The planning of all the materials for which one MRP controller is responsible.
• The planning of the
distribution of a selected material across several locations. • The planning of a selected material in a selected location and its supplying locations and the components in the production location or locations, multilevel across the complete supply chain. Improved performance and execute the planning run in much shorter cycles (10+ times) – several planning runs daily can be executed providing the MRP controller with the following benefits, for example: • More up-to-date supply and demand information on which to base decisions. • Faster reaction to demand changes reduces the risk of stock-outs and means that you can reduce safety stocks. • Match demand and supply more efficiently than was previously possible. • Identify and react to issues faster than was previously possible.