING
14. PROVIDE DRIP LEGS FOR ALL GAS RISERS. RPBP
P-# FIXTURE NUMBER PG PRESSURE GAUGE BACKFLOW PREVENTER
GV GV GAS VENT PIPING
15. AN AIR GAP OF AT LEAST TWICE THE EFFECTIVE DIAMETER OF THE DRAIN SERVED SHALL BE FLR FLOOR STRAINER
PROVIDED ON ALL EQUIPMENT DRAINS PIPED TO FLOOR DRAINS. BACK WATER VALVE TW TW TEMPERED WATER
FP FIRE PROTECTION WATER HAMMER
GLOBE VALVE WHA/SA
16. REQUIRED FIRE RESISTANCE RATING OF FLOORS, WALLS AND CEILINGS SHALL BE MAINTAINED ARRESTOR/SHOCK ABSORBER A A,CA COMPRESSED AIR
FS FLOW SWITCH
WHEN PIPE PENETRATIONS ARE MADE. FLOW IN DIRECTION OF ARROW
FT FOOT FLOW SWITCH
NP NPCW NON POTABLE COLD WATER
17. REFER TO RISER DIAGRAMS AND DETAILS FOR PIPE AND EQUIPMENT SIZES NOT SHOWN ON THE FV FLUSH VALVE S
SOLENOID VALVE DIRECTION OF SLOPE
PLANS. TP TP TRAP PRIMER
GALV GALVANIZED
NEEDLE VALVE CNR CONCENTRIC REDUCER
18. ALL WORK SHOWN ON RISER DIAGRAMS BUT NOT ON PLANS OR VICE VERSA SHALL BE GC GENERAL CONTRACTOR
M
INCLUDED AS IF SHOWN ON BOTH. MOTOR OPERATED GATE VALVE PIPE SLEEVE
GI GREASE INTERCEPTOR
GPF GALLON PER FLUSH
M
MOTOR OPERATED BALL VALVE ECC ECCENTRIC REDUCER
GPM GALLONS PER MINUTE
DOUBLE WALL PIPING
HC HANDICAPPED
HW HOT WATER
DESIGNATION INDICATOR PIPE ANCHOR
NO NORMALLY OPEN
HC HANDICAPPED ACCESSIBLE
NTS NOT TO SCALE SECTION DESIGNATION LETTER
A
NIC NOT IN CONTRACT P-1 SECTION DESIGNATION DRAWING
NUM KEY NOTE DESIGNATION
OD OUTSIDE DIAMETER
OED OPEN END DRAIN TP TP TRAP PRIMER
PC PLUMBING CONTRACTOR
PLBG PLUMBING
PSI POUNDS PER SQUARE INCH
REDUCED PRESSURE BACKFLOW
RPBP
PREVENTER
SA SHOCK ABSORBER
SPEC SPECIFICATION
SS SOIL STACK
SV SPECIAL VENT
SVTR SPECIAL VENT THRU ROOF
SW SPECIAL WASTE
ST.ST. STAINLESS STEEL
T P-TRAP
TW TEMPERED WATER
TYP TYPICAL
V VENT
VB VACUUM BREAKER
VS VENT STACK
VTR VENT THRU ROOF
W WASTE
K
J.9
J
I.5
I
H
G.9
G.1
G
F
E.4
E
D.9
D.6
F C
B.1
N
KEY PLAN
A
A B
C D
F
1 PLUMBING - 00 FOUNDATION OVERALL
SCALE: 3/64" = 1'-0"
E
G
PART PLAN A
PART PLAN B
LPC = 5'-0"
LPC = 5'-0"
LPC = 5'-0"
INV. EL. = 135'+/- INV. EL. = 135'+/- INV. EL. = 135'+/-
(2)1/2"TP UP
K
4"RL 4"RL 4"RL
6"SW UP & T (3,488SF) (5,320SF) (5,320SF) J.9
(2)1/2"TP UP
6"SW UP TO FCO
3"SV UP
4"SW UP & T
I.5
SW
SV
SV
4"SW UP & T
(2)2"SV UP
I
(2)2"SV RISE TO 6" ABOVE FLOOD RIM
6"SW UP & T
SW
3"SV UP
H
G.9
6"SW UP & T
PART PLAN A
PART PLAN C
1/2"TP UP
3"SV UP 3"SV UP
1/2"TP UP G.1
G
SW
3"SV UP 2"W UP F
(4)1/2"TP UP
N
KEY PLAN
A B
C D
F
E
G
PART PLAN A
PART PLAN B
LPC = 5'-0"
INV. EL. = 135'+/- LPC = 5'-0"
INV. EL. = 135'+/-
(2)1/2"TP UP
K
4"RL
(5,450SF)
4"RL
(5,285SF)
J.9
SW
3"SV UP
I
4"W UP & T (2)2"SV UP 6"SW UP TO FCO
(2)1/2"TP UP
H
G.9
SW
SW
6"SW UP & T
6"SW UP & T
3"SV UP
G.1
G
1 PLUMBING
SCALE: 1/8" =
- FOUNDATION - PART PLAN B - SOUTH REPAIR BAYS
1'-0"
N
KEY PLAN
A B
C D
F
E
G
6"SW UP & T
PART PLAN A
3"SV UP (2)2"SV UP PART PLAN C
G.1
G
F
3"SV UP
SW
(4)1/2"TP UP
6"SW UP TO FCO
SW
4"W UP & T
D.9
4"SW UP & T
6"SW UP & T (2)2"SV RISE TO 3"SW UP & T
6" ABOVE FLOOD RIM
3"SV UP
6"SW UP TO FCO
6"SW UP & T
SW
8"RL UP 2"SV UP
SW (14,576SF)
3"SV UP
D.6
LPC = 5'-0"
(4)1/2"TP UP
(2)2"SV UP PART PLAN C
3"SV UP
INV. EL. = 135.1'+/- PART PLAN D
N
KEY PLAN
A B
C D
F
E
G
1/2"TP UP
3"SV UP 3"SV UP
1/2"TP UP
G.1
G
F
SW
SW
6"SW UP TO FCO
6"SW UP TO FCO
E.4
SW E
D.9
SW
2"W UP
(2)1/2"TP UP
3"SV UP
6"W UP TO FCO
D.6
SW
6"SW UP & T
6"W UP TO FCO
W
PART PLAN C
PART PLAN D
LPC = 5'-0"
PART PLAN D
INV. EL. = 134.25'+/- PART PLAN E
(2)1/2"TP UP (2)2"V UP
N
KEY PLAN
A B
C D
F
E
G
3"SV UP
G.1
G
F
2"W UP
SW
6"SW UP TO FCO
E.4
E
D.9
W
(3)1/2"TP UP 2"W UP & T 3"W UP & T
2"W UP & T
2"V UP
2"W UP 4"W UP (2)2"V UP
4"W UP TO FCO TO FCO
(3)1/2"TP UP 12"RL UP
2"W UP & T (31,494SF)
2"V UP
6"W UP TO FCO
D.6
4"W UP 3"W UP & T
W
SW
2"W UP TO FCO 3"W UP 2"V UP
2"W UP & T
2"V UP
PART PLAN D W
PART PLAN E
D
3"W UP
3"W UP 2"V UP
3"W UP & T
(2)1/2"TP UP (2)2"V UP
2"W UP 2"W UP
2"W
3"W UP TO FCO
3"W UP & T
SW
RL
3"W UP & T
6"W
C
INV. EL. = 133.1'+/- 6"RL UP
(3,466SF)
SW SW
2"W UP
6"RL UP
6"W UP & T (3,466SF)
6"SW UP TO FCO
LPC = 5'-0"
RL
RL
3"W UP & T 1/2"TP UP
N
6"SW UP & T
KEY PLAN
3"W UP & T A B
B.1
B C D
F
LPC = 5'-0"
PART PLAN F
PART PLAN E
INV. EL. =
E
134.5'+/-
G
PART PLAN B
3"SV UP PART PLAN F
G.1
G
F
1/2"TP UP 3"SV UP
SW
6"SW UP TO FCO
SW
6"SW UP & T
E.4
4"RL (4,791SF)
E
INV. EL. = 135'+/-
D.9
(3)1/2"TP UP
3"SV UP
D.6
6"SW UP & T
3"SV UP
3"W UP & T
2"W UP
SW
6"SW UP & T
6"SW UP TO FCO
3"SV UP
SW SW PART PLAN F
S=.01
PART PLAN G
6"SW UP TO FCO
2"SV UP
3"SV UP
SW
1/2"TP UP
SW
6"SW UP & T
4"SW UP & T
N
KEY PLAN
B.1
B
LPC = 5'-0"
INV. EL. =
134.5'+/-
PART PLAN G
(3)1/2"TP UP
C D
PART PLAN F
F
PART PLAN E
E
G
4"SW UP & T
2"SV UP
6"SW UP TO FCO
3"SV UP PART PLAN F
PART PLAN G
C
SW
6"SW UP TO FCO
2"SV UP
SW
SW
4"SW UP & T
B.1
B
PART PLAN F 2"SV UP
S=.02
PART PLAN G
(3)1/2"TP UP
4"SW UP & T
2"SV UP
2"SW UP & T
4"RL
(1,291SF)
INV. EL. = 135'+/- INV. EL. = 135'+/-
LPC = 5'-0"
LPC = 5'-0"
4"RL
(4,527SF)
N
KEY PLAN
A B
C D
F
E
G
K
J.9
I.5
I
H
G.9
G.1
G
F
E.4
E
D.9
D.6
B.1
B
PART PLAN A
PART PLAN B
4"RL; PROVIDE DOWNSPOUT BOOT 05 TOOL CRIB 4"RL; PROVIDE DOWNSPOUT BOOT 05
(3,488SF) PLM-600 27 (5,320SF) PLM-600 05 4"RL; PROVIDE DOWNSPOUT BOOT
PLM-600 (5,320SF)
K
P-6
P-10 P-6
P-10 J.9
FCO
TD-C
J
EQUIPMENT
INSPECTION /
CNG
3"SV DN & RISE
INSPECTION
26
I.5
FCO (2)2"SV DN & RISE 4"FD-B
4"FD-B
I
TD-C
FCO
H
G.9
REPAIR BAYS
28
TD-C
TD-C
FCO FCO
PART PLAN A
PART PLAN C FCO 3"SV DN & RISE 3"SV DN & RISE
G.1
3"SV DN & RISE
P-7
G
SERVICE
VESTIBULE F
19
N
KEY PLAN
A B
C D
F
E
G
PART PLAN A
PART PLAN B
TOOL CRIB OXYGEN /
WITH NO ACETYLENE
4"RL; PROVIDE DOWNSPOUT BOOT 05 CHARGE AREA STORAGE CRIB
05 4"RL; PROVIDE DOWNSPOUT BOOT
(5,450SF) PLM-600 29 30.1
PLM-600 (5,285SF)
K
J.9
P-6
P-10
TD-C
WELD SHOP
30
I.5
P-6
4"FD-B
FCO
FCO
4"FD-B
FCO
H
G.9
OXYGEN /
ACETYLENE
STORAGE CRIB
TD-C REPAIR BAYS TD-C 30.2
28
TD-C
FCO
P-7 G.1
G
F
6"RL UP 8"RL UP
(3,863SF) (7,664SF) 3"SV DN & RISE PART PLAN B
PART PLAN F
N
KEY PLAN
A B
C D
F
E
G
TD-C
4"SVTR
LUBRICANT
STORAGE / WASH BAY
4"FD-B LUBE BAYS COMPRESSOR 23
25 24
E.4
4"FD-B FCO P-6
FCO
TD-C
D.9
2"SV DN & RISE
3"SV DN & RISE
3"FD-B
FCO
6"RL UP 6"RL UP
4"FD-B (4,673SF)
(3,010SF)
FCO FCO
8"RL DN
(14,576SF)
D.6
3"SV DN & RISE
3"SV DN & RISE (2)2"SV DN & RISE
PART PLAN C
PART PLAN D
N
KEY PLAN
A B
C D
F
E
G
G.1
G
F
SERVICE
VESTIBULE
19
STORES
STOCKROOM STORES
22 MATERIAL
MANAGEMENT
20
E.4
FCO
FCO
FCO
6"RL UP(3,022SF)
E
& 6"RL DN(9,915SF)
D.9
STORES
STOCK ROOM
SUPERVISOR
6"RL UP 21
(6,893SF)
1 1/2"W DN & V RISE
P-10 P-7
D.6
6"RL UP
3"SV DN & RISE (6,893SF)
FCO
FCO
PART PLAN C
FCO
PART PLAN D
COMM
08
N
KEY PLAN
A B
C D
F
E
G
G.1
6"RL UP G.1
(3,022SF)
G P-7 G
F
SERVICE
6"RL DN F VESTIBULE
2"W DN
(3,022SF) & V RISE
19 MEDIA
GARAGE
STORAGE 8"RL UP
SUPERVISOR
ROOM (11,527SF)
15
18 R
RL
L
REPAIR CREW
STORES LEADER &
MATERIAL SUPERVISOR
MANAGEMENT OFFICE
20 EQUIPMENT 16
6"RL UP INSPECTION EQUIPMENT
EQUIPMENT (3,022SF) AND GENERAL
V
PLATFORM IN-SERVICE SUPERVISOR
41
E.4 E.4
OFFICE 14
17
RL
3"VTR FCO
E E
D.9 D.9
3"V UP
STORES WOMENS
2"FD-A 2"FD-A
STOCK ROOM ROOM
SUPERVISOR 13
2"W DN & V RISE FCO
6"RL UP
21 P-9
2"FD-A
(3,022SF)
3"W UP & T 3"W UP & T LOCKER/SHOWER P-9
P-1A
RL RL
P-1 P-3 P-3 13A 12"RL DN
2"FD-A (31,494SF)
3"FD-B P-10 P-9
P-7
3"FD-B D.6 6"RL UP
FCO D.6
6"RL DN 3"W DN
(3,022SF) (9,915SF)
W
P-2 P-2 P-2
2"FD-A P-1A P-1 P-1 P-3 P-3 6"RL UP
P-9 (7,030SF)
FCO
2"V UP
PART PLAN D 2"V UP 2"FD-A
MENS ROOM
V
2"V DN & RISE 2"V DN & RISE 2"V DN & RISE FCO
W
3"FD-B PART PLAN E 2"V UP 12
D D
3"W UP & T 3"W DN
3"W DN
VEST 3"W DN HALL 2"V DN & RISE
2"V DN
11 02
1 1/2"W DN & V RISE
PLUMBING - DRAINAGE - EQUIPMENT PLATFORM
2 SCALE: 1/8" = 1'-0"
P-4
(2)2"V DN & RISE P-5
COMM 3"FD-B JAN
08 FCO
06 P-7
2"
BREAK ROOM 2"W DN
07 & V RISE
3"FD-B P-6
MECHANICAL
ROOM
3"VTR
10
MACHINE
6"RL UP SHOP CREW
(3,466SF) P-8 LEADER &
CLERK OFFICE C
V
RL 04
V
ELECTRICAL FCO
RL
6"FD-B
ROOM
FCO 6"RL DN
09 (3,466SF)
2"W DN & V RISE
6"RL UP
CONFERENCE (3,466SF)
FCO ROOM
05
3"FD-B 6"RL DN
(2)2"V DN & RISE (3,466SF)
3"V DN & RISE SPRINKLER
ROOM
40 MACHINE
SHOP FCO
3"FD-B SUPERVISIOR
03
N
VEST KEY PLAN
01 B.1
B A B
PART PLAN F
PART PLAN E
C D
F
E
G
PLUMBING - DRAINAGE - PART PLAN E - OFFICE AREA
1 SCALE: 1/8" = 1'-0"
RL
8"RL UP FCO
(7,664SF)
8"RL DN
(11,527SF) TD-C
AERIAL
P-6
BUCKET BAYS
32
FCO
E.4
6"RL DN TD-C
(7,030SF)
OXYGEN/ACETYLENE
STORAGE CRIB
33.1
D.6
FCO
FCO
D
MACHINE 3"SV DN & RISE
SHOP
RL
31 P-6
WELD /
FABRICATION
JAN P-4 P-7 SHOP
TD-C
06 33
P-6
FCO
OXYGEN /
ACETYLENE
STORAGE CRIB
RL
33.2
C
FCO 3"SV DN & RISE
FCO PART PLAN F
PART PLAN G
2"SV DN
& RISE
6"RL UP
TD-C (4,600SF) 4"FD-B PAINT
REMOVAL
BOOTH
RL 37
N
SECONDARY ROOF DRAIN
8"RL DROP
PARTS KEY PLAN
DOWNSPOUT NOZZLE P-6 WASHER
34 B.1
B A B
PART PLAN F
6"RL UP
PART PLAN E
PART PLAN F
PART PLAN G
C
FCO 3"SV DN & RISE
FCO
2"SV DN
& RISE
6"RL UP
(4,600SF) 4"FD-B PAINT
REMOVAL
BOOTH
37
PARTS
8"RL DROP
P-6 WASHER
34 B.1
B
PAINT MIX 2"SV DN & RISE
PART PLAN F
ROOM
PART PLAN G 39 PAINT BAYS
36
2"FD-B
PAINT SPRAY
PAINT BOOTH
EQUIPMENT 38
ROOM
05 4"RL; PROVIDE DOWNSPOUT BOOT 35
(1,291SF)
PLM-600
A
N
KEY PLAN
A B
C D
F
E
G
K
J.9
I.5
I
H
G.9
G.1
G
F
E.4
E
D.9
D.6
B.1
B
PART PLAN A
PART PLAN B
1/2"CW DROP TO TP
(2)1/2"TP DN
TP
HB-2
K
J.9
HB-2 HB-2 P-10 HB-2
TW TW
TW TW
HB-2 P-10
2"
2" 2" 1"
J
EQUIPMENT
INSPECTION /
CNG
INSPECTION
TP 26
1"
1/2"CW DROP TO TP
I.5
(2)1/2"TP DN 2"
TW
I
TW
3/4"CW DROP
HB-2
H
G.9
REPAIR BAYS
28
PART PLAN A
PART PLAN C
3/4"CW DROP
HB-2
HB-2
TP TP G.1
P-7 G
TP F
SERVICE
VESTIBULE 1/2"CW DROP
1/2"CW DROP TO TP 19 1/2"HW DROP
(4)1/2"TP DN
N
KEY PLAN
A B
C D
F
E
G
PART PLAN A
PART PLAN B
TOOL CRIB OXYGEN /
2"TW DROP WITH NO ACETYLENE
1"TW RISE CHARGE AREA STORAGE CRIB
3/4"CW DROP 1/2"CW DROP TO TP 3/4"CW DROP 29 30.1
(2)1/2"TP DN
TP K
J.9
HB-2 P-10
TW TW
TW TW
HB-2
2" 3/4"CW DROP
1"
1"
2"
HB-2
1/2"CW DROP
WELD SHOP
30
P-6
I.5
3/4"CW DROP
HB-2
1/2"CW DROP TO TP
(2)1/2"TP DN
H
G.9
TP
OXYGEN /
ACETYLENE
STORAGE CRIB
REPAIR BAYS 30.2
28
3
PLM-801
HB-2 HB-2
TP G.1
G
F
3/4"CW DROP PART PLAN B
PART PLAN F
N
KEY PLAN
A B
C D
F
E
G
PART PLAN A
PART PLAN C
G.1
G
TP F
1/2"CW DROP TO TP
(4)1/2"TP DN
LUBRICANT
STORAGE / WASH BAY
LUBE BAYS COMPRESSOR 23
25 24
E.4
P-6
HB-2
1/2"CW DROP
HB-2
3/4"HW DROP
D.9
3/4"CW DROP
3/4"HW RISE
3/4"CW DROP
TO GHW-2
TP
D.6
GHW-2
INSTANTANEOUS GAS WATER PART PLAN C TP
HEATER DEDICATED TO WASH BAY 1 1/2" CW 1/2"CW DROP TO TP
HOSE VALVE PART PLAN D (2)1/2"TP DN
1 1/2"CW DROP
N
KEY PLAN
A B
C D
F
E
G
3/4"CW DROP
HB-2
TP TP G.1
G
F
SERVICE
VESTIBULE
19 1"
2"
STORES
STOCKROOM STORES
22 MATERIAL
MANAGEMENT
20
E.4
3/4"NPCW UP
E
D.9
TW
STORES
TW
STOCK ROOM
1/2"HW DROP
1/2"CW DROP SUPERVISOR
21
2"
1 1/4"CW DROP
P-7
P-10 HB-2
D.6
TP 1"
1/2"CW DROP TO TP
(2)1/2"TP DN 2"
PART PLAN C
PART PLAN D
COMM
08
N
1/8" = 1'-0"
KEY PLAN
A B
C D
F
E
G
19 1"
1/2"HW DROP
MEDIA
GARAGE
STORAGE
SUPERVISOR
2" ROOM
15
18
REPAIR CREW
STORES LEADER &
MATERIAL SUPERVISOR
MANAGEMENT OFFICE
20 EQUIPMENT 16
INSPECTION EQUIPMENT
EQUIPMENT AND GENERAL
PLATFORM IN-SERVICE SUPERVISOR
3/4"NPCW DN 41
E.4 E.4
OFFICE 14
HB-2
3/4"NPCW UP 17
E E
D.9 D.9
TW
NP
STORES WOMENS
TW
STOCK ROOM ROOM
1/2"HW DROP
1/2"CW DROP SUPERVISOR 13
21
2"
1 1/4"CW DROP
P-9
LOCKER/SHOWER
P-1A P-1 P-3 P-3 HB-1 13A
2
P-9
P-7 PLM-801
P-10 HB-2 P-9
D.6 D.6
P-2 P-2 P-2
P-1A P-1 P-1 P-3 P-3
1" P-9
HB-1
2"
PART PLAN D
MENS ROOM
PART PLAN E 12
D D
VEST HALL
11 1/2"CW DROP
02
P-4
PLUMBING - WATER DIST. - EQUIPMENT PLATFORM
2 SCALE: 1/8" = 1'-0" P-5 P-7
COMM JAN
08 06
1
MECHANICAL PLM-800 CW RISE
NP
ROOM
10
MACHINE
TW
SHOP CREW
TW
P-8 LEADER &
F
CLERK OFFICE C
04
ELECTRICAL
1/2"CW DROP 1/2"CW DROP
ROOM 1/2"HW DROP
09 NP NP NP
CONFERENCE
TP
ROOM
05
1/2"CW DROP TO TP
(3)1/2"TP DN
SPRINKLER
ROOM
40 MACHINE
SHOP
SUPERVISIOR TP
03
VEST
N
01 KEY PLAN
B.1
B
PART PLAN F
PART PLAN E
TANKLESS WATER HEATER
(TYPICAL FOR 4) A B
C D
F
E
1 PLUMBING - WATER DIST. - PART PLAN E - OFFICE AREA
SCALE: 1/8" = 1'-0"
G
1/2"CW DROP
P-6
AERIAL
BUCKET BAYS
32
E.4
E
D.9
1/2"CW DROP TO TP
(3)1/2"TP DN
TP
OXYGEN/ACETYLENE
STORAGE CRIB
33.1
D.6
D
1/2"CW DROP
MACHINE
SHOP
31 P-6
P-4
WELD /
FABRICATION
JAN P-7 SHOP
06 33
3/4"CW DROP
3/4"HW DROP
P-6
CW RISE
OXYGEN /
ACETYLENE
STORAGE CRIB
33.2
PART PLAN F
PART PLAN G
NP
1"NPCW DROP TO
PARTS WASHER
NP
HB-2
37
N
PARTS KEY PLAN
WASHER 1/2"CW DROP TO TP
NP NP (3)1/2"TP DN
34 B.1
B A B
PART PLAN F
PART PLAN E
TP PAINT MIX
PART PLAN F
ROOM C
PART PLAN G 39 PAINT BAYS D
F
36 E
G
PART PLAN F
PART PLAN G
C
1"NPCW DROP TO
PARTS WASHER
1/2"CW DROP
3/4"CW DROP PAINT
P-6 REMOVAL
BOOTH
NP
HB-2
37
PARTS
WASHER 1/2"CW DROP TO TP
NP (3)1/2"TP DN
34 B.1
B
TP PAINT MIX
PART PLAN F
ROOM
PART PLAN G 39 PAINT BAYS
36
PAINT SPRAY
PAINT BOOTH
EQUIPMENT 38
ROOM
35
N
KEY PLAN
A B
C D
F
E
G
K
J.9
I.5
I
H
G.9
G.1
G
F
E.4
E
D.9
D.6
B.1
B
PART PLAN A
PART PLAN B
1"CA DROP TO
TOOL CRIB BELOW SLAB
27 CA REGULATOR
06
1/2"CA DROP 1/2"CA DROP 1/2"CA DROP PLM-600 1/2"CA DROP 1/2"CA DROP 1/2"CA DROP 1/2"CA DROP
1 1/2"
K
J.9
1/2"CA DROP CA CA
1/2"CA DROP
1 1/2" 1 1/2" 1 1/4"
CA
1/2"
CA
1"CA UNDER GROUND
TO VEHICLE LIFT
CA
1/2"
CA
CA
CA
CA
CA
CA
1/2"
CNG 1/2" 1/2" 1/2" 1/2"
INSPECTION
26
1/2"CA DROP
I.5
1/2"CA DROP
1/2"CA DROP
H
G.9
CA
1/2"
REPAIR BAYS
28
CA
1 1/2"
PART PLAN A
PART PLAN C
G G G.1
G
F
CA 1 1/2"G (200 CFH) 1 1/2"G (200 CFH) SERVICE
VESTIBULE
19
N
KEY PLAN
A B
C D
F
E
G
PART PLAN A
PART PLAN B
TOOL CRIB OXYGEN /
WITH NO ACETYLENE
1"CA DROP TO
BELOW SLAB CHARGE AREA STORAGE CRIB
CA REGULATOR
06 29 30.1
1/2"CA DROP 1/2"CA DROP 1/2"CA DROP PLM-600 1/2"CA DROP 1/2"CA DROP
1"CA DROP
K
J.9
CA CA
1"CA UNDER GROUND
CA
1 1/4" TO VEHICLE LIFT
1 1/4" 1 1/4"
CA
CA
CA
CA
CA
CA
CA
J
WELD SHOP
30
I.5
I
1/2"CA DROP
1"
CA
H
G.9
CA
1/2"CA DROP
OXYGEN / 1/2"
ACETYLENE
STORAGE CRIB
REPAIR BAYS 30.2
28
1"
G.1
G
F
PART PLAN B
PART PLAN F
N
KEY PLAN
A B
C D
F
E
G
CA
4. CHASSIS GREASE 1"(TYP)
5. 75W-90 GEAR OIL
6. WINDSHIELD WASHER FLUID 1 1/2"
7. ANTIFREEZE
8. COMPRESSED AIR
1
1"CA UNDER GROUND PLM-801
TO VEHICLE LIFT 1/2"(TYP)
CA
LUBRICANT
1/2"CA DROP 1" STORAGE / WASH BAY
G
LUBE BAYS COMPRESSOR 23
25 24
E.4
AIR DRYER
AIR COMPRESSOR
CA
D.9
VEHICLE MAINTENANCE
FLUIDS HOSE REELS
1. 15W-40 ENGINE OIL 1"GVTR
2. 5W-30 ENGINE OIL
3. 10W HYDRAULIC OIL
4. CHASSIS GREASE 1/2"(TYP)
5. 75W-90 GEAR OIL
6. WINDSHIELD WASHER FLUID 1"
CA
7. ANTIFREEZE
8. COMPRESSED AIR 1/2"
CA
D.6
PLUMBING - FLUID & AIR - PART PLAN C - LUBE & WASH BAYS
1 SCALE: 1/8" = 1'-0"
N
KEY PLAN
A B
C D
F
E
G
G G G.1
G
F
1 1/2"G (200 CFH) SERVICE
VESTIBULE
19
STORES
STOCKROOM STORES
22 MATERIAL
MANAGEMENT
20
E.4
G
E
D.9
STORES
STOCK ROOM
SUPERVISOR
21
1 1/2"G (200 CFH)
D.6
PART PLAN C
PART PLAN D
D
1 1/2"G (200 CFH)
PART PLAN D VEST
PART PLAN E 11
COMM
08
N
1/8" = 1'-0" KEY PLAN
A B
C D
F
E
G
G.1
G
F
SERVICE
VESTIBULE
19 MEDIA
GARAGE
STORAGE
SUPERVISOR
ROOM
15
18
REPAIR CREW
STORES LEADER &
MATERIAL SUPERVISOR
MANAGEMENT OFFICE
20 EQUIPMENT 16
INSPECTION EQUIPMENT
AND GENERAL
IN-SERVICE SUPERVISOR E.4
OFFICE 14
17
G
E
D.9
STORES WOMENS
STOCK ROOM ROOM
SUPERVISOR 13
21
1 1/2"G (200 CFH)
LOCKER/SHOWER
13A
D.6
PART PLAN D
MENS ROOM
PART PLAN E 12
D
1 1/2"G (200 CFH)
1 1/2"G UP TO RTU (350 CFH)
VEST HALL
11 2 1/2"G DROP TO HVAC BOILER (2,200 CFH) 02
(TYP FOR 3)
COMM JAN
08 06
BREAK ROOM
G
07
G
MECHANICAL GAS PRESSURE REGULATOR
W/ ISOLATION VALVES (350 CFM)
ROOM
10 GAS PRESSURE REGULATOR
W/ ISOLATION VALVES (6,600CFH)
GV MACHINE
SHOP CREW
4"G(6,600 CFH)
LEADER &
GV F
CLERK OFFICE C
04
ELECTRICAL G G
ROOM GAS PRESSURE REGULATOR
GV W/ ISOLATION VALVES (800 CFH) 4"G(3,650 CFH) 2 1/2"G (3,300 CFH)
09
CONFERENCE
ROOM
2 1/2"G DROP(800 CFH) 05
(TYP FOR 4)
6"G(11,250 CFH)
SPRINKLER
ROOM
40 MACHINE
SHOP
SUPERVISIOR
N
VEST
03 KEY PLAN
01
6"G RISE
B.1
B A B
PART PLAN F
PART PLAN E
C D
GAS METER F
LOAD = 11,250 CFH E
PRESSURE REQUIRED = 2 PSI
G
PLUMBING - FLUID & AIR - PART PLAN E - OFFICE AREA
1 SCALE: 1/8" = 1'-0"
PART PLAN B
PART PLAN F
G.1
G
F
1"
CA
AERIAL
BUCKET BAYS
32
E.4
OVERHEAD CA HOSE REEL
(TYPICAL FOR 3) E
1/2"
D.9
CA
3/4"
OXYGEN/ACETYLENE
STORAGE CRIB
33.1
D.6
D
MACHINE
SHOP 1/2"
31
CA
WELD /
FABRICATION
JAN SHOP
06 33 3/4"
CA
OXYGEN /
ACETYLENE
MACHINE STORAGE CRIB 1/2"
SHOP CREW 33.2
CA
LEADER &
CLERK OFFICE C
04
G 2 1/2"G (3,300 CFH) PART PLAN F
MACHINE PAINT
SHOP REMOVAL
SUPERVISIOR BOOTH
N
03 37 KEY PLAN
PARTS
WASHER
34 B.1
B A B
PART PLAN F
PART PLAN E
PAINT MIX
PART PLAN F
ROOM C D
PART PLAN G 39 PAINT BAYS F
36 E
G
1/2"
PART PLAN F
CA PART PLAN G
C
PAINT
REMOVAL
BOOTH
G
37
PARTS
WASHER
34 B.1
B
PAINT MIX
PART PLAN F
ROOM
PART PLAN G 39 PAINT BAYS
36
PAINT SPRAY
PAINT BOOTH
EQUIPMENT 38
ROOM
35
N
KEY PLAN
A B
C D
F
E
G
K
J.9
I.5
I
H
G.9
G.1
G
F
E.4
E
D.9
D.6
B.1
B
PART PLAN A
PART PLAN B
DOWNSPOUT DOWNSPOUT DOWNSPOUT
(REFER TO ARCHITECTURAL DRAWINGS) (REFER TO ARCHITECTURAL DRAWINGS) (REFER TO ARCHITECTURAL DRAWINGS)
K
J.9
J
40' - 6"
I.5
H
G.9
40' - 6"
PART PLAN A
PART PLAN C
G.1
G
F
N
KEY PLAN
A B
C D
F
E
G
PART PLAN A
PART PLAN B
DOWNSPOUT DOWNSPOUT
(REFER TO ARCHITECTURAL DRAWINGS) (REFER TO ARCHITECTURAL DRAWINGS)
K
J.9
I.5
H
G.9
G.1
G
8"RD-D
F
(7,664SF) PART PLAN B
PART PLAN F
6"RD-D
(3,863SF)
N
KEY PLAN
A B
C D
F
E
G
PART PLAN A
PART PLAN C
G.1
G
F
4"VTR
4"SVTR
E.4
6"RD-D
(3,010SF) 6"RD-D
(4,673SF)
04 D.9
1"GV GOOSENECK TERMINATION
PLM-601
D.6
PART PLAN C
PART PLAN D
N
KEY PLAN
A B
C D
F
E
G
G.1
G
F
E.4
E
D.9
6"RD-D 6"RD-D
(6,893SF) (6,893SF)
D.6
PART PLAN C
PART PLAN D
PART PLAN D
PART PLAN E
N
1/8" = 1'-0" KEY PLAN
A B
C D
F
E
G
G.1
G
F
6"RD-D
(3,022SF)
E.4
4"VTR
E
D.9
6"RD-D
(6,893SF) 6"RD-D
(3,022SF)
D.6
PART PLAN D
PART PLAN E
D
6"RD-D
3"VTR (3,466SF)
6"RD-D
(3,466SF)
04
1"GV GOOSENECK TERMINATION
(TYP FOR 3) PLM-601
6"RD-D
(2,430SF)
N
KEY PLAN
B.1
B A B
PART PLAN F
PART PLAN E
C D
F
E
G
PLUMBING - ROOF LEVEL - PART PLAN E
1 SCALE: 1/8" = 1'-0"
PART PLAN B
PART PLAN F
G.1
G
8"RD-D
F
(7,664SF)
8"RD-E
(7,664SF)
6"RD-D
(3,863SF)
E.4
DOWNSPOUT E
(REFER TO ARCHITECTURAL DRAWINGS)
D.9
D.6
PART PLAN F
PART PLAN G
4"SVTR
6"RD-D 6"RD-D
(2,430SF) (4,600SF)
N
KEY PLAN
B.1
B
A B
PART PLAN F
PART PLAN E
PART PLAN F
PART PLAN G C D
F
E
G
PART PLAN F
PART PLAN G
C
6"RD-D
(4,600SF)
B.1
B
PART PLAN F
PART PLAN G
04 1"GV GOOSENECK
PLM-601 TERMINATION
DOWNSPOUT DOWNSPOUT
(REFER TO ARCHITECTURAL DRAWINGS) (REFER TO ARCHITECTURAL DRAWINGS)
N
KEY PLAN
A B
C D
F
E
G
2"
1 1/2 "
1 1/2 "
1 1/2 "
3"
FD-B FD-B
1 1/2 "
FD-B
3"
P-7
3"
4"
4" 4" 4"
1 1/2 "
6" 1 1/2 " 1 1/2 "
1 1/2 "
3" 6" 1 1/2 " 3"
3" P-4
FD-B 1 1/2 "
3"
1 1/2 " 1 1/2 " P-5
FD-B 3"
P-8 2"
CO P-7
CO
6" FD-B
6" 2"
2"
FD-B
FD-B
3" SANITARY WASTE AND VENT
RISER DIAGRAM
NO SCALE
TW TW
TW TW
1 1/4"
3/ "
1 1/4" 4
1 1/4"
1/ "
P-10 P-10 P-10 2
P-6
1"
TW
TW
1" 1 1/2 "
1/ "
2
1"
P-6
2" P-7
3/ "
4 1 1/2 " 1"
1 1/4"
1 1/4"
SA"A"
2"
11/4"
1" 1/ "
2" P-9 2" 2
1/ "
2
P-6 1"
3/ "
P-9 P-3 4
P-9
P-3
P-3 P-2 P-2 3/ " P-6
3/ " 2" 11/4" 4
4 P-9 P-1A P-1 SA"B"
3/ "
SA"C"
4
P-1A P-2
P-3 1/ "
P-1 2" P-1 2"
2
1"
1" 1 1/2 "
11/4" 1" 3/ "
4
1 1/2 " 1"
P-10 P-7
1" 1"
TW
P-4
TW
3/ "
4
GWH-2
2" 1/ " P-7
2
1"
3/ " 1/ "
1 1/4" 4 3/ " 2
4
P-5
P-6
TW 1/ "
TW 2
1/ "
1/ " 2
2
P-8
1" 1/ "
2
P-6
DOWNSPOUT BY
ARCHITECT (TYP)
8"RD-E
6"RD-D
DOWNSPOUT BY 8"
ARCHITECT (TYP)
6"
6"RD-D
8"
6"RD-D 6"
6"
6"
6"RD-D
6"
6"RD-D
6" 10"
6"
6"RD-D 4"RL; PROVIDE DOWNSPOUT BOOT 05
6"RD-D (1,291SF) PLM-600
4"RL; PROVIDE DOWNSPOUT BOOT
05 (4,527SF)
6" SECONDARY ROOF DRAIN PLM-600
6"RD-D
12"RL; REFER TO
10"RL; DOWNSPOUT NOZZLE
6" 6" CIVIL DRAWINGS
FOR CONTINUATION
6"RD-D
6" 8"
8"RL; REFER TO
CIVIL DRAWINGS
FOR CONTINUATION
NO. Revision Description Date Plotted: 6/9/2014 5:18:48 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt - RAIN LEADER 09.45
DESIGNER/DRAFTER SIGNATURE/BLOCK: PROJECT TITLE TOWN PROJECT NO.
THE INFORMATION, INCLUDING ESTIMATED RHL 118-0167
QUANTITIES OF WORK, SHOWN ON THESE
SHEETS IS BASED ON LIMITED
CHECKED BY: ROCKY HILL
INVESTIGATIONS BY THE STATE AND IS RSL STATE OF CONNECTICUT REPAIR FACILITY
DRAWING NO.
IN NO WAY WARRANTED TO INDICATE
SCALE DRAWING TITLE PLM-503
THE CONDITIONS OF ACTUAL QUANTITIES
OF WORK WHICH WILL BE REQUIRED. DEPARTMENT OF TRANSPORTATION PLUMBING RISER DIAGRAM SHEET NO.
NO. Revision Description Date Plotted: 6/9/2014 5:19:07 PM File Name: MPFP_CTDOT_Rocky Hill Repair Facility_Central.rvt - SPECIAL WASTE 09.46
CW TO POTABLE
TO NON-POTABLE WATER SYSTEM FLANGED CONNECTION
WATER SYSTEM REDUCED PRESSURE
DOWNSPOUT BY OTHERS BACKFLOW PREVENTER WALL
DOWNSPOUT BOOT 05 WATER METER AND NON-POTABLE 03 WATER SERVICE ENTRANCE DIAGRAM 01
WATER BACKFLOW PREVENTER NO SCALE
CA
1/2"
SIGNAGE
DRENCH SHOWER
1/ " x 1/ " REDUCER
2 4
PUSH PLATE
EYE/FASH WASH w/GRAPHICS
80" MIN
EYE/FASH WASH
1/ "FLUID
DISTRIBUTION PIPING; EWH-1
2
REFER TO FLOOR PLANS (TYP)
48" MAX
PROVIDE 1/2 "FNPT 1/ "BALL
2 VALVE (TYP)
CONNECTION TO FLEX HOSE
36" MAX
1/ "CA PIPING
2
1/ "BALL VALVE (TYP)
2
PROVIDE 1 1/4 "NPT WASTE
36" MAX
1/ "FNPT
CONNECTION
2 W/DOWNTURNED ELBOW;
TO FLEX HOSE
SPILL TO FLOOR
WASTE 1 1/4 "NPT TO FLOOR
FINISHED FLOOR
FINISHED FLOOR
1 2 3 4 5 6 7 8
HOSE REEL
FLEX HOSE CONNECTION
PROVIDED WITH HOSE REEL
1 15W-40 ENGINE OIL PEDESTAL MOUNTED EYE/FACE WASH 04 COMBINATION SHOWER/EYE/FACE WASH 02
4 CHASSIS GREASE
7 ANTIFREEZE
8 COMPRESSED AIR
OVERHEAD LUBRICANT/FLUID 07
HOSE REEL STATION
1 1
TO COMPRESSED AIR A PRV #1 4
SYSTEM DISTRIBUTION DUPLEX TWO-STAGE
RECIPROCATING COMPRESSORS
5 5 B
1" 1"
1/ "
CLEAR CONDENSATE
1 1/2 "X1" REDUCER 2
WASTE PIPED TO FLOOR DRAIN PRESSURE REDUCING VALVE SCHEDULE
PIPE SIZE
1/4" DRYER DRAIN
INLET PRESSURE FLOW SCHEDULE
PRV STATION PRV OUTLET
HIGH EFFICIENCY LOCATION
1/ " NO. NO. MAX. MIN. (PSI) PIPE SECTION
0.01-MICRON FILTER 120-GALLLON
2 1/ "
4 MIN. (GPM) MAX. (GPM)
RECEIVER (PSI) (PSI)
ELECTRONIC CONDENSATE A 2
DRAIN VALVE 1 300 25 50 5 50 MECHANICAL ROOM
NON-CYCLING
REFRIGERATED AIR DRYER PRV-1 B 1
2 300 25 50 5 50 MECHANICAL ROOM
NOTE : PROVIDE STRAINERS UPSTREAM OF ALL PRV STATIONS IN ACCORDANCE WITH THE CONTRACT SPECIFICATION
1/2"CA
DRUM MOUNTED AIR DRIVEN
PISTON PUMP
24" MIN.
55-GALLON DRUM
MANUAL FLUSH
P-2 URINAL KOHLER K-4904-ET SLOAN ROYAL 186-0.5 INTEGRAL 2" 2" 3/ " - - -
RTU-1 1 350 350 2.5-14 ROOF VALVE 4
PAINT BOOTH
1 3,300 3,300 29-138.5 PAINT BOOTHS ROOM P-3 WALL MOUNT LAVATORY KOHLER K-2032 LAVATORY FAUCET SYMMONS S-20-2-G-W-.5 1 1/4 " X 1 1/2 " 1 1/2 " 1 1/2 " 1/ " 1/ " - -
HEATER 2 2
TOTAL
11,250 *HIGH PRESSURE GAS REQUIRED*
LOAD P-4 MOP SINK FIAT MSB-3624 MOP BASIN FAUCET FIAT 830-AA 3" 3" 2" 1/ "
2
1/ "
2 - -
P-5 WATER COOLER HALSEY TAYLOR HAC8FS-Q-ADA - - - 1 1/4 " X 1 1/2 " 1 1/2 " 1 1/2 " 1/ "
2 - - -
P-7 WASH BASIN BRADLEY WF2603 - - - - 1 1/2 " 1 1/2 " 1" 1" - -
P-8 KITCHEN SINK JUST MFG SL-ADA-1921-A-GR FAUCET KOHLER K-15172-TL 1 1/2 " 1 1/2 " 1 1/2 " 1/ "
2
1/ "
2 - -
GWH-2 200 5 GPM 80 5.0 - 10.5 4" 120 120 1 60 A.O. SMITH ATI-540H-N WASH BAY HOT WATER
TANKLESS WATER
SA "C" 33-60 JAY R. SMITH 5020 EWH-1 0 3 GPM 40 3 18 208 3 60 80 EEMAX EX180T3 EE HEATER FOR EMERGENCY
EYE/FACE WASH STATIONS
FLOOR
TMV-1 1 1/4 " 1 1/4 " 1 1/4 " 5/
60 85 LAWLER 911-8334 FD-A WATTS FD-100-M 6" SQUARE TOILET ROOM FLOOR DRAIN
DRAIN
FLOOR
FD-B WATTS FD-330-Y 8" SQUARE MECHANICAL ROOM FLOOR DRAIN
DRAIN
ROOF
RD-D WATTS RD-300 15" DOME FLAT ROOF PRIMARY DRAIN
DRAIN
ROOF
RD-E WATTS RD-300-W 15" DOME FLAT ROOF OVERFLOW DRAIN
DRAIN
6"EXHAUST HEADER
CW
6"INTAKE HEADER
(2)2"V DN & RISE
2 1/2"NPCW
2"CW
4"INTAKE
3"FD-B (TYP 4 WATER HEATERS
4"EXHAUST
TW (TYP 4 WATER HEATERS
TW
NP
V
HW
G
2"TW
3"FD-B
PRV STATION
MECHANICAL GWH-1A (SEE DETAIL 01 ON PLM-601)
ROOM GWH-1B
10
GWH-1C
GWH-1D
STRAINER
HWR
TW CIRC. PUMP
1"CA DROP 17
G
HB-2 G.1
G
CA
F
1"
CA
CA
G
3 HOSE BIBB DETAIL
SCALE: 1/4" = 1'-0" 13 14
CA
CA
CA
1" D.9
CA
3"VTR
E.4
1 1/2"CW RISE 1/2"CW DROP TO TP
REFRIGERATED AIR DRYER
(3)1/2"TP DN
TP
NP
2"FD-A
D.6
1"GVTR FCO
2"V DN & RISE HB-1 P-2 TP P-2 P-2 12"RL DN
(31,494SF)
P-1A P-3 P-3
GAS PRESSURE REGULATOR P-1
2"V DN & RISE P-1 (2)2"V DN & RISE
W/ ISOLATION VALVES (200 CFH) 2"FD-A P-9 1"HW
2"V UP 3/4"HW DROP 1/2"CW DROP TO TP
3"W DN 4"CW 2"V UP 2"FD-A (3)1/2"TP DN
3/4"CW DROP
GWH-2 2"V DN & RISE
2"V UP