You are on page 1of 67

PUN HLAING SILOAM TAUNG GYI HOSPITAL

MARCH,2020

CONSTRUCTION DRAWING

ELECTRICAL SYSTEM

M & E DESIGN

SAN T I
SANTI ENGINEERING CO., LTD.
No. 7(B-1), 163rd Street, Tarmway Township, Yangon.
Ph: +951-8430066, Email: tinmaungthwin@santi-engineering.com
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

LIST OF DRAWINGS Project:

PUN HLAING SILOAM TAUNG


SR. DRAWING TITLE REVISION ISSUED DATE SHEET NO. SYSTEM SR. DRAWING TITLE REVISION ISSUED DATE SHEET NO. SYSTEM
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

STANDARD

1 LIST OF DRAWINGS 1 MARCH, 2020 GE - 01 STANDARD 34 LEVEL-1 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-02 WIRE WAY SYSTEM Prepared For:
2 LEGENDS, NOTES & ABBREVIATION 1 MARCH, 2020 GE - 02 STANDARD 35 LEVEL-2 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-03 WIRE WAY SYSTEM

ELECTRICAL DRAWINGS 36 LEVEL-3 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-04 WIRE WAY SYSTEM
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
3 BASEMENT STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-01 LIGHTING SYSTEM 37 LEVEL-4 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-05 WIRE WAY SYSTEM
TAUNGGYI, MYANMAR
4 LEVEL-1 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-02 LIGHTING SYSTEM 38 LEVEL-5 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-06 WIRE WAY SYSTEM
Contract No: 2018.04A
5 LEVEL-2 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-03 LIGHTING SYSTEM 39 LEVEL-6 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-07 WIRE WAY SYSTEM

6 LEVEL-3 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-04 LIGHTING SYSTEM 40 BASEMENT STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-01 CCTV SYSTEM

7 LEVEL-4 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-05 LIGHTING SYSTEM 41 LEVEL-1 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-02 CCTV SYSTEM

8 LEVEL-5 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-06 LIGHTING SYSTEM 42 LEVEL-2 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-03 CCTV SYSTEM

9 LEVEL-6 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-07 LIGHTING SYSTEM 43 LEVEL-3 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-04 CCTV SYSTEM

10 BASEMENT STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-01 POWER SYSTEM 44 LEVEL-4 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-05 CCTV SYSTEM

11 LEVEL-1 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-02 POWER SYSTEM 45 LEVEL-5 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-06 CCTV SYSTEM

12 LEVEL-2 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-03 POWER SYSTEM 46 LEVEL-6 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-07 CCTV SYSTEM Key Plan

13 LEVEL-3 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-04 POWER SYSTEM 47 CCTV SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 CCTV-08 CCTV SYSTEM

14 LEVEL-4 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-05 POWER SYSTEM 48 BASEMENT STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-01 PA SYSTEM

15 LEVEL-5 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-06 POWER SYSTEM 49 LEVEL-1 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-02 PA SYSTEM

16 LEVEL-6 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-07 POWER SYSTEM 50 LEVEL-2 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-03 PA SYSTEM

17 DB-1B & DB-111 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-01 SINGLE LINE 51 LEVEL-3 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-04 PA SYSTEM

18 DB-121 & DB-131 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-02 SINGLE LINE 52 LEVEL-4 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-05 PA SYSTEM

19 DB-141 & DB-2B1 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-03 SINGLE LINE 53 LEVEL-5 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-06 PA SYSTEM

20 DB-211 & DB-221 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-04 SINGLE LINE 54 LEVEL-6 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-07 PA SYSTEM

21 DB-231 & DB-241 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-05 SINGLE LINE 55 PA SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 PA-08 PA SYSTEM
No. Description DD/MM/YY
22 DB-5 & DB-6 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-06 SINGLE LINE 56 BASEMENT STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-01 FA SYSTEM

23 DB-U1, DB-U2, DB-OT & SDB-CT SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-07 SINGLE LINE 57 LEVEL-1 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-02 FA SYSTEM 1 ISSUE FOR CONSTRUCTION MARCH 2020

24 MSB-1 & MSB-2 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-08 SINGLE LINE 58 LEVEL-2 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-03 FA SYSTEM

25 ELECTRICAL SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 SL-09 ELECTRICAL SYSTEM 59 LEVEL-3 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-04 FA SYSTEM

26 EARTHING SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 ET-01 EARTHING SYSTEM 60 LEVEL-4 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-05 FA SYSTEM

27 BASEMENT FLOOR EARTHING SYSTEM LAYOUT 1 MARCH, 2020 ET-02 EARTHING SYSTEM 61 LEVEL-5 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-06 FA SYSTEM

28 ROOF STAGE2 LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-01 LA SYSTEM 62 LEVEL-6 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-07 FA SYSTEM

29 EAST ELEVATION LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-02 LA SYSTEM 63 FA SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 FA-08 FA SYSTEM

30 WEST ELEVATION LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-03 LA SYSTEM 64 PABX SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 PABX-01 PABX SYSTEM

31 SOUTH ELEVATION LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-04 LA SYSTEM 65 DATA SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 DATA-01 DATA SYSTEM

32 NORTH ELEVATION LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-05 LA SYSTEM 66 MATV SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 MATV-01 MATV SYSTEM

33 BASEMENT STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-01 WIRE WAY SYSTEM

Scale: Drawn by: Reviewed by:


NTS HNO HKW
Sheet Title:

LISTS OF DRAWINGS

Sheet Number

GE01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

LEGEND
GENERAL NOTES
2
Recessed hygeia 13A Switch Socket Outlet (Double)
Electrical work, materials and equipment shall comply with the Myanmar standards and electrical codes of practice.
Surface mounted troffer light Universal Socket Outlet Project:
ELECTRICAL SYSTEM
Surface mounted fluorescent Connector Unit (for Bed Head and Pendant)
PUN HLAING SILOAM TAUNG
The location of lighting fixtures and receptacles could be varied from the drawing to avoid interferences except for ceiling layouts. GYI HOSPITAL
15A
Recessed mounted troffer light
15A Switch Socket Outlet All switches are located ~150 mm from the edge of the openings and doors No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

Mounting height of switches, socket outlets shall be kept as follows, unless otherwise noted on drawings.
Recessed mounted downlight
Telephone Socket Outlet (RJ-11)
Switches _______________ 1200mm above finished floor to bottom Prepared For:
Surface mounted downlight
TV
(exterior) Receptacles ____________ 300mm above finished floor to bottom
Television Socket Outlet
RENOVATION & EXTENSION TO 3 & 6
Recessed downlight (water C
Distribution boards ________ 1800mm above finished floor to top STOREY RCC BUILDING
Computer Socket Outlet (RJ-45)(Cat-6)
proof)
Shop drawings to show exact location of electrical fixtures shall be submitted to interior designer for approval prior to installation. TAUNGGYI, MYANMAR
Medical lighting pendant WAP
Wifi Access Point (PoE ) Contract No: 2018.04A

4' Fluorescent (Suspended) Isolator Unit GROUNDING SYSTEM


All steel structures, metallic equipment, piping and non-current carrying metal parts shall be bonded together and permanently grounded.
EXIT EXIT LIGHT
Breaker and Panel Box
Earth electrode shall be made of 5/8" dia x 6 ft long copper clad steel.
SINGLE SIDED DIRECTIONAL Distribution Board

ARROW FACING RIGHT


Cable ladder, tray and trunking shall be bonded at each section with a copper bonding jumper.
Wall Mounted Data Rack
Resistance of electrical system should not exceed than 2 ohm.
SINGLE SIDED DIRECTIONAL
IDF
ARROW FACING LEFT Intermediate Distribution Frame (IDF)
All joint and connection in electrical earthing system must be exothermic welding. Key Plan

DOUBLE SIDED DIRECTIONAL Earth Jack Connection


ARROW FACING LEFT & RIGHT
LIGHTNING PROTECTION SYSTEM
EXIT DOUBLE SIDED DIRECTIONAL
CCTV Camera (Outdoor)
ARROW FACING LEFT
All non-currenty carrying metal parts exposed on roof or sides of building shall be electrically connected to lightning protection system.
CCTV Camera (Doom) Resistance of each earth pit of lightning protection system should not exceed than 10 ohm.
One way one gang switch

2 S All joint and connection in lightning protection system must be exothermic welding.
Smoke Detector
One way two gang switch
H
3 Heat Detector
One way three gang switch
M
MATV SYSTEM
Manual Call Point
4
No. Description DD/MM/YY
One way four gang switch
C
D
Fire Alarm Bell c/w Strobe Light
The signal strength of all television outlets shall not be less than 60db and not exceed than 80db at 800MHz. 1 ISSUE FOR CONSTRUCTION MARCH 2020
Dimmer switch
Out Put Module / Control Module
AOM
Two way one gang switch
Input Module / Monitoring Module
AIM
FIRE ALARM SYSTEM
Two way two gang switch
S PA Speaker (Ceiling Recessed)

13A Switch Socket Outlet (Single) S PA Speaker (Wall Mounted) All fire alarm systems installations shall comply with relevant NFPA regulations and standards and guidelines issued by civil defence and
CL
13A Switch Socket Outlet (Ceiling Level)
fire department.

Fire alarm system design, installation shall be in accordance to NFPA 72, NFPA 70, NFPA 101, SS:CP 10 and international building code 2003.

All fire alarm detection devices, control panel shall be installed new with UL listed and FM approved or approved equivalent.

Break glass unit to be mounted at 1200mm from finish floor line.

Installation of fire sounder shall be 2200mm from finish floor to center of device.
Installation of fire control panel shall be 1200mm from finish floor to center of panel.
Sounder and break glass unit to be mounted on the same center vertical line.
2 core 1.5 sq.mm fire rated cable shall be used or approved equivalent. Scale: Drawn by: Reviewed by:
NTS HNO HKW
Fire alarm system must be interfaced with tamper switch of fire pump/ sprinkler system. Sheet Title:

LEGENDS, NOTES &


ABBREVIATION

Sheet Number

GE02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
GEN SET A
B24 PUN HLAING SILOAM TAUNG
Not Enclosed
DB-2B1-1 GYI HOSPITAL
PUMP ROOM WASTE MEP No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
WARE HOUSE RAW WATER B25 B23 B22
DB-1B-3
B10 B15 Not Enclosed Not Enclosed Not Enclosed
Not Enclosed Not Enclosed
DB-2B1-1
DB-2B1-1 Prepared For:
DB-2B1-1
DB-2B1
B RENOVATION & EXTENSION TO 3 & 6
MEDICAL RECORDS DB-2B1-2 STOREY RCC BUILDING

DB-U2-1
DB-2B1-1
B09 MEP OFFICE
TAUNGGYI, MYANMAR
Not Enclosed DB-2B1-3
MSB
B21
DB-U2-1

DB-U2
Not Enclosed
Contract No: 2018.04A
C
DB-1B-3 DB-U1-1

DB-U2-1
EXIT

DB-1B-2
DB-U1-1
LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
DB-1B-1 C'
B13 DB-2B1-1
Not Enclosed
D

Key Plan
D'
MEP

MSB
DB-U2-1
B08 IRONING ROOM

2
Not Enclosed LAST OFFICE B35
B19 Not Enclosed

DB-U1-1
Not Enclosed DB-2B1-5
DB-1B-3
DB-1B DB-1B-1 E
EARTH
TOILET

DB-2B1-5
DB-U1-1
DB-U1
DB-1B-2 B14
Not Enclosed
BIKE PARKING AREA E'
DB-2B1-2
B18

DB-2B1-5
DB-U1-1
TOILET Not Enclosed
B12 F

DB-2B1-3
Not Enclosed
DB-1B-1
BOTTLE STORAGE G
DB-1B-5 B16 No. Description DD/MM/YY
PHARMACY STORAGE SECURITY Not Enclosed
B06 B07 DB-U2-1
DB-1B-5 1 ISSUE FOR CONSTRUCTION MARCH 2020
Not Enclosed Not Enclosed

H
DB-1B-2
DB-U1-1 CORRIDOR
POD

DB-U1-1
B11

EXIT
B05 Not Enclosed

EXIT
Not Enclosed
DB-1B-5 DB-U2-1

DB-1B-5 K
HOUSE KEEPING DB-1B-5

Not Enclosed
BIO MED
MEDICAL SUPPLY
B03
B02
DB-1B-5
B04 Not Enclosed
Not Enclosed DB-2B1-5

MALE CHANGING
B01
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

BASEMENT STAGE2
LIGHTING SYSTEM LAYOUT

Sheet Number

LT01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

A Project:

DB-111-18

DB-111-18
DB-111-17

DB-111-17
MEDICATION
PUN HLAING SILOAM TAUNG

DB-111-17
DB-111-18

DB-211-4
DB-111-17
122A TOILET TOILET

DB-111-17
TOILET TOILET TOILET TOILET TOILET TOILET 114C
DB-111-5
120a
Not Enclosed
119a
Not Enclosed
118a 117a
Not Enclosed Not Enclosed
116a 115a
Not Enclosed
DB-111-18
Not Enclosed
158A
Not Enclosed CONSULT
DB-211-4 GYI HOSPITAL

DB-111-18
Not Enclosed
Not Enclosed

DB-111-18
DB-111-17

DB-111-17

DB-111-17
TOILET CONSULT CONSULT 157 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-111-11 Not Enclosed

DB-211-4
DOUBLE IPD STD IPD STD IPD STD IPD STD IPD STD IPD STD IPD DB-211-4
NURSE STATION STD IPD TOILET DB-211-4
DB-111-11 114 159A
122B
DB-111-18

DB-111-18
Not Enclosed Not Enclosed Not Enclosed DB-211-4 Prepared For:
2 2
2
B
DB-U1-3
DB-111-4 DB-U2-3
CONSULT RENOVATION & EXTENSION TO 3 & 6
156
DB-211-4
Not Enclosed STOREY RCC BUILDING
DB-U2-3
DB-U1-3
DB-111-2 TAUNGGYI, MYANMAR
DB-U1-5 C
DB-U1-3 EXIT DB-211 Contract No: 2018.04A

MEDICATION

Not Enclosed
DB-211-4

DB-111-12
STD IPD

DB-U1-3
DB-U1-3
SEPTIC DB-211-4

126
DB-U1-3 GP DB-111-16
DB-111-12 XRAY VITAL
DB-111-11

EXIT
TRIAGE MAMMO 127
DB-111-11 Not Enclosed DB-U2-3

EXIT
SDB-CT-3
C'
EXIT
DB-U1-3
DB-U2-3

DB-U2-3
MEDDICAL SUPPLIER 2 D
SDB-CT
UPS PIPING TOILET
IMAGING F
DB-111-16 128
SDB-CT-1 155A
DB-111-14
7 sqm CHANGING
SDB-CT-3 Not Enclosed NotDB-211-1
Enclosed D' Key Plan
DB-111-4
CONTROL

DB-211-3
CONSULT
2

2
Light Box Signage

DB-211-1

Not Enclosed DB-U1-5


CORRIDOR DB-U1-3
GENERAL WAITING
EXIT

DB-U1-3 124
ED ENTRY USG 129
Not Enclosed

IMAGING CORRIDOR
E
2
ED DB-111-16 Not Enclosed

DB-211-6

DB-211-6
DB-U1-3 7 sqm

142
DB-111-2 DB-211-1
DU TOILET JAN
DB-111-14

DB-111-14

DB-111-14

DB-211-5
2
DB-111-14 E'
USG CONSULT
DB-111-16 DB-211-1

5.5 sqm CT TOILET DB-211-1 F


DB-111-3

DB-111 154A
EXIT Not Enclosed
DB-111-8 DB-U1-5 G
TOILET

SDB-CT-1
SDB-CT-1
DB-111-15

DB-111-15
DB-U1-3
DB-111-1

153A
DB-111-19 Not Enclosed No. Description DD/MM/YY
5.5 sqm DB-211-1
LED Strip Light

LOBBY TOILET TOILET CONSULT


2 1 ISSUE FOR CONSTRUCTION MARCH 2020
Not Enclosed
EXIT
STAIR 132 131
DB-U1-5 DB-U1-5 Not Enclosed Not Enclosed Not Enclosed DB-211-1
DB-U1-5

H
DB-111-6 DB-U1-5 DB-111-9 DB-U1-5 BLOOD COLLECTION
CORRIDOR DB-U2-3
152 TOILET
DB-211-2

EXIT
RECEPTION
DB-111-8 DB-U1-5 137 Not Enclosed 151B
Not Enclosed DB-111-7 Not Enclosed DB-211-2 Not Enclosed
2
EXIT DB-U2-3 J
2 DB-U1-5
DB-111-13

2
CONSULT 2 K

DB-111-10
DB-111-10 DB-U2-3

DB-111-10
DB-111-13 DB-111-10 108

PATHOLOGIST

Not Enclosed
DB-U1-5 FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 DB-111-10 107

109
Not Enclosed LAB
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
To Level-2 Light 151
REF. DB-111-13
Fixture Not Enclosed
DB-211-2

REF. DB-111-10 STAIR


DB-211-2

S1-1
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-1 STAGE2 LIGHTING


SYSTEM LAYOUT

Sheet Number

LT02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
DB-121-8 PUN HLAING SILOAM TAUNG
TOILET
Not Enclosed
DB-121-8
TOILET
DB-121-8
TOILET
DB-121-8 DB-121-10
TOILET
DB-121-10
TOILET
DB-121-10
DB-121-14 DB-121-14 OT 2
257
OT 3
256
OT 4
B47
GYI HOSPITAL

DB-OT-3

DB-OT-3

DB-OT-5

DB-OT-5
DB-121-8
Not Enclosed Not Enclosed Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-OT-2
DB-121-8 DR CHANGING
DB-121-10
DB-121-8 STD IPD PRE / POST
STD IPD STD IPD STD IPD
DB-121-8

2
DB-121-8 DB-121-10 DB-121-10 Prepared For:

2
2 2 2 2 2

DB-U1-4
DB-U1-4

2
DN B
DB-U1-2
DB-U1-2
DB-121-2
RENOVATION & EXTENSION TO 3 & 6
EXIT

DB-OT-2
FIRE LANDING DB-U1-2 DB-U2-5
STOREY RCC BUILDING

EXIT
Not Enclosed CORRIDOR
B164 DB-U2-5
DB-121-4 DB-U1-2 TAUNGGYI, MYANMAR

DB-U2-5
Not Enclosed
DB-OT
UP EXIT
C Contract No: 2018.04A
DB-U1-2

DB-221
DB-121-6
TOILET
DB-121-6 TOILET
DB-121-12 WASHING DB-221-3
TOILET ?
DB-121-15

STD IPD STD IPD STD IPD DB-121-14

DB-U2-5
DB-121-7
DOUBLE IPD LIFT CSSD STERILE
DB-121-15

DB-121-12 Not Enclosed CORRIDOR


DB-121-12 B166

DB-U2-5
DB-121-6

EXIT
TOILET DU C'

DB-U2-5
DB-121-12 Not Enclosed
2

DB-221-2 EXIT

DB-121-9
DB-121-14 D

DB-221-1
DB-121-17
TOILET
MEDICATION LDS DB-221-2 D' Key Plan
DB-221-6
DB-121-6 DB-221-2 2 DB-221-6
DB-121-14
DB-121-15 CSSD CLEAN STD IPD
DB-121-17 20 m²
LDS DR DB-221-6

DB-U1-4
DOUBLE IPD ROOF LOUNGE DB-U2-5
E
Acrylic Light DB-121-15 CLEAN
PASSAGE DB-221-5
DB-121-17 DB-221-4
3 m²

DB-221-5
CSSD DIRTY

DB-U2-5
E'

DB-U2-5

DB-221-4
2
DB-121-6 17 m²
Acrylic Light DOUBLE IPD TOILET MEDICATION

DB-OT-1
JAN
DB-121-6 TOILET DB-221-4 Not Enclosed
DB-121-15 F
CLEAN
DB-121 OT 1 CHANGING
DB-121-17 G
DB-U1-4
DB-121-5

BABY WASH
DB-111-19 DB-121-16 DB-121-17
EXIT

TOILET
2

PREP
LIFT 2

DB-OT-1
DB-121-15

DB-121-16 No. Description DD/MM/YY


CLEAN
NURSERY DB-221-5

DB-221-5
CHANGING
DB-221-4 1 ISSUE FOR CONSTRUCTION MARCH 2020
DB-U1-4
TOILET STD IPD CU
Acrylic Light TOILET
DB-121-16 DB-121-17 Not Enclosed
2 DB-221-5
H
Acrylic Light
DB-121-1 DB-U2-5

2
DB-U2-5
DB-121-11
DB-U1-4

EXIT
DB-221-5
DB-121-3
DB-U1-4 J
2

DB-U2-5 ICU

2
2 2 2 2
DB-121-11 DB-121-13
DELUXE DB-121-11
SUITE DB-121-13
2
K
DB-121-16

To Level-3 Light
STD IPD DB-221-5
STD IPD Fixture
STD IPD STD IPD STD IPD DB-121-13 DB-121-13 STD IPD
DB-121-11
DB-121-11 DB-121-16 DB-121-13 TOILET 251
TOILET TOILET TOILET DB-121-13 DB-221-5
DB-121-11 DB-121-16 DB-121-13 TOILET Not Enclosed DB-221-6
TOILET DB-121-13 DB-211-7
STAIR DB-221-6 TOILET
S1-2
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-2 STAGE2 LIGHTING


SYSTEM LAYOUT

Sheet Number

LT03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
DB-131-13
PUN HLAING SILOAM TAUNG
DB-231-4
DB-131-13
TOILET
DB-131-13 DB-131-10
DB-131-10
DB-131-10
DB-231-4
DB-231-4
GYI HOSPITAL
Not Enclosed DB-131-13 DB-131-13 DB-131-10
DB-131-13 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-131-10 DB-231-4

DB-231-4
DB-131-13 DB-231-4 DB-231-4 STD IPD
STD IPD
DB-131-13 DB-131-13 DB-131-10 DB-131-10 Prepared For:
DB-231-4
Not
2
Enclosed
2 2 2 2 2 2
DB-U1-6
DB-U1-6
2
B RENOVATION & EXTENSION TO 3 & 6
DB-U1-6 DB-U2-2
EXIT

FIRE LANDING CORRIDOR DB-131-3


DB-U1-6 STOREY RCC BUILDING
Not Enclosed Not Enclosed
DB-U2-2 DB-231-4 TAUNGGYI, MYANMAR
DB-131-4
TOIELT
Contract No: 2018.04A
2 C

-50
DB-231
DB-131-8
DB-131-7 DB-231-4
DB-231-4
FIRE EXIT

DB-U2-2
DB-131-5 DB-131-5 LANDING
DB-131-5

DB-U2-2
DB-U1-6

EXIT
DB-131-8 DB-131-7 DB-131-5 CORRIDOR C'
DB-U2-2
-50
EXIT

DB-131-12
2

TOILET
Key Plan

2
DB-131-7 DB-231-5 D'

DB-231-3
DB-131-11
VOID

2
2
DB-131-8 DB-231-5
DB-131-12
STD IPD
2

DB-231-5
DB-131-11

ROOF E

DB-231-1
2
DB-131-8

2
DB-131-12

DB-U2-2
DB-131-7 E'
DB-131-7 DB-131-11 DB-231-5

2
DB-U1-7
F
DB-131-8 DB-131

G
DB-U1-7

DB-131-11
EXIT
2

DB-231-5
No. Description DD/MM/YY
DB-111-19

DB-131-8

2
1 ISSUE FOR CONSTRUCTION MARCH 2020
DB-U1-7
DB-131-11 DB-131-11 DB-131-12
DB-131-11
DB-U1-7

DB-131-12
2
H
DB-131-2 DB-231-2

2
EXIT
DB-U1-7 DB-U2-2
DB-131-1 TOILET
DB-U1-7 DB-U2-2
J
2

DB-U2-2 DB-231-2
DB-131-9 2 2 2 2 2

2 GRAND SUITE K
DB-131-9 DB-131-6 DB-131-6
DB-131-9 DB-131-6 To Level-4 Light DB-231-2 DB-231-2
Fixture
DB-131-9
DB-131-9
DB-131-9 DB-131-9 DB-131-6 DB-131-6 DB-131-6
DB-231-2
DB-211-7
DB-231-2
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-3 STAGE2 LIGHTING


SYSTEM LAYOUT

Sheet Number

LT04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
DB-141-14 DB-141-14 DB-141-14 DB-141-14 DB-141-14 DB-141-14 DB-141-14 DB-141-14
DB-241-2
GYI HOSPITAL
DB-241-2 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

DB-141-11 DB-141-11 DB-141-14


DB-141-15
c c DB-241-2 DB-241-2
DB-141-15

3 3
c c Prepared For:
2

DB-241-2
DB-241-2
2
B RENOVATION & EXTENSION TO 3 & 6
DB-141-11

DB-141-9 DB-U1-9 DB-U2-4


STOREY RCC BUILDING

2
DB-U2-4 DB-241-2
DB-141-7 DB-U1-9
EXIT

DB-241-2
TAUNGGYI, MYANMAR
Light Box Signage

DB-U1-9 2 2 1400
DB-U1-9

a b
a a b
b Contract No: 2018.04A
C
DB-141-5 DB-241

DB-141-11
DB-141-11 DB-141-11
DB-141-11 DB-141-11 DB-141-11 DB-141-11 DB-141-15 DB-241-2 DB-241-2
MEDICATION
5 m² 1945 DB-141-15
DB-U2-4
DB-141-11 STAFF ROOM

DB-U2-4
EXIT
C'

DB-U2-4
DB-141-4
EXIT

DB-U1-11
DB-141-13
D

DB-241-1
DB-141-2

DB-141-13
SILVER BED TOILET
3 m² Key Plan
d DB-141-6 MEDICATION DB-241-4 D'

DB-241-3
DB-141-15
2
DB-241-4
DB-141-13

DB-141-13 STD IPD

DB-141-8
VOID
Not Enclosed
DB-241-4
DB-141-13
VOID
DB-U1-9

d SILVER BED
DB-141-6 E
STORAGE DB-241-4

DB-141-10
DB-141-13

DB-141-13
CORRIDOR DB-141-15

DB-U2-4
d
Not Enclosed E'
DB-141-13
SILVER BED CORRIDOR
EXIT 3 3 DB-141 DB-141-6
DB-241-4 F
d
DB-U1-9 3

2
G

DB-141-2

DB-141-4
CU DB-141-6 No. Description DD/MM/YY
e DB-U1-11 DB-241-4
3 3 DB-111-19 DB-141-6 STAFF
PANTRY 1 ISSUE FOR CONSTRUCTION MARCH 2020
DB-141-6
DB-141-17
SILVER BED SILVER BED SILVER BED DU
DB-141-6
DB-141-6

H
2

DB-U1-11
EXIT AP2-802-1`
DB-U1-11
DB-141-17

EXIT
SILVER BED
DB-U2-4
DB-U1-11 DB-241-5 DB-241-5

DB-U1-11 J
DB-U2-4 DB-U2-4

2
e e e 2 K
SILVER BED
3

SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED To Level-5 Light DB-241-5
STAFF TOILET

DB-141-17 DB-141-12 DB-141-12 DB-141-12


WAITING GRAND SUITE
SILVER BED TOILET 04 TOILET 05 Fixture DB-241-5
DB-241-5
DB-141-12
DB-241-5
DB-141-3 DB-141-17 DB-141-17 DB-141-17 DB-141-12 DB-141-12 DB-141-12
DB-241-5

DB-141-1

DB-211-7
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-4 STAGE2 LIGHTING


SYSTEM LAYOUT

Sheet Number

LT05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

A Project:

TOILET
DB-5-9
PUN HLAING SILOAM TAUNG
DB-5-5
TOILET TOILET
DB-5-5
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

TOILET STD IPD


DB-5-9
TOILET DB-5-5
ISO STD DB-5-5
IPD
DB-5-9 DB-5-9 DB-5-5 Prepared For:
2 DB-5-5
DELUXE SUITE B
DB-U2-6 RENOVATION & EXTENSION TO 3 & 6
CORRIDOR
DB-U2-6 DB-5-5 STOREY RCC BUILDING
DB-5-5
TAUNGGYI, MYANMAR

2
TOILET
C
Contract No: 2018.04A
DB-U2-6 EXIT 2 DB-5

DB-5-9 DB-5-9

COUNTER
NURSE

DB-U2-6
MEDICATION

DB-U2-6

EXIT
DB-U2-6 C'
DB-5-6 EXIT DB-U2-6

2
TOILET
CONFERENCE OFFICE
DB-5-2 D' Key Plan

DB-5-7
DB-5-6
2

DB-5-7
DB-5-2
VOID
STD IPD

DB-5-1
DB-5-2
VOID
E

DB-U2-6
DB-5-2
DB-5-7
PANTRY
DB-5-6
HR OFFICE E'

DB-5-3
F
DOUBLE IPD

2
2 G
OUTDOOR DB-5-2
SEATING
No. Description DD/MM/YY
TOILET
DB-5-2
1 ISSUE FOR CONSTRUCTION MARCH 2020

DB-5-11 H
WATER DB-5-4
STORAGE TOILET
DB-5-4
DB-U2-6
EXIT
DB-U2-6 GRAND SUITE J
DB-U2-6

2
DB-5-11
DB-5-11 2
DB-5-4 DB-5-4 K
STD IPD

To Level-6 Light DB-5-4


Fixture
DB-5-4 DB-5-4

STAIR 02 TOILET
Not Enclosed
DB-211-7 L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-5 STAGE2 LIGHTING


SYSTEM LAYOUT

Sheet Number

LT06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16


Light Box Signage
Located at Roof
level
A
DB-6-5 Project:
DB-6-2
DIS TOILET PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-6-2
SHOWER DB-6-7 DB-6-7
DB-6-7 DB-6-7
IPD STD 01 IPD STD 02 IPD STD 03 IPD STD 04
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
DB-6-2
TOILET Prepared For:
B
EXTG: TOILET RENOVATION & EXTENSION TO 3 & 6
Not Enclosed
DB-6-2
DB-U2-7
STOREY RCC BUILDING

EXIT
DB-U2-7
DB-6-2
TAUNGGYI, MYANMAR
C
Contract No: 2018.04A
IPD STD 05
DB-6-7
DB-6-2 Not Enclosed
IPD STD 06

MEDICATION
Not Enclosed
Not Enclosed
DB-6-7
DB-6
C'

EXIT
DB-U2-7 DB-U2-7

DB-U2-7 EXIT
D

PREP COUNTER
D'
Key Plan

IPD STD 07
DB-6-6

DB-6-3
Not Enclosed

E
VOID

DB-6-1
IPD STD 08
DB-6-6 E'
CORRIDOR Not Enclosed
Not Enclosed
F
DB-U2-7

LIFT MECH IPD STD 09


DB-6-6
ROOM Not Enclosed No. Description DD/MM/YY
8 m²
1 ISSUE FOR CONSTRUCTION MARCH 2020

IPD STD 10
DB-6-6 H
PREP COUNTER Not Enclosed
DB-U2-7 DB-U2-7
STAIR
NURSE
S1-6

DB-U2-7
Not Enclosed STATION 1

EXIT
Not Enclosed DB-U2-7
J

DB-6-4 IPD STD 11


DB-6-4
Not Enclosed K

DB-211-7
IPD STD 13
DB-6-4 IPD STD 12 DB-6-4
Not Enclosed Not Enclosed
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-6 STAGE2 LIGHTING


SYSTEM LAYOUT

Sheet Number

LT07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

GEN SET HL HL A
B24 DB-2B1-12
Project:
Not Enclosed
CL CL
CL
PUN HLAING SILOAM TAUNG
PUMP ROOM WASTE MEP
WARE HOUSE
B10
RAW WATER
B15
B25 B23
DB-2B1-11
B22 GYI HOSPITAL
Not Enclosed TRANSFER PUMP Not Enclosed Not Enclosed
Not Enclosed Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
MSB-2-13

Prepared For:
AC HL B

2
DB-2B1
RENOVATION & EXTENSION TO 3 & 6
2 C
MEDICAL RECORDS

DB-1B-7
DB-1B-17 DB-2B1-7
DB-U2
B09 MEP OFFICE
STOREY RCC BUILDING

C
Not Enclosed MSB
B21

2
Not Enclosed
DB-2B1-14 TAUNGGYI, MYANMAR
C

AC
HL

DB-2B1-17
DB-2B1-13

DB-2B1-15
15A 15A 15A
Contract No: 2018.04A

HL
MSB-2-11

DB-1B-10
WATER TREATMENT PUMP
LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
DB-2B1-9 C'
B13
Not Enclosed
D

D'
MEP

MSB
B08 IRONING ROOM Key Plan
Not Enclosed DB-1B-13 LAST OFFICE B35
B19 Not Enclosed
DB-2B1-8
Not Enclosed
DB-1B
EARTH E
DB-U1 TOILET
B14 DB-2B1-10
Not Enclosed
BIKE PARKING AREA E'
DB-2B1-19,21,23 B18
TOILET 20A,4P Not Enclosed
B12 Isolator F
DB-1B-9
Not Enclosed
BOTTLE STORAGE G
MATV
B16
PHARMACY STORAGE SECURITY Not Enclosed
B06 B07
Not Enclosed Not Enclosed No. Description DD/MM/YY
DB-1B-14
PA RACK

AC
HL 1 ISSUE FOR CONSTRUCTION MARCH 2020
HL
FAP
2 C

AC
DB-1B-18
H
CCTV
CORRIDOR
POD B11
DB-1B-11
B05 Not Enclosed
Not Enclosed
J

DB-1B-8
2
K

HOUSE KEEPING

Not Enclosed
C
DB-1B-12
BIO MED
MEDICAL SUPPLY

B03
B02
C

B04 Not Enclosed

2
Not Enclosed

C
DB-1B-15

AC
DB-1B-16
AC

HL HL MALE CHANGING
B01
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

BASEMENT STAGE2 POWER


SYSTEM LAYOUT

Sheet Number

PW01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
2
HL
A PUN HLAING SILOAM TAUNG

WH
HL 2 2

AC
MEDICATION
2 2 2 2 2 2 2 2

HL HL HL
122A TOILET DB-211-29
TOILET GYI HOSPITAL
WH

DB-111-71

2
TOILET TOILET HL
DB-111-26 DB-111-37 TOILET TOILET DB-111-33 DB-111-36 TOILET TOILET DB-111-32 114C DB-211-17
Not Enclosed

C
WH
DB-111-35 158A

WH

DB-111-40
DB-111-49
120a 119a 118a 117a

WH
116a 115a Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-111-55

Not Enclosed CONSULT

DB-211-13
Not Enclosed
Not Enclosed Not Enclosed Not Enclosed HL DB-211-26
Not Enclosed
Not Enclosed 157
TOILET CONSULT CONSULT

2
DB-111-56 Not Enclosed
DOUBLE IPD STD IPD STD IPD STD IPD DB-111-59 STD IPD STD IPD STD IPD
DB-111-57
H1800

NURSE STATION STD IPD TOILET C


AC 2 Prepared For:

C 2

C 2
114 159A HL
TV

122B DB-211-31
TV TV TV TV TV TV
Not Enclosed NotTVEnclosed Not Enclosed
RENOVATION & EXTENSION TO 3 & 6
C 2
H1800 H1800
H1800 H1800 H1800 H1800 H1800 B
CONSULT STOREY RCC BUILDING

DB-211-27
156
DB-111-45 WAP
DB-211-24 Not Enclosed TAUNGGYI, MYANMAR
2 100A,4P Contract No: 2018.04A
H1800 H1800 2
Breaker Panel DB-111-67 HL
40A,4P
DB-211
2 C
HL
TV TV AC
Breaker Panel

AC
Vb
DB-111-53 SDB-CT-13,15,17
DB-111-50

MEDICATION
SDB-CT-14,16,18

Not Enclosed

2
2 C
STD IPD SEPTIC DB-111-63

DB-211-15
C
DB-111-27

126
GP
XRAY VITAL

2
TRIAGE SDB-CT-10 MAMMO 127 WAP
Vb

SDB-CT-6

AC
DB-211-35 Not Enclosed C'
2

DB-111-61 HL
C 2 HL
2 2 C C 2 2 DB-211-30 2

AC
HL
DB-111-39 2 2 C C 2
AC
MEDDICAL SUPPLIER
SDB-CT 2 D
DB-111-25 UPS PIPING TOILET
IMAGING F DB-111-44 Key Plan
2
SDB-CT-2 128DB-211-16 TV 155A
7 sqm CHANGING
Not Enclosed DB-211-20 Not Enclosed D'

DB-211-19
2 C C 2

AC
CONTROL CONSULT
CL SDB-CT-4 C 2 C 2 C 2
2 2 C
DB-111-46
CORRIDOR 2 2 2 C C
DB-111-64 GENERAL WAITING

2
124 SDB-CT-7

C
C 2
ED ENTRY USG 129
Not Enclosed

IMAGING CORRIDOR
Not Enclosed E

DB-111-34
2
ED C 2
7 sqm AC DB-111-69

Not Enclosed
HL
HL
SDB-CT-9

2
2
142
DB-111-66
AC
DU TOILET JAN
E'
2
DB-111-38 SDB-CT-8 HL
USG

AC
C
CONSULT
2

DB-211-18
2

DB-111-28 2 C DB-111-62 TOILET


5.5 sqm CT F
154A
2

2
HL
DB-111 Not Enclosed

AC
G
TOILET 2
No. Description DD/MM/YY
153A
2

SDB-CT-19,21,23
Not Enclosed
5.5 sqm DB-111-65 DB-211-14 1 ISSUE FOR CONSTRUCTION MARCH 2020
LOBBY TOILET TOILET CONSULT
Not Enclosed STAIR 132 131 SDB-CT-11
DB-111-41 Not Enclosed Not Enclosed Not Enclosed
TV 150A,4P
2 2
2

C 2
Breaker Panel
2 C C 2 2 C 2 C
H
15A C 2

DB-111-58 BLOOD COLLECTION


DB-211-25
DB-111-42
CORRIDOR 152 TOILET
RECEPTION WAP
137 Not Enclosed 151B
Not Enclosed Not Enclosed Not Enclosed
DB-211-28 J
2
HL
C C 2
2

CONSULT DB-211-33
K
2 AC
DB-111-29

DB-111-52 108

PATHOLOGIST

H1200
C

Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION DB-211-23

2
2
2

PHARMACY AC Not Enclosed


H1800

C
TV

CL DB-111-60 104 105 106 107


C

AC
109
Not Enclosed LAB

2
HL
Ref

Not Enclosed Not Enclosed Not Enclosed Not Enclosed

H1200
C

151
HL

DB-111-48

DB-111-43

2
REF.
C
DB-111-54

Not Enclosed
C
2

DB-111-47
C

C
DB-111-30
2

DB-111-31
2

REF. DB-211-22

H1200
DB-211-21
C

STAIR
Ref

2
2

HL HL

C
S1-1
Not Enclosed C 2 C 2 C 2 C 2 HL C 2
L
2

H1200 H1200 H1200 H1200 H1200 H1200


M

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-1 STAGE2 POWER


SYSTEM LAYOUT

Sheet Number

PW02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

2
2 2 2 2
A
2 2
2 2 2
HL HL
DB-121-25 DB-121-63 Project:
TV

DB-OT-16
H1800

DB-121-38
TOILET DB-OT-10 DB-OT-15
WH
TOILET TOILET TOILET TOILET

WH
DB-121-46
Not Enclosed
HL OT 2 OT 3 OT 4
PUN HLAING SILOAM TAUNG

H1800
257 256 B47
DB-121-62

C
H1800

H1800

WH

C
TV
Not Enclosed Not Enclosed Not Enclosed
GYI HOSPITAL

2
DB-OT-17

DB-OT-14
DB-OT-13
TV

DB-OT-8

DB-OT-12

DB-OT-18
TV

2
DR CHANGING
DB-121-28 DB-121-29

2
2

STD IPD DB-121-65 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
PRE / POST

2
STD IPD STD IPD STD IPD

2
2

2
TV
40A,4P
DN H1800
Isolator B Prepared For:
DB-OT-26,28,30
FIRE LANDING
Not Enclosed WAP CORRIDOR RENOVATION & EXTENSION TO 3 & 6
B164
Not Enclosed STOREY RCC BUILDING
UP H1800 DB-OT
TV
HL HL HL C TAUNGGYI, MYANMAR

DB-221-27
DB-221-20
HL

WH
DB-121-58
WH

WH WH
DB-221
Contract No: 2018.04A
TOILET TOILET WASHING
TOILET HL HL ?

AC

2
DB-121-60 STD IPD STD IPD STD IPD

DB-221-38,40,42
DOUBLE IPD
AC LIFT CSSD STERILE
DB-121-71

DB-121-66
2 2
2

CORRIDOR

TV
Not Enclosed

TV
B166

H1800
H1800
DB-121-31 DB-121-43
TOILET DB-121-26 DU Not Enclosed C'
2 WH 2
HL
DB-121-49

DB-121-51
D
DB-121-54
2 HL
AC
DB-221-22 2
H1800

2
DB-221-43,45,47

DB-221-31
2

TOILET

WH
TV

DB-121-47 MEDICATION LDS HL


DB-221-14 D'
DB-121-68 DB-221-26

DB-221-44,46,48
AC
DB-121-48 CL Key Plan
DB-121-27 CSSD CLEAN

AC
STD IPD HL
AC 20 m²

H1800
LDS DR

H1800
HL

H1800
DOUBLE IPD ROOF DB-121-44 TV
LOUNGE

DB-121-67
TV
E
2 2

H1000
2 C 2
AC CLEAN DB-221-30 HL

DB-OT-19
DB-121-40 DB-121-69 HL WAP
PASSAGE

AC
TV

3 m²

DB-221-19
DB-121-59

DB-OT-25,27,29 CSSD DIRTY


40A,4P 17 m² E'
DOUBLE IPD TOILET Isolator MEDICATION
JAN TOILET DB-121-41HL

C
Not Enclosed
H1800

C
WH WH
CLEAN F

2
HL

2
HL
TV

DB-OT-7
DB-121-56

2
DB-OT-11
OT 1 CHANGING

DB-221-23
DB-121 2 2
H1000
DB-121-45 G
BABY WASH
2
TOILET HL DB-221-21

2
DB-121-35

PREP
LIFT 2

2
HL
DB-121-55
WH

WH
HL WH DB-221-25
CLEAN
NURSERY
DB-121-52 CHANGING DB-221-24 No. Description DD/MM/YY

DB-221-28
TOILET STD IPD

2
CU DB-OT-9 TOILET
DB-121-33 Not Enclosed 1 ISSUE FOR CONSTRUCTION MARCH 2020
TV 2 2

AC
2 2 2 C
C 2 WH
HL
HL H

2
2

DB-221-13
DB-121-41

C
WAP

C
2
ICU J
DB-121-61

DELUXE SUITE DB-121-50 K


DB-121-53

DB-121-36

Ref DB-221-17
STD IPD DB-121-39 DB-121-42
DB-121-57
WH

HL
STD IPD STD IPD STD IPD

2
WH

STD IPD H1800


H1800

HL
H1800

H1800
HL
STD IPD
H1800

WH
TV

HL

TV
TOILET
WH
DB-121-64

TV

TOILET TOILET TOILET 251


TV
TV

DB-121-32 DB-121-37 DB-121-30 H1800


TOILET
2

Not Enclosed

H1800

DB-221-29
TOILET
2

2
STAIR DB-221-16
TOILET

TV
2

TV AC S1-2 DB-OT-21
HL
Not Enclosed C 2 2 C 2
L
H1800 WH 2

HL H1000 H1000
M
DB-221-15

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-2 STAGE2 POWER


SYSTEM LAYOUT

Sheet Number

PW03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

2
A Project:
2 HL

WH
2 2

PUN HLAING SILOAM TAUNG


2
HL HL HL HL
WH

DB-131-45

WH
WH
TV

WH
DB-231-13 DB-231-14 HL DB-231-15
2
TOILET
H1800

DB-231-30
GYI HOSPITAL
DB-131-38 DB-131-26 DB-131-35 DB-131-28
Not Enclosed

WH
DB-131-61

H1800

H1800

H1800
H1800
WH

TV
TV

H1800
TV 2
DB-131-46 DB-131-57 HL DB-231-22 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

TV
DB-131-48

H1800

TV
TV
STD IPD
STD IPD DB-231-29
Not Enclosed Prepared For:
TV TV
AC
H1800 H1800
HL B
DB-231-34
RENOVATION & EXTENSION TO 3 & 6

WH
FIRE LANDING CORRIDOR
Not Enclosed Not Enclosed DB-131-24 WAP
DB-131-24 HL
STOREY RCC BUILDING
DB-231-28 TOIELT TAUNGGYI, MYANMAR
H1800 H1800
C
WH

TV 2 2
Contract No: 2018.04A
TV
HL

-50
DB-231
HL DB-131-34

C 2
DB-131-63 DB-131-64 DB-231-21
AC

H1800
FIRE EXIT
DB-231-23

2
HL LANDING
2

TV
WAP

WH
DB-131-44 DB-131-39 DB-131-31
CORRIDOR C'

DB-231-25
DB-131-22

DB-131-60-50
2 WH 2 2
HL DB-131-59
D

2
2 2
2

WH
HL
TV TOILET
2

DB-131-47
H1800 DB-231-19 D' Key Plan
VOID

DB-231-35
H1800

H1800
TV
TV

STD IPD
TV
HL

AC
2
ROOF
H1800
E
DB-131-20 2

2
TV
WH HL
DB-131-56 WH
DB-131-50 HL
E'

DB-231-16
H1800
TV

DB-131-36 WH

DB-231-33
HL F
DB-131
C 2 2 TV
H1800
G

AC
DB-131-55 HL H1800

2
TV
AC

TV

H1800
DB-131-32 DB-131-42 HL
DB-131-65
No. Description DD/MM/YY

2
DB-231-24
DB-131-52 1 ISSUE FOR CONSTRUCTION MARCH 2020
WH

DB-131-40 DB-231-17
HL
WH

DB-131-49

WH
HL TV HL
2
C 2 2

2
H1800 H
WH HL
DB-131-33
WAP

TOILET
DB-231-27
H1800 H1800 H1800 H1800 H1800

TV TV TV TV TV

DB-131-41 GRAND SUITE K


DB-131-58

Ref
Ref DB-131-51
DB-131-53
DB-131-54
2

H1800
TV
DB-231-26
WH

WH

WH

HL HL DB-131-30 DB-131-25
WH
DB-131-27
HL DB-131-37 HL DB-131-29
DB-131-62

2
HL

AC
TV
2 2 2 DB-231-20 DB-231-32

WH
TV AC
L

2
HL HL
H1800 DB-231-31

AC
HL
M

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-3 STAGE2 POWER


SYSTEM LAYOUT

Sheet Number

PW04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

HL
A

WH
2 2

HL Project:

WH
DB-141-27 DB-141-29 DB-141-26 DB-241-21
DB-241-16
PUN HLAING SILOAM TAUNG

2
DB-141-45
WH DB-241-24
HL

DB-141-47 GYI HOSPITAL


DB-241-25 DB-241-32
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-141-30 DB-241-15

AC
HL
TV TV TV
TV
H1800 H1800 H1800 H1800 B Prepared For:
HL
WH
WAP

DB-241-28
RENOVATION & EXTENSION TO 3 & 6
1400
STOREY RCC BUILDING
C
C 2 C 2 TAUNGGYI, MYANMAR
DB-241
Contract No: 2018.04A

2
MEDICATION DB-141-33

C
DB-141-34 DB-141-35
5 m² 1945 DB-241-13
STAFF ROOM DB-141-25 DB-241-19

2
WAP
C'

HL
2
D
DB-141-44

AC
DB-241-29
TOILET
SILVER BED

WH
3 m²

DB-241-23
MEDICATION HL
DB-241-33 D'

Key Plan
DB-141-28

DB-141-31

DB-141-46 STD IPD


15A

VOID
Not Enclosed

AC
HL

DB-141-37
TV
SILVER BED VOID
H1800 E
DB-141-36

2
STORAGE
DB-241-14
CORRIDOR
E'
Not Enclosed
SILVER BED CORRIDOR
DB-241-31

DB-241-20
DB-141 F

DB-141-43
G

AC TV

2
HL
DB-141-38
CU

H1800
STAFF
PANTRY
No. Description DD/MM/YY
SILVER BED SILVER BED SILVER BED DU
DB-241-22

Ref
1 ISSUE FOR CONSTRUCTION MARCH 2020

WH
HL
2
H
HL
AP2-802-1`
WH
DB-241-26
DB-141-32

SILVER BED DB-141-42


WAP

J
H1800

DB-141-41
TV K
SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED

Ref
STAFF TOILET

WAITING GRAND SUITE

H1800
SILVER BED TOILET 04 TOILET 05

TV
DB-241-27

H1800
TV
DB-141-40 DB-141-39

WH
DB-241-18

AC
DB-241-17 HL
DB-241-30 HL
L
2
DB-241-35

2
AC
HL
M

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-4 STAGE2 POWER


SYSTEM LAYOUT

Sheet Number

PW05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

A Project:
2 2

PUN HLAING SILOAM TAUNG


2 2

TOILET
DB-5-22 TOILET DB-5-33 DB-5-19 TOILET DB-5-36
HL
GYI HOSPITAL

WH
WH WH

TV
HL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

H1800
HL
DB-5-39
TOILET STD IPD
TOILET
DB-5-40 ISO STD IPD DB-5-38

Prepared For:
TV TV TV HL

AC
DELUXE SUITE B
H1800 H1800 H1800
DB-5-50 WH HL RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
CORRIDOR
DB-5-31 DB-5-37
DB-5-55 TAUNGGYI, MYANMAR

Ref
TOILET
C Contract No: 2018.04A
AC HL DB-5
HL DB-5-48 WAP

AC

COUNTER
NURSE
C
DB-5-24
C
MEDICATION
2 2

C'

C
DB-5-25
2 C C 2

2
DB-5-18
DB-5-45
DB-5-21 D
2
TOILET
DB-5-14

WH
CONFERENCE OFFICE DB-5-32
HL

2 C C 2 D' Key Plan

DB-5-44

DB-5-51
2 C C 2

DB-5-28
DB-5-35 VOID
DB-5-49 AC
STD IPD
HL TV
VOID HL

15A

AC
Ref
H1800
E
DB-5-47

C
2

AC
2
HL
DB-5-29
PANTRY 2 C C 2 DB-5-30

DB-5-23
HR OFFICE

DB-5-16
2 C C 2 E'
DB-5-27

C
DB-5-46
F

2
DB-5-53
Wc AC DOUBLE IPD
HL
G

AC TV

2
40A,4P 20A,4P HL
OUTDOOR ISOLATOR ISOLATOR

H1800
SEATING No. Description DD/MM/YY
HOSE REEL PUMP
MSB-2-14 TOILET
1 ISSUE FOR CONSTRUCTION MARCH 2020
BOOSTER PUMP DB-5-42
MSB-2-12

WH
HL
2
H
HL

DB-5-26
DB-5-43
WH
WATER
STORAGE TOILET

GRAND SUITE J
H1800
TV K
STD IPD

Ref
DB-5-41

H1800
TV

DB-5-34
DB-5-34

2
TOILET

AC
STAIR 02 DB-5-20 DB-5-52
Not Enclosed

WH
HL HL
L
2
DB-5-54

2
AC
HL
M

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-5 STAGE2 POWER


SYSTEM LAYOUT

Sheet Number

PW06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

2 2 2 2
A Project:

DIS TOILET DB-6-30


DB-6-19 DB-6-16
PUN HLAING SILOAM TAUNG

H1800
GYI HOSPITAL

H1800

TV
H1800
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

TV

TV
TV
SHOWER
IPD STD 01 IPD STD 02 IPD STD 03 IPD STD 04

H1800
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
DB-6-42
Prepared For:

AC
AC
TOILET HL

AC
HL HL HL
B

AC
DB-6-47
EXTG: TOILET DB-6-40
DB-6-43
RENOVATION & EXTENSION TO 3 & 6
WH DB-6-33
Not Enclosed
HL
DB-6-14
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
40A,4P
H1800
C
Isolator
TV
Contract No: 2018.04A

2
IPD STD 05
Not Enclosed

DB-6-26
MSB-2-9 IPD STD 06 DB-6-18

MEDICATION
Not Enclosed
Not Enclosed DB-6-38AC TV

2
HL H1800

DB-6
C'
HLDB-6-44

AC

AC
HL
DB-6-41
D

PREP COUNTER
D'
WAP Key Plan

IPD STD 07

DB-6-36
Not Enclosed
DB-6-21

2
TV
AC
HL
E
H1800
VOID

IPD STD 08 E'

DB-6-39
CORRIDOR Not Enclosed
DB-6-20
Not Enclosed AC TV F

2
HL
H1800

LIFT MECH IPD STD 09

DB-6-34
ROOM Not Enclosed No. Description DD/MM/YY
8MSB-2-10
m² DB-6-25
TV

2
AC
HL 1 ISSUE FOR CONSTRUCTION MARCH 2020
H1800
40A,4P
Isolator

IPD STD 10 H

DB-6-37
PREP COUNTER Not Enclosed
STAIR DB-6-22
NURSE DB-6-28 AC TV

2
S1-6 HL
Not Enclosed STATION 1 H1800
Not Enclosed
J
2 IPD STD 11
K
C

DB-6-32
Not Enclosed DB-6-27

2
DB-6-31
AC TV
HL
H1800

DB-6-29

IPD STD 13 IPD STD 12

DB-6-35
DB-6-45
Not Enclosed Not Enclosed
DB-6-24 L

2
AC TV AC TV
HL HL
H1800
H1800
M

Scale: Drawn by: Reviewed by:


1 : 150 Author HKW
Sheet Title:

LEVEL-6 STAGE2 POWER


SYSTEM LAYOUT

Sheet Number

PW07
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

DB-111
MCB
10A,1P

1
LR1
Outdoor lighting

CL: 45.74kW
2
LR2
ED entry corridor lighting

7
LR3
Imaging corridor & reception corridor lighting
Spare

8
LR4
Reception & lobby lighting

LR5
13
Pharmacy & finance lighting

25A,2P

(Located at Level-1 Stair(S2-1)


RCCB(30mA)
14
LR6
ED lighting

Stair lighting

19
LR7
Spare

20
LR8
T

LR9
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

MCB
10A,1P

3
LY1
Outdoor lighting

4
LY2
ED entry corridor lighting

9
LY3
Imaging corridor & reception corridor lighting
Spare

LY4
10
Imag;male, radiologist, Imag; reeception, consult & pathologist lighting

MCB
LY5

20A,3P
Toilet lighting

15

25A,2P
LY6

RCCB(30mA)
16
Imag; female chang;, mammo & USG lighting

LY7
Spare

21
LY8
22
Spare

LY9
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

MCB
10A,1P

5
LB1
Outdoor lamp post lighting

6
LB2
LED Strip Light & Light Box Signage lighting

LB3
11
STD IPD & double IPD lighting

LB4
12
Triage & septic lighting

LB5
17
4 x STD IPD lighting

25A,2P
RCCB(30mA)
18
LB6
3 x STD IPD lighting

LB7
23
Spare

LB8
Spare

24
T

LB9
DB-1B

Room)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)


2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
CL: 10.41kW

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


MCB

MCB
10A,1P

20A,1P
1
LR1

Female Changing & Toilet Lighting

25
Receptacle

PR1
3
LY1

Receptacle Ware House, Medical Records & MEP Lighting

26
PR2
5
LB1

Receptacle Security, Pharmacy, POD, House Keeping & Bio Med Lighting

31
(Located at Basement MEP

PR3
2
LR2

Corridor Lighting

32
Receptacle

PR4
MCB
4

37
Receptacle
LY2

PR5
20A,3P

Spare
25A,4P
6

38
Receptacle

PR6
RCCB(30mA)
LB2

Spare

MCB
43
Receptacle

PR7

100A,3P

Feed From MSB-1


44
Receptacle

PR8
49
Receptacle

PR9
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)
MCB

50
Receptacle

+ 16sqmm Cu/PVC (E)


20A,1P

4 x 35sqmm Cu/XLPE/PVC
Receptacle
PR1

55
Water heater power

80A,2P
9
PY1

Receptacle

RCCB(30mA)
56
Water heater power
MCB
32A,3P

Receptacle
11
PB1

Feed From MSB-1

61
ACIU power
8

Receptacle
PR2

62
ACIU power
PY2

Receptacle
10

ACIU power

67
6sqmm Cu/PVC (E)

Receptacle
12
PB2

Spare

68
4 x 6sqmm Cu/XLPE/PVC +

Spare Receptacle

73
13
PR3

74
Spare
PY3

ACIU Power
15

PR10 PR11 PR12 PR13 PR14 PR15 PR16 PR17 PR18


2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E) ACIU Power
17
PB3

MCB

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


25A,3P

ACIU Power

MCB
14
PR4

25A,4P

20A,1P

PY1
27
Receptacle
RCCB(30mA)
PY4

ACIU Power
16

28
PY2
Receptacle
ACIU Power
18
PB4

33
PY3
Receptacle
Spare
19
PR5

34

Receptacle
PY4
PY5

Spare
21

PY5
39

Receptacle
Spare
23
PB5

40

Receptacle
PY6

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)


45
PY7

Receptacle
46
PY8

Receptacle
51

Receptacle
PY9
52

Receptacle
MCB
80A,3P
57

Water heater power


80A,2P
RCCB(30mA)
58

Printer power
63

ACIU power

ACIU power
64

ACIU power
69 70

Spare
75

Spare
76

Spare
PY10 PY11 PY12 PY13 PY14 PY15 PY16 PY17 PY18

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


MCB
20A,1P

29

Receptacle
PB1

Receptacle
30
PB2
35

Receptacle
PB3
36

Receptacle
PB4
41

Receptacle
PB5
42

Receptacle
PB6
47

Receptacle
PB7
48

Receptacle
PB8
53

Receptacle
PB9
54

Receptacle
59

Water heater power


80A,2P
RCCB(30mA)

ACIU power
60

ACIU power
65 66

ACIU power
71

ACIU power
72

Spare
77

Spare
78

Spare
PB10 PB11 PB12 PB13 PB14 PB15 PB16 PB17 PB18
1
No.

Scale:
Project:

Key Plan

Sheet Title:
NOTE:

Contract No:
Prepared For:

Sheet Number
As indicated
TAUNGGYI, MYANMAR

2018.04A
GYI HOSPITAL
Drawings are not to be scaled.

Description

HNO
ISSUE FOR CONSTRUCTION

Drawn by:
STOREY RCC BUILDING

LINE DIAGRAM LAYOUT


DB-1B & DB-111 SINGLE
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
All reproduction & intellectual property rights reserved.

PUN HLAING SILOAM TAUNG


of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.

HKW
RENOVATION & EXTENSION TO 3 & 6

DD/MM/YY

Reviewed by:
This Drawing is an instrument of service and shall remain the property

SL01
MARCH 2020
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

DB-121

MCB

DB-131
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

10A,1P
MCB

1
10A,1P

LR1
Corridor lighting

1
LR1
Corridor lighting

CL: 44.52kW

CL: 43.93kW
2
LR2
Corridor lighting

2
LR2
Corridor lighting

7
LR3
STD IPD, double IPD & jan; lighting

7
LR3
OT corridor lighting

8
Spare

LR4

(Located at Level-3 Stair


2 x double IPD lighting

8
LR4
3 x STD IPD lighting

LR5
3 x STD IPD Lighting

13
(Located at Level-2 Stair(S2-2)
LR5
3 x STD IPD Lighting

13

25A,2P
LR6
Spare

14
LR6
LDS, washing & pre/post lighting

14

25A,2P

RCCB(30mA)
T

LR7
19
RCCB(30mA)
LR7
Spare

19
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

MCB
T

LR8
20

10A,1P

3
LY1
Corridor Lighting
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

4
MCB

LY2
Corridor Lighting

10A,1P

3
LY1
Corridor lighting

9
LY3
Deluxe suite & 2 x IPD lighting

4
LY2
Corridor lighting

LY4
3 x STD IPD lighting

10
9
LY3
OT corridor lighting

LY5
Spare

15
Spare

MCB
LY4
2 x STD IPD Lighting
10

20A,3P
LY6

25A,2P
Spare

16
LY5
2 x double IPD lighting
15

RCCB(30mA)
LY7
21
MCB
LY6

20A,3P
2 x STD IPD Lighting
16

25A,2P
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

MCB
10A,1P
LY7

RCCB(30mA)

Spare
21

5
LB1
2 x STD IPD lighting
T

LY8
22

6
LB2
3 x STD IPD lighting
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

LB3
Server, STD IPD & double IPD lighting

11
MCB
10A,1P

LB4
2 x double IPD lighting
LB1

Acrylic lighting

12
Spare
6

LB5
Spare
LB2

STD IPD & double IPD lighting

17
LB6
Spare
LB3

2 x STD IPD, deluxe suite lighting

18
11

25A,2P
RCCB(30mA)
LB7
Spare
LB4

23
2 x STD IPD & DU lighting
12
LB5

Nursery, DR Lounge & medication lighting


17
LB6

Spare
18

25A,2P

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)


RCCB(30mA)

Spare
LB7
23

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

MCB
20A,1P
T

LB8
24

20
Receptacle

PR1
2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

25
Receptacle

PR2
MCB
20A,1P

Receptacle

26
PR3
25

Receptacle
PR1

31
Receptacle

PR4
26

Receptacle
PR2

32
Receptacle

PR5
31

Receptacle
PR3

37
Receptacle

PR6
Receptacle
32
PR4

38
Receptacle

PR7
37

Receptacle
PR5

43
Receptacle

PR8
38

Receptacle
PR6

44
Receptacle

PR9
43

Receptacle
PR7

MCB
100A,3P

Feed From MSB-1


49
Water heater power
44

Receptacle
PR8

MCB

50
Water heater power

80A,2P
49

Receptacle
100A,3P
PR9

Feed From MSB-1

RCCB(30mA)
55
Water heater power
50

Water heater power

+ 16sqmm Cu/PVC (E)


56
Water heater power

4 x 35sqmm Cu/XLPE/PVC
55

Water heater power


80A,2P

61
Water heater power
+ 16sqmm Cu/PVC (E)
RCCB(30mA)
56

Water heater power


4 x 35sqmm Cu/XLPE/PVC

62
ACIU power
61

Water heater power

67
Spare
62

Water heater power

68
Spare
67

ACIU power

73
Spare
68

ACIU power

PR10 PR11 PR12 PR13 PR14 PR15 PR16 PR17 PR18


73

Spare
PR10 PR11 PR12 PR13 PR14 PR15 PR16 PR17

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

MCB
20A,1P
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

PY1
22
Receptacle
MCB
20A,1P

PY2
27
Receptacle
PY1
27

Receptacle

28
PY3 Receptacle
PY2
28

Receptacle
PY4
33

Receptacle
33
PY3

Receptacle
PY5
34

Receptacle
PY4
34

Receptacle
39
PY6

Receptacle
39
PY5

Receptacle
40
PY7

Receptacle
40
PY6

Receptacle
PY8
45

Receptacle
PY7
45

Receptacle
PY9
46

Water heater power


46
PY8

Receptacle
51

Water heater power


51
PY9

Receptacle
MCB
80A,3P
52

Water heater power


80A,2P
52

Water heater power


MCB

RCCB(30mA)
57

Water heater power


80A,3P
57

Water heater power


80A,2P

58

Water heater power


RCCB(30mA)
58

Water heater power


63

Water heater power


63

Water heater power


64

ACIU power
64

ACIU power
69

Spare
69

ACIU power
70

Spare
70

Spare
75

Spare
75

Spare
PY10 PY11 PY12 PY13 PY14 PY15 PY16 PY17 PY18
PY10 PY11 PY12 PY13 PY14 PY15 PY16 PY17

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E) 2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E) 2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)
MCB
MCB

20A,1P
20A,1P

24

Receptacle
PB1
29

Receptacle
PB1

29

Receptacle
PB2
30

Receptacle
PB2

30

Receptacle
PB3
35

Receptacle
PB3

35

Receptacle
PB4
36

Receptacle
PB4

36

Receptacle
PB5
41

Receptacle
PB5

41

Receptacle
PB6
42

Receptacle
PB6

42

Receptacle
PB7
47

Receptacle
PB7

47

Receptacle
PB8
48

Receptacle
PB8

48

Water heater power


PB9
53

Water heater power


PB9

53

Water heater power


54

Water heater power


54

Water heater power


80A,2P
59

Water heater power


80A,2P

RCCB(30mA)
59

Water heater power


RCCB(30mA)
60

Water heater power


60

Water heater power


65

Water heater power


65

ACIU power
66

ACIU power
66

Spare
71

ACIU power
71

Spare
72

Spare
72

Spare Spare
77
PB10 PB11 PB12 PB13 PB14 PB15 PB16 PB17

77

Spare
PB10 PB11 PB12 PB13 PB14 PB15 PB16 PB17 PB18
1
No.

NTS
Scale:
Project:

Key Plan

Sheet Title:
NOTE:

Contract No:
Prepared For:

Sheet Number
TAUNGGYI, MYANMAR

2018.04A
GYI HOSPITAL
Drawings are not to be scaled.

Description

HNO
ISSUE FOR CONSTRUCTION

Drawn by:
STOREY RCC BUILDING

LINE DIAGRAM LAYOUT


No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

DB-121 & DB-131 SINGLE


All reproduction & intellectual property rights reserved.

PUN HLAING SILOAM TAUNG


of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.

HKW
RENOVATION & EXTENSION TO 3 & 6

DD/MM/YY

Reviewed by:
This Drawing is an instrument of service and shall remain the property

SL02
MARCH 2020
NOTE:

Male changing, bottle storage & last office lighting


All reproduction & intellectual property rights reserved.

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


This Drawing is an instrument of service and shall remain the property

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

4 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)


of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

MEP, waste, genset lighting

Bike parking lighting

Bike parking lighting

Last Office Power


Laundry Power

Laundry Power

Laundry Power

ACIU Power
Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle
Spare

Spare

Spare

Spare

Spare
Project:

10A,1P 20A,1P 20A,3P PUN HLAING SILOAM TAUNG


GYI HOSPITAL
MCB MCB MCB

LR1 LY1 LB1 LR2 LY2 LB2 PR1 PY1 PB1 PR2 PY2 PB2 PR3 PY3 PB3 PR4 PY4 PB4 RYB5 RYB6
1 3 5 2 4 6 7 9 11 8 10 12 13 15 17 14 16 18 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

19,21,23

20,22,24
25A,4P 25A,4P
RCCB(30mA) RCCB(30mA)

Prepared For:
20A,3P 25A,3P
MCB MCB

RENOVATION & EXTENSION TO 3 & 6


STOREY RCC BUILDING
32A,3P
MCB TAUNGGYI, MYANMAR

CL: 13.27kW Contract No: 2018.04A


DB-2B1 4 x 6sqmm Cu/XLPE/PVC +
(Located at Basement MEP 6sqmm Cu/PVC (E)
Room)
Feed From MSB-2

Key Plan
Nurse station, medication, storage & STD IPD lighting
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)


Silver bed, staff pantry, CU & DU lighting

Silver bed, medication & toilet lighting

Silver bed, waiting & toilet lighting


Silver bed & pantry lighting

Light box signage lighting

Water heater power


Silver Bed Lighting

Silver Bed Lighting


Corridor lighting

Corridor lighting

Corridor lighting

Corridor lighting

Corridor lighting

Corridor lighting

Corridor lighting

Corridor lighting

Pantry power
ACIU power
Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle
Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare
No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020

T T T

10A,1P 10A,1P 10A,1P 20A,1P 20A,1P 20A,1P


MCB MCB MCB MCB MCB MCB

LR1 LR2 LR3 LR4 LR5 LR6 LR7 LR8 LY1 LY2 LY3 LY4 LY5 LY6 LY7 LY8 LB1 LB2 LB3 LB4 LB5 LB6 LB7 LB8 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9
1 2 7 8 13 14 19 20 3 4 9 10 15 16 21 22 5 6 11 12 17 18 23 24 25 26 31 32 37 38 43 44 49 27 28 33 34 39 40 45 46 51 29 30 35 36 41 42 47 48 53

25A,2P 25A,2P 25A,2P 25A,2P 25A,2P 25A,2P


RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA)

20A,3P 32A,3P
MCB MCB

50A,3P
MCB Scale: Drawn by: Reviewed by:
NTS HNO HKW

CL: 19.03kW Sheet Title:


DB-141
(Located at Level-4 Stair)
4 x 10sqmm Cu/XLPE/PVC
+ 10sqmm Cu/PVC (E) DB-141 & DB-2B1 SINGLE
Feed From MSB-1
LINE DIAGRAM LAYOUT

Sheet Number

SL03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


Contractors must verify all dimensions on site and report any

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)


discrepancies to the architect before proceeding with the work.

3 x consult, vital, medication lighting


Drawings are not to be scaled.

Lab, blood collection lighting

General waiting lighting

Water heater power


3 x consult lighting

Corridor lighting

Corridor lighting
Stair lighting

ACIU power

ACIU power

ACIU power

ACIU power

ACIU power
Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle
Spare
Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare
Project:

PUN HLAING SILOAM TAUNG


GYI HOSPITAL
T T

No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi


10A,1P 10A,1P 10A,1P 20A,1P 20A,1P 20A,1P
MCB MCB MCB MCB MCB MCB

LR1 LR2 LR3 LR4 LY1 LY2 LY3 LY4 LB1 LB2 LB3 LB4 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9 Prepared For:
1 2 7 8 3 4 9 10 5 6 11 12 13 14 19 20 25 26 31 32 37 15 16 21 22 27 28 33 34 39 17 18 23 24 29 30 35 36 41

25A,2P
RCCB(30mA)
25A,2P
RCCB(30mA)
25A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
40A,2P
RCCB(30mA) RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
TAUNGGYI, MYANMAR

20A,3P 40A,3P Contract No: 2018.04A


MCB MCB

40A,3P
MCB

CL: 16.06kW Key Plan


DB-211 4 x 10sqmm Cu/XLPE/PVC
(Located at Level-1 Corridor) + 10sqmm Cu/PVC (E)

Feed From MSB-2


2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

4 x 1C x 35 sqmm PVC+ 16 sqmm PVC (E)


CSSD dirty, passage & changing lighting

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

4 x 1C x 6 sqmm PVC+ 6 sqmm PVC (E)


2 x STD IPD, Eye Procedure Lighting
CSSD clean & sterile lighting

ICU & medication lighting

No. Description DD/MM/YY


Water heater power

Water heater power

Water heater power

Water heater power

Water heater power

Water heater power


1 ISSUE FOR CONSTRUCTION MARCH 2020
Corridor Lighting

Corridor Lighting

CSSD Power

CSSD Power

CSSD Power
ACIU power

ACIU power

ACIU power

ACIU power
Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle
Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare
T T

10A,1P 10A,1P 10A,1P 20A,1P 20A,1P 20A,1P 80A,3P 32A,3P 32A,3P 20A,3P 20A,3P
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB

LR1 LR2 LR3 LR4 LY1 LY2 LY3 LY4 LB1 LB2 LB3 LB4 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9 RYB10 RYB11 RYB12 RYB13 RYB14
1 2 7 8 3 4 9 10 5 6 11 12 13 14 19 20 25 26 31 32 37 15 16 21 22 27 28 33 34 39 17 18 23 24 29 30 35 36 41 38,40,42 43,45,47 44,46,48 49,51,53 50,52,54

25A,2P 25A,2P 25A,2P 40A,2P 40A,2P 40A,2P 100A,4P


RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA)

20A,3P 125A,3P
MCB MCB

Scale: Drawn by: Reviewed by:


NTS HNO HKW
Sheet Title:

160A,3P DB-211 & DB-221 SINGLE


LINE DIAGRAM LAYOUT
MCCB

CL: 79.89kW
DB-221 4 x 70sqmm Cu/XLPE/PVC
(Located at Level-2 Corridor) + 35sqmm Cu/PVC (E)

Sheet Number
Feed From MSB-2

SL04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


Contractors must verify all dimensions on site and report any

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)


discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

3 x STD IPD, nurse station lighting


Grand suite & STD IPD lighting

Double IPD & STD IPD lighting

Water heater power

Water heater power

Water heater power

Water heater power

Water heater power

Water heater power

Water heater power

Water heater power


Corridor lighting

Corridor lighting

ACIU Power
ACIU power

ACIU power

ACIU power

ACIU power
Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle
Spare
Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare
Project:

PUN HLAING SILOAM TAUNG


T T
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
10A,1P 10A,1P 10A,1P 20A,1P 20A,1P 20A,1P
MCB MCB MCB MCB MCB MCB

LR1 LR2 LR3 LR4 LY1 LY2 LY3 LY4 LB1 LB2 LB3 LB4 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9
Prepared For:
1 2 7 8 3 4 9 10 5 6 11 12 13 14 19 20 25 26 31 32 37 15 16 21 22 27 28 33 34 39 17 18 23 24 29 30 35 36 41

25A,2P
RCCB(30mA)
25A,2P
RCCB(30mA)
25A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
TAUNGGYI, MYANMAR

Contract No: 2018.04A


20A,3P 50A,3P
MCB MCB

63A,3P
MCB

CL: 23.53kW Key Plan


DB-231 4 x 16sqmm Cu/XLPE/PVC
(Located at Level-3 Corridor) + 16sqmm Cu/PVC (E)

Feed From MSB-2


EXEC IPD, STD IPD, nurse station & toilet lighting
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)


Grand suite & STD IPD lighting
Double IPD & STD IPD lighting

No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020

Water heater power

Water heater power

Water heater power

Water heater power

Water heater power

Water heater power

Water heater power


Corridor lighting

Corridor lighting

ACIU power

ACIU power

ACIU power

ACIU power

ACIU power
Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle
Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare
T T

10A,1P 10A,1P 10A,1P 20A,1P 20A,1P 20A,1P


MCB MCB MCB MCB MCB MCB

LR1 LR2 LR3 LR4 LY1 LY2 LY3 LY4 LB1 LB2 LB3 LB4 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9
1 2 7 8 3 4 9 10 5 6 11 12 13 14 19 20 25 26 31 32 37 15 16 21 22 27 28 33 34 39 17 18 23 24 29 30 35 36 41

25A,2P 25A,2P 25A,2P 40A,2P 40A,2P 40A,2P


RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA) RCCB(30mA)

20A,3P 50A,3P
MCB MCB

Scale: Drawn by: Reviewed by:


NTS HNO HKW
Sheet Title:

DB-231 & DB-241 SINGLE


63A,3P
MCB LINE DIAGRAM LAYOUT
CL: 22.17kW
DB-241 4 x 16sqmm Cu/XLPE/PVC
(Located at Level-4 Corridor) + 16sqmm Cu/PVC (E)
Sheet Number
Feed From MSB-2
SL05
DB-5
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

MCB
10A,1P

1
LR1
Corridor Lighting
Spare

CL: 36.95kW
2
LR2
Double IPD & STD IPD lighting

7
LR3
Office & pantry Lighting

8
LR4
Spare

25A,2P

(Located at Level-5 Corridor)


LR5
13

RCCB(30mA)
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

MCB
10A,1P

DB-6
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

3
LY1
Corridor Lighting

MCB
Spare

10A,1P
4

1
LY2
Grand IPD & STD IPD lighting

LR1
Corridor Lighting
Spare

CL: 22.27kW
9

2
LY3
Medication, STD IPD, nurse counter & toilet lighting

LR2
Medication, toilet & shower lighting

7
LY4

Spare
10

LR3
6 x STD IPD lighting

MCB
20A,3P
25A,2P
T

8
LY5
15

LR4
Spare RCCB(30mA)

(Located at Level-6 Corridor)


T

25A,2P
LR5
13
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

RCCB(30mA)
MCB

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)


10A,1P

MCB
LB1

Deluxe suite & STD IPD lighting

10A,1P

3
LY1
Corridor Lighting
6
LB2

Spare HR office & conference lighting

4
LY2
3 x STD IPD & nurse station lighting
LB3

Outdoor seating & water storage lighting


11

9
LY3
Spare
LB4

Spare
12

LY4
Spare

10
25A,2P
LB5

Spare
17

MCB
20A,3P
25A,2P
T

LY5
15
RCCB(30mA)

RCCB(30mA)
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E) 2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

MCB
10A,1P
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

5
LB1
Light box signage lighting
MCB

Spare
20A,1P

6
14

Receptacle
PR1

LB2
4 x STD IPD lighting
19

Receptacle
PR2

LB3
Spare

11
20

Receptacle
PR3

LB4
Spare

12
T

25A,2P
25

Receptacle
PR4

LB5
17

RCCB(30mA)
26

Receptacle
PR5
31

Receptacle
PR6

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


32

Receptacle
PR7

MCB
20A,1P
37

Water heater power


PR8

Receptacle

14
PR1
MCB
38

Water heater power


PR9

80A,3P

19
Receptacle

PR2
Feed From MSB-2
43

Water heater power


63A,2P

20
Receptacle

PR3
RCCB(30mA)
44

ACIU power

25
Receptacle

PR4
49

ACIU power
+ 16sqmm Cu/PVC (E)

26
Receptacle

PR5
4 x 25sqmm Cu/XLPE/PVC

MCB
ACIU power
50

63A,3P
31
Receptacle

PR6

Feed From MSB-2


55

ACIU power

32
ACIU power

PR7
56

Spare

37
ACIU power

PR8

40A,2P
61

Spare

RCCB(30mA)
38
ACIU power
PR10 PR11 PR12 PR13 PR14 PR15 PR16

PR9

+ 16sqmm Cu/PVC (E)


4 x 16sqmm Cu/XLPE/PVC
43
ACIU power
2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)

44
ACIU power 2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)
MCB
20A,1P

49
Spare

PR10 PR11 PR12


16
PY1

Receptacle
2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)
PY2
21

Receptacle
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

MCB
22
PY3

20A,1P Receptacle

16
PY1
Receptacle
PY4
27

Receptacle

21
PY2 Receptacle
PY5
28

Receptacle
PY3
22
Receptacle
33
PY6

Receptacle
PY4
27

Receptacle
34
PY7

Receptacle
PY5
28

Receptacle
39
PY8

Water heater power


33
PY6

Water heater power


40
PY9

Water heater power


34
PY7

ACIU power
MCB
63A,3P
45

Water heater power


63A,2P

MCB
50A,3P
39
PY8

ACIU power
40A,2P
RCCB(30mA)
46

ACIU power
RCCB(30mA)
40
PY9

ACIU power
51

ACIU power
45

ACIU power
52

ACIU power
46

Spare
57

Spare
51

Spare
PY10 PY11 PY12
58

Spare
2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)
63

Spare
PY10 PY11 PY12 PY13 PY14 PY15 PY16

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


MCB
20A,1P

2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)


18

Receptacle
PB1

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)


23

Receptacle
PB2
MCB
20A,1P

18

Receptacle
PB1

24

Receptacle
PB3
23

Receptacle
PB2

Receptacle
29
PB4
24

Receptacle
PB3

30

Receptacle
PB5
29

Receptacle
PB4

35

ACIU power
PB6
30

Receptacle
PB5

36

ACIU power
PB7
35

Receptacle
PB6

41

ACIU power
PB8

40A,2P
36

Receptacle
RCCB(30mA)
PB7

42

ACIU power
PB9
41

Water heater power


PB8

47

ACIU power
42

Water heater power


PB9

48

Spare
47

Spare Pantry power


63A,2P

53
PB10 PB11 PB12
RCCB(30mA)
48

ACIU power
53

ACIU power
54

ACIU power
59

Spare
60

Spare
65

Spare
PB10 PB11 PB12 PB13 PB14 PB15 PB16

1
No.

NTS
Scale:
Project:

Key Plan

Sheet Title:
NOTE:

Contract No:
Prepared For:

Sheet Number
TAUNGGYI, MYANMAR

2018.04A
GYI HOSPITAL
Drawings are not to be scaled.

Description

HNO
ISSUE FOR CONSTRUCTION

DIAGRAM LAYOUT
Drawn by:
STOREY RCC BUILDING
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

DB-5 & DB-6 SINGLE LINE


All reproduction & intellectual property rights reserved.

PUN HLAING SILOAM TAUNG


of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.

HKW
RENOVATION & EXTENSION TO 3 & 6

DD/MM/YY

Reviewed by:
This Drawing is an instrument of service and shall remain the property

SL06
MARCH 2020
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.

2 x 1C x 1.5 sqmm CU/MICA/XLPE/LSZH +


2 x 1C x 2.5 sqmm CU/MICA/XLPE/LSZH +
Drawings are not to be scaled.

1.5 sqmm PVC (E)


2.5 sqmm PVC (E)

Lighting

Lighting

Lighting

Lighting

Lighting

Lighting

Lighting
Lighting

Lighting

Lighting

Lighting

Lighting

Lighting

Lighting

Lighting

Lighting

Spare

Spare
Spare

Spare

Spare
Project:

PUN HLAING SILOAM TAUNG


GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

10A,1P
10A,1P
MCB
MCB
Prepared For:
LR1 LY1 LB1 LR2 LY2 LB2 LR3 LY3 LB3
LR1 LY1 LB1 LR2 LY2 LB2 LR3 LY3 LB3 LR4 LY4 LB4
1 3 5 2 4 6 7 9 11
1 3 5 2 4 6 7 9 11 8 10 12

25A,4P
RENOVATION & EXTENSION TO 3 & 6
25A,4P
RCCB
(30mA)
RCCB
(30mA)
25A,4P
STOREY RCC BUILDING
25A,4P
MCB
MCB CL: 1.2kVA
CL: 1.4kVA TAUNGGYI, MYANMAR
DB-U1 (Located at DB-U2 (Located at 4 x 4sqmm Cu/MICA/XLPE/LSZH +
4 x 4sqmm Cu/MICA/XLPE/LSZH + Basement MEP Room) Contract No: 2018.04A
Basement MEP Room) 4sqmm Cu/PVC (E)
4sqmm Cu/PVC (E)

25A,4P
25A,4P
MCB
MCB
UPS
UPS
25A,4P
25A,4P
MCB
MCB

5.0kVA Breaker Box UPS 5.0kVA


Breaker Box UPS 4 x 4sqmm Cu/XLPE/PVC +
4 x 4sqmm Cu/XLPE/PVC +
4sqmm Cu/PVC (E)
4sqmm Cu/PVC (E)

Feed From MSB-1 Feed From MSB-2

Key Plan

XRAY Machine (Supply with Breaker, Panel and Earth Bar)

CT Machine (Supply with Breaker, Panel and Earth Bar)


Mammo (Supply with Breaker, Panel and Earth Bar)
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)

2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)

4 x 1C x 50 sqmm PVC+ 25 sqmm PVC (E)

4 x 1C x 95 sqmm PVC+ 50 sqmm PVC (E)

4 x 1C x 95 sqmm PVC+ 50 sqmm PVC (E)


No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020

Control, X-Ray Lighting


UPS & CT lighting
OT-1 lighting

OT-2 lighting

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle
Lighting

Lighting

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle

Receptacle
Power

Power
Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare
10A,1P 20A,1P 40A,3P
MCB MCB MCB

LR1 LY1 LB1 LR2 LY2 LB2 PR1 PY1 PB1 PR2 PY2 PB2 PR3 PY3 PB3 PR4 PY4 PB4 PR5 PY5 PB5 PR6 PY6 PB6 RYB7 RYB8 RYB9
1 3 5 2 4 6 7 9 11 8 10 12 13 15 17 14 16 18 19 21 23 20 22 24
25,27,29

26,28,30

31,33,35

10A,1P 20A,1P 63A,3P 100A,3P 160A,3P 63A,3P


MCB MCB MCCB MCCB MCCB MCCB
2A/F R Y B 32A,4P
A/S MCB LR1 LY1 LB1 PR1 PY1 PB1 PR2 PY2 PB2 PR3 PY3 PB3 PRYB3 PRYB4 PRYB5 PRYB6
0~250A A MCT HRC Fuse 1 3 5 2 4 6 7 9 11 8 10 12 13,15,17 14,16,18 19,21,23 20,22,24
V
32A
V/S 2A/F R Y B
OCR SPD, 80kA
PCT A/S
EFR (All Mode)
0~250A A MCT
80A,4P V
ST
MCB OCR CT V/S

2A/F R Y B EFR PCT

250A,4P
ST
MCCB
CL: 37.58kW
2A/F R Y B
DB-OT (Located at Level-2 )
4 x 25sqmm Cu/MICA/XLPE/LSZH + CL: 126.79kW Scale: Drawn by: Reviewed by:
16sqmm Cu/PVC (E) SDB-CT (Located at Level-1 ) 4 x 120sqmm Cu/XLPE/PVC + NTS HNO HKW
70sqmm Cu/PVC (E)
Sheet Title:
80A,4P
250A,4P

DB-U1, DB-U2, DB-OT &


MCB
MCCB
UPS
UPS
80A,4P
MCB 250A,4P
MCCB
SDB-CT SINGLE LINE
Breaker Box
4 x 25sqmm Cu/XLPE/PVC
DB-OT (By Owner)
Breaker Box
4 x 120sqmm Cu/XLPE/PVC
UPS (By Owner) DIAGRAM LAYOUT
+ 16sqmm Cu/PVC (E)
+ 70sqmm Cu/PVC (E)

Feed From MSB-2


Feed From MSB-1 Sheet Number

SL07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

Project:

PUN HLAING SILOAM TAUNG

4 x 1C x 4 sqmm CU/MICA/XLPE/LSZH +
4 x 1C x 6 sqmm CU/MICA/XLPE/LSZH+
GYI HOSPITAL

4 x 1C x 120 sqmm CU/XLPE/PVC +


4 x 1C x 35 sqmm CU/XLPE/PVC +

4 x 1C x 35 sqmm CU/XLPE/PVC +

4 x 1C x 10 sqmm CU/XLPE/PVC +

4 x 1C x 70 sqmm CU/XLPE/PVC +

4 x 1C x 4 sqmm CU/XLPE/PVC +

4 x 1C x 6 sqmm CU/XLPE/PVC +

4 x 1C x 4 sqmm CU/XLPE/PVC +
4 x 1C x 4 sqmm CU/XLPE/PVC +

4 x 1C x 16 sqmm CU/XLPE/PVC

4 x 1C x 16 sqmm CU/XLPE/PVC

4 x 1C x 25 sqmm CU/XLPE/PVC

4 x 1C x 16 sqmm CU/XLPE/PVC

4 x 1C x 25 sqmm CU/XLPE/PVC
4 x 1C x 35 sqmm CU/XLPE/PVC

4 x 1C x 10 sqmm CU/XLPE/PVC
4 x 1C x 6 sqmm CU/XLPE/PVC

4 x 1C x 6 sqmm CU/XLPE/PVC

4 x 1C x 4 sqmm CU/XLPE/PVC
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

WATER TREATMENT PUMP


CU/MICA/XLPE/LSZH+
+ 16 sqmm PVC(E)

HOSEREEL PUMP
+ 10 sqmm PVC(E)

TRANSFER PUMP
BOOSTER PUMP
Prepared For:

4 x 1C x 6 sqmm
16 sqmm PVC(E)

16 sqmm PVC(E)

10 sqmm PVC(E)

70 sqmm PVC(E)

35 sqmm PVC(E)

16 sqmm PVC(E)

16 sqmm PVC(E)

16 sqmm PVC(E)

16 sqmm PVC(E)

16 sqmm PVC(E)
6 sqmm PVC(E)

4 sqmm PVC(E)

6 sqmm PVC(E)

4 sqmm PVC(E)

6 sqmm PVC(E)

4 sqmm PVC(E)

6 sqmm PVC(E)

4 sqmm PVC(E)
6 sqmm PVC(E)

4 sqmm PVC(E)
RENOVATION & EXTENSION TO 3 & 6

SDB-CT

DB-2B1
DB-111

DB-121

DB-131

DB-141

DB-211

DB-221

DB-231

DB-241
SPARE

SPARE

SPARE

SPARE

SPARE
DB-OT
DB-U1

DB-U2
DB-1B

LIFT-1

LIFT-2
DB-5

DB-6
STOREY RCC BUILDING
+

+
TAUNGGYI, MYANMAR

Contract No: 2018.04A


40AT/ 100AT/ 100AT/ 100AT/ 50AT/ 200AT/ 25AT/ 40AT/ 40AT/ 40AT/ 32AT/ 25AT/ 40AT/ 160AT/ 63AT/ 63AT/ 80AT/ 63AT/ 25AT/ 25AT/ 25AT/ 40AT/ 25AT/ 25AT/ 80AT/ 40AT/ 40AT/
125AF, 160AF, 160AF, 160AF, 125AF, 250AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF, 160AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF, 125AF,
3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB 3P MCCB
(36 kA) (36 kA) (36kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA) (36 kA)

320A Bus Bar 320A Bus Bar


100% Neutral, 50% Ground 1 2 3 4 5 6 7 8 9 10 100% Neutral, 50% Ground 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

160AT,160AF, 160AT,160AF,
2A/F R Y B 2A/F R Y B
25KA,TPN 25KA,TPN
0~400A 0~400A
MCCB MCCB
A A A MCT 160A A A A MCT 160A
V 0~500V V 0~500V
HRC FUSE HRC FUSE
V/S V/S
Surge Surge
OCR CT OCR CT
Arrester Arrester
EFR PCT EFR PCT
100kA 100kA Key Plan
320AT/630AF,4P 320AT/630AF,4P
ST (8/20 μA) ST (8/20 μA)
MCCB (50kA) MCCB (50kA)
TDL: 173.28kW (All Mode) TDL: 153.28kW (All Mode)
TCL: 288.81kW TCL: 255.48kW
<2Ω <2Ω
MSB-1 (Located at Basement MEP Room) MSB-2 (Located at Basement MEP Room)
4 x 1C x 185 sqmm Cu/XLPE/PVC 4 x 1C x 185 sqmm Cu/XLPE/PVC

400A,4P
400A,4P
ATS (40kA)
ATS (40kA)

2A/F R Y B R Y B 2A/F

4 x 1C x 185 sqmm 4 x 1C x 185 sqmm


2A/F R Y B R Y B 2A/F
Cu/MICA/XLPE/LSZH Cu/MICA/XLPE/LSZH

2A/F GENSET SENSING CABLE GENSET SENSING CABLE 2A/F

6A,TPN 6A,TPN
MCB MCB
No. Description DD/MM/YY
4 x 1C x 185 sqmm Cu/XLPE/PVC 4 x 1C x 185 sqmm Cu/XLPE/PVC

1 ISSUE FOR CONSTRUCTION MARCH 2020

125A,TPN 125A,TPN
MCCB CT Meter CT Meter MCCB
2A/F 2A/F
Compartment Compartment
PFC CT CT PFC
GENERATOR CONTROL PANEL
320AT/630AF,4P 320AT/630AF,4P
MCCB (50kA) MCCB (50kA)
4 x 1C x 185 sqmm 4 x 1C x 185 sqmm
kWh Cu/MICA/XLPE/LSZH Cu/MICA/XLPE/LSZH kWh
70 kVAR 70 kVAR
CAPACITOR CAPACITOR
MAIN METER 150kVA, PRIME 200kVA, PRIME MAIN METER
BANK GEN GEN BANK
3Ph4W, 400V, 50Hz 3Ph4W, 400V, 50Hz
200kVA TRANSFORMER 200kVA TRANSFORMER
ONAN, Dyn11,11/0.4kV, 50Hz ONAN, Dyn11,11/0.4kV, 50Hz

DOF DOF

LA DS LA DS

1 x 3C x 95 sqmm Cu/XLPE/SCT/PVC/SWA/PVC, 12kV 1 x 3C x 95 sqmm Cu/XLPE/SCT/PVC/SWA/PVC, 12kV

TAP FROM HT O/H LINE (ESE) TAP FROM HT O/H LINE (ESE)

Scale: Drawn by: Reviewed by:


NTS HNO HKW
Sheet Title:

MSB-1 & MSB-2 SINGLE


LINE DIAGRAM LAYOUT

Sheet Number

SL08
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

ROOF
LIFT-1 LIFT-2
4 x 1C x 6 sqmm CU/MICA/XLPE/LSZH + 4 x 1C x 6 sqmm CU/MICA/XLPE/LSZH + Project:
6 sqmm PVC (E) 6 sqmm PVC (E)
DB-6 PUN HLAING SILOAM TAUNG
4 x 1C x 16 sqmm CU/XLPE/PVC +
16 sqmm PVC (E) GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
HOSEREEL PUMP LEVEL-6
4 x 1C x 4 sqmm CU/MICA/XLPE/LSZH +
DB-5 4sqmm PVC (E)
4 x 1C x 25 sqmm CU/XLPE/PVC + Prepared For:
16 sqmm PVC (E) BOOSTER PUMP
4 x 1C x 6 sqmm CU/XLPE/PVC +
6 sqmm PVC (E) RENOVATION & EXTENSION TO 3 & 6
ROOF LEVEL-5
STOREY RCC BUILDING
TAUNGGYI, MYANMAR

DB-141 DB-241 Contract No: 2018.04A


4 x 1C x 10 sqmm CU/XLPE/PVC + 4 x 1C x 16 sqmm CU/XLPE/PVC +
10 sqmm PVC (E) 16 sqmm PVC (E)

LEVEL-4 LEVEL-4

DB-131 DB-231
4 x 1C x 35 sqmm CU/XLPE/PVC + 4 x 1C x 16 sqmm CU/XLPE/PVC +
16 sqmm PVC (E) 16 sqmm PVC (E)

LEVEL-3 LEVEL-3
Key Plan
DB-221
4 x 1C x 70 sqmm CU/XLPE/PVC +
DB-121 35 sqmm PVC (E)
4 x 1C x 35 sqmm CU/XLPE/PVC +
16 sqmm PVC (E) DB-OT
4 x 1C x 25 sqmm CU/XLPE/PVC +
16 sqmm PVC (E)
LEVEL-2 LEVEL-2
200 kVA ,
Transformer
DB-111 SDB-CT DB-211
4 x 1C x 35 sqmm CU/XLPE/PVC + 4 x 1C x 120 sqmm CU/XLPE/PVC + 4 x 1C x 10 sqmm CU/XLPE/PVC +
200 kVA , 16 sqmm PVC (E) 70 sqmm PVC (E) 10 sqmm PVC (E)
Transformer

LEVEL-1 LEVEL-1
No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020


1 x 3C x 95 sqmm Cu/XLPE/SCT/PVC/SWA/PVC, 12kV

DB-1B DB-2B1 DB-U2


4 x 1C x 6 sqmm CU/XLPE/PVC + 4 x 1C x 6 sqmm CU/XLPE/PVC + 4 x 1C x 4 sqmm CU/XLPE/PVC +
6 sqmm PVC (E) 6 sqmm PVC (E) 4 sqmm PVC (E)
DB-U1 TRANSFER PUMP WATER TREATMENT PUMP
4 x 1C x 4 sqmm CU/XLPE/PVC + 4 x 1C x 4 sqmm CU/XLPE/PVC +
4 x 1C x 4 sqmm CU/XLPE/PVC +
4 sqmm PVC (E) 4 sqmm PVC (E)
4 sqmm PVC (E)

MSB-1 MSB-2

GSP

150 kVA , Prime 200 kVA , Prime


3Ph, 4W G G 3Ph, 4W

BASEMENT BASEMENT
Scale: Drawn by: Reviewed by:
NTS HNO HKW

EXISTING BUILDING NEW BUILDING Sheet Title:

ELECTRICAL SCHEMATIC
DIAGRAM LAYOUT

Sheet Number

SL09
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

ROOF

LIFT-1 LIFT-2
Project:

LEVEL-6 PUN HLAING SILOAM TAUNG


GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

Prepared For:
ROOF LEVEL-5
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
TAUNGGYI, MYANMAR

Contract No: 2018.04A


LEVEL-4 LEVEL-4

PABX
SERVER

LEVEL-3 LEVEL-3

Key Plan

OT-1 GROUND JACK


OT-2 GROUND JACK
OT-3 GROUND JACK
OT-4 GROUND JACK

MED EARTH

LEVEL-2 LEVEL-2
TRANSFORMER

TRANSFORMER

X-RAY CT No. Description DD/MM/YY


LEVEL-1 LEVEL-1
1 ISSUE FOR CONSTRUCTION MARCH 2020
6 sqmm PVC (E)

TO RESPECTIVE TO RESPECTIVE
DB, PANEL AND LMCP DB, PANEL AND LMCP

MSB-1 MSB-2
GEN;
LIFT CORE-2
LIFT CORE-1
FIRE FIGHTING PIPE BONDING LIFT EARTH BAR MED EQUIPMENT GEN; FIRE FIGHTING PIPE BONDING
MEDICAL GAS PIPE BONDING (MEP ROOM) MEDICAL GAS PIPE BONDING
WIRE WAY EARTH LINK WIRE WAY EARTH LINK

MAIN EARTH BAR (MEP ROOM) IT EARTH BAR MAIN EARTH BAR (MEP ROOM)
(MEP ROOM)

TN-S EARTHING SYSTEM


NOTE:
NO OF EARTH ELECTRODE LOCATION ARE NOT LIMITED
BASEMENT IT SHALL BE CONSIDERED ON SITE ACCORDING TO SOIL RESISTIVITY BASEMENT Scale: Drawn by: Reviewed by:
NTS HNO HKW
Sheet Title:
EXISTING BUILDING NEW BUILDING
EARTHING SCHEMATIC
DIAGRAM LAYOUT

Sheet Number

ET01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

LA Earth <10 Ω
LA Earth <10 Ω
1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16
Project:

Medical Earth <2 Ω Main Earth <2 Ω PUN HLAING SILOAM TAUNG
Main Earth <2 Ω IT Earth <2 Ω GEN SET
B24
A
GYI HOSPITAL
Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
NOTE; PUMP ROOM WASTE MEP
Number of Electrode and Earth Pit shown in drawing are not limited. WARE HOUSE RAW WATER B25 B23 B22
B10 B15 Not Enclosed GENERATOR Not Enclosed Not Enclosed
It shall be considered on site according to soil resistivity. Not Enclosed Not Enclosed Prepared For:
All Lightning Protection System Earth Pit shall be bonded each other
as Earth Termination Network. RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
B
MEDICAL RECORDS
TAUNGGYI, MYANMAR
B09 MEP OFFICE
Not Enclosed Main Earth Bar Contract No: 2018.04A
B21
Not Enclosed
C

LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
B13 C'
Not Enclosed

D Key Plan
Main Earth Bar

MEP D'
B08 IRONING ROOM
Not Enclosed LAST OFFICE B35
B19 Not Enclosed
Not Enclosed

EARTH E
TOILET
B14
Not Enclosed LA Earth <10 Ω
BIKE PARKING AREA E'
B18
TOILET Not Enclosed
B12 F
Not Enclosed No. Description DD/MM/YY
BOTTLE STORAGE G
B16 1 ISSUE FOR CONSTRUCTION MARCH 2020
PHARMACY STORAGE SECURITY
Not Enclosed
B06 B07
Not Enclosed Not Enclosed

H
CORRIDOR
POD
B11
B05 Not Enclosed
Not Enclosed

K
HOUSE KEEPING

Not Enclosed BIO MED


MEDICAL SUPPLY
B03

B02
B04 Not Enclosed
Not Enclosed

MALE CHANGING
CT Earth to Breaker Box B01
CT Earth to Breaker Box Not Enclosed
LA Earth <10 Ω
CT Earth <2 Ω CT Earth <2 Ω L
LA Earth <10 Ω
M
Scale: Drawn by: Reviewed by:
1 : 150 HNO HKW
Sheet Title:

BASEMENT FLOOR
EARTHING SYSTEM LAYOUT

Sheet Number

ET02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:

LV CABLE LADDER 200 mm x 50 mm


A
GEN SET
B24
GEN SET(150kVA) PUN HLAING SILOAM TAUNG
Not Enclosed
GYI HOSPITAL
PUMP ROOM WASTE MEP
LV CABLE LADDER 450 mm x 50 mm No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
WARE HOUSE RAW WATER B25 B23 B22
B10 B15 Not Enclosed Not Enclosed Not Enclosed GEN SET(200kVA)
Not Enclosed Not Enclosed
Prepared For:

DB-2B1
B RENOVATION & EXTENSION TO 3 & 6

LV TRUNKING 600 mm x 50 mm
MEDICAL RECORDS
STOREY RCC BUILDING
B09 MEP OFFICE TAUNGGYI, MYANMAR
Not Enclosed MSB
B21
Not Enclosed
DB-U2
Contract No: 2018.04A
MSB-2 C
LV CABLE LADDER 300 mm x 50 mm

LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
C'
B13
Not Enclosed
D

LV TRUNKING 400 mm x 50 mm
Key Plan
D'
MEP

MSB
MSB-1 IRONING ROOM
B08
Not Enclosed LAST OFFICE B35
B19 Not Enclosed
Not Enclosed
DB-1B E
EARTH
DB-U1 TOILET
B14
LV TRUNKING 100 mm x 50 mm ELV TRUNKING 200 mm x 50 mm
Not Enclosed
BIKE PARKING AREA E'
LV TRUNKING 75 mm x 50 mm
B18
TOILET Not Enclosed
B12 F
Not Enclosed
BOTTLE STORAGE G
B16 No. Description DD/MM/YY
PHARMACY STORAGE SECURITY Not Enclosed
B06 MATV B07
Not Enclosed Not Enclosed 1 ISSUE FOR CONSTRUCTION MARCH 2020

PA RACK

FAP
CCTV
H
CORRIDOR
POD B11
B05 Not Enclosed
Not Enclosed
J

K
HOUSE KEEPING

Not Enclosed
BIO MED
MEDICAL SUPPLY
B03
B02
B04 Not Enclosed
Not Enclosed

MALE CHANGING
B01
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

BASEMENT STAGE2 WIRE


WAY SYSTEM LAYOUT

Sheet Number

WW01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7 8 9 10 11 12 13 14 15 16

Project:
A
MEDICATION PUN HLAING SILOAM TAUNG
TOILET
TOILET TOILET
120a 119a
TOILET
118a
TOILET
117a
TOILET TOILET
122A
Not Enclosed 114C
TOILET
158A GYI HOSPITAL
116a 115a Not Enclosed Not Enclosed CONSULT No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Not Enclosed
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
Not Enclosed
TOILET CONSULT CONSULT 157
DOUBLE IPD STD IPD STD IPD STD IPD STD IPD STD IPD STD IPD Not Enclosed
NURSE STATION STD IPD TOILET
122B 114 159A Prepared For:
Not Enclosed Not Enclosed Not Enclosed LV TRUNKING 200 mm x 50 mm

B RENOVATION & EXTENSION TO 3 & 6


CONSULT
ELV TRUNKING 150 mm x 50 mm ELV TRUNKING 100 mm x 50 mm 156
STOREY RCC BUILDING
Not Enclosed
TAUNGGYI, MYANMAR
LV TRUNKING 150 mm x 50 mm LV TRUNKING 100 mm x 50 mm
BREAKER Contract No: 2018.04A
PANEL
C
BREAKER DB-211

LV TRUNKING 100 mm x 50 mm
PANEL

MEDICATION

Not Enclosed
LV TRUNKING 150 mm x 50 mm ELV TRUNKING 150 mm x 50 mm
STD IPD SEPTIC

126
GP
ELV TRUNKING 150 mm x 50 mm

XRAY VITAL
TRIAGE MAMMO 127
ELV TRUNKING 150 mm x 50 mm Not Enclosed
LV TRUNKING 200 mm x 50 mm C'
LV TRUNKING 150 mm x 50 mm

SDB-CT
MEDDICAL SUPPLIER D

ELV TRUNKING 75 mm x 50 mm
UPS PIPING TOILET
LV TRUNKING 250 mm IMAGING
x 50 mm F

LV TRUNKING 100 mm x 50 mm
128 155A Key Plan
7 sqm CHANGING LV TRUNKING 300 mm x 50 mm
Not Enclosed Not Enclosed D'
ELV TRUNKING 400 mm x 50 mm ELV TRUNKING 400 mm x 50 mm CONTROL CONSULT

CORRIDOR LV TRUNKING 300 mm x 50 mm


GENERAL WAITING
124
ED ENTRY USG
LV TRUNKING 250 mm x 50 mm 129
Not Enclosed

IMAGING CORRIDOR
ED Not Enclosed E

LV TRUNKING 150 mm x 50 mm
7 sqm

Not Enclosed
LV TRUNKING 150 mm x 50 mm

142
DU TOILET JAN
E'
USG CONSULT

ELV TRUNKING 150 mm x 50 mm


LV TRUNKING 200 mm x 50 mm

LV TRUNKING 100 mm x 50 mm
LV TRUNKING 75 mm x 50 mm

5.5 sqm CT TOILET F


DB-111 154A
Not Enclosed
G
TOILET
153A No. Description DD/MM/YY
Not Enclosed
5.5 sqm 1 ISSUE FOR CONSTRUCTION MARCH 2020
LOBBY TOILET TOILET CONSULT
Not Enclosed STAIR 132 131
Not Enclosed Not Enclosed Not Enclosed
BREAKER
PANEL
LV TRUNKING 150 mm x 50 mm H
LV TRUNKING 150 mm x 50 mm
BLOOD COLLECTION
CORRIDOR 152 TOILET
RECEPTION ELV TRUNKING 200 mm x 50 mm
ELV TRUNKING 150 mm x 50 mm 137 Not Enclosed 151B
Not Enclosed Not Enclosed Not Enclosed
J

CONSULT K
108

PATHOLOGIST

Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 107

109
Not Enclosed LAB
Not Enclosed Not Enclosed Not Enclosed Not Enclosed 151
REF. Not Enclosed

REF. STAIR
S1-1
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-1 STAGE2 WIRE WAY


SYSTEM LAYOUT

Sheet Number

WW02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
TOILET
Not Enclosed
TOILET TOILET TOILET TOILET OT 2 OT 3 OT 4 GYI HOSPITAL
257 256 B47 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Not Enclosed Not Enclosed Not Enclosed
DR CHANGING
STD IPD PRE / POST
STD IPD STD IPD STD IPD
Prepared For:

DN B RENOVATION & EXTENSION TO 3 & 6


FIRE LANDING ELV TRUNKING 150 mm x 50 mm
STOREY RCC BUILDING
Not Enclosed CORRIDOR DB-OT
B164 TAUNGGYI, MYANMAR
Not Enclosed
UP ELV TRUNKING 150 mm x 50 mm Contract No: 2018.04A
C
DB-221
TOILET TOILET WASHING
TOILET ?
STD IPD STD IPD STD IPD
ELV TRUNKING 150 mm x 50 mm

DOUBLE IPD LIFT CSSD STERILE LV TRUNKING 200 mm x 50 mm


Not Enclosed CORRIDOR
B166
TOILET DU Not Enclosed C'
ELV TRUNKING 150 mm x 50 mm

ELV TRUNKING 75 mm x 50 mm

LV TRUNKING 100 mm x 50 mm
TOILET Key Plan
MEDICATION LDS D'

ELV TRUNKING 150 mm x 50 mm


CSSD CLEAN STD IPD

LV TRUNKING 150 mm x 50 mm
ELV TRUNKING 200 mm x 50 mm 20 m²
LDS DR
DOUBLE IPD ROOF LOUNGE
E
CLEAN
LV TRUNKING 150 mm x 50 mm PASSAGE
CSSD DIRTY 3 m²
17 m² E'
DOUBLE IPD TOILET MEDICATION
JAN LV TRUNKING 200 mm x 50 mm
TOILET Not Enclosed
DB-121 CLEAN F
OT 1 CHANGING
G
BABY WASH

TOILET No. Description DD/MM/YY

PREP
LIFT 2
CLEAN
NURSERY 1 ISSUE FOR CONSTRUCTION MARCH 2020
CHANGING
TOILET STD IPD CU TOILET
Not Enclosed
ELV TRUNKING 150 mm x 50 mm
H

LV TRUNKING 150 mm x 50 mm

ICU J

DELUXE SUITE K

STD IPD
STD IPD STD IPD STD IPD
STD IPD STD IPD
TOILET 251
TOILET TOILET TOILET
TOILET TOILET Not Enclosed
STAIR TOILET
S1-2
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-2 STAGE2 WIRE WAY


SYSTEM LAYOUT

Sheet Number

WW03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

A Project:

PUN HLAING SILOAM TAUNG


TOILET
Not Enclosed GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

STD IPD
STD IPD
Not Enclosed Prepared For:
B
RENOVATION & EXTENSION TO 3 & 6
FIRE LANDING CORRIDOR
Not Enclosed Not Enclosed
ELV TRUNKING 200 mm x 50 mm ELV TRUNKING 200 mm x 50 mm ELV TRUNKING 200 mm x 50 mm
STOREY RCC BUILDING
TOIELT TAUNGGYI, MYANMAR
LV TRUNKING 150 mm x 50 mm LV TRUNKING 150 mm x 50 mm LV TRUNKING 150 mm x 50 mm
DB-231 C
Contract No: 2018.04A

-50
ELV TRUNKING 200 mm x 50 mm

FIRE EXIT
LV TRUNKING 150 mm x 50 mm

LV TRUNKING 200 mm x 50 mm
LANDING

CORRIDOR C'
-50

ELV TRUNKING 200 mm x 50 mm


D

LV TRUNKING 150 mm x 50 mm
TOILET
D' Key Plan
VOID

LV TRUNKING 100 mm x 50 mm
ELV TRUNKING 300 mm x 50 mm STD IPD

ELV TRUNKING 75 mm x 50 mm
ROOF E
ELV TRUNKING 300 mm x 50 mm

LV TRUNKING 300 mm x 50 mm
E'
LV TRUNKING 300 mm x 50 mm

F
ELV TRUNKING 300 mm x 50 mm

DB-131

No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020

LV TRUNKING 150 mm x 50 mm
H

ELV TRUNKING 300 mm x 50 mm


TOILET
J

GRAND SUITE K

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-3 STAGE2 WIRE WAY


SYSTEM LAYOUT

Sheet Number

WW04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

Prepared For:

ELV TRUNKING 75 mm x 50 mm
B RENOVATION & EXTENSION TO 3 & 6
LV TRUNKING 150 mm x 50 mm STOREY RCC BUILDING
LV TRUNKING 100 mm x 50 mm
TAUNGGYI, MYANMAR
1400
ELV TRUNKING 150 mm x 50 mm Contract No: 2018.04A
C
DB-241
ELV TRUNKING 150 mm x 50 mm

MEDICATION
ELV TRUNKING 150 mm x 50 mm
LV TRUNKING 150 mm x 50 mm

5 m² 1945
STAFF ROOM LV TRUNKING 200 mm x 50 mm

C'

LV TRUNKING 150 mm x 50 mm
ELV TRUNKING 150 mm x 50 mm
SILVER BED TOILET
Key Plan

ELV TRUNKING 75 mm x 50 mm
MEDICATION 3 m²
D'

LV TRUNKING 100 mm x 50 mm
STD IPD
VOID
ELV TRUNKING 200 mm x 50 mm Not Enclosed
SILVER BED VOID
E
STORAGE

CORRIDOR
E'
Not Enclosed
SILVER BED CORRIDOR
DB-141 F
LV TRUNKING 300 mm x 50 mm
G
LV TRUNKING 150 mm x 50 mm

No. Description DD/MM/YY


ELV TRUNKING 150 mm x 50 mm

CU
STAFF
PANTRY 1 ISSUE FOR CONSTRUCTION MARCH 2020

SILVER BED SILVER BED SILVER BED DU

H
AP2-802-1`
ELV TRUNKING 150 mm x 50 mm
SILVER BED

J
LV TRUNKING 150 mm x 50 mm
K
SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED
STAFF TOILET

WAITING GRAND SUITE


SILVER BED TOILET 04 TOILET 05

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-4 STAGE2 WIRE WAY


SYSTEM LAYOUT

Sheet Number

WW05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A

TOILET
PUN HLAING SILOAM TAUNG
TOILET TOILET GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

TOILET STD IPD


TOILET ISO STD IPD
Prepared For:

ELV TRUNKING 75 mm x 50 mm
DELUXE SUITE B RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
LV TRUNKING 150 mm x 50 mm
CORRIDOR TAUNGGYI, MYANMAR

ELV TRUNKING 75 mm x 50 mm
TOILET Contract No: 2018.04A
LV TRUNKING 200 mm x 50 mm
C
DB-5

LV TRUNKING 150 mm x 50 mm

COUNTER
NURSE
MEDICATION

C'
ELV TRUNKING 150 mm x 50 mm

LV TRUNKING 100 mm x 50 mm
TOILET

ELV TRUNKING 75 mm x 50 mm
CONFERENCE OFFICE Key Plan
D'

VOID
STD IPD
VOID
E

PANTRY
HR OFFICE E'

F
DOUBLE IPD
G
OUTDOOR
SEATING No. Description DD/MM/YY

TOILET 1 ISSUE FOR CONSTRUCTION MARCH 2020

H
WATER
STORAGE TOILET

GRAND SUITE J

K
STD IPD

STAIR 02 TOILET
Not Enclosed
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-5 STAGE2 WIRE WAY


SYSTEM LAYOUT

Sheet Number

WW06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

A Project:

PUN HLAING SILOAM TAUNG


DIS TOILET
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

SHOWER
IPD STD 01 IPD STD 02 IPD STD 03 IPD STD 04
Not Enclosed Not Enclosed Not Enclosed Not Enclosed Prepared For:
TOILET
B
RENOVATION & EXTENSION TO 3 & 6
EXTG: TOILET
Not Enclosed STOREY RCC BUILDING
TAUNGGYI, MYANMAR

Lift-1 C Contract No: 2018.04A

IPD STD 05
Not Enclosed
IPD STD 06

MEDICATION
Not Enclosed
Not Enclosed DB-6

C'

PREP COUNTER
D' Key Plan

IPD STD 07

ELV TRUNKING 100 mm x 50 mm


Not Enclosed

LV TRUNKING 150 mm x 50 mm
E
VOID

IPD STD 08 E'


CORRIDOR Not Enclosed
Not Enclosed
F

LIFT MECH IPD STD 09 No. Description DD/MM/YY


ROOM Not Enclosed
8 m² 1 ISSUE FOR CONSTRUCTION MARCH 2020

Lift-2

IPD STD 10 H
PREP COUNTER Not Enclosed
STAIR
NURSE
S1-6
Not Enclosed STATION 1
Not Enclosed
J
IPD STD 11
Not Enclosed K

IPD STD 13 IPD STD 12


Not Enclosed Not Enclosed
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-6 STAGE2 WIRE WAY


SYSTEM LAYOUT

Sheet Number

WW07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

GEN SET CCTV-2B5 A Project:


B24
Not Enclosed PUN HLAING SILOAM TAUNG
PUMP ROOM WASTE MEP GYI HOSPITAL
WARE HOUSE RAW WATER B25 B23 B22 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
B10 B15 Not Enclosed Not Enclosed Not Enclosed
Not Enclosed Not Enclosed

Prepared For:

B
RENOVATION & EXTENSION TO 3 & 6
MEDICAL RECORDS
B09 MEP OFFICE
STOREY RCC BUILDING
CCTV-1B3
Not Enclosed B21 TAUNGGYI, MYANMAR
Not Enclosed
C Contract No: 2018.04A

LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
C'
B13
Not Enclosed
D

CCTV-2B4
D' Key Plan
MEP
B08 IRONING ROOM
Not Enclosed LAST OFFICE B35
B19 Not Enclosed
Not Enclosed

EARTH E
CCTV-2B3
TOILET
B14
Not Enclosed
BIKE PARKING AREA E'
CCTV-1B2 B18
TOILET Not Enclosed
B12 F
Not Enclosed
BOTTLE STORAGE G
B16
PHARMACY STORAGE SECURITY Not Enclosed No. Description DD/MM/YY
B06 MATV B07
Not Enclosed Not Enclosed
1 ISSUE FOR CONSTRUCTION MARCH 2020
PA PANEL

FA PANEL
CCTV
H
CORRIDOR
POD B11
B05 Not Enclosed
Not Enclosed
CCTV-1B1
J
CCTV-2B1
K
HOUSE KEEPING
CCTV-2B2

Not Enclosed
BIO MED
MEDICAL SUPPLY B03 B02
B04 Not Enclosed
Not Enclosed

MALE CHANGING
B01
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

BASEMENT STAGE2 CCTV


SYSTEM LAYOUT

Sheet Number

CCTV01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

A Project:

TOILET TOILET TOILET TOILET


MEDICATION
122A TOILET TOILET
PUN HLAING SILOAM TAUNG
TOILET TOILET 114C
120a
Not Enclosed
119a
Not Enclosed
118a 117a
Not Enclosed Not Enclosed
116a 115a
Not Enclosed
Not Enclosed
158A
Not Enclosed CONSULT GYI HOSPITAL
Not Enclosed
Not Enclosed 157 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
TOILET CONSULT CONSULT
DOUBLE IPD STD IPD STD IPD STD IPD STD IPD STD IPD STD IPD Not Enclosed
NURSE STATION STD IPD TOILET
122B 114 159A
Not Enclosed Not Enclosed Prepared For:
Not Enclosed
B
CCTV-114
CCTV-113
CCTV-214 CONSULT RENOVATION & EXTENSION TO 3 & 6
156
Not Enclosed
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
C Contract No: 2018.04A

MEDICATION

Not Enclosed
STD IPD SEPTIC

126
GP CCTV-215
XRAY VITAL
TRIAGE MAMMO 127
Not Enclosed C'

CCTV-116
CCTV-211
MEDDICAL SUPPLIER D
CCTV-115 UPS PIPING TOILET
IMAGING F
128 155A
7 sqm CHANGING
Not Enclosed Not Enclosed D' Key Plan
CONTROL CONSULT

CORRIDOR
GENERAL WAITING
124
ED ENTRY USG 129
Not Enclosed

IMAGING CORRIDOR
ED Not Enclosed E
7 sqm

Not Enclosed
142
DU TOILET JAN
E'
USG CONSULT

5.5 sqm CT TOILET F


CCTV-117 154A
Not Enclosed
G
TOILET
153A
Not Enclosed No. Description DD/MM/YY
5.5 sqm
LOBBY TOILET TOILET CONSULT 1 ISSUE FOR CONSTRUCTION MARCH 2020
Not Enclosed STAIR 132 131 CCTV-112
Not Enclosed Not Enclosed Not Enclosed

CCTV-212 BLOOD COLLECTION


CORRIDOR 152 TOILET
RECEPTION 137 Not Enclosed 151B
Not Enclosed Not Enclosed Not Enclosed
J
CCTV-118

CONSULT CCTV-213
K
108

PATHOLOGIST

Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 107

109
Not Enclosed LAB
Not Enclosed Not Enclosed Not Enclosed Not Enclosed 151
REF. Not Enclosed

REF. STAIR
S1-1
CCTV-111
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-1 STAGE2 CCTV


SYSTEM LAYOUT

Sheet Number

CCTV02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

A
Project:

PUN HLAING SILOAM TAUNG


GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

Prepared For:
DN B
CCTV-123
CCTV-221 RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
CCTV-124
TAUNGGYI, MYANMAR
UP
C
CCTV-222 Contract No: 2018.04A

?
CCTV-223

C'

D'
Key Plan

ROOF
E

E'

PREP
CCTV-122
No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020

H
CCTV-121

J
CCTV-125

CCTV-224 K

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-2 STAGE2 CCTV


SYSTEM LAYOUT

Sheet Number

CCTV03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
TOILET
Not Enclosed GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

STD IPD
STD IPD
Not Enclosed Prepared For:
CCTV-132
B RENOVATION & EXTENSION TO 3 & 6
CCTV-133
FIRE LANDING CORRIDOR CCTV-233 STOREY RCC BUILDING
Not Enclosed Not Enclosed
TOIELT TAUNGGYI, MYANMAR

C Contract No: 2018.04A

-50
FIRE EXIT CCTV-232
LANDING

-50 CORRIDOR C'

TOILET
D' Key Plan
VOID

STD IPD

ROOF E

E'

No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020

CCTV-131
TOILET
J
CCTV-134
CCTV-231
GRAND SUITE K

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-3 STAGE2 CCTV


SYSTEM LAYOUT

Sheet Number

CCTV04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

Prepared For:

CCTV-145 B RENOVATION & EXTENSION TO 3 & 6


CCTV-242
STOREY RCC BUILDING
CCTV-143
TAUNGGYI, MYANMAR
1400
Contract No: 2018.04A
C
CCTV-144

MEDICATION
5 m² 1945 CCTV-243
STAFF ROOM
C'

SILVER BED TOILET Key Plan


MEDICATION 3 m²
D'

STD IPD
VOID
Not Enclosed
SILVER BED VOID
E
STORAGE

CORRIDOR
Not Enclosed E'
SILVER BED CORRIDOR
F

CCTV-142
G
CU No. Description DD/MM/YY
STAFF
PANTRY 1 ISSUE FOR CONSTRUCTION MARCH 2020

SILVER BED SILVER BED SILVER BED DU

H
AP2-802-1`

SILVER BED
CCTV-141
J

CCTV-241 K
CCTV-146 SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED
STAFF TOILET

WAITING GRAND SUITE


SILVER BED TOILET 04 TOILET 05

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-4 STAGE2 CCTV


SYSTEM LAYOUT

Sheet Number

CCTV05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
TOILET
TOILET TOILET GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

TOILET STD IPD


TOILET ISO STD IPD Prepared For:

DELUXE SUITE B RENOVATION & EXTENSION TO 3 & 6


CCTV-51 STOREY RCC BUILDING
CORRIDOR TAUNGGYI, MYANMAR

TOILET Contract No: 2018.04A


C

COUNTER
NURSE
CCTV-52
MEDICATION

C'

TOILET
CONFERENCE OFFICE Key Plan
D'

VOID
STD IPD
VOID
E

PANTRY
HR OFFICE E'

F
CCTV-53 DOUBLE IPD
G
OUTDOOR No. Description DD/MM/YY
SEATING
TOILET 1 ISSUE FOR CONSTRUCTION MARCH 2020

H
WATER
STORAGE TOILET

GRAND SUITE J
CCTV-54

K
STD IPD

STAIR 02 TOILET
Not Enclosed
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-5 STAGE2 CCTV


SYSTEM LAYOUT

Sheet Number

CCTV06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

DIS TOILET Project:

PUN HLAING SILOAM TAUNG


GYI HOSPITAL
SHOWER
IPD STD 01 IPD STD 02 IPD STD 03 IPD STD 04 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
TOILET
B
Prepared For:
CCTV-62
EXTG: TOILET CCTV-61
Not Enclosed
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
C
TAUNGGYI, MYANMAR

IPD STD 05 Contract No: 2018.04A


Not Enclosed
IPD STD 06

MEDICATION
Not Enclosed
Not Enclosed

C'
CCTV-63

PREP COUNTER
D'

Key Plan
IPD STD 07
Not Enclosed

E
VOID

IPD STD 08 E'


CORRIDOR Not Enclosed
Not Enclosed
F

LIFT MECH IPD STD 09


ROOM Not Enclosed
8 m²
No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020

IPD STD 10 H
PREP COUNTER Not Enclosed
STAIR
NURSE
S1-6
Not Enclosed STATION 1
Not Enclosed
J
CCTV-64
IPD STD 11
Not Enclosed K

IPD STD 13 IPD STD 12


Not Enclosed Not Enclosed
L
CCTV-65
M

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-6 STAGE2 CCTV


SYSTEM LAYOUT

Sheet Number

CCTV07
NOTE:
All reproduction & intellectual property rights reserved.
ROOF This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

CCTV-61 CCTV-62 CCTV-63 CCTV-64 CCTV-65

LEVEL-6

Project:

PUN HLAING SILOAM TAUNG


CCTV-51 CCTV-52 CCTV-53 CCTV-54
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

ROOF LEVEL-5

Prepared For:

RENOVATION & EXTENSION TO 3 & 6


CCTV-141 CCTV-142 CCTV-143 CCTV-144 CCTV-145 CCTV-146
STOREY RCC BUILDING
CCTV-241 CCTV-242 CCTV-243
TAUNGGYI, MYANMAR

Contract No: 2018.04A


LEVEL-4 LEVEL-4

Patch Panel Patch Panel


24 PORT 24 PORT
PoE SWITCH PoE SWITCH
24 PORT 15 x Cat-6 24 PORT 15 x Cat-6
CCTV-131 CCTV-132 CCTV-133 CCTV-134 CCTV-231 CCTV-232 CCTV-233
Fiber Optic Fiber Optic
Patch Panel Patch Panel

LEVEL-3 Located in Data Rack Located in Data Rack LEVEL-3


Key Plan

CCTV-121 CCTV-122 CCTV-123 CCTV-124 CCTV-125 CCTV-221 CCTV-222 CCTV-223 CCTV-224

LEVEL-2 LEVEL-2

CCTV-111 CCTV-112 CCTV-113 CCTV-114 CCTV-115 CCTV-116 CCTV-117 CCTV-118 CCTV-211 CCTV-212 CCTV-213 CCTV-214 CCTV-215 No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020


LEVEL-1 LEVEL-1

Patch Panel Patch Panel


24 PORT 24 PORT
PoE SWITCH PoE SWITCH
24 PORT 11 x Cat-6 24 PORT 19 x Cat-6
CCTV-1B1 CCTV-1B2 CCTV-1B3 CCTV-2B1 CCTV-2B2 CCTV-2B3 CCTV-2B3 CCTV-2B3
Fiber Optic Fiber Optic
Patch Panel Patch Panel
To Level-3 Server

Located in Data Rack Located in Data Rack

Fiber Optic
Patch Panel

Main Switch

NVR
NVR
NVR
NVR

Scale: Drawn by: Reviewed by:


UPS
NTS HNO HKW
CCTV Rack Sheet Title:
(Located at Security Room)
BASEMENT BASEMENT CCTV SCHEMATIC DIAGRAM
LAYOUT
EXISTING BUILDING NEW BUILDING

Sheet Number

CCTV08
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

GEN SET A Project:


B24
Not Enclosed PUN HLAING SILOAM TAUNG
WARE HOUSE RAW WATER
PUMP ROOM WASTE MEP GYI HOSPITAL
B25 B23 B22
B10 B15 Not Enclosed Not Enclosed Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Not Enclosed Not Enclosed

Prepared For:
B
RENOVATION & EXTENSION TO 3 & 6
MEDICAL RECORDS
B09 MEP OFFICE STOREY RCC BUILDING
Not Enclosed B21
Not Enclosed TAUNGGYI, MYANMAR
C
Contract No: 2018.04A

s
LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
C'
B13
Not Enclosed

s
D

D' Key Plan


MEP
B08 IRONING ROOM
Not Enclosed LAST OFFICE B35
B19 Not Enclosed
Not Enclosed

EARTH E
s
TOILET
B14
Not Enclosed
BIKE PARKING AREA E'
B18
TOILET Not Enclosed
B12 F
Not Enclosed
BOTTLE STORAGE G
B16
PHARMACY STORAGE SECURITY Not Enclosed
B06 MATV B07 No. Description DD/MM/YY
Not Enclosed Not Enclosed
1 ISSUE FOR CONSTRUCTION MARCH 2020
PA PANEL

FA PANEL
CCTV
H

s
CORRIDOR
POD B11
B05 Not Enclosed
Not Enclosed
s
J

HOUSE KEEPING

Not Enclosed
BIO MED
MEDICAL SUPPLY
B03
B02
B04 Not Enclosed
Not Enclosed

MALE CHANGING
B01
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

BASEMENT STAGE2 PA
SYSTEM LAYOUT

Sheet Number

PA01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

A
MEDICATION Project:
122A TOILET TOILET
TOILET TOILET
120a 119a
TOILET
118a
TOILET
117a
TOILET TOILET
116a 115a
Not Enclosed 114C
Not Enclosed
158A PUN HLAING SILOAM TAUNG
Not Enclosed CONSULT
TOILET
Not Enclosed
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
Not Enclosed
CONSULT CONSULT 157 GYI HOSPITAL
DOUBLE IPD STD IPD STD IPD STD IPD STD IPD STD IPD STD IPD Not Enclosed
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
NURSE STATION STD IPD TOILET
122B 114 159A
Not Enclosed Not Enclosed Not Enclosed
B Prepared For:
CONSULT
S S S
156 RENOVATION & EXTENSION TO 3 & 6
Not Enclosed
STOREY RCC BUILDING
C TAUNGGYI, MYANMAR

Contract No: 2018.04A

MEDICATION

Not Enclosed
STD IPD SEPTIC

126
GP
XRAY VITAL
TRIAGE MAMMO 127
Not Enclosed C'

MEDDICAL SUPPLIER D
UPS PIPING TOILET
IMAGING F
128 155A
7 sqm CHANGING
Not Enclosed Not Enclosed D'
CONTROL CONSULT Key Plan
S

S
CORRIDOR
GENERAL WAITING
124 S
ED ENTRY USG S 129
Not Enclosed

IMAGING CORRIDOR
ED Not Enclosed E
7 sqm

Not Enclosed
142
DU TOILET JAN
E'
USG CONSULT

5.5 sqm CT TOILET F


154A
Not Enclosed
G
TOILET
153A
Not Enclosed
5.5 sqm No. Description DD/MM/YY
LOBBY TOILET TOILET CONSULT
Not Enclosed STAIR 132 131
Not Enclosed Not Enclosed Not Enclosed 1 ISSUE FOR CONSTRUCTION MARCH 2020

H
BLOOD COLLECTION
S S
CORRIDOR 152 TOILET
RECEPTION S 137 Not Enclosed 151B
Not Enclosed Not Enclosed Not Enclosed
J

CONSULT K
108

PATHOLOGIST

Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 107

109
Not Enclosed LAB
Not Enclosed Not Enclosed Not Enclosed Not Enclosed 151
REF. Not Enclosed

REF. STAIR
S1-1
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-1 STAGE2 PA
SYSTEM LAYOUT

Sheet Number

PA02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

Prepared For:

DN B RENOVATION & EXTENSION TO 3 & 6


STOREY RCC BUILDING
S
S TAUNGGYI, MYANMAR

UP Contract No: 2018.04A


C
S

C'

Key Plan
S
D'

ROOF
E

E'

G
No. Description DD/MM/YY

PREP
1 ISSUE FOR CONSTRUCTION MARCH 2020

S S
S

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-2 STAGE2 PA
SYSTEM LAYOUT

Sheet Number

PA03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:

A PUN HLAING SILOAM TAUNG


TOILET
GYI HOSPITAL
Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

STD IPD Prepared For:


STD IPD
Not Enclosed
RENOVATION & EXTENSION TO 3 & 6
B
STOREY RCC BUILDING
FIRE LANDING CORRIDOR
S S
Not Enclosed Not Enclosed TAUNGGYI, MYANMAR
TOIELT
Contract No: 2018.04A
C

-50
S
FIRE EXIT
LANDING

CORRIDOR C'
-50

TOILET Key Plan


D'
VOID

STD IPD

ROOF E

E'

G
No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020

S H

S
TOILET
J

GRAND SUITE K

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-3 STAGE2 PA
SYSTEM LAYOUT

Sheet Number

PA04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

Prepared For:

B RENOVATION & EXTENSION TO 3 & 6


STOREY RCC BUILDING
TAUNGGYI, MYANMAR
S
1400

C Contract No: 2018.04A


S

MEDICATION
5 m² 1945
S STAFF ROOM
C'

SILVER BED TOILET


3 m² Key Plan
MEDICATION D'

STD IPD
VOID
Not Enclosed
SILVER BED VOID
S E
STORAGE

CORRIDOR
Not Enclosed E'
SILVER BED CORRIDOR
F

G
CU No. Description DD/MM/YY
STAFF
PANTRY 1 ISSUE FOR CONSTRUCTION MARCH 2020
SILVER BED SILVER BED SILVER BED DU

S
H
AP2-802-1`

SILVER BED S S

K
SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED
STAFF TOILET

WAITING GRAND SUITE


SILVER BED TOILET 04 TOILET 05

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-4 STAGE2 PA
SYSTEM LAYOUT

Sheet Number

PA05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:

A PUN HLAING SILOAM TAUNG


TOILET
TOILET TOILET
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

TOILET STD IPD Prepared For:


TOILET ISO STD IPD

DELUXE SUITE
RENOVATION & EXTENSION TO 3 & 6
B
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
CORRIDOR
Contract No: 2018.04A
TOILET
C

COUNTER
NURSE
MEDICATION

C'

D
TOILET Key Plan
CONFERENCE OFFICE
S D'

VOID
STD IPD
VOID
E

PANTRY
HR OFFICE E'

F
DOUBLE IPD
G
OUTDOOR No. Description DD/MM/YY
SEATING
TOILET 1 ISSUE FOR CONSTRUCTION MARCH 2020

H
WATER
STORAGE TOILET
S

GRAND SUITE J

K
STD IPD

STAIR 02 TOILET
Not Enclosed
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-5 STAGE2 PA
SYSTEM LAYOUT

Sheet Number

PA06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
DIS TOILET GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

SHOWER
IPD STD 01 IPD STD 02 IPD STD 03 IPD STD 04 Prepared For:
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
TOILET
B
RENOVATION & EXTENSION TO 3 & 6
EXTG: TOILET
STOREY RCC BUILDING
Not Enclosed
TAUNGGYI, MYANMAR

Contract No: 2018.04A


C

IPD STD 05
Not Enclosed
IPD STD 06

MEDICATION
Not Enclosed
Not Enclosed

S
C'

PREP COUNTER Key Plan


D'

IPD STD 07
Not Enclosed

E
VOID

IPD STD 08 E'


CORRIDOR Not Enclosed
Not Enclosed
F

G
No. Description DD/MM/YY
LIFT MECH IPD STD 09
ROOM Not Enclosed 1 ISSUE FOR CONSTRUCTION MARCH 2020
8 m²
S

IPD STD 10 H
PREP COUNTER Not Enclosed
STAIR
NURSE
S1-6
Not Enclosed STATION 1
Not Enclosed
J
IPD STD 11
Not Enclosed K

IPD STD 13 IPD STD 12


Not Enclosed Not Enclosed
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-6 STAGE2 PA
SYSTEM LAYOUT

Sheet Number

PA07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

ROOF

S S Project:

PUN HLAING SILOAM TAUNG


GYI HOSPITAL
LEVEL-6 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

S S S
Prepared For:

RENOVATION & EXTENSION TO 3 & 6


ROOF LEVEL-5 STOREY RCC BUILDING
TAUNGGYI, MYANMAR
S S S S S S S
Contract No: 2018.04A

LEVEL-4 LEVEL-4

S S S S S S

Key Plan
LEVEL-3 LEVEL-3

S S S S S S S S

LEVEL-2 LEVEL-2

S S S S S S S S S S

LEVEL-1 LEVEL-1 No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020

S S S S S

ZONE SELECTOR

CONTROLLER
EMERGENCY MICRO
VCD/CD/DVD PLAYER
DIGITAL PLAYBACK
MIC

BGM

AMPLIFIER
ANNOUNCER

4 x 480W

BATTERY-4KVA
2H OPERATION

SECURITY RM

FROM 230 V
FIRE ALARM PANEL
BASEMENT BASEMENT

EXISTING BUILDING NEW BUILDING Scale: Drawn by: Reviewed by:


NTS HNO HKW
Sheet Title:

PA SCHEMATIC DIAGRAM
LAYOUT

Sheet Number

PA08
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16


Project:

PUN HLAING SILOAM TAUNG


GEN SET A
B24 GYI HOSPITAL
Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
PUMP ROOM WASTE MEP
WARE HOUSE RAW WATER B25 B23
S
B22
B10 S B15 Not Enclosed Not Enclosed Not Enclosed
S Prepared For:
Not Enclosed Not Enclosed S

RENOVATION & EXTENSION TO 3 & 6


B
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
MEDICAL RECORDS
B09 MEP OFFICE
S Contract No: 2018.04A
Not Enclosed B21
Not Enclosed
C
S
S

LAUNDRY
B20S
Not Enclosed
FEMALE CHANGING
C'
B13
S
Not Enclosed
D Key Plan

D'

AOM
MEP
B08 IRONINGSROOM
Not Enclosed LAST OFFICE B35
Not Enclosed

M
B19
Not Enclosed
S
S
EARTH E
TOILET
B14
S
Not Enclosed S
BIKE PARKING AREA E'
B18
TOILET Not Enclosed
B12 F
Not Enclosed No. Description DD/MM/YY
BOTTLE STORAGE G
B16 1 ISSUE FOR CONSTRUCTION MARCH 2020
PHARMACY STORAGE SECURITY Not Enclosed
B06 S
B07
Not Enclosed Not Enclosed
S

FA PANEL

M
H

AOM
CORRIDOR
POD B11
S B05
S Not Enclosed
Not Enclosed
J

HOUSE KEEPING K

Not Enclosed BIO MED


MEDICAL SSUPPLY
B03

B02
B04 S Not Enclosed
S S
Not Enclosed

MALE CHANGING
B01
Not Enclosed L

M
Scale: Drawn by: Reviewed by:
1 : 150 HNO HKW
Sheet Title:

BASEMENT STAGE2 FIRE


ALARM SYSTEM LAYOUT

Sheet Number

FA01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
MEDICATION
TOILET
PUN HLAING SILOAM TAUNG
S 122A TOILET
TOILET TOILET
120a 119a
TOILET
118a
TOILET
117a
TOILET TOILET
116a 115a
Not Enclosed 114C
Not Enclosed
158A GYI HOSPITAL
Not Enclosed
Not Enclosed Not Enclosed Not Enclosed Not Enclosed CONSULT No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
S S S S S Not Enclosed
Not Enclosed S S
157
TOILET CONSULT
S CONSULT S S
DOUBLE IPD STD IPD STD IPD STD IPD STD IPD STD IPD STD IPD Not Enclosed
NURSE STATION STD IPD TOILET
122B 114 159A Prepared For:
S
Not Enclosed Not Enclosed Not Enclosed
B RENOVATION & EXTENSION TO 3 & 6
CONSULT
S S
156 STOREY RCC BUILDING
S
Not Enclosed
S TAUNGGYI, MYANMAR
S
M
AOM
C Contract No: 2018.04A

MEDICATION

Not Enclosed
STD IPD SEPTIC

126
GP S S
S S XRAYS VITAL
S
TRIAGE MAMMO 127
S
Not Enclosed C'
S
M
AOM D
MEDDICAL SUPPLIER
S UPS
S
PIPING TOILET
IMAGING F
128 155A Key Plan
7 sqm CHANGING
S
Not Enclosed Not Enclosed D'
CONTROL CONSULT
S
S

CORRIDOR
S GENERAL WAITING
124 S
ED ENTRY USG 129
Not Enclosed

IMAGING CORRIDOR
ED Not Enclosed E
7 sqm

Not Enclosed
S

142
S
DU TOILET JAN
S S S E'
USG CONSULT

5.5 sqm CT TOILET F


S 154A
Not Enclosed
G
TOILET
153A No. Description DD/MM/YY
S Not Enclosed
5.5 sqm
LOBBY TOILET TOILET S 1 ISSUE FOR CONSTRUCTION MARCH 2020
CONSULT
Not Enclosed
S STAIR 132 131
Not Enclosed Not Enclosed Not Enclosed

H
AOM
M

BLOOD COLLECTION
CORRIDOR 152 TOILET
RECEPTION S S S 137 Not Enclosed
S 151B
Not Enclosed Not Enclosed Not Enclosed
J
M
CONSULT AOM
K
108

PATHOLOGIST

Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 107

109
Not Enclosed S LAB
Not Enclosed S S
Not Enclosed S
Not Enclosed S
Not Enclosed S S
151
REF. S
Not Enclosed

REF. STAIR
S1-1
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-1 STAGE2 FIRE


ALARM SYSTEM LAYOUT

Sheet Number

FA02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
TOILET
Not Enclosed
TOILET TOILET TOILET TOILET OT 2 OT 3 OT 4 GYI HOSPITAL
257 256 S B47
S S S S S No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Not Enclosed S Not Enclosed Not Enclosed
DR CHANGING
STD IPD PRE / POST
STD IPD STD IPD STD IPD S
Prepared For:
S

DN B RENOVATION & EXTENSION TO 3 & 6


FIRE LANDING STOREY RCC BUILDING
Not Enclosed S CORRIDOR
S S
M

B164 TAUNGGYI, MYANMAR


S
Not Enclosed
AOM

M
UP AOM Contract No: 2018.04A
C
S
S
TOILET TOILET WASHING
TOILET ?
STD IPD STDS IPD STD IPDS LIFT CSSD STERILE
DOUBLE IPD
Not Enclosed CORRIDOR
B166
TOILET DU S S Not Enclosed C'
S

S M
AOM D

S S
TOILET Key Plan
MEDICATION LDS D'

CSSDSCLEAN STD IPD


S 20 m² S
LDS DR
DOUBLE IPD ROOF LOUNGE
S E
CLEAN
S PASSAGE
S
CSSD DIRTY 3 m²
17 m² E'
S
DOUBLE IPD S TOILET MEDICATION
JAN TOILET Not Enclosed
CLEAN F
S S
OT 1 CHANGING
S
G
BABY WASH

TOILET S

PREP
LIFT 2 S No. Description DD/MM/YY
S CLEAN
NURSERY
S
CHANGING 1 ISSUE FOR CONSTRUCTION MARCH 2020
TOILET STD IPD CU TOILET
Not Enclosed
AOM

M
H

S S S

ICU J
M
AOM
DELUXE SUITE
S K

S S S
STD IPD S S
STD IPD STD IPD STD IPD
STD IPD STD IPD
TOILET 251
S S
TOILET TOILET TOILET
TOILET TOILET Not Enclosed
STAIR TOILET
S1-2
Not Enclosed L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-2 STAGE1 FIRE


ALARM SYSTEM LAYOUT

Sheet Number

FA03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

A Project:

PUN HLAING SILOAM TAUNG


TOILET
Not Enclosed
S
GYI HOSPITAL
S S S S S S
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
S

STDSIPD
STD IPD
Not Enclosed Prepared For:

B
RENOVATION & EXTENSION TO 3 & 6
FIRE LANDING
Not Enclosed
CORRIDOR
S
Not Enclosed S S S STOREY RCC BUILDING
M

TOIELT TAUNGGYI, MYANMAR


AOM

C Contract No: 2018.04A

-50
S S
S

S FIRE EXIT
S LANDING

CORRIDOR C'
-50 S

S M
AOM D

TOILET
D' Key Plan
VOID
S S

S S STD IPD

ROOF E
S

E'
S

S F
S
S

G
S
No. Description DD/MM/YY
S

1 ISSUE FOR CONSTRUCTION MARCH 2020


S
AOM

M
H

S S S S
TOILET
J
M
AOM GRAND SUITE
S K

S
S S
S S S
S
S

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-3 STAGE2 FIRE


ALARM SYSTEM LAYOUT

Sheet Number

FA04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

S S S

Prepared For:

AOM
S

RENOVATION & EXTENSION TO 3 & 6

M
B
S S S STOREY RCC BUILDING
S
TAUNGGYI, MYANMAR
M S 1400
AOM
Contract No: 2018.04A
C

MEDICATION S
5 m² 1945 S
S
STAFF ROOM
C'

M
AOM D

SILVER BED TOILET


3 m² Key Plan
MEDICATION D'
S
S
S
S
STD IPD
VOID S Not Enclosed
SILVER BED VOID
H E
STORAGE S
S

CORRIDOR
Not Enclosed E'
SILVER BED CORRIDOR

S
F

G
CU No. Description DD/MM/YY
STAFF
PANTRY
S 1 ISSUE FOR CONSTRUCTION MARCH 2020

SILVER BED SILVER BED SILVER BED DU

AOM
M H
AP2-802-1`

SILVER BED S S S
S S

J
M
AOM
K
SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED S
STAFF TOILET

WAITING GRAND SUITE


SILVER BED TOILET 04 TOILET 05

S
S

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-4 STAGE2 FIRE


ALARM SYSTEM LAYOUT

Sheet Number

FA05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A PUN HLAING SILOAM TAUNG
TOILET
TOILET TOILET
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

TOILET STD
S IPD S S
TOILET ISO STD IPD S Prepared For:

DELUXE SUITE B
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
CORRIDOR TAUNGGYI, MYANMAR
S

TOILET Contract No: 2018.04A


C

COUNTER
S

NURSE
MEDICATION

S C'

M
AOM D
TOILET
Key Plan
CONFERENCE
S OFFICE
D'
S S

VOID
STD IPD
VOID
E

PANTRY S

HRSOFFICE E'

F
S
DOUBLE IPD
G
OUTDOOR No. Description DD/MM/YY
SEATING
TOILET 1 ISSUE FOR CONSTRUCTION MARCH 2020

H
WATER
STORAGE TOILET
S

GRAND SUITE J
M
AOM
K
STD IPD S

STAIR 02 TOILET
Not Enclosed
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-5 STAGE2 FIRE


ALARM SYSTEM LAYOUT

Sheet Number

FA06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16

Project:
A
PUN HLAING SILOAM TAUNG
DIS TOILET
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

SHOWER S STD 01 S STD 02 S STD 03 S 04


IPD IPD IPD IPD STD
Not Enclosed Not Enclosed Not Enclosed Not Enclosed Prepared For:

TOILET
B RENOVATION & EXTENSION TO 3 & 6
EXTG: TOILET STOREY RCC BUILDING
Not Enclosed
S
TAUNGGYI, MYANMAR

Contract No: 2018.04A


C
AOM

S IPD STDS 05
S Not Enclosed
IPD STD 06

MEDICATION
Not Enclosed
Not Enclosed

C'
S

AOM
D

M
PREP COUNTER Key Plan
D'

IPD STDS 07
Not Enclosed

E
VOID

IPD STDS 08 E'


CORRIDOR Not Enclosed
Not Enclosed
F

G
No. Description DD/MM/YY
LIFT MECH IPD STDS 09
ROOM Not Enclosed
8 m² 1 ISSUE FOR CONSTRUCTION MARCH 2020

AOM

IPD STDS 10 H
PREP COUNTER S
Not Enclosed
STAIR

AOM
NURSE

M
S1-6
Not Enclosed STATION 1
Not Enclosed
J
IPD STDS 11
Not Enclosed K

IPD SSTD 13 IPD STD 12 S


Not Enclosed Not Enclosed
L

Scale: Drawn by: Reviewed by:


1 : 150 HNO HKW
Sheet Title:

LEVEL-6 STAGE2 FIRE


ALARM SYSTEM LAYOUT

Sheet Number

FA07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

ROOF

Lift Lift
S S S S S S S S S S S S S S
AOM AOM AOM AOM

LEVEL-6
Project:

PUN HLAING SILOAM TAUNG


GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
S S S S S S
AOM AOM

Prepared For:
S S S S S S S S S S

RENOVATION & EXTENSION TO 3 & 6


ROOF LEVEL-5
STOREY RCC BUILDING
TAUNGGYI, MYANMAR

Contract No: 2018.04A

S S S S S S S S S S S S S S
AOM AOM

S S S S S S S S S S H S S S S S S S
AOM AOM AOM

LEVEL-4 LEVEL-4

S S S S S S S S S
Key Plan

S S S S S S S S S S S S S S S S S S
AOM AOM

S S S S S S S S S S S S S S S S S S
AOM AOM

LEVEL-3 LEVEL-3

S S S S S S S S S
AOM

S S S S S S S S S S S S S S S S S S S S
AOM AOM No. Description DD/MM/YY

1 ISSUE FOR CONSTRUCTION MARCH 2020


S S S S S S S S S S S S S S S S S S S S S
AOM AOM

LEVEL-2 LEVEL-2

S S S S S S S S S S S

S S S S S S S S S S S S S S S S S S S S S
AOM AOM

S S S S S S S S S S S S S S S S S S S S S
AOM AOM

LEVEL-1 LEVEL-1

S S S S S S S S S S S S S S S S S S S S S S
AOM AOM
Loop-1 Supply

Loop-2 Supply
Loop-1 Return

Loop-2 Return

Scale: Drawn by: Reviewed by:


NTS HNO HKW
Fire Alarm Panel Sheet Title:
BASEMENT Security Room BASEMENT
FIRE ALARM SCHEMATIC
DIAGRAM LAYOUT
EXISTING BUILDING NEW BUILDING

Sheet Number

FA08
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

ROOF

Project:

1 x Cat-5e PUN HLAING SILOAM TAUNG


LEVEL-6
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
1 x Cat-5e

Prepared For:
1 x Cat-5e
IDF RENOVATION & EXTENSION TO 3 & 6
60 Pairs
ROOF LEVEL-5 STOREY RCC BUILDING
TAUNGGYI, MYANMAR

1 x Cat-5e 1 x Cat-5e Contract No: 2018.04A


IDF
30 Pairs
LEVEL-4 LEVEL-4

1 x Cat-5e

1 x Cat-5e 1 x Cat-5e
IDF IDF
60 Pairs 30 Pairs Key Plan

MDF PABX PRT


400 Pairs Located at Server Rm

LEVEL-3 LEVEL-3

1 x Cat-5e 1 x Cat-5e No. Description DD/MM/YY


IDF IDF
40 Pairs 10 Pairs 1 ISSUE FOR CONSTRUCTION MARCH 2020
LEVEL-2 LEVEL-2

1 x Cat-5e

1 x Cat-5e 1 x Cat-5e
IDF IDF
Incoming From MPT

60 Pairs 30 Pairs

LEVEL-1 LEVEL-1

1 x Cat-5e 20 Pairs 1 x Cat-5e


IDF

BASEMENT BASEMENT

EXISTING BUILDING NEW BUILDING

Scale: Drawn by: Reviewed by:


NTS HNO HKW
Sheet Title:

PABX SCHEMATIC DIAGRAM


LAYOUT

Sheet Number

PABX01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
ROOF of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
C C C
WAP

LEVEL-6

C C C C C C C C C
Project:

PUN HLAING SILOAM TAUNG


GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

C C C C C C C C C
WAP
Prepared For:

ROOF LEVEL-5
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
C C C
WAP WAP WAP Contract No: 2018.04A

12Core, Dual Mode Fiber Optic


LEVEL-4 LEVEL-4

Fiber Optic
Patch Panel

Main Switch
Key Plan
Patch Panel Patch Panel
24 PORT 48 PORT
PoE SWITCH PoE SWITCH
24 PORT Main Switch 48 PORT
Patch Panel Patch Panel
15 x Cat6 38 x Cat6
24 PORT 24 PORT
C C SERVER C C C C
PoE SWITCH PoE SWITCH
WAP WAP WAP
24 PORT To CCTV To CCTV 24 PORT
Fiber Optic Fiber Optic
UPS
Patch Panel Patch Panel

Server Rack
LEVEL-3 (Located at Sever Room) LEVEL-3

C C C C C C C C
WAP WAP WAP No. Description DD/MM/YY

LEVEL-2 LEVEL-2

C C C C C C C C C C C C C C C C C C C C C C C C C C
WAP

C C C C C C C C C C C C C C C C C C C C C C C C
WAP WAP

From ISP

LEVEL-1

Patch Panel Patch Panel


48 PORT 48 PORT
PoE SWITCH PoE SWITCH
48 PORT 48 PORT
Scale: Drawn by: Reviewed by:
C C C C C 36 x Cat6 Patch Panel Patch Panel
28 x Cat6 C C NTS HNO HKW
24 PORT 24 PORT
To CCTV Rack
PoE SWITCH PoE SWITCH Sheet Title:
24 PORT To CCTV To CCTV 24 PORT
Fiber Optic
Patch Panel
Fiber Optic
Patch Panel DATA SCHEMATIC DIAGRAM
BASEMENT BASEMENT
LAYOUT
EXISTING BUILDING NEW BUILDING

Note:
All Cat-6 cable at end user outlet shall keep 500mm long from respective KO Box. Sheet Number

DATA01
Satellite Antenna

NOTE:
ROOF
All reproduction & intellectual property rights reserved.
TV This Drawing is an instrument of service and shall remain the property
Spare of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
TV TV TV TV discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.

TV TV TV TV

TV TV TV TV

LEVEL-6

TV TV TV TV Project:

PUN HLAING SILOAM TAUNG


TV TV TV TV
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi

1 x RG 6
ROOF LEVEL-5
Prepared For:
TV TV TV
Spare

RENOVATION & EXTENSION TO 3 & 6


TV TV TV TV
STOREY RCC BUILDING
TV TV
TAUNGGYI, MYANMAR

1 x RG 6 Contract No: 2018.04A


LEVEL-4 LEVEL-4

TV TV

TV TV TV TV

TV TV TV TV

TV TV TV TV
Key Plan

TV TV TV TV TV TV TV TV

TV TV TV TV TV TV TV TV

1 x RG 6 1 x RG 6
LEVEL-3 LEVEL-3

TV TV TV
Spare

TV TV TV TV

No. Description DD/MM/YY


TV TV TV TV
1 ISSUE FOR CONSTRUCTION MARCH 2020

TV TV TV TV

TV TV TV TV TV TV

1 x RG 6
LEVEL-2 LEVEL-2

TV TV TV TV

TV TV TV TV

TV TV TV TV TV
Spare

1 x RG 6 1 x RG 6
LEVEL-1 LEVEL-1

Scale: Drawn by: Reviewed by:


NTS HNO HKW
HEAD END HEAD END
Sheet Title:

MATV SCHEMATIC DIAGRAM


MODULATOR LAYOUT
RECEIVER

RECEIVER

BASEMENT Located at Security Rm BASEMENT Sheet Number

EXISTING BUILDING NEW BUILDING MATV01