Professional Documents
Culture Documents
Name of the Project : GEOTECHNICAL INVESTIGATION REPORT FOR REDEVELOPMENT OF TOLANAKERE SDSL, HUBLI. JOB CODE: Smart City, Hubli
Strucutre : - Northing : 15.359907 R.L of Existing G.L : 100.000 Type of Foundation : As per GTE Report Start Date : 27-Nov-20
Span of Structure: - Easting : 75.103709 R.L of Scour Level : Na Recommended SBC, t/m2 : As per GTE Report End Date : 28-Nov-20
Borehole No. : 01 Method of Boring : Rotary SMART CITY PROJECT, Prepared By : Saddam
Client: Dep. of G.W.T From G.L,, m : 2.00
Location : Hubli Termination Depth, m : 10.50 HUBLI. Checked By : Rukmini
Water Absorption
S.P.T, N Rock Cores Grain Size Analysis Atterberg Limits
Natural Moisture
Specific Gravity
Mean Depth of
Free Swell Index
Sample Depth
Graphical Log
Parameters
IS Classification
Specific Gravity
Sample Type
Remarks
Slit Factor
Dia.of BH
Enhanced
Discharge
Designation, R.Q.D
Porosity
Core Recovery,
Angle of Internal
UCS/PLI
Corrected 'N'
Observed 'N'
Cohesion,C
Scour
Plastic Limit
Level, R.L
Liquid Limit
Rock Quality
Reduced
Strata Description
Friction,f
Depth
Plasticity
Content
CR
Gravel
15 Cm
15 Cm
15 Cm
Value
Value
Index
Sand
Clay
Silt
m m m - - - - - % % % % % % % % % % G % t/m2 Deg t/m2 Ksf m3/s m
0.00 100.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
150 mm Dia
2.00 98.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2.50 97.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3.50 96.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4.00 96.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5.00 95.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5.50 94.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7.00 93.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8.00 92.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8.50 91.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9.50 90.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10.00 90.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Page No.:1 of 2
SUMMARIZED FIELD AND LAB BORELOG TEST RESULTS
Name of the Project : GEOTECHNICAL INVESTIGATION REPORT FOR REDEVELOPMENT OF TOLANAKERE SDSL, HUBLI. JOB CODE: Smart City, Hubli
Strucutre : - Northing : 15.359890 R.L of Existing G.L : 100.000 Type of Foundation : As per GTE Report Start Date : 29-Nov-20
Span of Structure: - Easting : 75.103733 R.L of Scour Level : NA Recommended SBC, t/m2 : As per GTE Report End Date : 1-Dec-20
Borehole No. : 02 Method of Boring : Rotary SMART CITY PROJECT, Prepared By : Saddam
Client: Dep. of G.W.T From G.L,, m : 0.00
Location : Hubli Termination Depth, m : 10.50 HUBLI. Checked By : Rukmini
Water Absorption
S.P.T, N Rock Cores Grain Size Analysis Atterberg Limits
Natural Moisture
Specific Gravity
Mean Depth of
Free Swell Index
Sample Depth
Graphical Log
Parameters
Sample Type
IS Classification
Specific Gravity
Remarks
Slit Factor
Dia.of BH
Discharge
Enhanced
Designation, R.Q.D
Angle of Internal
Porosity
UCS/PLI
Core Recovery,
Corrected 'N'
Observed 'N'
Cohesion,C
Scour
Plastic Limit
Level, R.L
Rock Quality
Liquid Limit
Reduced
Strata Description
Friction,f
Depth
Plasticity
Content
CR
Gravel
15 Cm
15 Cm
15 Cm
Value
Value
Index
Sand
Clay
Silt
m m m - - - - - % % % % % % % % % % G % t/m2 Deg t/m2 Ksf m3/s m
0.00 100.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
150 mm Dia
0.50 99.50 - - - - - - - - - - - - - - - - - - - - - - -
Hard Brownish Clay
1.00 99.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2.00 98.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2.50 97.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3.50 96.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4.00 96.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5.00 95.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5.50 94.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7.00 93.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8.00 92.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8.50 91.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9.50 90.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10.00 90.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Page No.:2 of 2