Notes
SPECIFIC TYPE TRANSFER PUMP TRANSFER PUMP
TEMPERATURE (C) 40 40
QUANTITY 1 1
KW 0.75 0.75
U4 U5 U6
32mm CWS
65mm TREATED WATER
65mm TREATED WATER
100mm INCOMING DOMESTIC WATER MAIN PIPE A ISSUED FOR TENDER FV BM* AH* 08.03.15
FROM EXISTING NETWORK Job Project
No Revision Drawn Manager Director Date
STORE
Specialist Consultant
Third Party
Operational Advisor
PUMP ROOM
CWS 65
CWS 50
CWS 80
Client
ADAC
Project
MIDFIELD TERMINAL FIRE
HB
STATION
Title DOMESTIC WATER SERVICES -
UA
CWS' 20
HB
PUMP ROOM ENLARGED PLAN
CWS' 25 CWS' 25 CWS' 20
& SECTIONS
Scale As indicated DO NOT SCALE
50mm CWS TRANSFER PIPE
Drawn F. VILLETE Designer P. MOHD.
80mm CWS OVERFLOW PIPE
65mm CWS BY-PASS PIPE DOMESTIC WATER SERVICES - PUMP Drafting
Check
Design
Check
3 ROOM ENLARGED PLAN & SECTIONS Approved
SCALE 1 : 50 (Project Director)
W116 Date
0 500 1000 1500 2000 2500 mm This Drawing must not be used for Construction unless signed as Approved
Original Size
SCALE 1: 50 AT ORIGINAL SIZE Drawing No:
A1
DETAIL DESIGN 76-10526- W302 Rev: A
Plot Date: 3/8/2015 8:17:39 AM Cad File No: C:\Users\arnoceja\Documents\76-10526_Midfield Fire Station MEP-Central_arnoceja.rvt