You are on page 1of 2

CL OF MEDIAN Skew angle not mention in schedule-B.

12500 1500 12500 So, we will proposed at 90degree angle,


500 1500 500 9500 500
MEDIAN
GAP 500 9500 500 1500 500
This bridge will no be in Skew. PRO
W

RAILING FP CB CARRIAGEWAY CB CB CARRIAGEWAY CB FP RAILING PRO


W

DRAINAGE FRL FRL


2.5% SLOPE 2.5% SLOPE PRO
W
SPOUT 100MM DIA WEEP
HOLES 1.0M C/C PROW

1000 20mm GAP STAGGERED PRO


W

500
1000
W
I.L. U/S I.L. I.L. D/S PRO

550
SLOPE 1:1000 D/S
W
PRO
W
PRO
W PRO

100 THK. W
PRO
P.C.C. (M15)
SECTION A-A 2
W
PRO
W

SCALE : 1/100 PRO


W

W
PRO
KEY PLAN
PRO
12500 1500 12500 FLOOR APRON 6000
MEDIAN DN STREAM NOTES:
1500 500 9500 500 GAP 500 9500 500 1500 500 FLEXIBLE APRON 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE.
FP CB MAIN CARRIAGEWAY CB CB MAIN CARRIAGEWAY CB FP RAILING B
2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS IS TO BE FOLLOWED.
1:2 3. CHAINAGES SHOWN IN TABLE ARE ALONG CENTER LINE OF MEDIAN.
4.
OPTIMUM MOISTURE CONTENT TO 98% PROCTOR DENSITY, SHALL BE CONFIRMED AS PER CI:710.1.4 OF IRC 78.
1:1.5
5. WEEP HOLES OF 100MM DIA SHALL BE PLACED AT 1.0M C/C HORIZONTALLY AND 1.0M C/C VERTICALLY IN
STAGGERED MANNER.
6. ALL DIMENSIONS & LEVELS OF STRUCTURES AS SHOWN IN SCHEDULE SHALL BE VERIFIED AT SITE BEFORE
STARTING THE WORK.
3000 FLOOR APRON
UP STREAM 7. GRADE OF CONCRETE
FLEXIBLE

FLEXIBLE APRON
A BOX ....................................... M35 APPROACH SLAB ....................... M30
APRON
LEVELING COURSE .............M15 CRASH BARRIER ......................... M40
1:2
APPR B
3500 CH

8. ALL REINFORCING STEEL SHALL BE HYSD / CRS (CORROSIVE RESISTANT STEEL) BARS GRADE Fe 500D OR ANY
SLA

APRON
FLOOR
OA

SUITABLE ANTI- CORROSIVE TREATMENT SHALL BE PROVIDED INLINE WITH SP 80.


20mm GAP

TYP.
5000
1:1.5
9. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE-
DRAINAGE
550

(a) TOP SLAB - TOP FACE = 45mm , BOTTOM FACE = 45mm


(575)

SPOUT
(b) BOTTOM SLAB - TOP FACE = 75mm , BOTTOM FACE = 75mm
AGARTALA

(c) SIDE WALL/RETAINING WALL EARTH FACE = 75mm , NON EARTH FACE = 45mm
10. WEARING COAT - 65mm THK. WITH ONE LAYER OF ASPHALTIC CONCRETE OF THK. OF 40mm OVER ONE LAYER OF
(1000
9563 )

25mm THK. MASTIC ASPHALT.


0

11. DRAINAGE SPOUT SHALL BE PROVIDED IN DECK SLAB AS PER MORTH.


APRON
FLOOR

1:1.5 12. DESIGN LOAD SHALL AS PER IRC:6 -2017 . STRUCTURE TO BE DESIGNED FOR 70R VEHICLE, CLASS A VEHICLE &
SPECIAL VEHICLE LOADING AS PER TABLE 6 .
FLEXIBLE APRON

B
550
(575)

13. FRL, CAMBER, SUPER ELEVATION, MEDIAN, SKEW SHALL BE VERIFIED AT SITE BASED ON APPROVED PLAN AND
1:2
PROFILE .
A
14. EXPANSION JOINTS : FILLER TYPE.
15.
APPR B
3500 CH
SLA

16. SIMULTANEOUS BACKFILLING ON BOTH SIDES OF WALL TO BE PERFORMED DURING EXECUTION OF WORK.
OA

17. THE WORK IS TO BE CARRIED OUT AS PER APPROVED RELEVANT DETAILED DRAWINGS FOR DIFFERENT
WALL (TYP.)
RETAINING

COMPONENTS OF THE STRUCTURE.


18. LAYOUT OF STRUCTURE SHALL BE CHECKED AT SITE WITH RESPECT OF FORMATION LEVEL, EXISTING GROUND
1:1.5 LEVEL, SKEW, AVAILABLE CLEARANCE ETC. AND ANY DISCREPANCY / AMBIGUITY FOUND IN DRAWING OR SITE SHALL
SILCHAR

BE BROUGHT TO THE NOTICE OF DESIGN CONSULTANT PRIOR TO EXECUTION OF WORK.


19. 300 THK. STONE PITCHING OVER 150 THK. GRANULAR FILL SHALL BE PROVIDED AS PER MORTH STANDARD.
1:2
20. ANY LOOSE / UNSTABLE MATERIAL BELOW BOX STRUCTURE IF FOUND DURING EXECUTION SHALL BE REPLACED BY

PLAN SUITABLE MATERIAL.

SCALE : 1/100 21. 600mm THK. FILTER MATERIAL BEHIND WALL SHALL BE AS PER APPENDIX 6 OF IRC:78-2014.
22. SKEW DIMENSIONS ARE SHOWN IN BRACKETS ( ).

CLIENT: EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : AUTHORITY ENGINEER : DRAWN PARVEEN CONSTRUCTION OF FOUR LANE BADARPUR BYPASS FROM DESIGN CHAINAGE
DESIGN PRABU KM: 27+300 AT CROSSING WITH NH-6 (OLD NH-44) NEAR SIDDESWAR PT.-I
BRIDGECON INFRACONSULTANTS VILLAGE TO DESIGN CHAINAGE KM: 38+400 ON NH-37 (OLD NH-44) AT
S.S. BUILDERS. CHECKED PRANJAL
PVT. LTD. KANDIGRAM CHAITA VILLAGE IN THE STATE OF ASSAM ON EPC MODE UNDER
APPROVED FARRUKH
249,NEW MODEL TOWN, 265, OKHLA INDUSTRIAL ESTATE BHARATMALA PARIYOJANA IN ECONOMIC CORRIDORS.
PHASE - III, NEW DELHI-110020 SAFETY CONSULTANT : PROOF
LUDHIANA (PUNJAB). CONSULTANT
GENERAL ARRANGEMENT DRAWING FOR MNBR AT CH.@ 32836.000
PH: +91-11-41832060
PH: +91-9254123666 AUTHORITY
+91-11-41832061 (SHEET 1 OF 2)
ENGINEER
0 Advance Copy PRABU PRANJAL FARRUKH 06-10-2023 REV. SCALE
DATE 06-10-2023 DRAWING NO. BIC-STR-MJR-BARAK-11001
REV. PARTICULARS DES. CHD. VER. DATE
BUILDING INFRASTRUCTURE-BUILDING THE NATION
0 AS SHOWN
550
(575)
20 EXPANSION JOINT EQ
3500 EQ EQ
SILCHAR AGARTALA RAILING APPROACH SLAB
3500 (21) 20mm GAP PEDESTRIAN RAILING 3500
(21) 20mm GAP
APPROACH SLAB APPROACH SLAB
TOP SLAB
WEARING COAT
CONSTRUCTION

500

100
JOINT

300
500
TOP SLAB
300X300

300

100
150 THK.

300
HAUNCH (TYP.)
600 THK PCC ( M15 )

550
FILTER MEDIA 3 BOTTOM SLAB
CONSTRUCTION 300
(575) (10000) (550) JOINT
500 9563 500
100 THK.
PCC ( M15 )

1.5 1.5 DETAILS OF


1 1
DETAIL - 3 CONSTRUCTION JOINT

550
SCALE : 1/35 SCLAE : 1/35

VIEW B-B 100 THK.


PCC ( M15) 500
SCALE : 1/40
32830.414 15.260 15.503 18.202

32836.000 15.150 15.686 18.185

32841.586 15.156 15.724 18.168

550
FRL

1200
OGL AT 20m LEFT FROM
PROPOSED CENTRE LINE

OGL AT 20m RIGHT FROM 300


PROPOSED CENTRE LINE
DETAIL - 1
SCALE : 1/40 DETAIL - 2
PROPOSED CHAINAGE SCALE : 1/40

125 150 THICK FLAT STONE APRON EMBEDDED 150 THICK FLAT STONE APRON EMBEDDED 125
200 IN 300 THICK M15 CONCRETE IN 300 THICK M15 CONCRETE
200

300
450

300

450
750

150

750
150
750

750
2000
150 450 150 425 450 425
2500
750

450 750 450

800
550

150
1300
150

150 150
1650
150 150

TYP. CROSS SECTION CURTAIN WALL TYPE-I TYP. CROSS SECTION CURTAIN WALL TYPE-II
(DOWN STREAM SIDE) (UP STREAM SIDE)

CLIENT: EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : AUTHORITY ENGINEER : DRAWN PARVEEN CONSTRUCTION OF FOUR LANE BADARPUR BYPASS FROM DESIGN CHAINAGE
DESIGN PRABU KM: 27+300 AT CROSSING WITH NH-6 (OLD NH-44) NEAR SIDDESWAR PT.-I
BRIDGECON INFRACONSULTANTS VILLAGE TO DESIGN CHAINAGE KM: 38+400 ON NH-37 (OLD NH-44) AT
S.S. BUILDERS. CHECKED PRANJAL
PVT. LTD. KANDIGRAM CHAITA VILLAGE IN THE STATE OF ASSAM ON EPC MODE UNDER
APPROVED FARRUKH
249,NEW MODEL TOWN, 265, OKHLA INDUSTRIAL ESTATE BHARATMALA PARIYOJANA IN ECONOMIC CORRIDORS.
PHASE - III, NEW DELHI-110020 SAFETY CONSULTANT : PROOF
LUDHIANA (PUNJAB). CONSULTANT
GENERAL ARRANGEMENT DRAWING FOR MNBR AT CH.@ 32836.001
PH: +91-11-41832060
PH: +91-9254123666 AUTHORITY
+91-11-41832061 (SHEET 2 OF 2)
ENGINEER
0 Advance Copy PRABU PRANJAL FARRUKH 06-10-2023 REV. SCALE
DATE 06-10-2023 DRAWING NO. BIC-STR-MJR-BARAK-11002
REV. PARTICULARS DES. CHD. VER. DATE
BUILDING INFRASTRUCTURE-BUILDING THE NATION
0 AS SHOWN

You might also like