You are on page 1of 2

SUMMARIZED FIELD AND LAB BORELOG TEST RESULTS

Name of the Project : GEOTECHNICAL INVESTIGATION REPORT FOR REDEVELOPMENT OF TOLANAKERE SDSL, HUBLI. JOB CODE: Smart City, Hubli

Strucutre : - Northing : 15.359907 R.L of Existing G.L : 100.000 Type of Foundation : As per GTE Report Start Date : 27-Nov-20
Span of Structure: - Easting : 75.103709 R.L of Scour Level : Na Recommended SBC, t/m2 : As per GTE Report End Date : 28-Nov-20
Borehole No. : 01 Method of Boring : Rotary SMART CITY PROJECT, Prepared By : Saddam
Client: Dep. of G.W.T From G.L,, m : 2.00
Location : Hubli Termination Depth, m : 10.50 HUBLI. Checked By : Rukmini

FIELD TEST RESULTS LABORATORY TEST RESULTS SCOUR DEPTH


Level, m Shear

Water Absorption
S.P.T, N Rock Cores Grain Size Analysis Atterberg Limits

Natural Moisture

Specific Gravity

Mean Depth of
Free Swell Index
Sample Depth
Graphical Log

Parameters

IS Classification

Specific Gravity
Sample Type

Remarks
Slit Factor
Dia.of BH

Enhanced
Discharge
Designation, R.Q.D

Porosity
Core Recovery,

Angle of Internal

UCS/PLI
Corrected 'N'
Observed 'N'

Cohesion,C

Scour
Plastic Limit
Level, R.L

Liquid Limit
Rock Quality
Reduced

Strata Description

Friction,f
Depth

Plasticity

Content
CR

Gravel
15 Cm

15 Cm

15 Cm

Value

Value

Index
Sand

Clay
Silt
m m m - - - - - % % % % % % % % % % G % t/m2 Deg t/m2 Ksf m3/s m

0.00 100.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
150 mm Dia

0.50 99.50 Medium Dense - - - - - - - - - - - - - - - - - - - - - - - - - - - - -


Brownish Clayey
1.00 99.00 Sand - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

1.50 98.50 1.50 SPT 4 6 10 16 16 - - 8 34 14.9 43.1 SC 44 23 21 30 2.587 - - - - - - - 2.09 - - -

2.00 98.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2.50 97.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

3.00 97.00 3.00 Core - - - 50 2.66 0 - - - - - - - - - - - - - - 2.11 9.246 19.51 - - - -

3.50 96.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.00 96.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.50 95.50 4.50 Core - - - 50 22 0 - - - - - - - - - - - - - - 2.12 9.243 19.44 - - - -

5.00 95.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

5.50 94.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

6.00 94.00 6.00 Core - - - 50 5.33 0 - - - - - - - - - - - - - - 2.08 10.973 22.82 - - - -


NX

Reddish Soft Shale


6.50 93.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

7.00 93.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

7.50 92.50 7.50 Core - - - 50 19.3 0 - - - - - - - - - - - - - - 1.95 14.123 27.53 - - - -

8.00 92.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

8.50 91.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

9.00 91.00 9.00 Core - - - 50 28 0 - - - - - - - - - - - - - - 2.06 11.32 23.36 - - - -

9.50 90.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

10.00 90.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

10.50 89.50 10.50 Core - - - 50 - 9.66 0 - - - - - - - - - - - - - 2.01 13.697 26.82 - - - -

Page No.:1 of 2
SUMMARIZED FIELD AND LAB BORELOG TEST RESULTS

Name of the Project : GEOTECHNICAL INVESTIGATION REPORT FOR REDEVELOPMENT OF TOLANAKERE SDSL, HUBLI. JOB CODE: Smart City, Hubli
Strucutre : - Northing : 15.359890 R.L of Existing G.L : 100.000 Type of Foundation : As per GTE Report Start Date : 29-Nov-20
Span of Structure: - Easting : 75.103733 R.L of Scour Level : NA Recommended SBC, t/m2 : As per GTE Report End Date : 1-Dec-20
Borehole No. : 02 Method of Boring : Rotary SMART CITY PROJECT, Prepared By : Saddam
Client: Dep. of G.W.T From G.L,, m : 0.00
Location : Hubli Termination Depth, m : 10.50 HUBLI. Checked By : Rukmini

FIELD TEST RESULTS LABORATORY TEST RESULTS SCOUR DEPTH


Level, m Shear

Water Absorption
S.P.T, N Rock Cores Grain Size Analysis Atterberg Limits

Natural Moisture

Specific Gravity

Mean Depth of
Free Swell Index
Sample Depth
Graphical Log

Parameters

Sample Type

IS Classification

Specific Gravity

Remarks
Slit Factor
Dia.of BH

Discharge
Enhanced
Designation, R.Q.D

Angle of Internal

Porosity
UCS/PLI
Core Recovery,
Corrected 'N'
Observed 'N'

Cohesion,C

Scour
Plastic Limit
Level, R.L

Rock Quality

Liquid Limit
Reduced

Strata Description

Friction,f
Depth

Plasticity

Content
CR

Gravel
15 Cm

15 Cm

15 Cm

Value

Value

Index
Sand

Clay
Silt
m m m - - - - - % % % % % % % % % % G % t/m2 Deg t/m2 Ksf m3/s m

0.00 100.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
150 mm Dia

0.50 99.50 - - - - - - - - - - - - - - - - - - - - - - -
Hard Brownish Clay
1.00 99.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

1.50 98.50 1.50-1.70 SPT/DS 11 >50 blows for 5 50 - - - - - - - - - - - - - - - - - - - 2.16 - - -

2.00 98.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

2.50 97.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

3.00 97.00 3.00 - - Boulders obtained - - - - - - - - - - - - - - 2.12 8.50 18.02 - - - -

3.50 96.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.00 96.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

4.50 95.50 4.50 - - Boulders obtained - - - - - - - - - - - - - - 2.11 9.60 20.26 - - - -

5.00 95.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

5.50 94.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

6.00 94.00 6.00 - - Boulders obtained - - - - - - - - - - - - - - 2.13 6.30 13.42 - - - -


NX

Reddish Soft Shale


6.50 93.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

7.00 93.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

7.50 92.50 7.50 - - Boulders obtained - - - - - - - - - - - - - - 2.00 8.50 17.00 - - - -

8.00 92.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

8.50 91.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

9.00 91.00 9.00 - - Boulders obtained - - - - - - - - - - - - - - 2.06 8.60 17.72 - - - -

9.50 90.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

10.00 90.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

10.50 89.50 10.50 - - Boulders obtained - - - - - - - - - - - - - - 2.10 9.10 19.11 - - - -

Page No.:2 of 2

You might also like