You are on page 1of 1

Key Plan

U1 U2 U3 U4 U5 U6 U7

A
BL
150mm SWP RISER

QI
TO BELOW
Notes

UC
RWO

100mm SWP FREE FLOWING


AT 300mm ABOVE ROOF LEVEL

100mm SWP RISER


FROM ABOVE
FD WITH FUNNEL
AND 100mm T/B
FOR CHILLERS DRAIN

UB

RWO

RWO

UA A ISSUED FOR TENDER FV BM* AH* 08.03.15

No Revision
Job Project
Drawn Manager Director Date

150mm SWP RISER


TO BELOW Note: * indicates signatures on original issue of drawing or last revision of drawing
Conditions of Use. This document may only be used by GHD's client (and any other
person who GHD has agreed can use this document) for the purpose for which it was
prepared and must not be used by any other person or for any other purpose.

DRAINAGE - LEVEL 1 (HIGH LEVEL) PART 3B Master Developper / Owner


SCALE 1 : 100
Abu Dhabi Airports Company PJSC
Planning & Development
PO Box 94449, Abu Dhabi, U.A.E
T: +971 (0) 2 505 5000
F: +971 (0) 2 575 8300

150mm SWP RISER


TO BELOW Lead Consultant

E
RWO
GHD GLOBAL PTY LTD
3rd Floor, Guardian Tower, Danet Community
PO Box 45921 Abu Dhabi United Arab Emirates
T 971 2 6968700 F 971 2 4472915
E abumail@ghd.com W www.ghd.com
FOR CONTINUATION REFER TO PART DWG. No. 76-10526-H127

Specialist Consultant

Fire Life Safety, Planning


and Regulatory Specialist
D

Specialist Consultant

Third Party
Operational Advisor

100mm VP F/B & T/A 100mm VP F/B & T/A


WITH VENT COWL WITH VENT COWL

C Client
ADAC
RWO

Project
MIDFIELD TERMINAL FIRE
150mm SWP RISER
TO BELOW
STATION
Title

DRAINAGE SERVICES LEVEL 1


12 HIGH LEVEL PART 3
Scale 1 : 100 DO NOT SCALE
Drawn F. VILLETE Designer P. MOHD.
Drafting Design
6 7 8 9 10 11 Check Check
Approved
(Project Director)

DRAINAGE - LEVEL 1 (HIGH LEVEL) PART 3A Date

SCALE 1 : 100 This Drawing must not be used for Construction unless signed as Approved
Original Size
Drawing No:
A1
DETAIL DESIGN 76-10526- H129 Rev: A
Plot Date: 7/03/2015 10:26:57 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt