Government of Nepal

Department of Roads
Kathmandu Valley Road Improvement Project

REPORT
ON
FIELD AND LABORATORY TEST
FOR
THE PAVEMENT DESIGN
ALONG
TU GATE - CHOVAR ROAD

Prepared and Submitted By:


PREPARED FOR
SOIL TECHGEOCOM
CONSULTANT (P.) LTD.
INTERNATIONAL (P.) LTD
New Baneshwor, Kathmandu
DHOBIGHAT-04, LALITPUR
Telephone: 977-1- 4784033, 9841122891, 9741030484
E-mail: soiltechconsultant@gmail.com

Planet Test (P.) Ltd


(Consulting Engineers)
KMC-31, Shantinagar, Kathmandu, Nepal
Tel: +977- 01-4107665
E-mail:- planettest2074@gmail.com/info@planettest.com.np

September, 2020
Report on Field and Laboratory Test for Pavement Design along TU Gate - Chovar Road PLANET TEST

Table of Contents
1. INTRODUCTION ....................................................................................................................................................... 1
2. CBR TEST ................................................................................................................................................................ 1
2.1 CBR Test Standard ................................................................................................................................................... 1
2.2 Apparatus and Tools used for CBR Test..................................................................................................... 1
2.3 Soil Sampling for CBR test .......................................................................................................................... 2
3. COMPACTION FOR CBR TEST .............................................................................................................................. 2
4. CBR TEST PROCEDURE ........................................................................................................................................ 3

LIST OF ANNEXES

1 TRIAL PIT TEST LOG


2 DCP TEST REPORT
3 LABORATORY TEST REPORT
4 FIELD AND LABORATORY TESTING PHOTOGRAPHS

Planet Test (P.) Ltd, Kathmandu /2020 Page I


Report on Field and Laboratory Test for Pavement Design along TU Gate - Chovar Road PLANET TEST

1. INTRODUCTION

This report is prepared upon the agreement between Geocom International (P) Ltd, Kathmandu and Planet Test
(P.) Ltd., Shantinagar, Kathmandu. It includes the final result of the field sampling, laboratory tests for the soil
sample collected along TU Gate - Chovar Road.

2. CBR TEST

The CBR test (California Bearing Ratio test ) is a penetration test which evaluates the strength of flexible pavements in
soaked or un-soaked condition. CBR test is the most widely used method for the checking and design of road and
pavement.

The test in which a ratio expressed in percentage of force per unit area required to penetrate a soil mass with a
circular plunger of 50 mm diameter at the rate of 1.25 mm per minute to that required for related penetration in a
standard material.

The CBR value is usually determined for penetration on 2.5 mm and 5 mm. Where the ratio at 5 mm is consistently
higher than that at 2.5 mm, the ratio at 5 mm is used.

2.1 CBR Test Standard

The Standard followed for CBR test of soil is IS: 2720 (Part-16).

2.2 Apparatus and Tools used for CBR Test

a) CBR testing machine with a movable head ( minimum capacity 5000 kg )


b) Moulds with base plate
c) Spacer disc
d) Surcharge weight
e) Metal rammer ( 4.89 kg )
f) Expansion measuring apparatus
g) Penetration plunger
h) Dial gauge 2 nos – reading 0.01 mm
i) IS Sieves 47.5 mm and 19.0 mm
j) Hot air oven
k) Straight edge
l) Non-absorbent tray
m) Miscellaneous like filter paper, dishes, calibrated measuring jar etc.

Planet Test (P.) Ltd, Kathmandu /2020 Page 1


Report on Field and Laboratory Test for Pavement Design along TU Gate - Chovar Road PLANET TEST

2.3 Soil Sampling for CBR test

a. Trial Pit of size 1 m X 1 m was excavated to the depth of sub-grade layer.


b. The soil sample of about 15-20 Kg was placed in a plastic bag from sub-grade layer.
c. The soil sample was sieved through 19 mm IS Sieve and retained on 4.75mm IS Sieve.

3. COMPACTION FOR CBR TEST

Dynamic Compaction method was used for Compaction of CBR Test, and the following procedure was followed for
Compaction:

a. In dynamically compaction method, we took initially 5.5 kg to 6.0 kg soil sample by sieving as we described
above.
b. Water weight was of OMC % of the soil weight. We checked either soil weight is 6000 gm then water weight =
6000 * 12.0 % = 720 gram is ready or not.
c. Soil and water was mixed properly in a non-absorbent tray.
d. CBR mould with extension collar was made ready for placing soil sample.
e. Spacer disc in mould and a filter paper on spacer disc was placed.
f. Mould was filled in five equal layers by giving 55 blows with a 4.89 kg rammer.
g. Minimum of 50 gram soil sample from mixed soil was filled to the mould each time.
h. After completing the fifth layer, extension collar was removed and an extra soil was struck off from the top of
the mould.
i. The nuts was loosed which was attached to the mould with base plate and turned to the filled mould vertically
which means top surface was put down on the base plate and tighten the nuts.
j. Spacer disc from the top of the filled mould was removed.
k. The weight of filled soil and mould was taken.
l. Extension collar was attached.
m. Filter paper was added on the top of the soil then it was inserted to one perforated disc.
n. Two surcharge weights (each 2.5 kg) on the perforated disc was placed. Then first specimen was ready
o. Similarly other specimen was prepared.
p. The Prepared Specimen was kept in water tank for four days for soaked CBR value.

Planet Test (P.) Ltd, Kathmandu /2020 Page 2


Report on Field and Laboratory Test for Pavement Design along TU Gate - Chovar Road PLANET TEST

4. CBR TEST PROCEDURE

Soaked Specimen CBR test was followed and the following procedure was adopted for the test:

a. Three specimens from water were removed and then the surcharge weight (2.5 kg * 2) was also removed
along with perforated disc and filter paper.
b. It was allowed to drain water by keeping the specimens horizontally for at least 10 minutes.
c. The weight of soil and mould was taken.
d. Then both surcharge weight (2.5 kg * 2) was placed in the same mould.
e. The first specimen with both surcharge weights was placed in CBR testing machine plate under penetration
plunger.
f. Both dial gauge load and penetration reading was set.
g. Speed or rate of loading of the machine was maintained at 1.25 mm per minute.
h. Both dial gauges was set to zero before starting the machine.
i. The machine was started until the plunger touches the top surface of the soil in mould and reading has
reached 4 kg in the load dial gauge. And then it was stopped.

The reading and Calculation was down as per the Standard IS: 2720 (Part-16). The reading and the Calculation of the
test has been attached in the following section.

Planet Test (P.) Ltd, Kathmandu /2020 Page 3


ANNEX:-1

TRAIL PIT TEST LOG


TRIAL PIT LOG PLANET TEST

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client: Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant: Geocom International (P.) Ltd

PIT No:-1 Chainage: 0+500 m

Water Table
Thickness

Backfill
Depth
Scale

Symbol

Scale
SOIL DESCRIPTION

m m m m
0 0 1

0.2 0.2

Water Table Not Encountered

Completely backfilled.
0.4 Brown very loose to loose gravel mixed silty sand 0.4

0.6 0.6

0.8 0.8
Dimension: General Remarks:

L=1m Trial pit terminated after


reaching 0.8 m depth
B=1m
TRIAL PIT LOG PLANET TEST

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client: Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant: Geocom International (P.) Ltd

PIT No:-2 Chainage: 1+000 m

Water Table
Thickness

Backfill
Depth
Scale

Symbol

Scale
SOIL DESCRIPTION

m m m m
0 0 1

0.2 0.2
Dark grey loose silty clay

Water Table Not Encountered

Completely backfilled.
0.4 0.4

0.6 0.6
Light brown medium dense sand with gravel

0.8 0.8
Dimension: General Remarks:

L=1m Trial pit terminated after


reaching 0.8 m depth
B=1m
TRIAL PIT LOG PLANET TEST

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client: Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant: Geocom International (P.) Ltd

PIT No:-3 Chainage: 1+500 m

Water Table
Thickness

Backfill
Depth
Scale

Symbol

Scale
SOIL DESCRIPTION

m m m m
0 0 1

Made Surface

0.2 0.2

Water Table Not Encountered

Completely backfilled.
0.4 0.4

Light Brown loose to medium dense silty sand with


gravel & cobbles
0.6 0.6

0.8 0.8
Dimension: General Remarks:

L=1m Trial pit terminated after


reaching 0.8 m depth
B=1m
TRIAL PIT LOG PLANET TEST

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client: Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant: Geocom International (P.) Ltd

PIT No:-4 Chainage: 2 + 000 m

Water Table
Thickness

Backfill
Depth
Scale

Symbol

Scale
SOIL DESCRIPTION

m m m m
0 0 1

0.2 0.2

Water Table Not Encountered

Completely backfilled.
0.4 Light brown medium dense to dense silty sand with 0.4
gravel & cobbles

0.6 0.6

0.8 0.8
Dimension: General Remarks:

L=1m Trial pit terminated after


reaching 0.8 m depth
B=1m
TRIAL PIT LOG PLANET TEST

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client: Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant: Geocom International (P.) Ltd

PIT No:- 5 Chainage: 2 + 500 m

Water Table
Thickness

Backfill
Depth
Scale

Symbol

Scale
SOIL DESCRIPTION

m m m m 0
0 1

0.2 0.2

Water Table Not Encountered

Completely backfilled.
0.4 Brownish very loose to loose silty sand with gravel 0.4

0.6 0.6

0.8 0.8
Dimension: General Remarks:

L=1m Trial pit terminated after


reaching 0.8 m depth
B=1m
TRIAL PIT LOG PLANET TEST

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client: Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant: Geocom International (P.) Ltd

PIT No:- 6 Chainage: 3 + 000 m

Water Table
Thickness

Backfill
Depth
Scale

Symbol

Scale
SOIL DESCRIPTION

m m m m
0 0 1

Brown loose to medium dense silty sand

0.2 0.2

Water Table Not Encountered

Completely backfilled.
Light brownish boulder & gravel mixed sand
0.4 0.4

0.6 0.6

Dark grey loose to medium dense silty clay

0.8 0.8
Dimension: General Remarks:

L=1m Trial pit terminated after


reaching 0.8 m depth
B=1m
TRIAL PIT LOG PLANET TEST

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client: Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant: Geocom International (P.) Ltd

PIT No:- 7 Chainage: 3 + 500 m

Water Table
Thickness

Backfill
Depth
Scale

Symbol

Scale
SOIL DESCRIPTION

m m m m
0 0 1

0.2 0.2

Water Table Not Encountered

Completely backfilled.
0.4 Dark grey loose to med. Dense silty sand with 0.4
gravel

0.6 0.6

0.8 0.8
Dimension: General Remarks:

L=1m Trial pit terminated after


reaching 0.8 m depth
B=1m
ANNEX:-2

DCP TEST REPORT


DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 0+100 LHS
Initial Reading (H2): 130 mm LEFT SIDE
Penetration

Penetration
No. of Blows
S Blows

0 10 20 30 40 50 60
in mm

in mm
No. of
Blows

H1-H2
0
H1

100

1 1 150 20
200
1 2 160 30
1 3 185 55 300

1 4 200 70
1 5 210 80 400
Penetration (mm)

2 7 240 110 500

2 9 270 140
3 12 330 200 600

3 15 395 265
700
3 18 480 350
3 21 605 475 800

3 24 680 550
3 27 715 585
900

3 30 755 625 1000

5 35 820 690
5 40 880 750
5 45 940 810

Thickness DCP CBR


Layer 1 264 mm 17.31 mm/blow 11 %
Layer 2 288 mm 33.20 mm/blow 5%
Layer 3 325 mm 11.76 mm/blow 18 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 0+200 RHS
Initial Reading (H2): Penetration 130 mm RIGHT SIDE

Penetration
No. of Blows
S Blows

in mm

in mm
No. of
Blows

H1-H2
0 10 20 30 40 50 60
H1

100

1 1 165 35
1 2 195 65 200

1 3 215 85
1 4 240 110 300

2 6 250 120
Penetration (mm)

400
2 8 260 130
2 10 270 140
500
3 13 280 150
3 16 290 160 600

3 19 380 250
3 22 460 330 700

3 25 510 380
3 28 530 400
800

3 31 570 440
900
5 36 630 500
5 41 750 620
5 46 830 700
5 51 910 780

Thickness DCP CBR


Layer 1 108 mm 25.66 mm/blow 7%
Layer 2 35 mm 4.03 mm/blow 73 %
Layer 3 693 mm 16.45 mm/blow 12 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 0+300 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows
No. of
Blows

0 2 4 6 8 10 12 14 16
H1-H2
in mm

in mm
H1

100

1 1 240 110
1 2 320 190 200

1 3 390 260
1 4 450 320 300

1 5 490 360
Penetration (mm)

400
1 6 540 410
1 7 580 450
500
1 8 620 490
1 9 680 550 600

1 10 750 620
1 11 810 680 700

1 12 890 760
1 13 950 820
800

1 14 970 840
900

Thickness DCP CBR


Layer 1 241 mm 89.63 mm/blow 1%
Layer 2 193 mm 47.34 mm/blow 3%
Layer 3 402 mm 55.56 mm/blow 3%
DCP TEST
Project: Upgrading of T.U Gate to Chobar Road
Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 0+400 RHS
Initial Reading (H2): 140 mm RIGHT SIDE
Penetration

Penetration
No. of Blows
S Blows

in mm

in mm
No. of
Blows

H1-H2 0 2 4 6 8 10 12 14 16 18
H1

100

1 1 200 60
1 2 230 90 200

1 3 290 150
1 4 330 190 300

1 5 380 240
Penetration (mm)

400
1 6 430 290
1 7 500 360
500
1 8 570 430
1 9 640 500 600

1 10 705 565
1 11 780 640 700

1 12 820 680
1 13 860 720
800

1 14 910 770
900
1 15 960 820
1 16 990 850

Thickness DCP CBR


Layer 1 211 mm 46.60 mm/blow 3%
Layer 2 409 mm 61.82 mm/blow 2%
Layer 3 216 mm 49.57 mm/blow 3%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 0+500 LHS
Initial Reading (H2): 150 mm LEFT SIDE
Penetration

Penetration
No. of Blows
S Blows

0 5 10 15 20 25 30 35 40 45 50
in mm

in mm
Blows
No. of

H1-H2
0
H1

100

1 1 230 80
1 2 290 140 200

1 3 330 180
300
1 4 350 200
2 6 370 220
Penetration (mm)

400

2 8 410 260
3 11 440 290 500

3 14 480 330
3 17 640 490 600

5 22 720 570
700
5 27 770 620
5 32 800 650
800
5 37 860 710
5 42 960 810 900

Thickness DCP CBR


Layer 1 196 mm 51.78 mm/blow 3%
Layer 2 130 mm 12.87 mm/blow 16 %
Layer 3 498 mm 16.77 mm/blow 12 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 0+600 RHS
Initial Reading (H2): 140 mm RIGHT SIDE

No. of Blows
Penetration

Penetration
S Blows
Blows
No. of

0 2 4 6 8 10 12 14
in mm

in mm
H1-H2
H1

100

1 1 170 30
200
1 2 185 45
1 3 265 125 300

1 4 310 170
Penetration (mm)

400
1 5 410 270
1 6 520 380 500

1 7 690 550
600
1 8 730 590
1 9 790 650 700

1 10 880 740
800
1 11 940 800
1 12 980 840 900

1 13 990 850
1000

Thickness DCP CBR


Layer 1 177 mm 42.36 mm/blow 4%
Layer 2 568 mm 98.67 mm/blow 1%
Layer 3 146 mm 43.07 mm/blow 3%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 0+700 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows
Blows
No. of

0 5 10 15 20 25 30 35 40
in mm

in mm
H1-H2
H1

1 1 155 25 100

1 2 230 100
2 4 280 150
200
2 6 330 200
Penetration (mm)

2 8 380 250
3 11 430 300 300

3 14 485 355
3 17 500 370
400
5 22 530 400
5 27 595 465
5 32 645 515 500

5 37 660 530
5 42 670 540
600
5 47 690 560
5 52 700 570

Thickness DCP CBR


Layer 1 212 mm 35.33 mm/blow 4%
Layer 2 142 mm 18.07 mm/blow 11 %
Layer 3 206 mm 8.67 mm/blow 27 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 0+800 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows
No. of

0 5 10 15 20 25 30
Blows

in mm

in mm
H1-H2

0
H1

50

1 1 150 20
100
1 2 170 40
1 3 195 65 150

1 4 210 80
Penetration (mm)

200
1 5 225 95
1 6 250 120 250

1 7 275 145
300
1 8 300 170
1 9 320 190 350

1 10 330 200
400
1 11 350 220
1 12 360 230 450

1 13 375 245
500
2 15 450 320
2 17 470 340
2 19 480 350
2 21 500 370
2 23 530 400
2 25 550 420

Thickness DCP CBR


Layer 1 45 mm 20.60 mm/blow 9%
Layer 2 136 mm 21.55 mm/blow 8%
Layer 3 252 mm 14.78 mm/blow 14 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 0+900 LHS
Initial Reading (H2): 140 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows
No. of

0 5 10 15 20 25 30 35
Blows

in mm

in mm
H1-H2

0
H1

100
1 1 180 40
2 3 240 100 200

2 5 290 150
2 7 330 190 300
Penetration (mm)

2 9 360 220
2 11 390 250 400

2 13 400 260
2 15 430 290 500

2 17 460 320
2 19 480 340 600

2 21 550 410
700
2 23 620 480
2 25 670 530
800
2 27 740 600
2 29 800 660
3 32 830 690
3 35 860 720
3 38 890 750
3 41 910 770

Thickness DCP CBR


Layer 1 177 mm 29.81 mm/blow 6%
Layer 2 140 mm 12.20 mm/blow 18 %
Layer 3 385 mm 29.10 mm/blow 6%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+000 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35
No. of
Blows

in mm

in mm
H1-H2
0
H1

50

1 1 170 40
100
1 2 180 50
1 3 210 80 150

1 4 240 110
1 5 280 150 200
Penetration (mm)

1 6 310 180
250
1 7 340 210
1 8 370 240 300

1 9 390 260
350
2 11 410 280
2 13 430 300 400

2 15 450 320
2 17 460 330 450

2 19 470 340
500
2 21 480 350
2 23 520 390
2 25 530 400
2 27 550 420
2 29 560 430

Thickness DCP CBR


Layer 1 252 mm 30.52 mm/blow 5%
Layer 2 85 mm 9.23 mm/blow 25 %
Layer 3 444 mm 8.20 mm/blow 29 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+100LHS
Initial Reading (H2): 140 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35
Blows
No. of

in mm

in mm
H1-H2
0
H1

100

1 1 170 30
200
1 2 180 40
1 3 200 60 300

1 4 240 100
1 5 260 120 400
Penetration (mm)

1 6 270 130
500
1 7 310 170
1 8 330 190 600

2 10 360 220
700
2 12 400 260
2 14 470 330 800

2 16 530 390
2 18 580 440 900

2 20 600 460
1000
2 22 680 540
2 24 760 620
2 26 870 730
2 28 920 780
2 30 990 850

Thickness DCP CBR


Layer 1 289 mm 22.40 mm/blow 8%
Layer 2 283 mm 30.00 mm/blow 6%
Layer 3 860 mm 38.18 mm/blow 4%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+200 LHS
Initial Reading (H2): 130 mm LEFT SIDE
Penetration

Penetration
No. of Blows
S Blows
Blows
No. of

in mm

in mm
H1-H2
0 10 20 30 40 50 60
H1

100

1 1 160 30
1 2 190 60 200

1 3 210 80
300
1 4 230 100
Penetration (mm)

1 5 240 110 400

2 7 270 140
2 9 320 190 500

2 11 345 215
600
2 13 400 270
3 16 450 320 700

3 19 480 350
3 22 510 380 800

3 25 560 430
900
3 28 600 470
3 31 630 500
3 34 680 550
3 37 760 630
3 40 800 670
3 43 810 680

Thickness DCP CBR


Layer 1 207 mm 21.14 mm/blow 9%
Layer 2 613 mm 14.77 mm/blow 14 %
Layer 3 -112 mm 14.92 mm/blow 14 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+300 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35 40 45
No. of
Blows

in mm

in mm
H1-H2
0
H1

50

1 1 145 15
1 2 155 25 100

1 3 160 30
1 4 170 40 150
Penetration (mm)

1 5 180 50
2 7 190 60 200

2 9 210 80
250
2 11 220 90
2 13 230 100
300
2 15 240 110
2 17 260 130 350

2 19 270 140
3 22 290 160 400

3 25 300 170
3 28 300 170
3 31 410 280
3 34 430 300
3 37 450 320
3 40 470 340

Thickness DCP CBR


Layer 1 48 mm 9.76 mm/blow 23 %
Layer 2 75 mm 6.89 mm/blow 37 %
Layer 3 236 mm 9.31 mm/blow 25 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+400 LHS
Initial Reading (H2): 140 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25
Blows
No. of

in mm

in mm
H1-H2
0
H1

1 1 180 40
50
1 2 230 90
1 3 260 120
2 5 270 130
Penetration (mm)

100
2 7 280 140
2 9 290 150
3 12 300 160 150

3 15 315 175
3 18 325 185
3 21 335 195 200

250

Thickness DCP CBR


Layer 1 110 mm 42.90 mm/blow 3%
Layer 2 40 mm 6.77 mm/blow 37 %
Layer 3 54 mm 3.63 mm/blow 83 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+500 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35 40
Blows
No. of

in mm

in mm
H1-H2
0
H1

1 1 160 30 100

1 2 170 40
1 3 180 50 200
1 4 190 60
Penetration (mm)

1 5 195 65
1 6 200 70 300

1 7 210 80
1 8 220 90 400

1 9 230 100
1 10 250 120
3 13 265 135
500

3 16 310 180
3 19 340 210 600

3 22 380 250
3 25 420 290
3 28 520 390
3 31 575 445
3 34 660 530
3 37 700 570

Thickness DCP CBR


Layer 1 76 mm 11.61 mm/blow 19 %
Layer 2 192 mm 11.76 mm/blow 18 %
Layer 3 291 mm 20.80 mm/blow 9%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+600 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 10 20 30 40 50 60
Blows
No. of

in mm

in mm
H1-H2
0
H1

100

1 1 170 40
1 2 240 110 200

1 3 310 180
300
2 5 390 260
Penetration (mm)

2 7 450 320 400

2 9 590 460
500
2 11 620 490
2 13 630 500 600

2 15 760 630
2 17 820 690 700

3 20 840 710
800
3 23 860 730
3 26 900 770 900

3 29 950 820
3 32 980 850

Thickness DCP CBR


Layer 1 51 mm 6.76 mm/blow 37 %
Layer 2 25 mm 3.24 mm/blow 96 %
Layer 3 99 mm 2.95 mm/blow >100
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+700 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35 40
Blows
No. of

in mm

in mm
H1-H2
0
H1

50
1 1 150 20
1 2 160 30
100
1 3 170 40
1 4 180 50
Penetration (mm)

1 5 190 60 150

2 7 210 80
2 9 220 90 200

2 11 230 100
2 13 245 115 250

2 15 290 160
2 17 315 185 300

2 19 330 200
2 21 350 220 350

3 24 370 240
3 27 390 260
3 30 410 280
3 33 430 300

Thickness DCP CBR


Layer 1 59 mm 11.63 mm/blow 19 %
Layer 2 141 mm 10.07 mm/blow 22 %
Layer 3 109 mm 7.31 mm/blow 34 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+800 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35 40 45 50
No. of
Blows

in mm

in mm
H1-H2
0
H1

100
1 1 150 20
1 2 160 30
200
1 3 170 40
2 5 180 50
Penetration (mm)

2 7 200 70 300

2 9 210 80
2 11 220 90 400

2 13 240 110
2 15 270 140 500

2 17 295 165
3 20 320 190 600

3 23 370 240
3 26 400 270 700

3 29 450 320
3 32 490 360
3 35 580 450
3 38 640 510
3 41 670 540
3 44 700 570

Thickness DCP CBR


Layer 1 91 mm 9.90 mm/blow 23 %
Layer 2 145 mm 11.16 mm/blow 20 %
Layer 3 340 mm 20.52 mm/blow 9%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 1+900 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35 40 45
No. of
Blows

in mm

in mm
H1-H2
0
H1

100
1 1 150 20
1 2 160 30
200
1 3 170 40
2 5 180 50
Penetration (mm)

2 7 200 70 300

2 9 210 80
2 11 240 110 400

2 13 255 125
2 15 270 140 500

2 17 300 170
2 19 330 200 600

3 22 370 240
3 25 430 300 700

3 28 560 430
3 31 600 470
3 34 630 500
3 37 660 530

Thickness DCP CBR


Layer 1 25 mm 6.43 mm/blow 40 %
Layer 2 109 mm 3.81 mm/blow 78 %
Layer 3 37 mm 1.31 mm/blow >100
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+000 LHS
Initial Reading (H2): 130 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 10 20 30 40 50 60
Blows
No. of

in mm

in mm
H1-H2
0
H1

50

1 1 150 20
1 2 175 45 100

1 3 195 65 150
2 5 210 80
Penetration (mm)

2 7 240 110 200

2 9 250 120
250
3 12 270 140
3 15 280 150 300

3 18 300 170
3 21 320 190 350

3 24 340 210
400
3 27 350 220
3 30 370 240 450

3 33 390 260
3 36 435 305
3 39 445 315
3 42 460 330
3 45 500 370
3 48 525 395

Thickness DCP CBR


Layer 1 77 mm 16.75 mm/blow 12 %
Layer 2 75 mm 7.45 mm/blow 33 %
Layer 3 260 mm 7.20 mm/blow 34 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+100 LHS
Initial Reading (H2): 140 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35 40 45 50
Blows
No. of

in mm

in mm
H1-H2
0
H1

100

1 1 160 20
200
1 2 170 30
1 3 190 50 300

2 5 200 60
Penetration (mm)

400
2 7 220 80
2 9 245 105 500

2 11 260 120 600

2 13 275 135
2 15 290 150 700

2 17 310 170 800

3 20 345 205
900
3 23 380 240
3 26 410 270 1000

3 29 480 340
3 32 620 480
3 35 790 650
3 38 830 690
3 41 950 810
3 44 990 850

Thickness DCP CBR


Layer 1 78 mm 16.75 mm/blow 12 %
Layer 2 180 mm 9.32 mm/blow 25 %
Layer 3 649 mm 29.55 mm/blow 6%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+200LHS
Initial Reading (H2): 140 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25
Blows
No. of

in mm

in mm
H1-H2
0
H1

100

1 1 160 20
1 2 175 35 200

1 3 190 50 300
1 4 205 65
Penetration (mm)

1 5 220 80 400

1 6 245 105
500
1 7 270 130
2 9 300 160 600

2 11 400 260
2 13 450 310 700

2 15 590 450
800
2 17 730 590
2 19 900 760 900

2 21 920 780

Thickness DCP CBR


Layer 1 91 mm 16.47 mm/blow 12 %
Layer 2 222 mm 30.37 mm/blow 5%
Layer 3 468 mm 72.71 mm/blow 2%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+300 LHS
Initial Reading (H2): 60 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35 40
Blows
No. of

in mm

in mm
H1-H2
0
H1

1 1 70 10
50
1 2 90 30
1 3 102 42
2 5 118 58
Penetration (mm)

100
2 7 128 68
2 9 143 83
3 12 158 98 150

3 15 170 110
3 18 185 125
3 21 195 135 200

3 24 205 145
3 27 218 158
3 30 235 175 250

3 33 245 185
3 36 249 189
3 39 256 196
3 42 267 207
3 45 270 210
3 48 274 214

Thickness DCP CBR


Layer 1 51 mm 11.67 mm/blow 19 %
Layer 2 94 mm 4.93 mm/blow 56 %
Layer 3 57 mm 4.10 mm/blow 71 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+400 RHS
Initial Reading (H2): 140 mm RIGHT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30
No. of
Blows

in mm

in mm
H1-H2
0
H1

20

1 1 150 10
1 2 155 15 40

1 3 160 20 60
2 5 175 35
Penetration (mm)

2 7 190 50 80

2 9 200 60
100
2 11 215 75
2 13 225 85 120

2 15 240 100
2 17 260 120 140

3 20 275 135
160
3 23 285 145
3 26 290 150 180

Thickness DCP CBR


Layer 1 81 mm 6.73 mm/blow 38 %
Layer 2 42 mm 7.63 mm/blow 32 %
Layer 3 34 mm 3.54 mm/blow 86 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+500
Initial Reading (H2): 140 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 2 4 6 8 10 12 14 16 18 20
Blows
No. of

in mm

in mm
H1-H2
0
H1

100

1 1 200 60
1 2 260 120 200

1 3 300 160 300


1 4 340 200
Penetration (mm)

1 5 380 240 400

1 6 420 280
500
1 7 460 320
1 8 480 340 600

1 9 530 390
1 10 570 430 700

1 11 610 470
800
1 12 670 530
1 13 710 570 900

1 14 750 610
1 15 810 670
1 16 850 710
1 17 900 760
1 18 930 790
1 19 970 830

Thickness DCP CBR


Layer 1 215 mm 58.43 mm/blow 2%
Layer 2 246 mm 33.30 mm/blow 5%
Layer 3 331 mm 48.58 mm/blow 3%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+600
Initial Reading (H2): 140 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows
Blows
No. of

0 5 10 15 20 25
in mm

in mm
H1-H2
H1

100

1 1 180 40
200
1 2 290 150
1 3 400 260 300

2 5 450 310
Penetration (mm)

400
2 7 490 350
2 9 570 430 500

2 11 620 480 600


2 13 720 580
2 15 780 640 700

2 17 850 710 800

2 19 890 750
2 21 940 800 900

2 23 990 850 1000

Thickness DCP CBR


Layer 1 277 mm 78.88 mm/blow 2%
Layer 2 296 mm 28.87 mm/blow 6%
Layer 3 289 mm 33.04 mm/blow 5%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+700
Initial Reading (H2): 140 mm RIGHT SIDE

No. of Blows
Penetration

Penetration
S Blows
Blows
No. of

0 5 10 15 20 25 30 35 40 45
in mm

in mm
H1-H2
H1

1 1 150 10 100

1 2 160 20
1 3 190 50
200
2 5 210 70
Penetration (mm)

2 7 220 80
2 9 240 100 300

2 11 250 110
2 13 270 130 400
3 16 300 160
3 19 340 200
3 22 360 220 500

3 25 400 260
3 28 420 280 600

3 31 470 330
3 34 520 380
3 37 590 450
3 40 640 500
3 43 690 550
3 46 770 630

Thickness DCP CBR


Layer 1 153 mm 9.92 mm/blow 23 %
Layer 2 216 mm 12.16 mm/blow 18 %
Layer 3 170 mm 18.54 mm/blow 10 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+800
Initial Reading (H2): 130 mm RIGHT SIDE

No. of Blows
Penetration

Penetration
S Blows
Blows
No. of

0 10 20 30 40 50 60
in mm

in mm
H1-H2
H1

100
1 1 150 20
1 2 180 50
1 3 195 65 200

2 5 220 90
Penetration (mm)

2 7 240 110 300

2 9 260 130
2 11 275 145 400

2 13 290 160
3 16 315 185 500

3 19 330 200
3 22 360 230 600

3 25 370 240
3 28 450 320 700

3 31 510 380
3 34 530 400
3 37 570 440
3 40 610 480
3 43 650 520
3 46 690 560

Thickness DCP CBR


Layer 1 171 mm 14.15 mm/blow 14 %
Layer 2 214 mm 9.92 mm/blow 23 %
Layer 3 203 mm 13.72 mm/blow 15 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 2+900
Initial Reading (H2): 140 mm RIGHT SIDE

No. of Blows
Penetration

Penetration
S Blows
Blows
No. of

0 5 10 15 20 25
in mm

in mm
H1-H2
H1

20
1 1 160 20
1 2 190 50
1 3 200 60 40

2 5 210 70
Penetration (mm)

2 7 225 85 60

2 9 240 100
3 12 245 105 80

3 15 255 115
3 18 265 125 100

120

140

Thickness DCP CBR


Layer 1 50 mm 22.80 mm/blow 8%
Layer 2 49 mm 7.36 mm/blow 34 %
Layer 3 32 mm 2.82 mm/blow >100
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 3+000
Initial Reading (H2): 130 mm LEFT SIDE
Penetration

Penetration
No. of Blows
S Blows
No. of
Blows

in mm

in mm
H1-H2
0 5 10 15 20 25 30
H1

100
1 1 170 40
1 2 190 60 200

1 3 220 90
1 4 260 130
300
Penetration (mm)

2 6 310 180 400

2 8 400 270
2 10 480 350 500

2 12 550 420
600
2 14 620 490
2 16 700 570 700

2 18 810 680
2 20 860 730
800

2 22 910 780 900

2 24 960 830

Thickness DCP CBR


Layer 1 132 mm 30.30 mm/blow 5%
Layer 2 570 mm 38.31 mm/blow 4%
Layer 3 146 mm 25.23 mm/blow 7%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 3+100
Initial Reading (H2): 140 mm LEFT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30
No. of
Blows

in mm

in mm
H1-H2

0
H1

100

1 1 155 15 200

1 2 180 40
1 3 200 60 300

1 4 230 90
Penetration (mm)

400

1 5 260 120
500
1 6 280 140
2 8 320 180 600

2 10 350 210
700
2 12 380 240
2 14 440 300 800

2 16 500 360 900

2 18 590 450
2 20 680 540 1000

2 22 730 590
2 24 820 680
2 26 920 780
2 28 990 850

Thickness DCP CBR


Layer 1 200 mm 23.41 mm/blow 8%
Layer 2 361 mm 28.24 mm/blow 6%
Layer 3 303 mm 46.21 mm/blow 3%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 3+200
Initial Reading (H2): 130 mm RIGHT SIDE

No. of Blows
Penetration

Penetration
S Blows

0 5 10 15 20 25 30 35 40
Blows
No. of

in mm

in mm
H1-H2

0
H1

100

1 1 170 40
200
1 2 210 80
1 3 260 130 300

1 4 350 220
Penetration (mm)

400
1 5 400 270
2 7 430 300 500

2 9 500 370 600


2 11 590 460
3 14 660 530 700

3 17 730 600 800

3 20 790 660
5 25 890 760 900

5 30 930 800 1000

5 35 990 860

Thickness DCP CBR


Layer 1 361 mm 54.24 mm/blow 3%
Layer 2 379 mm 22.02 mm/blow 8%
Layer 3 153 mm 11.53 mm/blow 19 %
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 3+300
Initial Reading (H2): 130 mm LEFT SIDE
Penetration

Penetration No. of Blows


S Blows
Blows
No. of

in mm

in mm
H1-H2
0 5 10 15 20 25 30 35 40
H1

100

1 1 160 30
1 2 190 60 200

1 3 220 90 300

1 4 270 140
Penetration (mm)

1 5 310 180
400

2 7 330 200 500

2 9 400 270
600
2 11 470 340
3 14 560 430 700

3 17 620 490
800
3 20 730 600
5 25 850 720 900

5 30 940 810
1000
5 35 990 860

Thickness DCP CBR


Layer 1 257 mm 33.21 mm/blow 5%
Layer 2 367 mm 26.19 mm/blow 7%
Layer 3 265 mm 20.17 mm/blow 9%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 3+400
Initial Reading (H2): 130 mm LEFT SIDE
Penetration

Penetration
No. of Blows
S Blows
Blows
No. of

in mm

in mm
H1-H2
0 5 10 15 20 25 30
H1

100

1 1 150 20
200
1 2 160 30
1 3 170 40 300

1 4 185 55
Penetration (mm)

400
1 5 200 70
2 7 220 90 500

2 9 250 120
600
2 11 285 155
2 13 320 190 700

2 15 350 220
800
2 17 400 270
2 19 480 350 900

2 21 580 450
1000
2 23 750 620
2 25 890 760
2 27 990 860

Thickness DCP CBR


Layer 1 78 mm 11.82 mm/blow 18 %
Layer 2 182 mm 16.03 mm/blow 12 %
Layer 3 630 mm 62.50 mm/blow 2%
DCP TEST

Project: Upgrading of T.U Gate to Chobar Road


Client : Kathamandu Valley Road Improvement Project(KVRIP)
Consultant : Geocom International (P).ltd
Chainage: 3+500
Initial Reading (H2): 170 mm LEFT SIDE
Penetration

Penetration
No. of Blows
S Blows
Blows
No. of

in mm

in mm
H1-H2
0 2 4 6 8 10 12 14 16 18 20
H1

100
1 1 240 70
1 2 280 110
200
1 3 320 150
1 4 360 190 300
Penetration (mm)

1 5 420 250
1 6 490 320 400

1 7 560 390
1 8 720 550 500

1 9 770 600
1 10 800 630 600

1 11 810 640
700
1 12 820 650
1 13 830 660
800
1 14 840 670
1 15 870 700
1 16 890 720
1 17 910 740
1 18 930 760
1 19 940 770
1 20 990 820

Thickness DCP CBR


Layer 1 358 mm 51.25 mm/blow 3%
Layer 2 231 mm 140.00 mm/blow 1%
Layer 3 121 mm 14.44 mm/blow 14 %
ANNEX:-3

LABORATORY TEST REPORT


PLANET TEST

GRAIN SIZE ANALYSIS


Test Method: IS: 2720 (Part 4) - 1985

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd Chainage:- 0 + 500

Sieve % Passing 100


75.00 mm 100.00
40.00 mm 100.00 90
20.00 mm 78.08 80
10.00 mm 59.33
4.75 mm 38.35 70
2.36 mm 26.25 60
% Passing

1.18 mm 17.82
0.600 mm 12.80 50
0.425 mm 9.34
40
0.300 mm 6.49
0.150 mm 4.28 30
0.075 mm 2.51
20

10

0
0.001 0.01 0.1 1 10 100
Sieves, mm

CLAY SILT SAND GRAVEL


0.0 % 2.51 % 35.8 % 61.7 %
PLANET TEST

GRAIN SIZE ANALYSIS


Test Method: IS: 2720 (Part 4) - 1985

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd Chainage:- 1 + 000

Sieve % Passing 100


75.00 mm 100.00
40.00 mm 100.00 90
20.00 mm 84.20 80
10.00 mm 63.48
4.75 mm 40.97 70
2.36 mm 28.59 60
% Passing

1.18 mm 19.22
0.600 mm 14.40 50
0.425 mm 11.47
40
0.300 mm 8.88
0.150 mm 5.65 30
0.075 mm 2.31
20

10

0
0.001 0.01 0.1 1 10 100
Sieves, mm

CLAY SILT SAND GRAVEL


0.0 % 2.31 % 38.7 % 59.0 %
PLANET TEST

GRAIN SIZE ANALYSIS


Test Method: IS: 2720 (Part 4) - 1985

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd Chainage:- 1 + 500

Sieve % Passing 100


75.00 mm 100.00
40.00 mm 100.00 90
20.00 mm 83.40 80
10.00 mm 68.95
4.75 mm 57.00 70
2.36 mm 46.10 60
% Passing

1.18 mm 33.25
0.600 mm 21.91 50
0.425 mm 16.27
40
0.300 mm 10.98
0.150 mm 5.66 30
0.075 mm 1.15
20

10

0
0.001 0.01 0.1 1 10 100
Sieves, mm

CLAY SILT SAND GRAVEL


0.0 % 1.15 % 55.9 % 43.0 %
PLANET TEST

GRAIN SIZE ANALYSIS


Test Method: IS: 2720 (Part 4) - 1985

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd Chainage:- 2 + 000

Sieve % Passing 100


75.00 mm 100.00
40.00 mm 100.00 90
20.00 mm 74.26 80
10.00 mm 53.11
4.75 mm 35.85 70
2.36 mm 24.90 60
% Passing

1.18 mm 15.70
0.600 mm 9.56 50
0.425 mm 7.57
40
0.300 mm 6.27
0.150 mm 3.70 30
0.075 mm 1.76
20

10

0
0.001 0.01 0.1 1 10 100
Sieves, mm

CLAY SILT SAND GRAVEL


0.0 % 1.76 % 34.1 % 64.1 %
PLANET TEST

GRAIN SIZE ANALYSIS


Test Method: IS: 2720 (Part 4) - 1985

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd Chainage:- 2 + 500

Sieve % Passing 100


75.00 mm 100.00
40.00 mm 100.00 90
20.00 mm 100.00 80
10.00 mm 66.12
4.75 mm 48.64 70
2.36 mm 37.14 60
% Passing

1.18 mm 24.33
0.600 mm 13.52 50
0.425 mm 8.96
40
0.300 mm 5.81
0.150 mm 3.68 30
0.075 mm 1.61
20

10

0
0.001 0.01 0.1 1 10 100
Sieves, mm

CLAY SILT SAND GRAVEL


0.0 % 1.61 % 47.0 % 51.4 %
PLANET TEST

GRAIN SIZE ANALYSIS


Test Method: IS: 2720 (Part 4) - 1985

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd Chainage:- 3 + 000

Sieve % Passing 100


75.00 mm 100.00
40.00 mm 100.00 90
20.00 mm 91.92 80
10.00 mm 55.73
4.75 mm 36.58 70
2.36 mm 27.84 60
% Passing

1.18 mm 21.36
0.600 mm 17.57 50
0.425 mm 13.43
40
0.300 mm 8.53
0.150 mm 4.83 30
0.075 mm 1.95
20

10

0
0.001 0.01 0.1 1 10 100
Sieves, mm

CLAY SILT SAND GRAVEL


0.0 % 1.95 % 34.6 % 63.4 %
PLANET TEST

GRAIN SIZE ANALYSIS


Test Method: IS: 2720 (Part 4) - 1985

Project: Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd Chainage:- 3 + 500

Sieve % Passing 100


75.00 mm 100.00
40.00 mm 100.00 90
20.00 mm 100.00 80
10.00 mm 97.50
4.75 mm 95.96 70
2.36 mm 94.86 60
% Passing

1.18 mm 93.79
0.600 mm 92.20 50
0.425 mm 90.96
40
0.300 mm 88.54
0.150 mm 84.08 30
0.075 mm 79.49
20
0.028 mm 68.44
0.019 mm 63.32 10
0.011 mm 58.19
0
0.008 mm 53.06 0.001 0.01 0.1 1 10 100
0.006 mm 45.37
Sieves, mm
0.003 mm 35.12
0.001 mm 32.56
CLAY SILT SAND GRAVEL
32.6 % 46.93 % 16.5 % 4.0 %
PLANET TEST

COMPACTION TEST (MODIFIED PROCTOR )


[Testing Method: IS 2720-Part 8-1983]

Project:- Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd
Chainage:- 0 + 500
Mould Volume :-
2250 cc
Test No. 1 2 3 4 5
Wt.of Wet Soil + Mould,(g) 10808 11077 11200 11250 11132
Wt. of Mould, (g) 6208 6208 6208 6208 6208
Wt. of Wet Soil, W (g) 4600 4869 4992 5042 4924
Wet Density, yT=W/V,(gm/cc) 2.044 2.164 2.219 2.241 2.188
Dry Density, yd=100yT÷(100+w),(gm/cc) 1.921 1.996 2.013 1.999 1.908
1.921 1.996 2.013 1.999 1.908 6.4 8.4 10.2 12.1 14.7
MOISTURE CONTENT
Container No. 1 2 3 4 5
Wt. of Wet Soil + Container(g) A 121.0 129.7 124.8 119.0 126.3
Wt. of Dry Soil + Container(g) B 116.0 122.7 116.8 110.3 114.9
Wt. of Water,(g) A-B=C 5.1 7.1 8.0 8.8 11.4
Wt. of Container(g) D 37.1 38.8 38.8 37.7 37.7
Wt. of Dry Soil (g) E 78.9 83.9 78.0 72.6 77.3
Moisture Content, w, (%) C/E*100 6.4 8.4 10.2 12.1 14.7
Average Moisture Content, (%) 6.4 8.4 10.2 12.1 14.7

2.050
Dry Density (gm/cc)

2.000

1.950

1.900
4 5 6 7 8 9 10 11 12 13 14 15 16
Moisture Content (%)

Max. Dry Density (gm/cc) :- 2.014


OMC (%) :- 10.3
PLANET TEST

COMPACTION TEST (MODIFIED PROCTOR )


[Testing Method: IS 2720-Part 8-1983]

Project:- Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd
Chainage:- 1 + 000
Mould Volume :-
2250 cc
Test No. 1 2 3 4 5
Wt.of Wet Soil + Mould,(g) 10872 11108 11252 11300 11163
Wt. of Mould, (g) 6184 6184 6184 6184 6184
Wt. of Wet Soil, W (g) 4688 4924 5068 5116 4979
Wet Density, yT=W/V,(gm/cc) 2.084 2.188 2.252 2.274 2.213
Dry Density, yd=100yT÷(100+w),(gm/cc) 1.959 2.012 2.036 2.030 1.927
1.959 2.012 2.036 2.030 1.927 6.4 8.8 10.6 12.0 14.8
MOISTURE CONTENT
Container No. 1 2 3 4 5
Wt. of Wet Soil + Container(g) A 118.5 124.2 125.8 122.9 120.9
Wt. of Dry Soil + Container(g) B 113.6 117.2 117.4 113.9 110.1
Wt. of Water,(g) A-B=C 4.8 7.0 8.4 9.0 10.8
Wt. of Container(g) D 37.5 37.7 38.5 38.9 37.6
Wt. of Dry Soil (g) E 76.1 79.6 78.9 75.0 72.6
Moisture Content, w, (%) C/E*100 6.4 8.8 10.6 12.0 14.8
Average Moisture Content, (%) 6.4 8.8 10.6 12.0 14.8

2.050
Dry Density (gm/cc)

2.000

1.950

1.900
4 5 6 7 8 9 10 11 12 13 14 15 16
Moisture Content (%)

Max. Dry Density (gm/cc) :- 2.034


OMC (%) :- 11.0
PLANET TEST

COMPACTION TEST (MODIFIED PROCTOR )


[Testing Method: IS 2720-Part 8-1983]

Project:- Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd
Chainage:- 1 + 500
Mould Volume :-
2250 cc
Test No. 1 2 3 4 5
Wt.of Wet Soil + Mould,(g) 10704 10993 11172 11210 11070
Wt. of Mould, (g) 6184 6184 6184 6184 6184
Wt. of Wet Soil, W (g) 4520 4809 4988 5026 4886
Wet Density, yT=W/V,(gm/cc) 2.009 2.137 2.217 2.234 2.172
Dry Density, yd=100yT÷(100+w),(gm/cc) 1.900 1.983 2.024 2.008 1.912
1.900 1.983 2.024 2.008 1.912 5.7 7.8 9.5 11.2 13.6
MOISTURE CONTENT
Container No. 1 2 3 4 5
Wt. of Wet Soil + Container(g) A 114.6 120.5 122.7 116.3 101.2
Wt. of Dry Soil + Container(g) B 110.5 114.6 115.3 108.4 92.5
Wt. of Water,(g) A-B=C 4.2 5.9 7.4 7.9 8.7
Wt. of Container(g) D 37.7 38.9 37.7 38.5 28.7
Wt. of Dry Soil (g) E 72.8 75.7 77.7 70.0 63.8
Moisture Content, w, (%) C/E*100 5.7 7.8 9.5 11.2 13.6
Average Moisture Content, (%) 5.7 7.8 9.5 11.2 13.6

2.050

2.000
Dry Density (gm/cc)

1.950

1.900

1.850
4 5 6 7 8 9 10 11 12 13 14 15
Moisture Content (%)

Max. Dry Density (gm/cc) :- 2.020


OMC (%) :- 10.0
PLANET TEST

COMPACTION TEST (MODIFIED PROCTOR )


[Testing Method: IS 2720-Part 8-1983]

Project:- Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd
Chainage:- 2 + 000
Mould Volume :-
2250 cc
Test No. 1 2 3 4 5
Wt.of Wet Soil + Mould,(g) 10574 10868 11100 11100 10962
Wt. of Mould, (g) 6184 6184 6184 6184 6184
Wt. of Wet Soil, W (g) 4390 4684 4916 4916 4778
Wet Density, yT=W/V,(gm/cc) 1.951 2.082 2.185 2.185 2.124
Dry Density, yd=100yT÷(100+w),(gm/cc) 1.843 1.938 1.999 1.955 1.883
1.843 1.938 1.999 1.955 1.883 5.9 7.4 9.3 11.8 12.8
MOISTURE CONTENT
Container No. 1 2 3 4 5
Wt. of Wet Soil + Container(g) A 109.1 108.7 112.4 121.4 119.6
Wt. of Dry Soil + Container(g) B 105.2 103.8 106.0 112.6 110.2
Wt. of Water,(g) A-B=C 4.0 4.9 6.4 8.8 9.4
Wt. of Container(g) D 37.3 37.7 37.6 37.8 37.1
Wt. of Dry Soil (g) E 67.9 66.1 68.4 74.9 73.1
Moisture Content, w, (%) C/E*100 5.9 7.4 9.3 11.8 12.8
Average Moisture Content, (%) 5.9 7.4 9.3 11.8 12.8

2.050

2.000
Dry Density (gm/cc)

1.950

1.900

1.850

1.800
4 5 6 7 8 9 10 11 12 13 14
Moisture Content (%)

Max. Dry Density (gm/cc) :- 2.001


OMC (%) :- 9.8
PLANET TEST

COMPACTION TEST (MODIFIED PROCTOR )


[Testing Method: IS 2720-Part 8-1983]

Project:- Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd
Chainage:- 2 + 500
Mould Volume :-
2250 cc
Test No. 1 2 3 4 5
Wt.of Wet Soil + Mould,(g) 10512 10826 11011 11080 10915
Wt. of Mould, (g) 6184 6184 6184 6184 6184
Wt. of Wet Soil, W (g) 4328 4642 4827 4896 4731
Wet Density, yT=W/V,(gm/cc) 1.924 2.063 2.145 2.176 2.103
Dry Density, yd=100yT÷(100+w),(gm/cc) 1.779 1.860 1.905 1.917 1.817
1.779 1.860 1.905 1.917 1.817 8.1 10.9 12.6 13.5 15.7
MOISTURE CONTENT
Container No. 1 2 3 4 5
Wt. of Wet Soil + Container(g) A 108.5 114.5 124.5 95.6 80.8
Wt. of Dry Soil + Container(g) B 103.2 107.0 114.9 88.8 74.1
Wt. of Water,(g) A-B=C 5.3 7.6 9.6 6.8 6.7
Wt. of Container(g) D 37.5 37.7 38.9 38.5 31.3
Wt. of Dry Soil (g) E 65.7 69.3 76.1 50.3 42.8
Moisture Content, w, (%) C/E*100 8.1 10.9 12.6 13.5 15.7
Average Moisture Content, (%) 8.1 10.9 12.6 13.5 15.7

1.960

1.910
Dry Density (gm/cc)

1.860

1.810

1.760
4 5 6 7 8 9 10 11 12 13 14 15 16 17
Moisture Content (%)

Max. Dry Density (gm/cc) :- 1.913


OMC (%) :- 13.3
PLANET TEST

COMPACTION TEST (MODIFIED PROCTOR )


[Testing Method: IS 2720-Part 8-1983]

Project:- Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd
Chainage:- 3 + 000
Mould Volume :-
2250 cc
Test No. 1 2 3 4 5
Wt.of Wet Soil + Mould,(g) 10120 10374 10520 10580 10290
Wt. of Mould, (g) 6184 6184 6184 6184 6184
Wt. of Wet Soil, W (g) 3936 4190 4336 4396 4106
Wet Density, yT=W/V,(gm/cc) 1.749 1.862 1.927 1.954 1.825
Dry Density, yd=100yT÷(100+w),(gm/cc) 1.621 1.695 1.731 1.720 1.577
1.621 1.695 1.731 1.720 1.577 7.9 9.9 11.3 13.6 15.7
MOISTURE CONTENT
Container No. 1 2 3 4 5
Wt. of Wet Soil + Container(g) A 88.9 107.8 73.2 81.9 81.7
Wt. of Dry Soil + Container(g) B 85.1 101.5 69.6 75.5 74.1
Wt. of Water,(g) A-B=C 3.8 6.3 3.6 6.4 7.6
Wt. of Container(g) D 37.3 37.8 37.7 28.7 25.6
Wt. of Dry Soil (g) E 47.8 63.7 31.9 46.9 48.5
Moisture Content, w, (%) C/E*100 7.9 9.9 11.3 13.6 15.7
Average Moisture Content, (%) 7.9 9.9 11.3 13.6 15.7

1.750

1.700
Dry Density (gm/cc)

1.650

1.600

1.550
4 5 6 7 8 9 10 11 12 13 14 15 16 17
Moisture Content (%)

Max. Dry Density (gm/cc) :- 1.738


OMC (%) :- 12.3
PLANET TEST

COMPACTION TEST (MODIFIED PROCTOR )


[Testing Method: IS 2720-Part 8-1983]

Project:- Upgrading of TU Gate to Chovar (Dry Port) Road


Client:- Department of Roads (DOR), Kathmandu Valley Road Improvement Project (KVRIP)
Consultant:- Geocom International (P.) Ltd
Chainage:- 3 + 500
Mould Volume :-
2250 cc
Test No. 1 2 3 4 5
Wt.of Wet Soil + Mould,(g) 10010 10250 10460 10520 10380
Wt. of Mould, (g) 6184 6184 6184 6184 6184
Wt. of Wet Soil, W (g) 3826 4066 4276 4336 4196
Wet Density, yT=W/V,(gm/cc) 1.700 1.807 1.900 1.927 1.865
Dry Density, yd=100yT÷(100+w),(gm/cc) 1.592 1.670 1.721 1.709 1.626
1.592 1.670 1.721 1.709 1.626 6.8 8.2 10.4 12.8 14.7
MOISTURE CONTENT
Container No. 1 2 3 4 5
Wt. of Wet Soil + Container(g) A 75.6 84.5 87.9 81.5 81.2
Wt. of Dry Soil + Container(g) B 72.6 79.9 81.9 75.5 74.1
Wt. of Water,(g) A-B=C 3.0 4.7 6.0 6.0 7.1
Wt. of Container(g) D 28.0 23.1 24.6 28.7 25.6
Wt. of Dry Soil (g) E 44.5 56.8 57.3 46.9 48.5
Moisture Content, w, (%) C/E*100 6.8 8.2 10.4 12.8 14.7
Average Moisture Content, (%) 6.8 8.2 10.4 12.8 14.7

1.750

1.700
Dry Density (gm/cc)

1.650

1.600

1.550
4 5 6 7 8 9 10 11 12 13 14 15 16
Moisture Content (%)

Max. Dry Density (gm/cc) :- 1.726


OMC (%) :- 11.1
PLANET TEST
CALIFORNIA BEARING RATIO
[Testing Method: IS-2720-PART-16-1979]

Project:- Upgrading of T.U Gate to Chobar Road


Client:- Kathamandu Valley Road Improvement Project(KVRIP)
Consultant:- Geocom International (P).ltd

Chainage:- 0+500
Standard Test Load CBR
Soaking Soaking mm Load kg kg/cm² Value Corrected
kg/cm² % %
Weight of wet sample + mould gm 12720 12965
Weight of mould gm 7948 7948 0.5 13.26 0.68
Weight of wet sample gm 4772 5017 1.0 24.48 1.25
Volume of sample cc 2244.48 2244.48 1.5 48.95 2.49
Wet unit weight gm/cc 2.13 2.24 2.0 79.54 4.05
Average moisture content % 9.79 11.2 2.5 70 101.98 5.19 7.4
Dry unit weight gm/cc 1.937 2.010 5.0 105 283.50 14.44 13.8
7.5 134 432.40 22.02
10.0 162 665.93 33.92
12.5 183 796.46 40.56

No. of layers : 5 Period of soaking : 4 days


No. of blows per layer :56 Swell : 0.47 %

45
40
35
30
Load, kg/cm²

25
20
15
10
5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Penetration in mm

Shift in Origin= 0.5


CBR Value = 13.8
PLANET TEST
CALIFORNIA BEARING RATIO
[Testing Method: IS-2720-PART-16-1979]

Project:- Upgrading of T.U Gate to Chobar Road


Client:- Kathamandu Valley Road Improvement Project(KVRIP)
Consultant:- Geocom International (P).ltd

Chainage:- 1+000
Standard Test Load CBR
Soaking Soaking mm Load kg kg/cm² Value Corrected
kg/cm² % %
Weight of wet sample + mould gm 12894 12980
Weight of mould gm 7948 7948 0.5 20.40 1.04
Weight of wet sample gm 4946 5032 1.0 46.91 2.39
Volume of sample cc 2244.48 2244.48 1.5 69.35 3.53
Wet unit weight gm/cc 2.20 2.24 2.0 98.92 5.04
Average moisture content % 10.50 12.68 2.5 70 143.79 7.32 10.5
Dry unit weight gm/cc 1.994 1.990 5.0 105 275.35 14.02 13.4
7.5 134 506.84 25.81
10.0 162 574.15 29.24
12.5 183 665.93 33.92

No. of layers : 5 Period of soaking : 4 days


No. of blows per layer :56 Swell : 0.42 %

40

35

30
Load, kg/cm²

25

20

15

10

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Penetration in mm

Shift in Origin= 0.4


CBR Value = 13.4
PLANET TEST
CALIFORNIA BEARING RATIO
[Testing Method: IS-2720-PART-16-1979]

Project:- Upgrading of T.U Gate to Chobar Road


Client:- Kathamandu Valley Road Improvement Project(KVRIP)
Consultant:- Geocom International (P).ltd

Chainage:- 1+500
Standard Test Load CBR
Soaking Soaking mm Load kg kg/cm² Value Corrected
kg/cm² % %
Weight of wet sample + mould gm 12706 12410
Weight of mould gm 8026 8026 0.5 18.36 0.93
Weight of wet sample gm 4680 4384 1.0 34.67 1.77
Volume of sample cc 2244.48 2244.48 1.5 62.21 3.17
Wet unit weight gm/cc 2.09 1.95 2.0 90.76 4.62
Average moisture content % 9.70 11.4 2.5 70 137.67 7.01 10.0
Dry unit weight gm/cc 1.901 1.753 5.0 105 290.64 14.80 14.1
7.5 134 442.59 22.54
10.0 162 700.60 35.68
12.5 183 836.24 42.59

No. of layers : 5 Period of soaking : 4 days


No. of blows per layer :56 Swell : 0.43 %

50
45
40
35
Load, kg/cm²

30
25
20
15
10
5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Penetration in mm

Shift in Origin= 0
CBR Value = 14.1
PLANET TEST
CALIFORNIA BEARING RATIO
[Testing Method: IS-2720-PART-16-1979]

Project:- Upgrading of T.U Gate to Chobar Road


Client:- Kathamandu Valley Road Improvement Project(KVRIP)
Consultant:- Geocom International (P).ltd

Chainage:- 2+000
Standard Test Load CBR
Soaking Soaking mm Load kg kg/cm² Value Corrected
kg/cm² % %
Weight of wet sample + mould gm 12738 12896
Weight of mould gm 8026 8026 0.5 23.46 1.19
Weight of wet sample gm 4712 4870 1.0 47.93 2.44
Volume of sample cc 2244.48 2244.48 1.5 81.58 4.16
Wet unit weight gm/cc 2.10 2.17 2.0 137.67 7.01
Average moisture content % 9.40 11.65 2.5 70 192.74 9.82 14.0
Dry unit weight gm/cc 1.919 1.943 5.0 105 306.96 15.63 14.9
7.5 134 495.62 25.24
10.0 162 597.60 30.44
12.5 183 735.28 37.45

No. of layers : 5 Period of soaking : 4 days


No. of blows per layer :56 Swell : 0.32 %

40
35
30
25
Load, kg/cm²

20
15
10
5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Penetration in mm

Shift in Origin= 0
CBR Value = 14.9
PLANET TEST
CALIFORNIA BEARING RATIO
[Testing Method: IS-2720-PART-16-1979]

Project:- Upgrading of T.U Gate to Chobar Road


Client:- Kathamandu Valley Road Improvement Project(KVRIP)
Consultant:- Geocom International (P).ltd

Chainage:- 2+500
Standard Test Load CBR
Soaking Soaking mm Load kg kg/cm² Value Corrected
kg/cm² % %
Weight of wet sample + mould gm 12530 12730
Weight of mould gm 7948 7948 0.5 20.40 1.04
Weight of wet sample gm 4582 4782 1.0 41.81 2.13
Volume of sample cc 2244.48 2244.48 1.5 75.47 3.84
Wet unit weight gm/cc 2.04 2.13 2.0 95.86 4.88
Average moisture content % 12.90 14.3 2.5 70 112.18 5.71 8.2
Dry unit weight gm/cc 1.808 1.864 5.0 105 211.10 10.75 10.2
7.5 134 405.88 20.67
10.0 162 498.68 25.40
12.5 183 635.34 32.36

No. of layers : 5 Period of soaking : 4 days


No. of blows per layer :56 Swell : 0.23 %

35

30

25
Load, kg/cm²

20

15

10

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Penetration in mm

Shift in Origin= 0.2


CBR Value = 8.2
PLANET TEST
CALIFORNIA BEARING RATIO
[Testing Method: IS-2720-PART-16-1979]

Project:- Upgrading of T.U Gate to Chobar Road


Client:- Kathamandu Valley Road Improvement Project(KVRIP)
Consultant:- Geocom International (P).ltd

Chainage:- 3+000
Standard Test Load CBR
Soaking Soaking mm Load kg kg/cm² Value Corrected
kg/cm² % %
Weight of wet sample + mould gm 12100 12200
Weight of mould gm 7324 7324 0.5 19.38 0.99
Weight of wet sample gm 4776 4876 1.0 44.87 2.29
Volume of sample cc 2244.48 2244.48 1.5 69.35 3.53
Wet unit weight gm/cc 2.13 2.17 2.0 98.92 5.04
Average moisture content % 10.10 11.5 2.5 70 126.46 6.44 9.2
Dry unit weight gm/cc 1.933 1.948 5.0 105 202.94 10.34 9.8
7.5 134 290.64 14.80
10.0 162 363.05 18.49
12.5 183 574.15 29.24

No. of layers : 5 Period of soaking : 4 days


No. of blows per layer :56 Swell : 0.23 %

35

30

25
Load, kg/cm²

20

15

10

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm

Shift in Origin= 0.1


CBR Value = 9.2
PLANET TEST
CALIFORNIA BEARING RATIO
[Testing Method: IS-2720-PART-16-1979]

Project:- Upgrading of T.U Gate to Chobar Road


Client:- Kathamandu Valley Road Improvement Project(KVRIP)
Consultant:- Geocom International (P).ltd

Chainage:- 3+500
Standard Test Load CBR
Soaking Soaking mm Load kg kg/cm² Value Corrected
kg/cm² % %
Weight of wet sample + mould gm 12258 12356
Weight of mould gm 8026 8026 0.5 10.20 0.52
Weight of wet sample gm 4232 4330 1.0 18.36 0.93
Volume of sample cc 2244.48 2244.48 1.5 33.65 1.71
Wet unit weight gm/cc 1.89 1.93 2.0 59.15 3.01
Average moisture content % 10.54 12.1 2.5 70 96.88 4.93 7.0
Dry unit weight gm/cc 1.706 1.721 5.0 105 117.28 5.97 5.7
7.5 134 167.25 8.52
10.0 162 218.24 11.11
12.5 183 392.62 20.00

No. of layers : 5 Period of soaking : 4 days


No. of blows per layer :56 Swell : 0.23 %

25

20
Load, kg/cm²

15

10

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm

Shift in Origin= 0
CBR Value = 5.7
ANNEX:-4

FIELD & LABORATORY TEST PHOTOGRAPHS


Photo-1: Excavation for DCP Test at Chainage 0+500 Photo-2: Conducting DCP Test at Chainage 0+500
(Trail Pit – 1) (Trail Pit - 1)

Photo-3: Excavation for DCP Test at Chainage 1+000 Photo-4: Conducting DCP Test at Chainage 1+000
(Trail Pit – 2) (Trail Pit - 2)
Photo-5: Excavation for DCP Test at Chainage 1+500 Photo-6: Conducting DCP Test at Chainage 1+500
(Trail Pit – 3) (Trail Pit - 3)

Photo-7: Excavation for DCP Test at Chainage 2+000 Photo-8: Conducting DCP Test at Chainage 2+000
(Trail Pit – 4) (Trail Pit - 4)
Photo-9: Excavation for DCP Test at Chainage 2+500 Photo-10: Conducting DCP Test at Chainage 2+500
(Trail Pit – 5) (Trail Pit - 5)

Photo-11: Excavation for DCP Test at Chainage 3+000 Photo-12: Conducting DCP Test at Chainage 3+000
(Trail Pit – 6) (Trail Pit - 6)
Photo-13: Excavation for DCP Test at Chainage 3+500 Photo-14: Conducting DCP Test at Chainage 3+500
(Trail Pit – 7) (Trail Pit - 7)

Photo-15: Helper Excavating Trail Pit Photo-16: Lab Technician taking field test data of DCP Test
Photo-17: Modified Proctor Test of Chainage 0+500 sample Photo-17: Modified Proctor Test of Chainage 2+000 sample
(Trail pit -1) (Trail pit -4)

Photo-17: Modified Proctor Test of Chainage 0+500 sample Photo-20: Compacting Sample of Chainage 2+000
(Trail pit -1) (Trail pit -4) for CBR test
Photo-13: Compacting sample of Chainage 2+500 for CBR test Photo-14: Measuring CBR Value for sample of
(Trail Pit -5) Trail Pit 7