Professional Documents
Culture Documents
MARCH,2020
CONSTRUCTION DRAWING
ELECTRICAL SYSTEM
M & E DESIGN
SAN T I
SANTI ENGINEERING CO., LTD.
No. 7(B-1), 163rd Street, Tarmway Township, Yangon.
Ph: +951-8430066, Email: tinmaungthwin@santi-engineering.com
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
STANDARD
1 LIST OF DRAWINGS 1 MARCH, 2020 GE - 01 STANDARD 34 LEVEL-1 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-02 WIRE WAY SYSTEM Prepared For:
2 LEGENDS, NOTES & ABBREVIATION 1 MARCH, 2020 GE - 02 STANDARD 35 LEVEL-2 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-03 WIRE WAY SYSTEM
ELECTRICAL DRAWINGS 36 LEVEL-3 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-04 WIRE WAY SYSTEM
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
3 BASEMENT STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-01 LIGHTING SYSTEM 37 LEVEL-4 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-05 WIRE WAY SYSTEM
TAUNGGYI, MYANMAR
4 LEVEL-1 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-02 LIGHTING SYSTEM 38 LEVEL-5 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-06 WIRE WAY SYSTEM
Contract No: 2018.04A
5 LEVEL-2 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-03 LIGHTING SYSTEM 39 LEVEL-6 STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-07 WIRE WAY SYSTEM
6 LEVEL-3 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-04 LIGHTING SYSTEM 40 BASEMENT STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-01 CCTV SYSTEM
7 LEVEL-4 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-05 LIGHTING SYSTEM 41 LEVEL-1 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-02 CCTV SYSTEM
8 LEVEL-5 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-06 LIGHTING SYSTEM 42 LEVEL-2 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-03 CCTV SYSTEM
9 LEVEL-6 STAGE2 LIGHTING SYSTEM LAYOUT 1 MARCH, 2020 LT-07 LIGHTING SYSTEM 43 LEVEL-3 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-04 CCTV SYSTEM
10 BASEMENT STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-01 POWER SYSTEM 44 LEVEL-4 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-05 CCTV SYSTEM
11 LEVEL-1 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-02 POWER SYSTEM 45 LEVEL-5 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-06 CCTV SYSTEM
12 LEVEL-2 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-03 POWER SYSTEM 46 LEVEL-6 STAGE2 CCTV SYSTEM LAYOUT 1 MARCH, 2020 CCTV-07 CCTV SYSTEM Key Plan
13 LEVEL-3 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-04 POWER SYSTEM 47 CCTV SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 CCTV-08 CCTV SYSTEM
14 LEVEL-4 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-05 POWER SYSTEM 48 BASEMENT STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-01 PA SYSTEM
15 LEVEL-5 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-06 POWER SYSTEM 49 LEVEL-1 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-02 PA SYSTEM
16 LEVEL-6 STAGE2 POWER SYSTEM LAYOUT 1 MARCH, 2020 PW-07 POWER SYSTEM 50 LEVEL-2 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-03 PA SYSTEM
17 DB-1B & DB-111 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-01 SINGLE LINE 51 LEVEL-3 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-04 PA SYSTEM
18 DB-121 & DB-131 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-02 SINGLE LINE 52 LEVEL-4 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-05 PA SYSTEM
19 DB-141 & DB-2B1 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-03 SINGLE LINE 53 LEVEL-5 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-06 PA SYSTEM
20 DB-211 & DB-221 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-04 SINGLE LINE 54 LEVEL-6 STAGE2 PA SYSTEM LAYOUT 1 MARCH, 2020 PA-07 PA SYSTEM
21 DB-231 & DB-241 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-05 SINGLE LINE 55 PA SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 PA-08 PA SYSTEM
No. Description DD/MM/YY
22 DB-5 & DB-6 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-06 SINGLE LINE 56 BASEMENT STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-01 FA SYSTEM
23 DB-U1, DB-U2, DB-OT & SDB-CT SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-07 SINGLE LINE 57 LEVEL-1 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-02 FA SYSTEM 1 ISSUE FOR CONSTRUCTION MARCH 2020
24 MSB-1 & MSB-2 SINGLE LINE DIAGRAM LAYOUT 1 MARCH, 2020 SL-08 SINGLE LINE 58 LEVEL-2 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-03 FA SYSTEM
25 ELECTRICAL SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 SL-09 ELECTRICAL SYSTEM 59 LEVEL-3 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-04 FA SYSTEM
26 EARTHING SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 ET-01 EARTHING SYSTEM 60 LEVEL-4 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-05 FA SYSTEM
27 BASEMENT FLOOR EARTHING SYSTEM LAYOUT 1 MARCH, 2020 ET-02 EARTHING SYSTEM 61 LEVEL-5 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-06 FA SYSTEM
28 ROOF STAGE2 LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-01 LA SYSTEM 62 LEVEL-6 STAGE2 FA SYSTEM LAYOUT 1 MARCH, 2020 FA-07 FA SYSTEM
29 EAST ELEVATION LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-02 LA SYSTEM 63 FA SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 FA-08 FA SYSTEM
30 WEST ELEVATION LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-03 LA SYSTEM 64 PABX SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 PABX-01 PABX SYSTEM
31 SOUTH ELEVATION LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-04 LA SYSTEM 65 DATA SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 DATA-01 DATA SYSTEM
32 NORTH ELEVATION LIGHTNING PROTECTION SYSTEM LAYOUT 1 MARCH, 2020 LA-05 LA SYSTEM 66 MATV SCHEMATIC DIAGRAM LAYOUT 1 MARCH, 2020 MATV-01 MATV SYSTEM
33 BASEMENT STAGE2 WIRE WAY SYSTEM LAYOUT 1 MARCH, 2020 WW-01 WIRE WAY SYSTEM
LISTS OF DRAWINGS
Sheet Number
GE01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
LEGEND
GENERAL NOTES
2
Recessed hygeia 13A Switch Socket Outlet (Double)
Electrical work, materials and equipment shall comply with the Myanmar standards and electrical codes of practice.
Surface mounted troffer light Universal Socket Outlet Project:
ELECTRICAL SYSTEM
Surface mounted fluorescent Connector Unit (for Bed Head and Pendant)
PUN HLAING SILOAM TAUNG
The location of lighting fixtures and receptacles could be varied from the drawing to avoid interferences except for ceiling layouts. GYI HOSPITAL
15A
Recessed mounted troffer light
15A Switch Socket Outlet All switches are located ~150 mm from the edge of the openings and doors No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Mounting height of switches, socket outlets shall be kept as follows, unless otherwise noted on drawings.
Recessed mounted downlight
Telephone Socket Outlet (RJ-11)
Switches _______________ 1200mm above finished floor to bottom Prepared For:
Surface mounted downlight
TV
(exterior) Receptacles ____________ 300mm above finished floor to bottom
Television Socket Outlet
RENOVATION & EXTENSION TO 3 & 6
Recessed downlight (water C
Distribution boards ________ 1800mm above finished floor to top STOREY RCC BUILDING
Computer Socket Outlet (RJ-45)(Cat-6)
proof)
Shop drawings to show exact location of electrical fixtures shall be submitted to interior designer for approval prior to installation. TAUNGGYI, MYANMAR
Medical lighting pendant WAP
Wifi Access Point (PoE ) Contract No: 2018.04A
2 S All joint and connection in lightning protection system must be exothermic welding.
Smoke Detector
One way two gang switch
H
3 Heat Detector
One way three gang switch
M
MATV SYSTEM
Manual Call Point
4
No. Description DD/MM/YY
One way four gang switch
C
D
Fire Alarm Bell c/w Strobe Light
The signal strength of all television outlets shall not be less than 60db and not exceed than 80db at 800MHz. 1 ISSUE FOR CONSTRUCTION MARCH 2020
Dimmer switch
Out Put Module / Control Module
AOM
Two way one gang switch
Input Module / Monitoring Module
AIM
FIRE ALARM SYSTEM
Two way two gang switch
S PA Speaker (Ceiling Recessed)
13A Switch Socket Outlet (Single) S PA Speaker (Wall Mounted) All fire alarm systems installations shall comply with relevant NFPA regulations and standards and guidelines issued by civil defence and
CL
13A Switch Socket Outlet (Ceiling Level)
fire department.
Fire alarm system design, installation shall be in accordance to NFPA 72, NFPA 70, NFPA 101, SS:CP 10 and international building code 2003.
All fire alarm detection devices, control panel shall be installed new with UL listed and FM approved or approved equivalent.
Installation of fire sounder shall be 2200mm from finish floor to center of device.
Installation of fire control panel shall be 1200mm from finish floor to center of panel.
Sounder and break glass unit to be mounted on the same center vertical line.
2 core 1.5 sq.mm fire rated cable shall be used or approved equivalent. Scale: Drawn by: Reviewed by:
NTS HNO HKW
Fire alarm system must be interfaced with tamper switch of fire pump/ sprinkler system. Sheet Title:
Sheet Number
GE02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
GEN SET A
B24 PUN HLAING SILOAM TAUNG
Not Enclosed
DB-2B1-1 GYI HOSPITAL
PUMP ROOM WASTE MEP No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
WARE HOUSE RAW WATER B25 B23 B22
DB-1B-3
B10 B15 Not Enclosed Not Enclosed Not Enclosed
Not Enclosed Not Enclosed
DB-2B1-1
DB-2B1-1 Prepared For:
DB-2B1-1
DB-2B1
B RENOVATION & EXTENSION TO 3 & 6
MEDICAL RECORDS DB-2B1-2 STOREY RCC BUILDING
DB-U2-1
DB-2B1-1
B09 MEP OFFICE
TAUNGGYI, MYANMAR
Not Enclosed DB-2B1-3
MSB
B21
DB-U2-1
DB-U2
Not Enclosed
Contract No: 2018.04A
C
DB-1B-3 DB-U1-1
DB-U2-1
EXIT
DB-1B-2
DB-U1-1
LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
DB-1B-1 C'
B13 DB-2B1-1
Not Enclosed
D
Key Plan
D'
MEP
MSB
DB-U2-1
B08 IRONING ROOM
2
Not Enclosed LAST OFFICE B35
B19 Not Enclosed
DB-U1-1
Not Enclosed DB-2B1-5
DB-1B-3
DB-1B DB-1B-1 E
EARTH
TOILET
DB-2B1-5
DB-U1-1
DB-U1
DB-1B-2 B14
Not Enclosed
BIKE PARKING AREA E'
DB-2B1-2
B18
DB-2B1-5
DB-U1-1
TOILET Not Enclosed
B12 F
DB-2B1-3
Not Enclosed
DB-1B-1
BOTTLE STORAGE G
DB-1B-5 B16 No. Description DD/MM/YY
PHARMACY STORAGE SECURITY Not Enclosed
B06 B07 DB-U2-1
DB-1B-5 1 ISSUE FOR CONSTRUCTION MARCH 2020
Not Enclosed Not Enclosed
H
DB-1B-2
DB-U1-1 CORRIDOR
POD
DB-U1-1
B11
EXIT
B05 Not Enclosed
EXIT
Not Enclosed
DB-1B-5 DB-U2-1
DB-1B-5 K
HOUSE KEEPING DB-1B-5
Not Enclosed
BIO MED
MEDICAL SUPPLY
B03
B02
DB-1B-5
B04 Not Enclosed
Not Enclosed DB-2B1-5
MALE CHANGING
B01
Not Enclosed L
BASEMENT STAGE2
LIGHTING SYSTEM LAYOUT
Sheet Number
LT01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
A Project:
DB-111-18
DB-111-18
DB-111-17
DB-111-17
MEDICATION
PUN HLAING SILOAM TAUNG
DB-111-17
DB-111-18
DB-211-4
DB-111-17
122A TOILET TOILET
DB-111-17
TOILET TOILET TOILET TOILET TOILET TOILET 114C
DB-111-5
120a
Not Enclosed
119a
Not Enclosed
118a 117a
Not Enclosed Not Enclosed
116a 115a
Not Enclosed
DB-111-18
Not Enclosed
158A
Not Enclosed CONSULT
DB-211-4 GYI HOSPITAL
DB-111-18
Not Enclosed
Not Enclosed
DB-111-18
DB-111-17
DB-111-17
DB-111-17
TOILET CONSULT CONSULT 157 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-111-11 Not Enclosed
DB-211-4
DOUBLE IPD STD IPD STD IPD STD IPD STD IPD STD IPD STD IPD DB-211-4
NURSE STATION STD IPD TOILET DB-211-4
DB-111-11 114 159A
122B
DB-111-18
DB-111-18
Not Enclosed Not Enclosed Not Enclosed DB-211-4 Prepared For:
2 2
2
B
DB-U1-3
DB-111-4 DB-U2-3
CONSULT RENOVATION & EXTENSION TO 3 & 6
156
DB-211-4
Not Enclosed STOREY RCC BUILDING
DB-U2-3
DB-U1-3
DB-111-2 TAUNGGYI, MYANMAR
DB-U1-5 C
DB-U1-3 EXIT DB-211 Contract No: 2018.04A
MEDICATION
Not Enclosed
DB-211-4
DB-111-12
STD IPD
DB-U1-3
DB-U1-3
SEPTIC DB-211-4
126
DB-U1-3 GP DB-111-16
DB-111-12 XRAY VITAL
DB-111-11
EXIT
TRIAGE MAMMO 127
DB-111-11 Not Enclosed DB-U2-3
EXIT
SDB-CT-3
C'
EXIT
DB-U1-3
DB-U2-3
DB-U2-3
MEDDICAL SUPPLIER 2 D
SDB-CT
UPS PIPING TOILET
IMAGING F
DB-111-16 128
SDB-CT-1 155A
DB-111-14
7 sqm CHANGING
SDB-CT-3 Not Enclosed NotDB-211-1
Enclosed D' Key Plan
DB-111-4
CONTROL
DB-211-3
CONSULT
2
2
Light Box Signage
DB-211-1
DB-U1-3 124
ED ENTRY USG 129
Not Enclosed
IMAGING CORRIDOR
E
2
ED DB-111-16 Not Enclosed
DB-211-6
DB-211-6
DB-U1-3 7 sqm
142
DB-111-2 DB-211-1
DU TOILET JAN
DB-111-14
DB-111-14
DB-111-14
DB-211-5
2
DB-111-14 E'
USG CONSULT
DB-111-16 DB-211-1
DB-111 154A
EXIT Not Enclosed
DB-111-8 DB-U1-5 G
TOILET
SDB-CT-1
SDB-CT-1
DB-111-15
DB-111-15
DB-U1-3
DB-111-1
153A
DB-111-19 Not Enclosed No. Description DD/MM/YY
5.5 sqm DB-211-1
LED Strip Light
H
DB-111-6 DB-U1-5 DB-111-9 DB-U1-5 BLOOD COLLECTION
CORRIDOR DB-U2-3
152 TOILET
DB-211-2
EXIT
RECEPTION
DB-111-8 DB-U1-5 137 Not Enclosed 151B
Not Enclosed DB-111-7 Not Enclosed DB-211-2 Not Enclosed
2
EXIT DB-U2-3 J
2 DB-U1-5
DB-111-13
2
CONSULT 2 K
DB-111-10
DB-111-10 DB-U2-3
DB-111-10
DB-111-13 DB-111-10 108
PATHOLOGIST
Not Enclosed
DB-U1-5 FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 DB-111-10 107
109
Not Enclosed LAB
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
To Level-2 Light 151
REF. DB-111-13
Fixture Not Enclosed
DB-211-2
S1-1
Not Enclosed L
Sheet Number
LT02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
DB-121-8 PUN HLAING SILOAM TAUNG
TOILET
Not Enclosed
DB-121-8
TOILET
DB-121-8
TOILET
DB-121-8 DB-121-10
TOILET
DB-121-10
TOILET
DB-121-10
DB-121-14 DB-121-14 OT 2
257
OT 3
256
OT 4
B47
GYI HOSPITAL
DB-OT-3
DB-OT-3
DB-OT-5
DB-OT-5
DB-121-8
Not Enclosed Not Enclosed Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-OT-2
DB-121-8 DR CHANGING
DB-121-10
DB-121-8 STD IPD PRE / POST
STD IPD STD IPD STD IPD
DB-121-8
2
DB-121-8 DB-121-10 DB-121-10 Prepared For:
2
2 2 2 2 2
DB-U1-4
DB-U1-4
2
DN B
DB-U1-2
DB-U1-2
DB-121-2
RENOVATION & EXTENSION TO 3 & 6
EXIT
DB-OT-2
FIRE LANDING DB-U1-2 DB-U2-5
STOREY RCC BUILDING
EXIT
Not Enclosed CORRIDOR
B164 DB-U2-5
DB-121-4 DB-U1-2 TAUNGGYI, MYANMAR
DB-U2-5
Not Enclosed
DB-OT
UP EXIT
C Contract No: 2018.04A
DB-U1-2
DB-221
DB-121-6
TOILET
DB-121-6 TOILET
DB-121-12 WASHING DB-221-3
TOILET ?
DB-121-15
DB-U2-5
DB-121-7
DOUBLE IPD LIFT CSSD STERILE
DB-121-15
DB-U2-5
DB-121-6
EXIT
TOILET DU C'
DB-U2-5
DB-121-12 Not Enclosed
2
DB-221-2 EXIT
DB-121-9
DB-121-14 D
DB-221-1
DB-121-17
TOILET
MEDICATION LDS DB-221-2 D' Key Plan
DB-221-6
DB-121-6 DB-221-2 2 DB-221-6
DB-121-14
DB-121-15 CSSD CLEAN STD IPD
DB-121-17 20 m²
LDS DR DB-221-6
DB-U1-4
DOUBLE IPD ROOF LOUNGE DB-U2-5
E
Acrylic Light DB-121-15 CLEAN
PASSAGE DB-221-5
DB-121-17 DB-221-4
3 m²
DB-221-5
CSSD DIRTY
DB-U2-5
E'
DB-U2-5
DB-221-4
2
DB-121-6 17 m²
Acrylic Light DOUBLE IPD TOILET MEDICATION
DB-OT-1
JAN
DB-121-6 TOILET DB-221-4 Not Enclosed
DB-121-15 F
CLEAN
DB-121 OT 1 CHANGING
DB-121-17 G
DB-U1-4
DB-121-5
BABY WASH
DB-111-19 DB-121-16 DB-121-17
EXIT
TOILET
2
PREP
LIFT 2
DB-OT-1
DB-121-15
DB-221-5
CHANGING
DB-221-4 1 ISSUE FOR CONSTRUCTION MARCH 2020
DB-U1-4
TOILET STD IPD CU
Acrylic Light TOILET
DB-121-16 DB-121-17 Not Enclosed
2 DB-221-5
H
Acrylic Light
DB-121-1 DB-U2-5
2
DB-U2-5
DB-121-11
DB-U1-4
EXIT
DB-221-5
DB-121-3
DB-U1-4 J
2
DB-U2-5 ICU
2
2 2 2 2
DB-121-11 DB-121-13
DELUXE DB-121-11
SUITE DB-121-13
2
K
DB-121-16
To Level-3 Light
STD IPD DB-221-5
STD IPD Fixture
STD IPD STD IPD STD IPD DB-121-13 DB-121-13 STD IPD
DB-121-11
DB-121-11 DB-121-16 DB-121-13 TOILET 251
TOILET TOILET TOILET DB-121-13 DB-221-5
DB-121-11 DB-121-16 DB-121-13 TOILET Not Enclosed DB-221-6
TOILET DB-121-13 DB-211-7
STAIR DB-221-6 TOILET
S1-2
Not Enclosed L
Sheet Number
LT03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
DB-131-13
PUN HLAING SILOAM TAUNG
DB-231-4
DB-131-13
TOILET
DB-131-13 DB-131-10
DB-131-10
DB-131-10
DB-231-4
DB-231-4
GYI HOSPITAL
Not Enclosed DB-131-13 DB-131-13 DB-131-10
DB-131-13 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-131-10 DB-231-4
DB-231-4
DB-131-13 DB-231-4 DB-231-4 STD IPD
STD IPD
DB-131-13 DB-131-13 DB-131-10 DB-131-10 Prepared For:
DB-231-4
Not
2
Enclosed
2 2 2 2 2 2
DB-U1-6
DB-U1-6
2
B RENOVATION & EXTENSION TO 3 & 6
DB-U1-6 DB-U2-2
EXIT
-50
DB-231
DB-131-8
DB-131-7 DB-231-4
DB-231-4
FIRE EXIT
DB-U2-2
DB-131-5 DB-131-5 LANDING
DB-131-5
DB-U2-2
DB-U1-6
EXIT
DB-131-8 DB-131-7 DB-131-5 CORRIDOR C'
DB-U2-2
-50
EXIT
DB-131-12
2
TOILET
Key Plan
2
DB-131-7 DB-231-5 D'
DB-231-3
DB-131-11
VOID
2
2
DB-131-8 DB-231-5
DB-131-12
STD IPD
2
DB-231-5
DB-131-11
ROOF E
DB-231-1
2
DB-131-8
2
DB-131-12
DB-U2-2
DB-131-7 E'
DB-131-7 DB-131-11 DB-231-5
2
DB-U1-7
F
DB-131-8 DB-131
G
DB-U1-7
DB-131-11
EXIT
2
DB-231-5
No. Description DD/MM/YY
DB-111-19
DB-131-8
2
1 ISSUE FOR CONSTRUCTION MARCH 2020
DB-U1-7
DB-131-11 DB-131-11 DB-131-12
DB-131-11
DB-U1-7
DB-131-12
2
H
DB-131-2 DB-231-2
2
EXIT
DB-U1-7 DB-U2-2
DB-131-1 TOILET
DB-U1-7 DB-U2-2
J
2
DB-U2-2 DB-231-2
DB-131-9 2 2 2 2 2
2 GRAND SUITE K
DB-131-9 DB-131-6 DB-131-6
DB-131-9 DB-131-6 To Level-4 Light DB-231-2 DB-231-2
Fixture
DB-131-9
DB-131-9
DB-131-9 DB-131-9 DB-131-6 DB-131-6 DB-131-6
DB-231-2
DB-211-7
DB-231-2
L
Sheet Number
LT04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
DB-141-14 DB-141-14 DB-141-14 DB-141-14 DB-141-14 DB-141-14 DB-141-14 DB-141-14
DB-241-2
GYI HOSPITAL
DB-241-2 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
3 3
c c Prepared For:
2
DB-241-2
DB-241-2
2
B RENOVATION & EXTENSION TO 3 & 6
DB-141-11
2
DB-U2-4 DB-241-2
DB-141-7 DB-U1-9
EXIT
DB-241-2
TAUNGGYI, MYANMAR
Light Box Signage
DB-U1-9 2 2 1400
DB-U1-9
a b
a a b
b Contract No: 2018.04A
C
DB-141-5 DB-241
DB-141-11
DB-141-11 DB-141-11
DB-141-11 DB-141-11 DB-141-11 DB-141-11 DB-141-15 DB-241-2 DB-241-2
MEDICATION
5 m² 1945 DB-141-15
DB-U2-4
DB-141-11 STAFF ROOM
DB-U2-4
EXIT
C'
DB-U2-4
DB-141-4
EXIT
DB-U1-11
DB-141-13
D
DB-241-1
DB-141-2
DB-141-13
SILVER BED TOILET
3 m² Key Plan
d DB-141-6 MEDICATION DB-241-4 D'
DB-241-3
DB-141-15
2
DB-241-4
DB-141-13
DB-141-8
VOID
Not Enclosed
DB-241-4
DB-141-13
VOID
DB-U1-9
d SILVER BED
DB-141-6 E
STORAGE DB-241-4
DB-141-10
DB-141-13
DB-141-13
CORRIDOR DB-141-15
DB-U2-4
d
Not Enclosed E'
DB-141-13
SILVER BED CORRIDOR
EXIT 3 3 DB-141 DB-141-6
DB-241-4 F
d
DB-U1-9 3
2
G
DB-141-2
DB-141-4
CU DB-141-6 No. Description DD/MM/YY
e DB-U1-11 DB-241-4
3 3 DB-111-19 DB-141-6 STAFF
PANTRY 1 ISSUE FOR CONSTRUCTION MARCH 2020
DB-141-6
DB-141-17
SILVER BED SILVER BED SILVER BED DU
DB-141-6
DB-141-6
H
2
DB-U1-11
EXIT AP2-802-1`
DB-U1-11
DB-141-17
EXIT
SILVER BED
DB-U2-4
DB-U1-11 DB-241-5 DB-241-5
DB-U1-11 J
DB-U2-4 DB-U2-4
2
e e e 2 K
SILVER BED
3
SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED To Level-5 Light DB-241-5
STAFF TOILET
DB-141-1
DB-211-7
L
Sheet Number
LT05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
A Project:
TOILET
DB-5-9
PUN HLAING SILOAM TAUNG
DB-5-5
TOILET TOILET
DB-5-5
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
2
TOILET
C
Contract No: 2018.04A
DB-U2-6 EXIT 2 DB-5
DB-5-9 DB-5-9
COUNTER
NURSE
DB-U2-6
MEDICATION
DB-U2-6
EXIT
DB-U2-6 C'
DB-5-6 EXIT DB-U2-6
2
TOILET
CONFERENCE OFFICE
DB-5-2 D' Key Plan
DB-5-7
DB-5-6
2
DB-5-7
DB-5-2
VOID
STD IPD
DB-5-1
DB-5-2
VOID
E
DB-U2-6
DB-5-2
DB-5-7
PANTRY
DB-5-6
HR OFFICE E'
DB-5-3
F
DOUBLE IPD
2
2 G
OUTDOOR DB-5-2
SEATING
No. Description DD/MM/YY
TOILET
DB-5-2
1 ISSUE FOR CONSTRUCTION MARCH 2020
DB-5-11 H
WATER DB-5-4
STORAGE TOILET
DB-5-4
DB-U2-6
EXIT
DB-U2-6 GRAND SUITE J
DB-U2-6
2
DB-5-11
DB-5-11 2
DB-5-4 DB-5-4 K
STD IPD
STAIR 02 TOILET
Not Enclosed
DB-211-7 L
Sheet Number
LT06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
EXIT
DB-U2-7
DB-6-2
TAUNGGYI, MYANMAR
C
Contract No: 2018.04A
IPD STD 05
DB-6-7
DB-6-2 Not Enclosed
IPD STD 06
MEDICATION
Not Enclosed
Not Enclosed
DB-6-7
DB-6
C'
EXIT
DB-U2-7 DB-U2-7
DB-U2-7 EXIT
D
PREP COUNTER
D'
Key Plan
IPD STD 07
DB-6-6
DB-6-3
Not Enclosed
E
VOID
DB-6-1
IPD STD 08
DB-6-6 E'
CORRIDOR Not Enclosed
Not Enclosed
F
DB-U2-7
IPD STD 10
DB-6-6 H
PREP COUNTER Not Enclosed
DB-U2-7 DB-U2-7
STAIR
NURSE
S1-6
DB-U2-7
Not Enclosed STATION 1
EXIT
Not Enclosed DB-U2-7
J
DB-211-7
IPD STD 13
DB-6-4 IPD STD 12 DB-6-4
Not Enclosed Not Enclosed
L
Sheet Number
LT07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
GEN SET HL HL A
B24 DB-2B1-12
Project:
Not Enclosed
CL CL
CL
PUN HLAING SILOAM TAUNG
PUMP ROOM WASTE MEP
WARE HOUSE
B10
RAW WATER
B15
B25 B23
DB-2B1-11
B22 GYI HOSPITAL
Not Enclosed TRANSFER PUMP Not Enclosed Not Enclosed
Not Enclosed Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
MSB-2-13
Prepared For:
AC HL B
2
DB-2B1
RENOVATION & EXTENSION TO 3 & 6
2 C
MEDICAL RECORDS
DB-1B-7
DB-1B-17 DB-2B1-7
DB-U2
B09 MEP OFFICE
STOREY RCC BUILDING
C
Not Enclosed MSB
B21
2
Not Enclosed
DB-2B1-14 TAUNGGYI, MYANMAR
C
AC
HL
DB-2B1-17
DB-2B1-13
DB-2B1-15
15A 15A 15A
Contract No: 2018.04A
HL
MSB-2-11
DB-1B-10
WATER TREATMENT PUMP
LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
DB-2B1-9 C'
B13
Not Enclosed
D
D'
MEP
MSB
B08 IRONING ROOM Key Plan
Not Enclosed DB-1B-13 LAST OFFICE B35
B19 Not Enclosed
DB-2B1-8
Not Enclosed
DB-1B
EARTH E
DB-U1 TOILET
B14 DB-2B1-10
Not Enclosed
BIKE PARKING AREA E'
DB-2B1-19,21,23 B18
TOILET 20A,4P Not Enclosed
B12 Isolator F
DB-1B-9
Not Enclosed
BOTTLE STORAGE G
MATV
B16
PHARMACY STORAGE SECURITY Not Enclosed
B06 B07
Not Enclosed Not Enclosed No. Description DD/MM/YY
DB-1B-14
PA RACK
AC
HL 1 ISSUE FOR CONSTRUCTION MARCH 2020
HL
FAP
2 C
AC
DB-1B-18
H
CCTV
CORRIDOR
POD B11
DB-1B-11
B05 Not Enclosed
Not Enclosed
J
DB-1B-8
2
K
HOUSE KEEPING
Not Enclosed
C
DB-1B-12
BIO MED
MEDICAL SUPPLY
B03
B02
C
2
Not Enclosed
C
DB-1B-15
AC
DB-1B-16
AC
HL HL MALE CHANGING
B01
Not Enclosed L
Sheet Number
PW01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
2
HL
A PUN HLAING SILOAM TAUNG
WH
HL 2 2
AC
MEDICATION
2 2 2 2 2 2 2 2
HL HL HL
122A TOILET DB-211-29
TOILET GYI HOSPITAL
WH
DB-111-71
2
TOILET TOILET HL
DB-111-26 DB-111-37 TOILET TOILET DB-111-33 DB-111-36 TOILET TOILET DB-111-32 114C DB-211-17
Not Enclosed
C
WH
DB-111-35 158A
WH
DB-111-40
DB-111-49
120a 119a 118a 117a
WH
116a 115a Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
DB-111-55
DB-211-13
Not Enclosed
Not Enclosed Not Enclosed Not Enclosed HL DB-211-26
Not Enclosed
Not Enclosed 157
TOILET CONSULT CONSULT
2
DB-111-56 Not Enclosed
DOUBLE IPD STD IPD STD IPD STD IPD DB-111-59 STD IPD STD IPD STD IPD
DB-111-57
H1800
C 2
C 2
114 159A HL
TV
122B DB-211-31
TV TV TV TV TV TV
Not Enclosed NotTVEnclosed Not Enclosed
RENOVATION & EXTENSION TO 3 & 6
C 2
H1800 H1800
H1800 H1800 H1800 H1800 H1800 B
CONSULT STOREY RCC BUILDING
DB-211-27
156
DB-111-45 WAP
DB-211-24 Not Enclosed TAUNGGYI, MYANMAR
2 100A,4P Contract No: 2018.04A
H1800 H1800 2
Breaker Panel DB-111-67 HL
40A,4P
DB-211
2 C
HL
TV TV AC
Breaker Panel
AC
Vb
DB-111-53 SDB-CT-13,15,17
DB-111-50
MEDICATION
SDB-CT-14,16,18
Not Enclosed
2
2 C
STD IPD SEPTIC DB-111-63
DB-211-15
C
DB-111-27
126
GP
XRAY VITAL
2
TRIAGE SDB-CT-10 MAMMO 127 WAP
Vb
SDB-CT-6
AC
DB-211-35 Not Enclosed C'
2
DB-111-61 HL
C 2 HL
2 2 C C 2 2 DB-211-30 2
AC
HL
DB-111-39 2 2 C C 2
AC
MEDDICAL SUPPLIER
SDB-CT 2 D
DB-111-25 UPS PIPING TOILET
IMAGING F DB-111-44 Key Plan
2
SDB-CT-2 128DB-211-16 TV 155A
7 sqm CHANGING
Not Enclosed DB-211-20 Not Enclosed D'
DB-211-19
2 C C 2
AC
CONTROL CONSULT
CL SDB-CT-4 C 2 C 2 C 2
2 2 C
DB-111-46
CORRIDOR 2 2 2 C C
DB-111-64 GENERAL WAITING
2
124 SDB-CT-7
C
C 2
ED ENTRY USG 129
Not Enclosed
IMAGING CORRIDOR
Not Enclosed E
DB-111-34
2
ED C 2
7 sqm AC DB-111-69
Not Enclosed
HL
HL
SDB-CT-9
2
2
142
DB-111-66
AC
DU TOILET JAN
E'
2
DB-111-38 SDB-CT-8 HL
USG
AC
C
CONSULT
2
DB-211-18
2
2
HL
DB-111 Not Enclosed
AC
G
TOILET 2
No. Description DD/MM/YY
153A
2
SDB-CT-19,21,23
Not Enclosed
5.5 sqm DB-111-65 DB-211-14 1 ISSUE FOR CONSTRUCTION MARCH 2020
LOBBY TOILET TOILET CONSULT
Not Enclosed STAIR 132 131 SDB-CT-11
DB-111-41 Not Enclosed Not Enclosed Not Enclosed
TV 150A,4P
2 2
2
C 2
Breaker Panel
2 C C 2 2 C 2 C
H
15A C 2
CONSULT DB-211-33
K
2 AC
DB-111-29
DB-111-52 108
PATHOLOGIST
H1200
C
Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION DB-211-23
2
2
2
C
TV
AC
109
Not Enclosed LAB
2
HL
Ref
H1200
C
151
HL
DB-111-48
DB-111-43
2
REF.
C
DB-111-54
Not Enclosed
C
2
DB-111-47
C
C
DB-111-30
2
DB-111-31
2
REF. DB-211-22
H1200
DB-211-21
C
STAIR
Ref
2
2
HL HL
C
S1-1
Not Enclosed C 2 C 2 C 2 C 2 HL C 2
L
2
Sheet Number
PW02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
2
2 2 2 2
A
2 2
2 2 2
HL HL
DB-121-25 DB-121-63 Project:
TV
DB-OT-16
H1800
DB-121-38
TOILET DB-OT-10 DB-OT-15
WH
TOILET TOILET TOILET TOILET
WH
DB-121-46
Not Enclosed
HL OT 2 OT 3 OT 4
PUN HLAING SILOAM TAUNG
H1800
257 256 B47
DB-121-62
C
H1800
H1800
WH
C
TV
Not Enclosed Not Enclosed Not Enclosed
GYI HOSPITAL
2
DB-OT-17
DB-OT-14
DB-OT-13
TV
DB-OT-8
DB-OT-12
DB-OT-18
TV
2
DR CHANGING
DB-121-28 DB-121-29
2
2
STD IPD DB-121-65 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
PRE / POST
2
STD IPD STD IPD STD IPD
2
2
2
TV
40A,4P
DN H1800
Isolator B Prepared For:
DB-OT-26,28,30
FIRE LANDING
Not Enclosed WAP CORRIDOR RENOVATION & EXTENSION TO 3 & 6
B164
Not Enclosed STOREY RCC BUILDING
UP H1800 DB-OT
TV
HL HL HL C TAUNGGYI, MYANMAR
DB-221-27
DB-221-20
HL
WH
DB-121-58
WH
WH WH
DB-221
Contract No: 2018.04A
TOILET TOILET WASHING
TOILET HL HL ?
AC
2
DB-121-60 STD IPD STD IPD STD IPD
DB-221-38,40,42
DOUBLE IPD
AC LIFT CSSD STERILE
DB-121-71
DB-121-66
2 2
2
CORRIDOR
TV
Not Enclosed
TV
B166
H1800
H1800
DB-121-31 DB-121-43
TOILET DB-121-26 DU Not Enclosed C'
2 WH 2
HL
DB-121-49
DB-121-51
D
DB-121-54
2 HL
AC
DB-221-22 2
H1800
2
DB-221-43,45,47
DB-221-31
2
TOILET
WH
TV
DB-221-44,46,48
AC
DB-121-48 CL Key Plan
DB-121-27 CSSD CLEAN
AC
STD IPD HL
AC 20 m²
H1800
LDS DR
H1800
HL
H1800
DOUBLE IPD ROOF DB-121-44 TV
LOUNGE
DB-121-67
TV
E
2 2
H1000
2 C 2
AC CLEAN DB-221-30 HL
DB-OT-19
DB-121-40 DB-121-69 HL WAP
PASSAGE
AC
TV
3 m²
DB-221-19
DB-121-59
C
Not Enclosed
H1800
C
WH WH
CLEAN F
2
HL
2
HL
TV
DB-OT-7
DB-121-56
2
DB-OT-11
OT 1 CHANGING
DB-221-23
DB-121 2 2
H1000
DB-121-45 G
BABY WASH
2
TOILET HL DB-221-21
2
DB-121-35
PREP
LIFT 2
2
HL
DB-121-55
WH
WH
HL WH DB-221-25
CLEAN
NURSERY
DB-121-52 CHANGING DB-221-24 No. Description DD/MM/YY
DB-221-28
TOILET STD IPD
2
CU DB-OT-9 TOILET
DB-121-33 Not Enclosed 1 ISSUE FOR CONSTRUCTION MARCH 2020
TV 2 2
AC
2 2 2 C
C 2 WH
HL
HL H
2
2
DB-221-13
DB-121-41
C
WAP
C
2
ICU J
DB-121-61
DB-121-36
Ref DB-221-17
STD IPD DB-121-39 DB-121-42
DB-121-57
WH
HL
STD IPD STD IPD STD IPD
2
WH
HL
H1800
H1800
HL
STD IPD
H1800
WH
TV
HL
TV
TOILET
WH
DB-121-64
TV
Not Enclosed
H1800
DB-221-29
TOILET
2
2
STAIR DB-221-16
TOILET
TV
2
TV AC S1-2 DB-OT-21
HL
Not Enclosed C 2 2 C 2
L
H1800 WH 2
HL H1000 H1000
M
DB-221-15
Sheet Number
PW03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
2
A Project:
2 HL
WH
2 2
DB-131-45
WH
WH
TV
WH
DB-231-13 DB-231-14 HL DB-231-15
2
TOILET
H1800
DB-231-30
GYI HOSPITAL
DB-131-38 DB-131-26 DB-131-35 DB-131-28
Not Enclosed
WH
DB-131-61
H1800
H1800
H1800
H1800
WH
TV
TV
H1800
TV 2
DB-131-46 DB-131-57 HL DB-231-22 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
TV
DB-131-48
H1800
TV
TV
STD IPD
STD IPD DB-231-29
Not Enclosed Prepared For:
TV TV
AC
H1800 H1800
HL B
DB-231-34
RENOVATION & EXTENSION TO 3 & 6
WH
FIRE LANDING CORRIDOR
Not Enclosed Not Enclosed DB-131-24 WAP
DB-131-24 HL
STOREY RCC BUILDING
DB-231-28 TOIELT TAUNGGYI, MYANMAR
H1800 H1800
C
WH
TV 2 2
Contract No: 2018.04A
TV
HL
-50
DB-231
HL DB-131-34
C 2
DB-131-63 DB-131-64 DB-231-21
AC
H1800
FIRE EXIT
DB-231-23
2
HL LANDING
2
TV
WAP
WH
DB-131-44 DB-131-39 DB-131-31
CORRIDOR C'
DB-231-25
DB-131-22
DB-131-60-50
2 WH 2 2
HL DB-131-59
D
2
2 2
2
WH
HL
TV TOILET
2
DB-131-47
H1800 DB-231-19 D' Key Plan
VOID
DB-231-35
H1800
H1800
TV
TV
STD IPD
TV
HL
AC
2
ROOF
H1800
E
DB-131-20 2
2
TV
WH HL
DB-131-56 WH
DB-131-50 HL
E'
DB-231-16
H1800
TV
DB-131-36 WH
DB-231-33
HL F
DB-131
C 2 2 TV
H1800
G
AC
DB-131-55 HL H1800
2
TV
AC
TV
H1800
DB-131-32 DB-131-42 HL
DB-131-65
No. Description DD/MM/YY
2
DB-231-24
DB-131-52 1 ISSUE FOR CONSTRUCTION MARCH 2020
WH
DB-131-40 DB-231-17
HL
WH
DB-131-49
WH
HL TV HL
2
C 2 2
2
H1800 H
WH HL
DB-131-33
WAP
TOILET
DB-231-27
H1800 H1800 H1800 H1800 H1800
TV TV TV TV TV
Ref
Ref DB-131-51
DB-131-53
DB-131-54
2
H1800
TV
DB-231-26
WH
WH
WH
HL HL DB-131-30 DB-131-25
WH
DB-131-27
HL DB-131-37 HL DB-131-29
DB-131-62
2
HL
AC
TV
2 2 2 DB-231-20 DB-231-32
WH
TV AC
L
2
HL HL
H1800 DB-231-31
AC
HL
M
Sheet Number
PW04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
HL
A
WH
2 2
HL Project:
WH
DB-141-27 DB-141-29 DB-141-26 DB-241-21
DB-241-16
PUN HLAING SILOAM TAUNG
2
DB-141-45
WH DB-241-24
HL
AC
HL
TV TV TV
TV
H1800 H1800 H1800 H1800 B Prepared For:
HL
WH
WAP
DB-241-28
RENOVATION & EXTENSION TO 3 & 6
1400
STOREY RCC BUILDING
C
C 2 C 2 TAUNGGYI, MYANMAR
DB-241
Contract No: 2018.04A
2
MEDICATION DB-141-33
C
DB-141-34 DB-141-35
5 m² 1945 DB-241-13
STAFF ROOM DB-141-25 DB-241-19
2
WAP
C'
HL
2
D
DB-141-44
AC
DB-241-29
TOILET
SILVER BED
WH
3 m²
DB-241-23
MEDICATION HL
DB-241-33 D'
Key Plan
DB-141-28
DB-141-31
VOID
Not Enclosed
AC
HL
DB-141-37
TV
SILVER BED VOID
H1800 E
DB-141-36
2
STORAGE
DB-241-14
CORRIDOR
E'
Not Enclosed
SILVER BED CORRIDOR
DB-241-31
DB-241-20
DB-141 F
DB-141-43
G
AC TV
2
HL
DB-141-38
CU
H1800
STAFF
PANTRY
No. Description DD/MM/YY
SILVER BED SILVER BED SILVER BED DU
DB-241-22
Ref
1 ISSUE FOR CONSTRUCTION MARCH 2020
WH
HL
2
H
HL
AP2-802-1`
WH
DB-241-26
DB-141-32
J
H1800
DB-141-41
TV K
SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED
Ref
STAFF TOILET
H1800
SILVER BED TOILET 04 TOILET 05
TV
DB-241-27
H1800
TV
DB-141-40 DB-141-39
WH
DB-241-18
AC
DB-241-17 HL
DB-241-30 HL
L
2
DB-241-35
2
AC
HL
M
Sheet Number
PW05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
A Project:
2 2
TOILET
DB-5-22 TOILET DB-5-33 DB-5-19 TOILET DB-5-36
HL
GYI HOSPITAL
WH
WH WH
TV
HL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
H1800
HL
DB-5-39
TOILET STD IPD
TOILET
DB-5-40 ISO STD IPD DB-5-38
Prepared For:
TV TV TV HL
AC
DELUXE SUITE B
H1800 H1800 H1800
DB-5-50 WH HL RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
CORRIDOR
DB-5-31 DB-5-37
DB-5-55 TAUNGGYI, MYANMAR
Ref
TOILET
C Contract No: 2018.04A
AC HL DB-5
HL DB-5-48 WAP
AC
COUNTER
NURSE
C
DB-5-24
C
MEDICATION
2 2
C'
C
DB-5-25
2 C C 2
2
DB-5-18
DB-5-45
DB-5-21 D
2
TOILET
DB-5-14
WH
CONFERENCE OFFICE DB-5-32
HL
DB-5-44
DB-5-51
2 C C 2
DB-5-28
DB-5-35 VOID
DB-5-49 AC
STD IPD
HL TV
VOID HL
15A
AC
Ref
H1800
E
DB-5-47
C
2
AC
2
HL
DB-5-29
PANTRY 2 C C 2 DB-5-30
DB-5-23
HR OFFICE
DB-5-16
2 C C 2 E'
DB-5-27
C
DB-5-46
F
2
DB-5-53
Wc AC DOUBLE IPD
HL
G
AC TV
2
40A,4P 20A,4P HL
OUTDOOR ISOLATOR ISOLATOR
H1800
SEATING No. Description DD/MM/YY
HOSE REEL PUMP
MSB-2-14 TOILET
1 ISSUE FOR CONSTRUCTION MARCH 2020
BOOSTER PUMP DB-5-42
MSB-2-12
WH
HL
2
H
HL
DB-5-26
DB-5-43
WH
WATER
STORAGE TOILET
GRAND SUITE J
H1800
TV K
STD IPD
Ref
DB-5-41
H1800
TV
DB-5-34
DB-5-34
2
TOILET
AC
STAIR 02 DB-5-20 DB-5-52
Not Enclosed
WH
HL HL
L
2
DB-5-54
2
AC
HL
M
Sheet Number
PW06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
2 2 2 2
A Project:
H1800
GYI HOSPITAL
H1800
TV
H1800
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
TV
TV
TV
SHOWER
IPD STD 01 IPD STD 02 IPD STD 03 IPD STD 04
H1800
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
DB-6-42
Prepared For:
AC
AC
TOILET HL
AC
HL HL HL
B
AC
DB-6-47
EXTG: TOILET DB-6-40
DB-6-43
RENOVATION & EXTENSION TO 3 & 6
WH DB-6-33
Not Enclosed
HL
DB-6-14
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
40A,4P
H1800
C
Isolator
TV
Contract No: 2018.04A
2
IPD STD 05
Not Enclosed
DB-6-26
MSB-2-9 IPD STD 06 DB-6-18
MEDICATION
Not Enclosed
Not Enclosed DB-6-38AC TV
2
HL H1800
DB-6
C'
HLDB-6-44
AC
AC
HL
DB-6-41
D
PREP COUNTER
D'
WAP Key Plan
IPD STD 07
DB-6-36
Not Enclosed
DB-6-21
2
TV
AC
HL
E
H1800
VOID
DB-6-39
CORRIDOR Not Enclosed
DB-6-20
Not Enclosed AC TV F
2
HL
H1800
DB-6-34
ROOM Not Enclosed No. Description DD/MM/YY
8MSB-2-10
m² DB-6-25
TV
2
AC
HL 1 ISSUE FOR CONSTRUCTION MARCH 2020
H1800
40A,4P
Isolator
IPD STD 10 H
DB-6-37
PREP COUNTER Not Enclosed
STAIR DB-6-22
NURSE DB-6-28 AC TV
2
S1-6 HL
Not Enclosed STATION 1 H1800
Not Enclosed
J
2 IPD STD 11
K
C
DB-6-32
Not Enclosed DB-6-27
2
DB-6-31
AC TV
HL
H1800
DB-6-29
DB-6-35
DB-6-45
Not Enclosed Not Enclosed
DB-6-24 L
2
AC TV AC TV
HL HL
H1800
H1800
M
Sheet Number
PW07
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
DB-111
MCB
10A,1P
1
LR1
Outdoor lighting
CL: 45.74kW
2
LR2
ED entry corridor lighting
7
LR3
Imaging corridor & reception corridor lighting
Spare
8
LR4
Reception & lobby lighting
LR5
13
Pharmacy & finance lighting
25A,2P
Stair lighting
19
LR7
Spare
20
LR8
T
LR9
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
MCB
10A,1P
3
LY1
Outdoor lighting
4
LY2
ED entry corridor lighting
9
LY3
Imaging corridor & reception corridor lighting
Spare
LY4
10
Imag;male, radiologist, Imag; reeception, consult & pathologist lighting
MCB
LY5
20A,3P
Toilet lighting
15
25A,2P
LY6
RCCB(30mA)
16
Imag; female chang;, mammo & USG lighting
LY7
Spare
21
LY8
22
Spare
LY9
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
MCB
10A,1P
5
LB1
Outdoor lamp post lighting
6
LB2
LED Strip Light & Light Box Signage lighting
LB3
11
STD IPD & double IPD lighting
LB4
12
Triage & septic lighting
LB5
17
4 x STD IPD lighting
25A,2P
RCCB(30mA)
18
LB6
3 x STD IPD lighting
LB7
23
Spare
LB8
Spare
24
T
LB9
DB-1B
Room)
MCB
10A,1P
20A,1P
1
LR1
25
Receptacle
PR1
3
LY1
26
PR2
5
LB1
Receptacle Security, Pharmacy, POD, House Keeping & Bio Med Lighting
31
(Located at Basement MEP
PR3
2
LR2
Corridor Lighting
32
Receptacle
PR4
MCB
4
37
Receptacle
LY2
PR5
20A,3P
Spare
25A,4P
6
38
Receptacle
PR6
RCCB(30mA)
LB2
Spare
MCB
43
Receptacle
PR7
100A,3P
PR8
49
Receptacle
PR9
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)
MCB
50
Receptacle
4 x 35sqmm Cu/XLPE/PVC
Receptacle
PR1
55
Water heater power
80A,2P
9
PY1
Receptacle
RCCB(30mA)
56
Water heater power
MCB
32A,3P
Receptacle
11
PB1
61
ACIU power
8
Receptacle
PR2
62
ACIU power
PY2
Receptacle
10
ACIU power
67
6sqmm Cu/PVC (E)
Receptacle
12
PB2
Spare
68
4 x 6sqmm Cu/XLPE/PVC +
Spare Receptacle
73
13
PR3
74
Spare
PY3
ACIU Power
15
MCB
ACIU Power
MCB
14
PR4
25A,4P
20A,1P
PY1
27
Receptacle
RCCB(30mA)
PY4
ACIU Power
16
28
PY2
Receptacle
ACIU Power
18
PB4
33
PY3
Receptacle
Spare
19
PR5
34
Receptacle
PY4
PY5
Spare
21
PY5
39
Receptacle
Spare
23
PB5
40
Receptacle
PY6
Receptacle
46
PY8
Receptacle
51
Receptacle
PY9
52
Receptacle
MCB
80A,3P
57
Printer power
63
ACIU power
ACIU power
64
ACIU power
69 70
Spare
75
Spare
76
Spare
PY10 PY11 PY12 PY13 PY14 PY15 PY16 PY17 PY18
29
Receptacle
PB1
Receptacle
30
PB2
35
Receptacle
PB3
36
Receptacle
PB4
41
Receptacle
PB5
42
Receptacle
PB6
47
Receptacle
PB7
48
Receptacle
PB8
53
Receptacle
PB9
54
Receptacle
59
ACIU power
60
ACIU power
65 66
ACIU power
71
ACIU power
72
Spare
77
Spare
78
Spare
PB10 PB11 PB12 PB13 PB14 PB15 PB16 PB17 PB18
1
No.
Scale:
Project:
Key Plan
Sheet Title:
NOTE:
Contract No:
Prepared For:
Sheet Number
As indicated
TAUNGGYI, MYANMAR
2018.04A
GYI HOSPITAL
Drawings are not to be scaled.
Description
HNO
ISSUE FOR CONSTRUCTION
Drawn by:
STOREY RCC BUILDING
HKW
RENOVATION & EXTENSION TO 3 & 6
DD/MM/YY
Reviewed by:
This Drawing is an instrument of service and shall remain the property
SL01
MARCH 2020
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
DB-121
MCB
DB-131
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
10A,1P
MCB
1
10A,1P
LR1
Corridor lighting
1
LR1
Corridor lighting
CL: 44.52kW
CL: 43.93kW
2
LR2
Corridor lighting
2
LR2
Corridor lighting
7
LR3
STD IPD, double IPD & jan; lighting
7
LR3
OT corridor lighting
8
Spare
LR4
8
LR4
3 x STD IPD lighting
LR5
3 x STD IPD Lighting
13
(Located at Level-2 Stair(S2-2)
LR5
3 x STD IPD Lighting
13
25A,2P
LR6
Spare
14
LR6
LDS, washing & pre/post lighting
14
25A,2P
RCCB(30mA)
T
LR7
19
RCCB(30mA)
LR7
Spare
19
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
MCB
T
LR8
20
10A,1P
3
LY1
Corridor Lighting
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
4
MCB
LY2
Corridor Lighting
10A,1P
3
LY1
Corridor lighting
9
LY3
Deluxe suite & 2 x IPD lighting
4
LY2
Corridor lighting
LY4
3 x STD IPD lighting
10
9
LY3
OT corridor lighting
LY5
Spare
15
Spare
MCB
LY4
2 x STD IPD Lighting
10
20A,3P
LY6
25A,2P
Spare
16
LY5
2 x double IPD lighting
15
RCCB(30mA)
LY7
21
MCB
LY6
20A,3P
2 x STD IPD Lighting
16
25A,2P
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
MCB
10A,1P
LY7
RCCB(30mA)
Spare
21
5
LB1
2 x STD IPD lighting
T
LY8
22
6
LB2
3 x STD IPD lighting
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
LB3
Server, STD IPD & double IPD lighting
11
MCB
10A,1P
LB4
2 x double IPD lighting
LB1
Acrylic lighting
12
Spare
6
LB5
Spare
LB2
17
LB6
Spare
LB3
18
11
25A,2P
RCCB(30mA)
LB7
Spare
LB4
23
2 x STD IPD & DU lighting
12
LB5
Spare
18
25A,2P
Spare
LB7
23
MCB
20A,1P
T
LB8
24
20
Receptacle
PR1
2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)
25
Receptacle
PR2
MCB
20A,1P
Receptacle
26
PR3
25
Receptacle
PR1
31
Receptacle
PR4
26
Receptacle
PR2
32
Receptacle
PR5
31
Receptacle
PR3
37
Receptacle
PR6
Receptacle
32
PR4
38
Receptacle
PR7
37
Receptacle
PR5
43
Receptacle
PR8
38
Receptacle
PR6
44
Receptacle
PR9
43
Receptacle
PR7
MCB
100A,3P
Receptacle
PR8
MCB
50
Water heater power
80A,2P
49
Receptacle
100A,3P
PR9
RCCB(30mA)
55
Water heater power
50
4 x 35sqmm Cu/XLPE/PVC
55
61
Water heater power
+ 16sqmm Cu/PVC (E)
RCCB(30mA)
56
62
ACIU power
61
67
Spare
62
68
Spare
67
ACIU power
73
Spare
68
ACIU power
Spare
PR10 PR11 PR12 PR13 PR14 PR15 PR16 PR17
MCB
20A,1P
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)
PY1
22
Receptacle
MCB
20A,1P
PY2
27
Receptacle
PY1
27
Receptacle
28
PY3 Receptacle
PY2
28
Receptacle
PY4
33
Receptacle
33
PY3
Receptacle
PY5
34
Receptacle
PY4
34
Receptacle
39
PY6
Receptacle
39
PY5
Receptacle
40
PY7
Receptacle
40
PY6
Receptacle
PY8
45
Receptacle
PY7
45
Receptacle
PY9
46
Receptacle
51
Receptacle
MCB
80A,3P
52
RCCB(30mA)
57
58
ACIU power
64
ACIU power
69
Spare
69
ACIU power
70
Spare
70
Spare
75
Spare
75
Spare
PY10 PY11 PY12 PY13 PY14 PY15 PY16 PY17 PY18
PY10 PY11 PY12 PY13 PY14 PY15 PY16 PY17
2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E) 2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E) 2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)
MCB
MCB
20A,1P
20A,1P
24
Receptacle
PB1
29
Receptacle
PB1
29
Receptacle
PB2
30
Receptacle
PB2
30
Receptacle
PB3
35
Receptacle
PB3
35
Receptacle
PB4
36
Receptacle
PB4
36
Receptacle
PB5
41
Receptacle
PB5
41
Receptacle
PB6
42
Receptacle
PB6
42
Receptacle
PB7
47
Receptacle
PB7
47
Receptacle
PB8
48
Receptacle
PB8
48
53
RCCB(30mA)
59
ACIU power
66
ACIU power
66
Spare
71
ACIU power
71
Spare
72
Spare
72
Spare Spare
77
PB10 PB11 PB12 PB13 PB14 PB15 PB16 PB17
77
Spare
PB10 PB11 PB12 PB13 PB14 PB15 PB16 PB17 PB18
1
No.
NTS
Scale:
Project:
Key Plan
Sheet Title:
NOTE:
Contract No:
Prepared For:
Sheet Number
TAUNGGYI, MYANMAR
2018.04A
GYI HOSPITAL
Drawings are not to be scaled.
Description
HNO
ISSUE FOR CONSTRUCTION
Drawn by:
STOREY RCC BUILDING
HKW
RENOVATION & EXTENSION TO 3 & 6
DD/MM/YY
Reviewed by:
This Drawing is an instrument of service and shall remain the property
SL02
MARCH 2020
NOTE:
Laundry Power
Laundry Power
ACIU Power
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Spare
Spare
Spare
Spare
Spare
Project:
LR1 LY1 LB1 LR2 LY2 LB2 PR1 PY1 PB1 PR2 PY2 PB2 PR3 PY3 PB3 PR4 PY4 PB4 RYB5 RYB6
1 3 5 2 4 6 7 9 11 8 10 12 13 15 17 14 16 18 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
19,21,23
20,22,24
25A,4P 25A,4P
RCCB(30mA) RCCB(30mA)
Prepared For:
20A,3P 25A,3P
MCB MCB
Key Plan
Nurse station, medication, storage & STD IPD lighting
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
Corridor lighting
Corridor lighting
Corridor lighting
Corridor lighting
Corridor lighting
Corridor lighting
Corridor lighting
Pantry power
ACIU power
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
No. Description DD/MM/YY
T T T
LR1 LR2 LR3 LR4 LR5 LR6 LR7 LR8 LY1 LY2 LY3 LY4 LY5 LY6 LY7 LY8 LB1 LB2 LB3 LB4 LB5 LB6 LB7 LB8 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9
1 2 7 8 13 14 19 20 3 4 9 10 15 16 21 22 5 6 11 12 17 18 23 24 25 26 31 32 37 38 43 44 49 27 28 33 34 39 40 45 46 51 29 30 35 36 41 42 47 48 53
20A,3P 32A,3P
MCB MCB
50A,3P
MCB Scale: Drawn by: Reviewed by:
NTS HNO HKW
Sheet Number
SL03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Corridor lighting
Corridor lighting
Stair lighting
ACIU power
ACIU power
ACIU power
ACIU power
ACIU power
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Project:
LR1 LR2 LR3 LR4 LY1 LY2 LY3 LY4 LB1 LB2 LB3 LB4 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9 Prepared For:
1 2 7 8 3 4 9 10 5 6 11 12 13 14 19 20 25 26 31 32 37 15 16 21 22 27 28 33 34 39 17 18 23 24 29 30 35 36 41
25A,2P
RCCB(30mA)
25A,2P
RCCB(30mA)
25A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
40A,2P
RCCB(30mA) RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
40A,3P
MCB
Corridor Lighting
CSSD Power
CSSD Power
CSSD Power
ACIU power
ACIU power
ACIU power
ACIU power
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
T T
10A,1P 10A,1P 10A,1P 20A,1P 20A,1P 20A,1P 80A,3P 32A,3P 32A,3P 20A,3P 20A,3P
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
LR1 LR2 LR3 LR4 LY1 LY2 LY3 LY4 LB1 LB2 LB3 LB4 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9 RYB10 RYB11 RYB12 RYB13 RYB14
1 2 7 8 3 4 9 10 5 6 11 12 13 14 19 20 25 26 31 32 37 15 16 21 22 27 28 33 34 39 17 18 23 24 29 30 35 36 41 38,40,42 43,45,47 44,46,48 49,51,53 50,52,54
20A,3P 125A,3P
MCB MCB
CL: 79.89kW
DB-221 4 x 70sqmm Cu/XLPE/PVC
(Located at Level-2 Corridor) + 35sqmm Cu/PVC (E)
Sheet Number
Feed From MSB-2
SL04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Corridor lighting
ACIU Power
ACIU power
ACIU power
ACIU power
ACIU power
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Project:
LR1 LR2 LR3 LR4 LY1 LY2 LY3 LY4 LB1 LB2 LB3 LB4 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9
Prepared For:
1 2 7 8 3 4 9 10 5 6 11 12 13 14 19 20 25 26 31 32 37 15 16 21 22 27 28 33 34 39 17 18 23 24 29 30 35 36 41
25A,2P
RCCB(30mA)
25A,2P
RCCB(30mA)
25A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
40A,2P
RCCB(30mA)
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
63A,3P
MCB
Corridor lighting
ACIU power
ACIU power
ACIU power
ACIU power
ACIU power
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
T T
LR1 LR2 LR3 LR4 LY1 LY2 LY3 LY4 LB1 LB2 LB3 LB4 PR1 PR2 PR3 PR4 PR5 PR6 PR7 PR8 PR9 PY1 PY2 PY3 PY4 PY5 PY6 PY7 PY8 PY9 PB1 PB2 PB3 PB4 PB5 PB6 PB7 PB8 PB9
1 2 7 8 3 4 9 10 5 6 11 12 13 14 19 20 25 26 31 32 37 15 16 21 22 27 28 33 34 39 17 18 23 24 29 30 35 36 41
20A,3P 50A,3P
MCB MCB
MCB
10A,1P
1
LR1
Corridor Lighting
Spare
CL: 36.95kW
2
LR2
Double IPD & STD IPD lighting
7
LR3
Office & pantry Lighting
8
LR4
Spare
25A,2P
RCCB(30mA)
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
MCB
10A,1P
DB-6
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
3
LY1
Corridor Lighting
MCB
Spare
10A,1P
4
1
LY2
Grand IPD & STD IPD lighting
LR1
Corridor Lighting
Spare
CL: 22.27kW
9
2
LY3
Medication, STD IPD, nurse counter & toilet lighting
LR2
Medication, toilet & shower lighting
7
LY4
Spare
10
LR3
6 x STD IPD lighting
MCB
20A,3P
25A,2P
T
8
LY5
15
LR4
Spare RCCB(30mA)
25A,2P
LR5
13
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E)
RCCB(30mA)
MCB
MCB
LB1
10A,1P
3
LY1
Corridor Lighting
6
LB2
4
LY2
3 x STD IPD & nurse station lighting
LB3
9
LY3
Spare
LB4
Spare
12
LY4
Spare
10
25A,2P
LB5
Spare
17
MCB
20A,3P
25A,2P
T
LY5
15
RCCB(30mA)
RCCB(30mA)
2 x 1C x 1.5 sqmm PVC+ 1.5 sqmm PVC (E) 2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)
MCB
10A,1P
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)
5
LB1
Light box signage lighting
MCB
Spare
20A,1P
6
14
Receptacle
PR1
LB2
4 x STD IPD lighting
19
Receptacle
PR2
LB3
Spare
11
20
Receptacle
PR3
LB4
Spare
12
T
25A,2P
25
Receptacle
PR4
LB5
17
RCCB(30mA)
26
Receptacle
PR5
31
Receptacle
PR6
Receptacle
PR7
MCB
20A,1P
37
Receptacle
14
PR1
MCB
38
80A,3P
19
Receptacle
PR2
Feed From MSB-2
43
20
Receptacle
PR3
RCCB(30mA)
44
ACIU power
25
Receptacle
PR4
49
ACIU power
+ 16sqmm Cu/PVC (E)
26
Receptacle
PR5
4 x 25sqmm Cu/XLPE/PVC
MCB
ACIU power
50
63A,3P
31
Receptacle
PR6
ACIU power
32
ACIU power
PR7
56
Spare
37
ACIU power
PR8
40A,2P
61
Spare
RCCB(30mA)
38
ACIU power
PR10 PR11 PR12 PR13 PR14 PR15 PR16
PR9
44
ACIU power 2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)
MCB
20A,1P
49
Spare
Receptacle
2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)
PY2
21
Receptacle
2 x 1C x 2.5 sqmm PVC+ 2.5 sqmm PVC (E)
MCB
22
PY3
20A,1P Receptacle
16
PY1
Receptacle
PY4
27
Receptacle
21
PY2 Receptacle
PY5
28
Receptacle
PY3
22
Receptacle
33
PY6
Receptacle
PY4
27
Receptacle
34
PY7
Receptacle
PY5
28
Receptacle
39
PY8
ACIU power
MCB
63A,3P
45
MCB
50A,3P
39
PY8
ACIU power
40A,2P
RCCB(30mA)
46
ACIU power
RCCB(30mA)
40
PY9
ACIU power
51
ACIU power
45
ACIU power
52
ACIU power
46
Spare
57
Spare
51
Spare
PY10 PY11 PY12
58
Spare
2 x 1C x 4 sqmm PVC+ 4 sqmm PVC (E)
63
Spare
PY10 PY11 PY12 PY13 PY14 PY15 PY16
Receptacle
PB1
Receptacle
PB2
MCB
20A,1P
18
Receptacle
PB1
24
Receptacle
PB3
23
Receptacle
PB2
Receptacle
29
PB4
24
Receptacle
PB3
30
Receptacle
PB5
29
Receptacle
PB4
35
ACIU power
PB6
30
Receptacle
PB5
36
ACIU power
PB7
35
Receptacle
PB6
41
ACIU power
PB8
40A,2P
36
Receptacle
RCCB(30mA)
PB7
42
ACIU power
PB9
41
47
ACIU power
42
48
Spare
47
53
PB10 PB11 PB12
RCCB(30mA)
48
ACIU power
53
ACIU power
54
ACIU power
59
Spare
60
Spare
65
Spare
PB10 PB11 PB12 PB13 PB14 PB15 PB16
1
No.
NTS
Scale:
Project:
Key Plan
Sheet Title:
NOTE:
Contract No:
Prepared For:
Sheet Number
TAUNGGYI, MYANMAR
2018.04A
GYI HOSPITAL
Drawings are not to be scaled.
Description
HNO
ISSUE FOR CONSTRUCTION
DIAGRAM LAYOUT
Drawn by:
STOREY RCC BUILDING
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
HKW
RENOVATION & EXTENSION TO 3 & 6
DD/MM/YY
Reviewed by:
This Drawing is an instrument of service and shall remain the property
SL06
MARCH 2020
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Lighting
Spare
Spare
Spare
Spare
Spare
Project:
10A,1P
10A,1P
MCB
MCB
Prepared For:
LR1 LY1 LB1 LR2 LY2 LB2 LR3 LY3 LB3
LR1 LY1 LB1 LR2 LY2 LB2 LR3 LY3 LB3 LR4 LY4 LB4
1 3 5 2 4 6 7 9 11
1 3 5 2 4 6 7 9 11 8 10 12
25A,4P
RENOVATION & EXTENSION TO 3 & 6
25A,4P
RCCB
(30mA)
RCCB
(30mA)
25A,4P
STOREY RCC BUILDING
25A,4P
MCB
MCB CL: 1.2kVA
CL: 1.4kVA TAUNGGYI, MYANMAR
DB-U1 (Located at DB-U2 (Located at 4 x 4sqmm Cu/MICA/XLPE/LSZH +
4 x 4sqmm Cu/MICA/XLPE/LSZH + Basement MEP Room) Contract No: 2018.04A
Basement MEP Room) 4sqmm Cu/PVC (E)
4sqmm Cu/PVC (E)
25A,4P
25A,4P
MCB
MCB
UPS
UPS
25A,4P
25A,4P
MCB
MCB
Key Plan
OT-2 lighting
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Lighting
Lighting
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Receptacle
Power
Power
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
10A,1P 20A,1P 40A,3P
MCB MCB MCB
LR1 LY1 LB1 LR2 LY2 LB2 PR1 PY1 PB1 PR2 PY2 PB2 PR3 PY3 PB3 PR4 PY4 PB4 PR5 PY5 PB5 PR6 PY6 PB6 RYB7 RYB8 RYB9
1 3 5 2 4 6 7 9 11 8 10 12 13 15 17 14 16 18 19 21 23 20 22 24
25,27,29
26,28,30
31,33,35
250A,4P
ST
MCCB
CL: 37.58kW
2A/F R Y B
DB-OT (Located at Level-2 )
4 x 25sqmm Cu/MICA/XLPE/LSZH + CL: 126.79kW Scale: Drawn by: Reviewed by:
16sqmm Cu/PVC (E) SDB-CT (Located at Level-1 ) 4 x 120sqmm Cu/XLPE/PVC + NTS HNO HKW
70sqmm Cu/PVC (E)
Sheet Title:
80A,4P
250A,4P
SL07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
4 x 1C x 4 sqmm CU/MICA/XLPE/LSZH +
4 x 1C x 6 sqmm CU/MICA/XLPE/LSZH+
GYI HOSPITAL
4 x 1C x 35 sqmm CU/XLPE/PVC +
4 x 1C x 10 sqmm CU/XLPE/PVC +
4 x 1C x 70 sqmm CU/XLPE/PVC +
4 x 1C x 4 sqmm CU/XLPE/PVC +
4 x 1C x 6 sqmm CU/XLPE/PVC +
4 x 1C x 4 sqmm CU/XLPE/PVC +
4 x 1C x 4 sqmm CU/XLPE/PVC +
4 x 1C x 16 sqmm CU/XLPE/PVC
4 x 1C x 16 sqmm CU/XLPE/PVC
4 x 1C x 25 sqmm CU/XLPE/PVC
4 x 1C x 16 sqmm CU/XLPE/PVC
4 x 1C x 25 sqmm CU/XLPE/PVC
4 x 1C x 35 sqmm CU/XLPE/PVC
4 x 1C x 10 sqmm CU/XLPE/PVC
4 x 1C x 6 sqmm CU/XLPE/PVC
4 x 1C x 6 sqmm CU/XLPE/PVC
4 x 1C x 4 sqmm CU/XLPE/PVC
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
HOSEREEL PUMP
+ 10 sqmm PVC(E)
TRANSFER PUMP
BOOSTER PUMP
Prepared For:
4 x 1C x 6 sqmm
16 sqmm PVC(E)
16 sqmm PVC(E)
10 sqmm PVC(E)
70 sqmm PVC(E)
35 sqmm PVC(E)
16 sqmm PVC(E)
16 sqmm PVC(E)
16 sqmm PVC(E)
16 sqmm PVC(E)
16 sqmm PVC(E)
6 sqmm PVC(E)
4 sqmm PVC(E)
6 sqmm PVC(E)
4 sqmm PVC(E)
6 sqmm PVC(E)
4 sqmm PVC(E)
6 sqmm PVC(E)
4 sqmm PVC(E)
6 sqmm PVC(E)
4 sqmm PVC(E)
RENOVATION & EXTENSION TO 3 & 6
SDB-CT
DB-2B1
DB-111
DB-121
DB-131
DB-141
DB-211
DB-221
DB-231
DB-241
SPARE
SPARE
SPARE
SPARE
SPARE
DB-OT
DB-U1
DB-U2
DB-1B
LIFT-1
LIFT-2
DB-5
DB-6
STOREY RCC BUILDING
+
+
TAUNGGYI, MYANMAR
160AT,160AF, 160AT,160AF,
2A/F R Y B 2A/F R Y B
25KA,TPN 25KA,TPN
0~400A 0~400A
MCCB MCCB
A A A MCT 160A A A A MCT 160A
V 0~500V V 0~500V
HRC FUSE HRC FUSE
V/S V/S
Surge Surge
OCR CT OCR CT
Arrester Arrester
EFR PCT EFR PCT
100kA 100kA Key Plan
320AT/630AF,4P 320AT/630AF,4P
ST (8/20 μA) ST (8/20 μA)
MCCB (50kA) MCCB (50kA)
TDL: 173.28kW (All Mode) TDL: 153.28kW (All Mode)
TCL: 288.81kW TCL: 255.48kW
<2Ω <2Ω
MSB-1 (Located at Basement MEP Room) MSB-2 (Located at Basement MEP Room)
4 x 1C x 185 sqmm Cu/XLPE/PVC 4 x 1C x 185 sqmm Cu/XLPE/PVC
400A,4P
400A,4P
ATS (40kA)
ATS (40kA)
2A/F R Y B R Y B 2A/F
6A,TPN 6A,TPN
MCB MCB
No. Description DD/MM/YY
4 x 1C x 185 sqmm Cu/XLPE/PVC 4 x 1C x 185 sqmm Cu/XLPE/PVC
125A,TPN 125A,TPN
MCCB CT Meter CT Meter MCCB
2A/F 2A/F
Compartment Compartment
PFC CT CT PFC
GENERATOR CONTROL PANEL
320AT/630AF,4P 320AT/630AF,4P
MCCB (50kA) MCCB (50kA)
4 x 1C x 185 sqmm 4 x 1C x 185 sqmm
kWh Cu/MICA/XLPE/LSZH Cu/MICA/XLPE/LSZH kWh
70 kVAR 70 kVAR
CAPACITOR CAPACITOR
MAIN METER 150kVA, PRIME 200kVA, PRIME MAIN METER
BANK GEN GEN BANK
3Ph4W, 400V, 50Hz 3Ph4W, 400V, 50Hz
200kVA TRANSFORMER 200kVA TRANSFORMER
ONAN, Dyn11,11/0.4kV, 50Hz ONAN, Dyn11,11/0.4kV, 50Hz
DOF DOF
LA DS LA DS
TAP FROM HT O/H LINE (ESE) TAP FROM HT O/H LINE (ESE)
Sheet Number
SL08
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
ROOF
LIFT-1 LIFT-2
4 x 1C x 6 sqmm CU/MICA/XLPE/LSZH + 4 x 1C x 6 sqmm CU/MICA/XLPE/LSZH + Project:
6 sqmm PVC (E) 6 sqmm PVC (E)
DB-6 PUN HLAING SILOAM TAUNG
4 x 1C x 16 sqmm CU/XLPE/PVC +
16 sqmm PVC (E) GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
HOSEREEL PUMP LEVEL-6
4 x 1C x 4 sqmm CU/MICA/XLPE/LSZH +
DB-5 4sqmm PVC (E)
4 x 1C x 25 sqmm CU/XLPE/PVC + Prepared For:
16 sqmm PVC (E) BOOSTER PUMP
4 x 1C x 6 sqmm CU/XLPE/PVC +
6 sqmm PVC (E) RENOVATION & EXTENSION TO 3 & 6
ROOF LEVEL-5
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
LEVEL-4 LEVEL-4
DB-131 DB-231
4 x 1C x 35 sqmm CU/XLPE/PVC + 4 x 1C x 16 sqmm CU/XLPE/PVC +
16 sqmm PVC (E) 16 sqmm PVC (E)
LEVEL-3 LEVEL-3
Key Plan
DB-221
4 x 1C x 70 sqmm CU/XLPE/PVC +
DB-121 35 sqmm PVC (E)
4 x 1C x 35 sqmm CU/XLPE/PVC +
16 sqmm PVC (E) DB-OT
4 x 1C x 25 sqmm CU/XLPE/PVC +
16 sqmm PVC (E)
LEVEL-2 LEVEL-2
200 kVA ,
Transformer
DB-111 SDB-CT DB-211
4 x 1C x 35 sqmm CU/XLPE/PVC + 4 x 1C x 120 sqmm CU/XLPE/PVC + 4 x 1C x 10 sqmm CU/XLPE/PVC +
200 kVA , 16 sqmm PVC (E) 70 sqmm PVC (E) 10 sqmm PVC (E)
Transformer
LEVEL-1 LEVEL-1
No. Description DD/MM/YY
MSB-1 MSB-2
GSP
BASEMENT BASEMENT
Scale: Drawn by: Reviewed by:
NTS HNO HKW
ELECTRICAL SCHEMATIC
DIAGRAM LAYOUT
Sheet Number
SL09
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
ROOF
LIFT-1 LIFT-2
Project:
Prepared For:
ROOF LEVEL-5
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
PABX
SERVER
LEVEL-3 LEVEL-3
Key Plan
MED EARTH
LEVEL-2 LEVEL-2
TRANSFORMER
TRANSFORMER
TO RESPECTIVE TO RESPECTIVE
DB, PANEL AND LMCP DB, PANEL AND LMCP
MSB-1 MSB-2
GEN;
LIFT CORE-2
LIFT CORE-1
FIRE FIGHTING PIPE BONDING LIFT EARTH BAR MED EQUIPMENT GEN; FIRE FIGHTING PIPE BONDING
MEDICAL GAS PIPE BONDING (MEP ROOM) MEDICAL GAS PIPE BONDING
WIRE WAY EARTH LINK WIRE WAY EARTH LINK
MAIN EARTH BAR (MEP ROOM) IT EARTH BAR MAIN EARTH BAR (MEP ROOM)
(MEP ROOM)
Sheet Number
ET01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
LA Earth <10 Ω
LA Earth <10 Ω
1 1' 2 3 4 5 5' 6 7' 7 8 9 10 11 12 13 14 15 16
Project:
Medical Earth <2 Ω Main Earth <2 Ω PUN HLAING SILOAM TAUNG
Main Earth <2 Ω IT Earth <2 Ω GEN SET
B24
A
GYI HOSPITAL
Not Enclosed No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
NOTE; PUMP ROOM WASTE MEP
Number of Electrode and Earth Pit shown in drawing are not limited. WARE HOUSE RAW WATER B25 B23 B22
B10 B15 Not Enclosed GENERATOR Not Enclosed Not Enclosed
It shall be considered on site according to soil resistivity. Not Enclosed Not Enclosed Prepared For:
All Lightning Protection System Earth Pit shall be bonded each other
as Earth Termination Network. RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
B
MEDICAL RECORDS
TAUNGGYI, MYANMAR
B09 MEP OFFICE
Not Enclosed Main Earth Bar Contract No: 2018.04A
B21
Not Enclosed
C
LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
B13 C'
Not Enclosed
D Key Plan
Main Earth Bar
MEP D'
B08 IRONING ROOM
Not Enclosed LAST OFFICE B35
B19 Not Enclosed
Not Enclosed
EARTH E
TOILET
B14
Not Enclosed LA Earth <10 Ω
BIKE PARKING AREA E'
B18
TOILET Not Enclosed
B12 F
Not Enclosed No. Description DD/MM/YY
BOTTLE STORAGE G
B16 1 ISSUE FOR CONSTRUCTION MARCH 2020
PHARMACY STORAGE SECURITY
Not Enclosed
B06 B07
Not Enclosed Not Enclosed
H
CORRIDOR
POD
B11
B05 Not Enclosed
Not Enclosed
K
HOUSE KEEPING
B02
B04 Not Enclosed
Not Enclosed
MALE CHANGING
CT Earth to Breaker Box B01
CT Earth to Breaker Box Not Enclosed
LA Earth <10 Ω
CT Earth <2 Ω CT Earth <2 Ω L
LA Earth <10 Ω
M
Scale: Drawn by: Reviewed by:
1 : 150 HNO HKW
Sheet Title:
BASEMENT FLOOR
EARTHING SYSTEM LAYOUT
Sheet Number
ET02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
DB-2B1
B RENOVATION & EXTENSION TO 3 & 6
LV TRUNKING 600 mm x 50 mm
MEDICAL RECORDS
STOREY RCC BUILDING
B09 MEP OFFICE TAUNGGYI, MYANMAR
Not Enclosed MSB
B21
Not Enclosed
DB-U2
Contract No: 2018.04A
MSB-2 C
LV CABLE LADDER 300 mm x 50 mm
LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
C'
B13
Not Enclosed
D
LV TRUNKING 400 mm x 50 mm
Key Plan
D'
MEP
MSB
MSB-1 IRONING ROOM
B08
Not Enclosed LAST OFFICE B35
B19 Not Enclosed
Not Enclosed
DB-1B E
EARTH
DB-U1 TOILET
B14
LV TRUNKING 100 mm x 50 mm ELV TRUNKING 200 mm x 50 mm
Not Enclosed
BIKE PARKING AREA E'
LV TRUNKING 75 mm x 50 mm
B18
TOILET Not Enclosed
B12 F
Not Enclosed
BOTTLE STORAGE G
B16 No. Description DD/MM/YY
PHARMACY STORAGE SECURITY Not Enclosed
B06 MATV B07
Not Enclosed Not Enclosed 1 ISSUE FOR CONSTRUCTION MARCH 2020
PA RACK
FAP
CCTV
H
CORRIDOR
POD B11
B05 Not Enclosed
Not Enclosed
J
K
HOUSE KEEPING
Not Enclosed
BIO MED
MEDICAL SUPPLY
B03
B02
B04 Not Enclosed
Not Enclosed
MALE CHANGING
B01
Not Enclosed L
Sheet Number
WW01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
1 1' 2 3 4 5 5' 6 7 8 9 10 11 12 13 14 15 16
Project:
A
MEDICATION PUN HLAING SILOAM TAUNG
TOILET
TOILET TOILET
120a 119a
TOILET
118a
TOILET
117a
TOILET TOILET
122A
Not Enclosed 114C
TOILET
158A GYI HOSPITAL
116a 115a Not Enclosed Not Enclosed CONSULT No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Not Enclosed
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
Not Enclosed
TOILET CONSULT CONSULT 157
DOUBLE IPD STD IPD STD IPD STD IPD STD IPD STD IPD STD IPD Not Enclosed
NURSE STATION STD IPD TOILET
122B 114 159A Prepared For:
Not Enclosed Not Enclosed Not Enclosed LV TRUNKING 200 mm x 50 mm
LV TRUNKING 100 mm x 50 mm
PANEL
MEDICATION
Not Enclosed
LV TRUNKING 150 mm x 50 mm ELV TRUNKING 150 mm x 50 mm
STD IPD SEPTIC
126
GP
ELV TRUNKING 150 mm x 50 mm
XRAY VITAL
TRIAGE MAMMO 127
ELV TRUNKING 150 mm x 50 mm Not Enclosed
LV TRUNKING 200 mm x 50 mm C'
LV TRUNKING 150 mm x 50 mm
SDB-CT
MEDDICAL SUPPLIER D
ELV TRUNKING 75 mm x 50 mm
UPS PIPING TOILET
LV TRUNKING 250 mm IMAGING
x 50 mm F
LV TRUNKING 100 mm x 50 mm
128 155A Key Plan
7 sqm CHANGING LV TRUNKING 300 mm x 50 mm
Not Enclosed Not Enclosed D'
ELV TRUNKING 400 mm x 50 mm ELV TRUNKING 400 mm x 50 mm CONTROL CONSULT
IMAGING CORRIDOR
ED Not Enclosed E
LV TRUNKING 150 mm x 50 mm
7 sqm
Not Enclosed
LV TRUNKING 150 mm x 50 mm
142
DU TOILET JAN
E'
USG CONSULT
LV TRUNKING 100 mm x 50 mm
LV TRUNKING 75 mm x 50 mm
CONSULT K
108
PATHOLOGIST
Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 107
109
Not Enclosed LAB
Not Enclosed Not Enclosed Not Enclosed Not Enclosed 151
REF. Not Enclosed
REF. STAIR
S1-1
Not Enclosed L
Sheet Number
WW02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
TOILET
Not Enclosed
TOILET TOILET TOILET TOILET OT 2 OT 3 OT 4 GYI HOSPITAL
257 256 B47 No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Not Enclosed Not Enclosed Not Enclosed
DR CHANGING
STD IPD PRE / POST
STD IPD STD IPD STD IPD
Prepared For:
ELV TRUNKING 75 mm x 50 mm
LV TRUNKING 100 mm x 50 mm
TOILET Key Plan
MEDICATION LDS D'
LV TRUNKING 150 mm x 50 mm
ELV TRUNKING 200 mm x 50 mm 20 m²
LDS DR
DOUBLE IPD ROOF LOUNGE
E
CLEAN
LV TRUNKING 150 mm x 50 mm PASSAGE
CSSD DIRTY 3 m²
17 m² E'
DOUBLE IPD TOILET MEDICATION
JAN LV TRUNKING 200 mm x 50 mm
TOILET Not Enclosed
DB-121 CLEAN F
OT 1 CHANGING
G
BABY WASH
PREP
LIFT 2
CLEAN
NURSERY 1 ISSUE FOR CONSTRUCTION MARCH 2020
CHANGING
TOILET STD IPD CU TOILET
Not Enclosed
ELV TRUNKING 150 mm x 50 mm
H
LV TRUNKING 150 mm x 50 mm
ICU J
DELUXE SUITE K
STD IPD
STD IPD STD IPD STD IPD
STD IPD STD IPD
TOILET 251
TOILET TOILET TOILET
TOILET TOILET Not Enclosed
STAIR TOILET
S1-2
Not Enclosed L
Sheet Number
WW03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
A Project:
STD IPD
STD IPD
Not Enclosed Prepared For:
B
RENOVATION & EXTENSION TO 3 & 6
FIRE LANDING CORRIDOR
Not Enclosed Not Enclosed
ELV TRUNKING 200 mm x 50 mm ELV TRUNKING 200 mm x 50 mm ELV TRUNKING 200 mm x 50 mm
STOREY RCC BUILDING
TOIELT TAUNGGYI, MYANMAR
LV TRUNKING 150 mm x 50 mm LV TRUNKING 150 mm x 50 mm LV TRUNKING 150 mm x 50 mm
DB-231 C
Contract No: 2018.04A
-50
ELV TRUNKING 200 mm x 50 mm
FIRE EXIT
LV TRUNKING 150 mm x 50 mm
LV TRUNKING 200 mm x 50 mm
LANDING
CORRIDOR C'
-50
LV TRUNKING 150 mm x 50 mm
TOILET
D' Key Plan
VOID
LV TRUNKING 100 mm x 50 mm
ELV TRUNKING 300 mm x 50 mm STD IPD
ELV TRUNKING 75 mm x 50 mm
ROOF E
ELV TRUNKING 300 mm x 50 mm
LV TRUNKING 300 mm x 50 mm
E'
LV TRUNKING 300 mm x 50 mm
F
ELV TRUNKING 300 mm x 50 mm
DB-131
LV TRUNKING 150 mm x 50 mm
H
GRAND SUITE K
Sheet Number
WW04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Prepared For:
ELV TRUNKING 75 mm x 50 mm
B RENOVATION & EXTENSION TO 3 & 6
LV TRUNKING 150 mm x 50 mm STOREY RCC BUILDING
LV TRUNKING 100 mm x 50 mm
TAUNGGYI, MYANMAR
1400
ELV TRUNKING 150 mm x 50 mm Contract No: 2018.04A
C
DB-241
ELV TRUNKING 150 mm x 50 mm
MEDICATION
ELV TRUNKING 150 mm x 50 mm
LV TRUNKING 150 mm x 50 mm
5 m² 1945
STAFF ROOM LV TRUNKING 200 mm x 50 mm
C'
LV TRUNKING 150 mm x 50 mm
ELV TRUNKING 150 mm x 50 mm
SILVER BED TOILET
Key Plan
ELV TRUNKING 75 mm x 50 mm
MEDICATION 3 m²
D'
LV TRUNKING 100 mm x 50 mm
STD IPD
VOID
ELV TRUNKING 200 mm x 50 mm Not Enclosed
SILVER BED VOID
E
STORAGE
CORRIDOR
E'
Not Enclosed
SILVER BED CORRIDOR
DB-141 F
LV TRUNKING 300 mm x 50 mm
G
LV TRUNKING 150 mm x 50 mm
CU
STAFF
PANTRY 1 ISSUE FOR CONSTRUCTION MARCH 2020
H
AP2-802-1`
ELV TRUNKING 150 mm x 50 mm
SILVER BED
J
LV TRUNKING 150 mm x 50 mm
K
SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED
STAFF TOILET
Sheet Number
WW05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
TOILET
PUN HLAING SILOAM TAUNG
TOILET TOILET GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
ELV TRUNKING 75 mm x 50 mm
DELUXE SUITE B RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
LV TRUNKING 150 mm x 50 mm
CORRIDOR TAUNGGYI, MYANMAR
ELV TRUNKING 75 mm x 50 mm
TOILET Contract No: 2018.04A
LV TRUNKING 200 mm x 50 mm
C
DB-5
LV TRUNKING 150 mm x 50 mm
COUNTER
NURSE
MEDICATION
C'
ELV TRUNKING 150 mm x 50 mm
LV TRUNKING 100 mm x 50 mm
TOILET
ELV TRUNKING 75 mm x 50 mm
CONFERENCE OFFICE Key Plan
D'
VOID
STD IPD
VOID
E
PANTRY
HR OFFICE E'
F
DOUBLE IPD
G
OUTDOOR
SEATING No. Description DD/MM/YY
H
WATER
STORAGE TOILET
GRAND SUITE J
K
STD IPD
STAIR 02 TOILET
Not Enclosed
L
Sheet Number
WW06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
A Project:
SHOWER
IPD STD 01 IPD STD 02 IPD STD 03 IPD STD 04
Not Enclosed Not Enclosed Not Enclosed Not Enclosed Prepared For:
TOILET
B
RENOVATION & EXTENSION TO 3 & 6
EXTG: TOILET
Not Enclosed STOREY RCC BUILDING
TAUNGGYI, MYANMAR
IPD STD 05
Not Enclosed
IPD STD 06
MEDICATION
Not Enclosed
Not Enclosed DB-6
C'
PREP COUNTER
D' Key Plan
IPD STD 07
LV TRUNKING 150 mm x 50 mm
E
VOID
Lift-2
IPD STD 10 H
PREP COUNTER Not Enclosed
STAIR
NURSE
S1-6
Not Enclosed STATION 1
Not Enclosed
J
IPD STD 11
Not Enclosed K
Sheet Number
WW07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Prepared For:
B
RENOVATION & EXTENSION TO 3 & 6
MEDICAL RECORDS
B09 MEP OFFICE
STOREY RCC BUILDING
CCTV-1B3
Not Enclosed B21 TAUNGGYI, MYANMAR
Not Enclosed
C Contract No: 2018.04A
LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
C'
B13
Not Enclosed
D
CCTV-2B4
D' Key Plan
MEP
B08 IRONING ROOM
Not Enclosed LAST OFFICE B35
B19 Not Enclosed
Not Enclosed
EARTH E
CCTV-2B3
TOILET
B14
Not Enclosed
BIKE PARKING AREA E'
CCTV-1B2 B18
TOILET Not Enclosed
B12 F
Not Enclosed
BOTTLE STORAGE G
B16
PHARMACY STORAGE SECURITY Not Enclosed No. Description DD/MM/YY
B06 MATV B07
Not Enclosed Not Enclosed
1 ISSUE FOR CONSTRUCTION MARCH 2020
PA PANEL
FA PANEL
CCTV
H
CORRIDOR
POD B11
B05 Not Enclosed
Not Enclosed
CCTV-1B1
J
CCTV-2B1
K
HOUSE KEEPING
CCTV-2B2
Not Enclosed
BIO MED
MEDICAL SUPPLY B03 B02
B04 Not Enclosed
Not Enclosed
MALE CHANGING
B01
Not Enclosed L
Sheet Number
CCTV01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
A Project:
MEDICATION
Not Enclosed
STD IPD SEPTIC
126
GP CCTV-215
XRAY VITAL
TRIAGE MAMMO 127
Not Enclosed C'
CCTV-116
CCTV-211
MEDDICAL SUPPLIER D
CCTV-115 UPS PIPING TOILET
IMAGING F
128 155A
7 sqm CHANGING
Not Enclosed Not Enclosed D' Key Plan
CONTROL CONSULT
CORRIDOR
GENERAL WAITING
124
ED ENTRY USG 129
Not Enclosed
IMAGING CORRIDOR
ED Not Enclosed E
7 sqm
Not Enclosed
142
DU TOILET JAN
E'
USG CONSULT
CONSULT CCTV-213
K
108
PATHOLOGIST
Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 107
109
Not Enclosed LAB
Not Enclosed Not Enclosed Not Enclosed Not Enclosed 151
REF. Not Enclosed
REF. STAIR
S1-1
CCTV-111
Not Enclosed L
Sheet Number
CCTV02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
A
Project:
Prepared For:
DN B
CCTV-123
CCTV-221 RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
CCTV-124
TAUNGGYI, MYANMAR
UP
C
CCTV-222 Contract No: 2018.04A
?
CCTV-223
C'
D'
Key Plan
ROOF
E
E'
PREP
CCTV-122
No. Description DD/MM/YY
H
CCTV-121
J
CCTV-125
CCTV-224 K
Sheet Number
CCTV03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
TOILET
Not Enclosed GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
STD IPD
STD IPD
Not Enclosed Prepared For:
CCTV-132
B RENOVATION & EXTENSION TO 3 & 6
CCTV-133
FIRE LANDING CORRIDOR CCTV-233 STOREY RCC BUILDING
Not Enclosed Not Enclosed
TOIELT TAUNGGYI, MYANMAR
-50
FIRE EXIT CCTV-232
LANDING
TOILET
D' Key Plan
VOID
STD IPD
ROOF E
E'
CCTV-131
TOILET
J
CCTV-134
CCTV-231
GRAND SUITE K
Sheet Number
CCTV04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Prepared For:
MEDICATION
5 m² 1945 CCTV-243
STAFF ROOM
C'
STD IPD
VOID
Not Enclosed
SILVER BED VOID
E
STORAGE
CORRIDOR
Not Enclosed E'
SILVER BED CORRIDOR
F
CCTV-142
G
CU No. Description DD/MM/YY
STAFF
PANTRY 1 ISSUE FOR CONSTRUCTION MARCH 2020
H
AP2-802-1`
SILVER BED
CCTV-141
J
CCTV-241 K
CCTV-146 SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED
STAFF TOILET
Sheet Number
CCTV05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
TOILET
TOILET TOILET GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
COUNTER
NURSE
CCTV-52
MEDICATION
C'
TOILET
CONFERENCE OFFICE Key Plan
D'
VOID
STD IPD
VOID
E
PANTRY
HR OFFICE E'
F
CCTV-53 DOUBLE IPD
G
OUTDOOR No. Description DD/MM/YY
SEATING
TOILET 1 ISSUE FOR CONSTRUCTION MARCH 2020
H
WATER
STORAGE TOILET
GRAND SUITE J
CCTV-54
K
STD IPD
STAIR 02 TOILET
Not Enclosed
L
Sheet Number
CCTV06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
MEDICATION
Not Enclosed
Not Enclosed
C'
CCTV-63
PREP COUNTER
D'
Key Plan
IPD STD 07
Not Enclosed
E
VOID
IPD STD 10 H
PREP COUNTER Not Enclosed
STAIR
NURSE
S1-6
Not Enclosed STATION 1
Not Enclosed
J
CCTV-64
IPD STD 11
Not Enclosed K
Sheet Number
CCTV07
NOTE:
All reproduction & intellectual property rights reserved.
ROOF This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
LEVEL-6
Project:
ROOF LEVEL-5
Prepared For:
LEVEL-2 LEVEL-2
CCTV-111 CCTV-112 CCTV-113 CCTV-114 CCTV-115 CCTV-116 CCTV-117 CCTV-118 CCTV-211 CCTV-212 CCTV-213 CCTV-214 CCTV-215 No. Description DD/MM/YY
Fiber Optic
Patch Panel
Main Switch
NVR
NVR
NVR
NVR
Sheet Number
CCTV08
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Prepared For:
B
RENOVATION & EXTENSION TO 3 & 6
MEDICAL RECORDS
B09 MEP OFFICE STOREY RCC BUILDING
Not Enclosed B21
Not Enclosed TAUNGGYI, MYANMAR
C
Contract No: 2018.04A
s
LAUNDRY
B20
Not Enclosed
FEMALE CHANGING
C'
B13
Not Enclosed
s
D
EARTH E
s
TOILET
B14
Not Enclosed
BIKE PARKING AREA E'
B18
TOILET Not Enclosed
B12 F
Not Enclosed
BOTTLE STORAGE G
B16
PHARMACY STORAGE SECURITY Not Enclosed
B06 MATV B07 No. Description DD/MM/YY
Not Enclosed Not Enclosed
1 ISSUE FOR CONSTRUCTION MARCH 2020
PA PANEL
FA PANEL
CCTV
H
s
CORRIDOR
POD B11
B05 Not Enclosed
Not Enclosed
s
J
HOUSE KEEPING
Not Enclosed
BIO MED
MEDICAL SUPPLY
B03
B02
B04 Not Enclosed
Not Enclosed
MALE CHANGING
B01
Not Enclosed L
BASEMENT STAGE2 PA
SYSTEM LAYOUT
Sheet Number
PA01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
A
MEDICATION Project:
122A TOILET TOILET
TOILET TOILET
120a 119a
TOILET
118a
TOILET
117a
TOILET TOILET
116a 115a
Not Enclosed 114C
Not Enclosed
158A PUN HLAING SILOAM TAUNG
Not Enclosed CONSULT
TOILET
Not Enclosed
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
Not Enclosed
CONSULT CONSULT 157 GYI HOSPITAL
DOUBLE IPD STD IPD STD IPD STD IPD STD IPD STD IPD STD IPD Not Enclosed
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
NURSE STATION STD IPD TOILET
122B 114 159A
Not Enclosed Not Enclosed Not Enclosed
B Prepared For:
CONSULT
S S S
156 RENOVATION & EXTENSION TO 3 & 6
Not Enclosed
STOREY RCC BUILDING
C TAUNGGYI, MYANMAR
MEDICATION
Not Enclosed
STD IPD SEPTIC
126
GP
XRAY VITAL
TRIAGE MAMMO 127
Not Enclosed C'
MEDDICAL SUPPLIER D
UPS PIPING TOILET
IMAGING F
128 155A
7 sqm CHANGING
Not Enclosed Not Enclosed D'
CONTROL CONSULT Key Plan
S
S
CORRIDOR
GENERAL WAITING
124 S
ED ENTRY USG S 129
Not Enclosed
IMAGING CORRIDOR
ED Not Enclosed E
7 sqm
Not Enclosed
142
DU TOILET JAN
E'
USG CONSULT
H
BLOOD COLLECTION
S S
CORRIDOR 152 TOILET
RECEPTION S 137 Not Enclosed 151B
Not Enclosed Not Enclosed Not Enclosed
J
CONSULT K
108
PATHOLOGIST
Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 107
109
Not Enclosed LAB
Not Enclosed Not Enclosed Not Enclosed Not Enclosed 151
REF. Not Enclosed
REF. STAIR
S1-1
Not Enclosed L
LEVEL-1 STAGE2 PA
SYSTEM LAYOUT
Sheet Number
PA02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Prepared For:
C'
Key Plan
S
D'
ROOF
E
E'
G
No. Description DD/MM/YY
PREP
1 ISSUE FOR CONSTRUCTION MARCH 2020
S S
S
LEVEL-2 STAGE2 PA
SYSTEM LAYOUT
Sheet Number
PA03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
-50
S
FIRE EXIT
LANDING
CORRIDOR C'
-50
STD IPD
ROOF E
E'
G
No. Description DD/MM/YY
S H
S
TOILET
J
GRAND SUITE K
LEVEL-3 STAGE2 PA
SYSTEM LAYOUT
Sheet Number
PA04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Prepared For:
MEDICATION
5 m² 1945
S STAFF ROOM
C'
STD IPD
VOID
Not Enclosed
SILVER BED VOID
S E
STORAGE
CORRIDOR
Not Enclosed E'
SILVER BED CORRIDOR
F
G
CU No. Description DD/MM/YY
STAFF
PANTRY 1 ISSUE FOR CONSTRUCTION MARCH 2020
SILVER BED SILVER BED SILVER BED DU
S
H
AP2-802-1`
SILVER BED S S
K
SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED
STAFF TOILET
LEVEL-4 STAGE2 PA
SYSTEM LAYOUT
Sheet Number
PA05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
DELUXE SUITE
RENOVATION & EXTENSION TO 3 & 6
B
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
CORRIDOR
Contract No: 2018.04A
TOILET
C
COUNTER
NURSE
MEDICATION
C'
D
TOILET Key Plan
CONFERENCE OFFICE
S D'
VOID
STD IPD
VOID
E
PANTRY
HR OFFICE E'
F
DOUBLE IPD
G
OUTDOOR No. Description DD/MM/YY
SEATING
TOILET 1 ISSUE FOR CONSTRUCTION MARCH 2020
H
WATER
STORAGE TOILET
S
GRAND SUITE J
K
STD IPD
STAIR 02 TOILET
Not Enclosed
L
LEVEL-5 STAGE2 PA
SYSTEM LAYOUT
Sheet Number
PA06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
DIS TOILET GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
SHOWER
IPD STD 01 IPD STD 02 IPD STD 03 IPD STD 04 Prepared For:
Not Enclosed Not Enclosed Not Enclosed Not Enclosed
TOILET
B
RENOVATION & EXTENSION TO 3 & 6
EXTG: TOILET
STOREY RCC BUILDING
Not Enclosed
TAUNGGYI, MYANMAR
IPD STD 05
Not Enclosed
IPD STD 06
MEDICATION
Not Enclosed
Not Enclosed
S
C'
IPD STD 07
Not Enclosed
E
VOID
G
No. Description DD/MM/YY
LIFT MECH IPD STD 09
ROOM Not Enclosed 1 ISSUE FOR CONSTRUCTION MARCH 2020
8 m²
S
IPD STD 10 H
PREP COUNTER Not Enclosed
STAIR
NURSE
S1-6
Not Enclosed STATION 1
Not Enclosed
J
IPD STD 11
Not Enclosed K
LEVEL-6 STAGE2 PA
SYSTEM LAYOUT
Sheet Number
PA07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
ROOF
S S Project:
S S S
Prepared For:
LEVEL-4 LEVEL-4
S S S S S S
Key Plan
LEVEL-3 LEVEL-3
S S S S S S S S
LEVEL-2 LEVEL-2
S S S S S S S S S S
S S S S S
ZONE SELECTOR
CONTROLLER
EMERGENCY MICRO
VCD/CD/DVD PLAYER
DIGITAL PLAYBACK
MIC
BGM
AMPLIFIER
ANNOUNCER
4 x 480W
BATTERY-4KVA
2H OPERATION
SECURITY RM
FROM 230 V
FIRE ALARM PANEL
BASEMENT BASEMENT
PA SCHEMATIC DIAGRAM
LAYOUT
Sheet Number
PA08
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
LAUNDRY
B20S
Not Enclosed
FEMALE CHANGING
C'
B13
S
Not Enclosed
D Key Plan
D'
AOM
MEP
B08 IRONINGSROOM
Not Enclosed LAST OFFICE B35
Not Enclosed
M
B19
Not Enclosed
S
S
EARTH E
TOILET
B14
S
Not Enclosed S
BIKE PARKING AREA E'
B18
TOILET Not Enclosed
B12 F
Not Enclosed No. Description DD/MM/YY
BOTTLE STORAGE G
B16 1 ISSUE FOR CONSTRUCTION MARCH 2020
PHARMACY STORAGE SECURITY Not Enclosed
B06 S
B07
Not Enclosed Not Enclosed
S
FA PANEL
M
H
AOM
CORRIDOR
POD B11
S B05
S Not Enclosed
Not Enclosed
J
HOUSE KEEPING K
B02
B04 S Not Enclosed
S S
Not Enclosed
MALE CHANGING
B01
Not Enclosed L
M
Scale: Drawn by: Reviewed by:
1 : 150 HNO HKW
Sheet Title:
Sheet Number
FA01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
MEDICATION
TOILET
PUN HLAING SILOAM TAUNG
S 122A TOILET
TOILET TOILET
120a 119a
TOILET
118a
TOILET
117a
TOILET TOILET
116a 115a
Not Enclosed 114C
Not Enclosed
158A GYI HOSPITAL
Not Enclosed
Not Enclosed Not Enclosed Not Enclosed Not Enclosed CONSULT No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
S S S S S Not Enclosed
Not Enclosed S S
157
TOILET CONSULT
S CONSULT S S
DOUBLE IPD STD IPD STD IPD STD IPD STD IPD STD IPD STD IPD Not Enclosed
NURSE STATION STD IPD TOILET
122B 114 159A Prepared For:
S
Not Enclosed Not Enclosed Not Enclosed
B RENOVATION & EXTENSION TO 3 & 6
CONSULT
S S
156 STOREY RCC BUILDING
S
Not Enclosed
S TAUNGGYI, MYANMAR
S
M
AOM
C Contract No: 2018.04A
MEDICATION
Not Enclosed
STD IPD SEPTIC
126
GP S S
S S XRAYS VITAL
S
TRIAGE MAMMO 127
S
Not Enclosed C'
S
M
AOM D
MEDDICAL SUPPLIER
S UPS
S
PIPING TOILET
IMAGING F
128 155A Key Plan
7 sqm CHANGING
S
Not Enclosed Not Enclosed D'
CONTROL CONSULT
S
S
CORRIDOR
S GENERAL WAITING
124 S
ED ENTRY USG 129
Not Enclosed
IMAGING CORRIDOR
ED Not Enclosed E
7 sqm
Not Enclosed
S
142
S
DU TOILET JAN
S S S E'
USG CONSULT
H
AOM
M
BLOOD COLLECTION
CORRIDOR 152 TOILET
RECEPTION S S S 137 Not Enclosed
S 151B
Not Enclosed Not Enclosed Not Enclosed
J
M
CONSULT AOM
K
108
PATHOLOGIST
Not Enclosed
FINANCE IMAGING M CHG RADIOLOGIST IMAGING RECEPTION Not Enclosed
PHARMACY 104 105 106 107
109
Not Enclosed S LAB
Not Enclosed S S
Not Enclosed S
Not Enclosed S
Not Enclosed S S
151
REF. S
Not Enclosed
REF. STAIR
S1-1
Not Enclosed L
Sheet Number
FA02
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
TOILET
Not Enclosed
TOILET TOILET TOILET TOILET OT 2 OT 3 OT 4 GYI HOSPITAL
257 256 S B47
S S S S S No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
Not Enclosed S Not Enclosed Not Enclosed
DR CHANGING
STD IPD PRE / POST
STD IPD STD IPD STD IPD S
Prepared For:
S
M
UP AOM Contract No: 2018.04A
C
S
S
TOILET TOILET WASHING
TOILET ?
STD IPD STDS IPD STD IPDS LIFT CSSD STERILE
DOUBLE IPD
Not Enclosed CORRIDOR
B166
TOILET DU S S Not Enclosed C'
S
S M
AOM D
S S
TOILET Key Plan
MEDICATION LDS D'
TOILET S
PREP
LIFT 2 S No. Description DD/MM/YY
S CLEAN
NURSERY
S
CHANGING 1 ISSUE FOR CONSTRUCTION MARCH 2020
TOILET STD IPD CU TOILET
Not Enclosed
AOM
M
H
S S S
ICU J
M
AOM
DELUXE SUITE
S K
S S S
STD IPD S S
STD IPD STD IPD STD IPD
STD IPD STD IPD
TOILET 251
S S
TOILET TOILET TOILET
TOILET TOILET Not Enclosed
STAIR TOILET
S1-2
Not Enclosed L
Sheet Number
FA03
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
A Project:
STDSIPD
STD IPD
Not Enclosed Prepared For:
B
RENOVATION & EXTENSION TO 3 & 6
FIRE LANDING
Not Enclosed
CORRIDOR
S
Not Enclosed S S S STOREY RCC BUILDING
M
-50
S S
S
S FIRE EXIT
S LANDING
CORRIDOR C'
-50 S
S M
AOM D
TOILET
D' Key Plan
VOID
S S
S S STD IPD
ROOF E
S
E'
S
S F
S
S
G
S
No. Description DD/MM/YY
S
M
H
S S S S
TOILET
J
M
AOM GRAND SUITE
S K
S
S S
S S S
S
S
Sheet Number
FA04
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
S S S
Prepared For:
AOM
S
M
B
S S S STOREY RCC BUILDING
S
TAUNGGYI, MYANMAR
M S 1400
AOM
Contract No: 2018.04A
C
MEDICATION S
5 m² 1945 S
S
STAFF ROOM
C'
M
AOM D
CORRIDOR
Not Enclosed E'
SILVER BED CORRIDOR
S
F
G
CU No. Description DD/MM/YY
STAFF
PANTRY
S 1 ISSUE FOR CONSTRUCTION MARCH 2020
AOM
M H
AP2-802-1`
SILVER BED S S S
S S
J
M
AOM
K
SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED SILVER BED S
STAFF TOILET
S
S
Sheet Number
FA05
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A PUN HLAING SILOAM TAUNG
TOILET
TOILET TOILET
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
TOILET STD
S IPD S S
TOILET ISO STD IPD S Prepared For:
DELUXE SUITE B
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
CORRIDOR TAUNGGYI, MYANMAR
S
COUNTER
S
NURSE
MEDICATION
S C'
M
AOM D
TOILET
Key Plan
CONFERENCE
S OFFICE
D'
S S
VOID
STD IPD
VOID
E
PANTRY S
HRSOFFICE E'
F
S
DOUBLE IPD
G
OUTDOOR No. Description DD/MM/YY
SEATING
TOILET 1 ISSUE FOR CONSTRUCTION MARCH 2020
H
WATER
STORAGE TOILET
S
GRAND SUITE J
M
AOM
K
STD IPD S
STAIR 02 TOILET
Not Enclosed
L
Sheet Number
FA06
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
Project:
A
PUN HLAING SILOAM TAUNG
DIS TOILET
GYI HOSPITAL
No.301 Shu Myaw Khin Street. Thit Taw Yat, Taungyi
TOILET
B RENOVATION & EXTENSION TO 3 & 6
EXTG: TOILET STOREY RCC BUILDING
Not Enclosed
S
TAUNGGYI, MYANMAR
S IPD STDS 05
S Not Enclosed
IPD STD 06
MEDICATION
Not Enclosed
Not Enclosed
C'
S
AOM
D
M
PREP COUNTER Key Plan
D'
IPD STDS 07
Not Enclosed
E
VOID
G
No. Description DD/MM/YY
LIFT MECH IPD STDS 09
ROOM Not Enclosed
8 m² 1 ISSUE FOR CONSTRUCTION MARCH 2020
AOM
IPD STDS 10 H
PREP COUNTER S
Not Enclosed
STAIR
AOM
NURSE
M
S1-6
Not Enclosed STATION 1
Not Enclosed
J
IPD STDS 11
Not Enclosed K
Sheet Number
FA07
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
ROOF
Lift Lift
S S S S S S S S S S S S S S
AOM AOM AOM AOM
LEVEL-6
Project:
Prepared For:
S S S S S S S S S S
S S S S S S S S S S S S S S
AOM AOM
S S S S S S S S S S H S S S S S S S
AOM AOM AOM
LEVEL-4 LEVEL-4
S S S S S S S S S
Key Plan
S S S S S S S S S S S S S S S S S S
AOM AOM
S S S S S S S S S S S S S S S S S S
AOM AOM
LEVEL-3 LEVEL-3
S S S S S S S S S
AOM
S S S S S S S S S S S S S S S S S S S S
AOM AOM No. Description DD/MM/YY
LEVEL-2 LEVEL-2
S S S S S S S S S S S
S S S S S S S S S S S S S S S S S S S S S
AOM AOM
S S S S S S S S S S S S S S S S S S S S S
AOM AOM
LEVEL-1 LEVEL-1
S S S S S S S S S S S S S S S S S S S S S S
AOM AOM
Loop-1 Supply
Loop-2 Supply
Loop-1 Return
Loop-2 Return
Sheet Number
FA08
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
ROOF
Project:
Prepared For:
1 x Cat-5e
IDF RENOVATION & EXTENSION TO 3 & 6
60 Pairs
ROOF LEVEL-5 STOREY RCC BUILDING
TAUNGGYI, MYANMAR
1 x Cat-5e
1 x Cat-5e 1 x Cat-5e
IDF IDF
60 Pairs 30 Pairs Key Plan
LEVEL-3 LEVEL-3
1 x Cat-5e
1 x Cat-5e 1 x Cat-5e
IDF IDF
Incoming From MPT
60 Pairs 30 Pairs
LEVEL-1 LEVEL-1
BASEMENT BASEMENT
Sheet Number
PABX01
NOTE:
All reproduction & intellectual property rights reserved.
This Drawing is an instrument of service and shall remain the property
ROOF of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
C C C
WAP
LEVEL-6
C C C C C C C C C
Project:
C C C C C C C C C
WAP
Prepared For:
ROOF LEVEL-5
RENOVATION & EXTENSION TO 3 & 6
STOREY RCC BUILDING
TAUNGGYI, MYANMAR
C C C
WAP WAP WAP Contract No: 2018.04A
Fiber Optic
Patch Panel
Main Switch
Key Plan
Patch Panel Patch Panel
24 PORT 48 PORT
PoE SWITCH PoE SWITCH
24 PORT Main Switch 48 PORT
Patch Panel Patch Panel
15 x Cat6 38 x Cat6
24 PORT 24 PORT
C C SERVER C C C C
PoE SWITCH PoE SWITCH
WAP WAP WAP
24 PORT To CCTV To CCTV 24 PORT
Fiber Optic Fiber Optic
UPS
Patch Panel Patch Panel
Server Rack
LEVEL-3 (Located at Sever Room) LEVEL-3
C C C C C C C C
WAP WAP WAP No. Description DD/MM/YY
LEVEL-2 LEVEL-2
C C C C C C C C C C C C C C C C C C C C C C C C C C
WAP
C C C C C C C C C C C C C C C C C C C C C C C C
WAP WAP
From ISP
LEVEL-1
Note:
All Cat-6 cable at end user outlet shall keep 500mm long from respective KO Box. Sheet Number
DATA01
Satellite Antenna
NOTE:
ROOF
All reproduction & intellectual property rights reserved.
TV This Drawing is an instrument of service and shall remain the property
Spare of SPA Design (Yangon) and the consultants named here on.
Contractors must verify all dimensions on site and report any
TV TV TV TV discrepancies to the architect before proceeding with the work.
Drawings are not to be scaled.
TV TV TV TV
TV TV TV TV
LEVEL-6
TV TV TV TV Project:
1 x RG 6
ROOF LEVEL-5
Prepared For:
TV TV TV
Spare
TV TV
TV TV TV TV
TV TV TV TV
TV TV TV TV
Key Plan
TV TV TV TV TV TV TV TV
TV TV TV TV TV TV TV TV
1 x RG 6 1 x RG 6
LEVEL-3 LEVEL-3
TV TV TV
Spare
TV TV TV TV
TV TV TV TV
TV TV TV TV TV TV
1 x RG 6
LEVEL-2 LEVEL-2
TV TV TV TV
TV TV TV TV
TV TV TV TV TV
Spare
1 x RG 6 1 x RG 6
LEVEL-1 LEVEL-1
RECEIVER